{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,6]],"date-time":"2026-05-06T07:29:38Z","timestamp":1778052578719,"version":"3.51.4"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2016,4,1]],"date-time":"2016-04-01T00:00:00Z","timestamp":1459468800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1007\/s00291-016-0441-3","type":"journal-article","created":{"date-parts":[[2016,4,1]],"date-time":"2016-04-01T06:47:35Z","timestamp":1459493255000},"page":"849-876","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":27,"title":["Capacitated dynamic production and remanufacturing planning under demand and return uncertainty"],"prefix":"10.1007","volume":"38","author":[{"given":"Timo","family":"Hilger","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7631-3068","authenticated-orcid":false,"given":"Florian","family":"Sahling","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Horst","family":"Tempelmeier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,4,1]]},"reference":[{"issue":"8","key":"441_CR1","doi-asserted-by":"crossref","first-page":"2373","DOI":"10.1080\/00207541003692021","volume":"49","author":"E Ak\u00e7al\u0131","year":"2011","unstructured":"Ak\u00e7al\u0131 E, Cetinkaya S (2011) Quantitative models for inventory and production planning in closed-loop supply chains. Int J Prod Res 49(8):2373\u20132407","journal-title":"Int J Prod Res"},{"key":"441_CR2","doi-asserted-by":"crossref","first-page":"2293","DOI":"10.1080\/00207543.2013.855336","volume":"52","author":"MA Aloulou","year":"2014","unstructured":"Aloulou MA, Dolgui A, Kovalyov MY (2014) A bibliography of non-deterministic lot-sizing models. Int J Prod Res 52:2293\u20132310","journal-title":"Int J Prod Res"},{"key":"441_CR3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ijpe.2014.08.012","volume":"160","author":"H Bae","year":"2015","unstructured":"Bae H, Moon I, Yun W (2015) A time-varying lot sizes approach for the economic lot scheduling problem with returns. Int J Prod Res 160:1\u201317","journal-title":"Int J Prod Res"},{"issue":"2","key":"441_CR4","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1016\/j.cor.2005.03.010","volume":"34","author":"ZP Bay\u0131nd\u0131r","year":"2007","unstructured":"Bay\u0131nd\u0131r ZP, Erkip N, G\u00fcll\u00fc R (2007) Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint. Comput Oper Res 34(2):487\u2013514","journal-title":"Comput Oper Res"},{"issue":"9","key":"441_CR5","doi-asserted-by":"crossref","first-page":"1096","DOI":"10.1287\/mnsc.34.9.1096","volume":"34","author":"J Bookbinder","year":"1988","unstructured":"Bookbinder J, Tan JY (1988) Strategies for the probabilistic lot-sizing problem with service-level constraints. Manag Sci 34(9):1096\u20131108","journal-title":"Manag Sci"},{"key":"441_CR6","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s00291-008-0150-7","volume":"32","author":"L Buschk\u00fchl","year":"2010","unstructured":"Buschk\u00fchl L, Sahling F, Helber S, Tempelmeier H (2010) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectr 32:231\u2013261","journal-title":"OR Spectr"},{"key":"441_CR7","doi-asserted-by":"crossref","unstructured":"Dekker R, Fleischmann M, Inderfurth K (2004) Reverse logistics: quantitative models for closed-loop supply chains. Springer, Berlin","DOI":"10.1007\/978-3-540-24803-3"},{"key":"441_CR8","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/j.cor.2013.10.001","volume":"43","author":"M Fazle Baki","year":"2014","unstructured":"Fazle Baki M, Chaouch BA, Abdul-Kader W (2014) A heuristic solution procedure for the dynamic lot sizing problem with remanufacturing and product recovery. Comput Oper Res 43:225\u2013236","journal-title":"Comput Oper Res"},{"issue":"1","key":"441_CR9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(97)00230-0","volume":"103","author":"M Fleischmann","year":"1997","unstructured":"Fleischmann M, Bloemhof-Ruwaard JM, Dekker R, Van Der Laan E, Van Nunen JA, Van Wassenhove LN (1997) Quantitative models for reverse logistics: a review. Eur J Oper Res 103(1):1\u201317","journal-title":"Eur J Oper Res"},{"issue":"2","key":"441_CR10","first-page":"135","volume":"10","author":"FW Harris","year":"1913","unstructured":"Harris FW (1913) How many parts to make at once. Factor Mag Manag 10(2):135\u2013136 (152)","journal-title":"Factor Mag Manag"},{"issue":"1","key":"441_CR11","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1007\/s00291-012-0283-6","volume":"35","author":"S Helber","year":"2013","unstructured":"Helber S, Sahling F, Schimmelpfeng K (2013) Dynamic capacitated lot sizing with random demand and dynamic safety stocks. OR Spectr 35(1):75\u2013105","journal-title":"OR Spectr"},{"key":"441_CR12","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B Karimi","year":"2003","unstructured":"Karimi B, Fatemi Ghomi SMT, Wilson JM (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31:365\u2013378","journal-title":"Omega"},{"issue":"2","key":"441_CR13","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1137\/S1052623499363220","volume":"12","author":"AJ Kleywegt","year":"2002","unstructured":"Kleywegt AJ, Shapiro A, de Mello TH (2002) The sample average approximation method for stochastic discrete optimization. SIAM J Optim 12(2):479\u2013502","journal-title":"SIAM J Optim"},{"issue":"13","key":"441_CR14","doi-asserted-by":"crossref","first-page":"3657","DOI":"10.1080\/00207540701837029","volume":"47","author":"C Li","year":"2009","unstructured":"Li C, Liu F, Cao H, Wang Q (2009) A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. Int J Prod Res 47(13):3657\u20133668","journal-title":"Int J Prod Res"},{"key":"441_CR15","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.omega.2013.03.003","volume":"42","author":"X Li","year":"2014","unstructured":"Li X, Baki F, Tian P, Chaouch BA (2014) A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing. Omega 42:75\u201387","journal-title":"Omega"},{"issue":"1","key":"441_CR16","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1007\/s00291-005-0012-5","volume":"28","author":"Y Li","year":"2006","unstructured":"Li Y, Chen J, Cai X (2006) Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution. OR Spectr 28(1):101\u2013125","journal-title":"OR Spectr"},{"issue":"2","key":"441_CR17","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.ijpe.2004.11.017","volume":"105","author":"Y Li","year":"2007","unstructured":"Li Y, Chen J, Cai X (2007) Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. Int J Prod Econ 105(2):301\u2013317","journal-title":"Int J Prod Econ"},{"issue":"4","key":"441_CR18","doi-asserted-by":"crossref","first-page":"717","DOI":"10.1007\/s10845-011-0619-0","volume":"24","author":"M Naeem","year":"2013","unstructured":"Naeem M, Dias D, Tibrewal R, Chang P, Tiwari M (2013) Production planning optimization for manufacturing and remanufacturing system in stochastic environment. J Intell Manuf 24(4):717\u2013728","journal-title":"J Intell Manuf"},{"issue":"3","key":"441_CR19","doi-asserted-by":"crossref","first-page":"810","DOI":"10.1016\/j.ejor.2008.10.018","volume":"198","author":"Z Pan","year":"2009","unstructured":"Pan Z, Tang J, Liu O (2009) Capacitated dynamic lot sizing problems in closed-loop supply chain. Eur J Oper Res 198(3):810\u2013821","journal-title":"Eur J Oper Res"},{"issue":"2","key":"441_CR20","doi-asserted-by":"crossref","first-page":"482","DOI":"10.1016\/j.ijpe.2010.01.007","volume":"124","author":"P Pi\u00f1eyro","year":"2010","unstructured":"Pi\u00f1eyro P, Viera O (2010) The economic lot-sizing problem with remanufacturing and one-way substitution. Int J Prod Econ 124(2):482\u2013488","journal-title":"Int J Prod Econ"},{"issue":"4","key":"441_CR21","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1016\/j.resconrec.2008.11.006","volume":"53","author":"S Pokharel","year":"2009","unstructured":"Pokharel S, Mutha A (2009) Perspectives in reverse logistics: a review. Resour Conserv Recycl 53(4):175\u2013182","journal-title":"Resour Conserv Recycl"},{"key":"441_CR22","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1007\/s10288-007-0057-1","volume":"6","author":"D Quadt","year":"2008","unstructured":"Quadt D, Kuhn H (2008) Capacitated lot-sizing with extansions: a review. 4OR 6:61\u201383","journal-title":"4OR"},{"issue":"3","key":"441_CR23","doi-asserted-by":"crossref","first-page":"670","DOI":"10.1016\/j.ejor.2007.06.056","volume":"193","author":"J Quariguasi Frota Neto","year":"2009","unstructured":"Quariguasi Frota Neto J, Walther G, Bloemhof J, Van Nunen J, Spengler T (2009) A methodology for assessing eco-efficiency in logistics networks. Eur J Oper Res 193(3):670\u2013682","journal-title":"Eur J Oper Res"},{"issue":"1","key":"441_CR24","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1080\/0740817X.2013.802842","volume":"46","author":"MJ Retel Helmrich","year":"2014","unstructured":"Retel Helmrich MJ, Jans R, van den Heuvel W, Wagelmans AP (2014) Economic lot-sizing with remanufacturing: complexity and efficient formulations. IIE Trans 46(1):67\u201386","journal-title":"IIE Trans"},{"issue":"2","key":"441_CR25","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1016\/S0377-2217(99)00219-2","volume":"121","author":"K Richter","year":"2000","unstructured":"Richter K, Sombrutzki M (2000) Remanufacturing planning for the reverse wagner\/whitin models. Eur J Oper Res 121(2):304\u2013315","journal-title":"Eur J Oper Res"},{"key":"441_CR26","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.omega.2014.08.003","volume":"50","author":"R Rossi","year":"2015","unstructured":"Rossi R, Kilic OA, Tarim SA (2015) Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing. Omega 50:126\u2013140","journal-title":"Omega"},{"issue":"4","key":"441_CR27","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1080\/00207540600943977","volume":"46","author":"S Rubio","year":"2008","unstructured":"Rubio S, Chamorro A, Miranda FJ (2008) Characteristics of the research on reverse logistics (1995\u20132005). Int J Prod Res 46(4):1099\u20131120","journal-title":"Int J Prod Res"},{"issue":"1","key":"441_CR28","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/BF03342742","volume":"6","author":"F Sahling","year":"2013","unstructured":"Sahling F (2013) A column-generation approach for a short-term production planning problem in closed-loop supply chains. BuR Bus Res 6(1):55\u201375","journal-title":"BuR Bus Res"},{"key":"441_CR29","doi-asserted-by":"publisher","unstructured":"Sahling F (2016) Integration of vendor selection into production and remanufacturing planning subject to emission constraints. Int J Prod Res 1\u201315. doi: 10.1080\/00207543.2016.1148276","DOI":"10.1080\/00207543.2016.1148276"},{"key":"441_CR30","doi-asserted-by":"crossref","unstructured":"Saliby E (1990) Descriptive sampling: a better approach to monte carlo simulation. J Oper Res Soc 41(12):1133\u20131142","DOI":"10.1057\/jors.1990.180"},{"key":"441_CR31","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/j.ijpe.2014.10.003","volume":"160","author":"A Sifaleras","year":"2015","unstructured":"Sifaleras A, Konstantaras I, Mladenovi\u0107 N (2015) Variable neighborhood search for the economic lot sizing problem with product returns and recovery. Int J Prod Econ 160:133\u2013143","journal-title":"Int J Prod Econ"},{"key":"441_CR32","doi-asserted-by":"crossref","first-page":"488","DOI":"10.1111\/j.1937-5956.2006.tb00158.x","volume":"15","author":"O Tang","year":"2006","unstructured":"Tang O, Teunter RH (2006) Economic lot scheduling problem with returns. Prod Oper Manag 15:488\u2013497","journal-title":"Prod Oper Manag"},{"key":"441_CR33","volume-title":"Handbook of Stochastic Models and Analysis of Manufacturing System Operations, chap 10","author":"H Tempelmeier","year":"2013","unstructured":"Tempelmeier H (2013) Stochastic lot sizing. In: Smith MJ, Tan B (eds) Handbook of Stochastic Models and Analysis of Manufacturing System Operations, chap 10. Springer, New York"},{"key":"441_CR34","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1016\/j.cor.2015.01.007","volume":"59","author":"H Tempelmeier","year":"2015","unstructured":"Tempelmeier H, Hilger T (2015) Linear programming models for a stochastic dynamic capacitated lot sizing problem. Comput Oper Res 59:119\u2013125","journal-title":"Comput Oper Res"},{"key":"441_CR35","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/j.ejor.2007.08.003","volume":"191","author":"R Teunter","year":"2008","unstructured":"Teunter R, Kaparis K, Tang O (2008) Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. Eur J Oper Res 191:241\u20131253","journal-title":"Eur J Oper Res"},{"issue":"20","key":"441_CR36","doi-asserted-by":"crossref","first-page":"4377","DOI":"10.1080\/00207540600693564","volume":"44","author":"RH Teunter","year":"2006","unstructured":"Teunter RH, Bayindir ZP, Den Heuvel WV (2006) Dynamic lot sizing with product returns and remanufacturing. Int J Prod Res 44(20):4377\u20134400","journal-title":"Int J Prod Res"},{"issue":"1","key":"441_CR37","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"HM Wagner","year":"1958","unstructured":"Wagner HM, Whitin TM (1958) Dynamic version of the economic lot size model. Manag Sci 5(1):89\u201396","journal-title":"Manag Sci"},{"issue":"4","key":"441_CR38","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1016\/j.cie.2011.12.030","volume":"62","author":"S Zanoni","year":"2012","unstructured":"Zanoni S, Segerstedt A, Tang O, Mazzoldi L (2012) Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy. Comput Ind Eng 62(4):1025\u20131033","journal-title":"Comput Ind Eng"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0441-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-016-0441-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0441-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0441-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T07:00:07Z","timestamp":1559026807000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-016-0441-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,4,1]]},"references-count":38,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2016,10]]}},"alternative-id":["441"],"URL":"https:\/\/doi.org\/10.1007\/s00291-016-0441-3","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,4,1]]}}}