{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:24:09Z","timestamp":1762521849587},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2015,12,10]],"date-time":"2015-12-10T00:00:00Z","timestamp":1449705600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2016,3]]},"DOI":"10.1007\/s00291-015-0423-x","type":"journal-article","created":{"date-parts":[[2015,12,10]],"date-time":"2015-12-10T00:39:37Z","timestamp":1449707977000},"page":"459-492","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions"],"prefix":"10.1007","volume":"38","author":[{"given":"Margaux","family":"Nattaf","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Christian","family":"Artigues","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pierre","family":"Lopez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"David","family":"Rivreau","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,12,10]]},"reference":[{"issue":"1","key":"423_CR1","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2010.09.030","volume":"143","author":"C Artigues","year":"2013","unstructured":"Artigues C, Lopez P, Ha\u00eft A (2013) The energy scheduling problem: industrial case study and constraint propagation techniques. Int J Prod Econ 143(1):13\u201323","journal-title":"Int J Prod Econ"},{"issue":"3","key":"423_CR2","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1007\/s10951-014-0404-y","volume":"18","author":"C Artigues","year":"2015","unstructured":"Artigues C, Lopez P (2015) Energetic reasoning for energy-constrained scheduling with a continuous resource. J Sched 18(3):225\u2013241","journal-title":"J Sched"},{"key":"423_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","volume-title":"Constraint-based scheduling","author":"P Baptiste","year":"2001","unstructured":"Baptiste P, Le Pape C, Nuijten W (2001) Constraint-based scheduling. Kluwer Academic Publishers, Boston\/Dordrecht\/London"},{"issue":"9","key":"423_CR4","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1109\/TC.1979.1675432","volume":"28","author":"JL Bentley","year":"1979","unstructured":"Bentley JL, Ottmann TA (1979) Algorithms for reporting and counting geometric intersections. IEEE Trans Comput 28(9):643\u2013647","journal-title":"IEEE Trans Comput"},{"key":"423_CR5","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-04363-9","volume-title":"Scheduling computer and manufacturing processes","author":"J B\u0142a\u017cewicz","year":"2001","unstructured":"B\u0142a\u017cewicz J, Ecker KH, Pesch E, Schmidt G, W\u0229glarz J (2001) Scheduling computer and manufacturing processes. Springer-Verlag, Berlin\/Heidelberg"},{"issue":"1\u20134","key":"423_CR6","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1023\/B:ANOR.0000030682.25673.c0","volume":"129","author":"J B\u0142a\u017cewicz","year":"2004","unstructured":"B\u0142a\u017cewicz J, Machowiak M, W\u0229glarz J, Kovalyov M, Trystram D (2004) Scheduling malleable tasks on parallel processors to minimize the makespan. Ann Oper Res 129(1\u20134):65\u201380","journal-title":"Ann Oper Res"},{"issue":"3","key":"423_CR7","first-page":"311","volume":"25","author":"J Carlier","year":"1991","unstructured":"Carlier J, Latapie B (1991) Une m\u00e9thode arborescente pour r\u00e9soudre les probl\u00e8mes cumulatifs. RAIRO Recherche op\u00e9rationnelle 25(3):311\u2013340","journal-title":"RAIRO Recherche op\u00e9rationnelle"},{"key":"423_CR8","doi-asserted-by":"crossref","unstructured":"Derrien A, Petit T (2014) A new characterization of relevant intervals for energetic reasoning. In: O\u2019Sullivan B (ed) Principles and practice of constraint programming. Lecture notes in computer science, vol 8656, Springer, pp 289\u2013297","DOI":"10.1007\/978-3-319-10428-7_22"},{"key":"423_CR9","unstructured":"Erschler J, Lopez P (1990) Energy-based approach for task scheduling under time and resources constraints. 2nd International workshop on project management and scheduling, pp 115\u2013121, Compi\u00e8gne, France"},{"issue":"3","key":"423_CR10","doi-asserted-by":"crossref","first-page":"568","DOI":"10.1016\/j.ejor.2009.09.019","volume":"203","author":"C-U F\u00fcndeling","year":"2010","unstructured":"F\u00fcndeling C-U, Trautmann N (2010) A priority-rule method for project scheduling with work-content constraints. Eur J Oper Res 203(3):568\u2013574","journal-title":"Eur J Oper Res"},{"key":"423_CR11","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/978-1-4615-5533-9_13","volume-title":"Project scheduling: recent models, algorithms, and applications","author":"J J\u00f3zefowska","year":"1999","unstructured":"J\u00f3zefowska J, Mika M, R\u00f3\u017cycki R, Walig\u00f3ra G, W\u0229glarz J (1999) Project scheduling under discrete and continuous resources. In: W\u0229glarz J (ed) Project scheduling: recent models, algorithms, and applications. Kluwer Academic Publishers, Boston, pp 289\u2013308"},{"key":"423_CR12","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1007\/s10107-004-0551-6","volume":"103","author":"T Kis","year":"2005","unstructured":"Kis T (2005) A branch-and-cut algorithm for scheduling of project with variable-intensity activities. Math Program Ser A 103:515\u2013539","journal-title":"Math Program Ser A"},{"issue":"1","key":"423_CR13","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.cor.2009.12.011","volume":"38","author":"O Kon\u00e9","year":"2011","unstructured":"Kon\u00e9 O, Artigues C, Lopez P, Mongeau M (2011) Event-based MILP models for resource-constrained project scheduling problems. Comput Oper Res 38(1):3\u201313","journal-title":"Comput Oper Res"},{"key":"423_CR14","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/j.ejor.2014.05.036","volume":"239","author":"A Naber","year":"2014","unstructured":"Naber A, Kolisch R (2014a) MIP models for resource-constrained project scheduling with flexible resource profiles. Eur J Oper Res 239:335\u2013348","journal-title":"Eur J Oper Res"},{"key":"423_CR15","unstructured":"Naber A, Kolisch R (2014b) A continuous time model for the resource-constrained project scheduling with flexible resource profiles. In: Proceedings of the 14th international conference on project management and scheduling, pp 166\u2013168, Munich, Germany"},{"key":"423_CR16","unstructured":"Nattaf M, Artigues C, Lopez P(2014) A polynomial satisfiability test using energetic reasoning for energy constraint scheduling. 14th International workshop on project management and scheduling, pp 169\u2013172, Munich, Germany"},{"issue":"3","key":"423_CR17","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1007\/s10601-015-9192-z","volume":"20","author":"M Nattaf","year":"2015","unstructured":"Nattaf M, Artigues C, Lopez P (2015) A hybrid exact method for a scheduling problem with a continuous resource and energy constraints. Constraints 20(3):304\u2013324","journal-title":"Constraints"},{"key":"423_CR18","doi-asserted-by":"crossref","DOI":"10.1007\/3-540-27852-4","volume-title":"Resource allocation in project management","author":"C Schwindt","year":"2005","unstructured":"Schwindt C (2005) Resource allocation in project management. Springer, Berlin"},{"key":"423_CR19","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.ejor.2010.03.037","volume":"208","author":"J W\u0229glarz","year":"2009","unstructured":"W\u0229glarz J, J\u00f3zefowska J, Mika M, Walig\u00f3ra G (2009) Project scheduling with finite or infinite number of activity processing modes\u2014a survey. Eur J Oper Res 208:177\u2013205","journal-title":"Eur J Oper Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0423-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-015-0423-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0423-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,2]],"date-time":"2019-09-02T05:24:42Z","timestamp":1567401882000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-015-0423-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,12,10]]},"references-count":19,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,3]]}},"alternative-id":["423"],"URL":"https:\/\/doi.org\/10.1007\/s00291-015-0423-x","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,12,10]]}}}