{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T13:33:13Z","timestamp":1772803993483,"version":"3.50.1"},"reference-count":43,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2016,6,10]],"date-time":"2016-06-10T00:00:00Z","timestamp":1465516800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"Deutscher Akademischer Austauschdienst (DAAD)","award":["57044990"],"award-info":[{"award-number":["57044990"]}]},{"name":"de Engenharia de Sistemas e Computadores (INESC) Porto","award":["AE2014-0185"],"award-info":[{"award-number":["AE2014-0185"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2017,1]]},"DOI":"10.1007\/s00291-016-0450-2","type":"journal-article","created":{"date-parts":[[2016,6,10]],"date-time":"2016-06-10T03:19:12Z","timestamp":1465528752000},"page":"193-229","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":33,"title":["Integrated versus hierarchical approach to aggregate production planning and master production scheduling"],"prefix":"10.1007","volume":"39","author":[{"given":"Tom","family":"Vogel","sequence":"first","affiliation":[]},{"given":"Bernardo","family":"Almada-Lobo","sequence":"additional","affiliation":[]},{"given":"Christian","family":"Almeder","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,6,10]]},"reference":[{"key":"450_CR1","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/j.cie.2010.12.005","volume":"60","author":"EH Aghezzaf","year":"2011","unstructured":"Aghezzaf EH, Sitompul C, Van Den Broecke F (2011) A robust hierarchical production planning for a capacitated two-stage production system. Comput Ind Eng 60:361\u2013372","journal-title":"Comput Ind Eng"},{"issue":"3","key":"450_CR2","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s10696-011-9122-3","volume":"25","author":"P Amorim","year":"2013","unstructured":"Amorim P, Meyr H, Almeder C, Almada-Lobo B (2013) Managing perishability in production-distribution planning: a discussion and review. Flex Serv Manuf J 25(3):389\u2013413","journal-title":"Flex Serv Manuf J"},{"key":"450_CR3","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/0377-2217(84)90129-2","volume":"17","author":"S Axs\u00e4ter","year":"1984","unstructured":"Axs\u00e4ter S, J\u00f6nsson H (1984) Aggregation and disaggregation in hierarchical production planning. Eur J Oper Res 17:338\u2013350","journal-title":"Eur J Oper Res"},{"issue":"4","key":"450_CR4","doi-asserted-by":"crossref","first-page":"717","DOI":"10.1287\/opre.29.4.717","volume":"29","author":"GR Bitran","year":"1981","unstructured":"Bitran GR, Haas EA, Hax AC (1981) Hierarchical production planning: a single stage system. Oper Res 29(4):717\u2013743","journal-title":"Oper Res"},{"key":"450_CR5","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/0377-2217(95)00060-4","volume":"86","author":"MA Carravilla","year":"1995","unstructured":"Carravilla MA, de Sousa JP (1995) Hierarchical production planning in a make-to-order company: a case study. Eur J Oper Res 86:43\u201356","journal-title":"Eur J Oper Res"},{"issue":"5","key":"450_CR6","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1080\/09537280701340631","volume":"18","author":"IT Christou","year":"2007","unstructured":"Christou IT, Lagodimos AG, Lycopoulou D (2007) Hierarchical production planning for multi-product lines in the beverage industry. Prod Plan Control 18(5):367\u2013376","journal-title":"Prod Plan Control"},{"issue":"5","key":"450_CR7","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/0305-0483(87)90041-7","volume":"15","author":"C-H Chung","year":"1987","unstructured":"Chung C-H, Krajewski LJ (1987) Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure. Omega Int J Manag Sci 15(5):401\u2013409","journal-title":"Omega Int J Manag Sci"},{"issue":"1","key":"450_CR8","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1080\/09537280412331286565","volume":"16","author":"AR Clark","year":"2005","unstructured":"Clark AR (2005) Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts. Prod Plan Control 16(1):81\u201397","journal-title":"Prod Plan Control"},{"key":"450_CR9","first-page":"1022","volume":"12","author":"A Drexl","year":"1994","unstructured":"Drexl A, Fleischmann B, G\u00fcnther H-O, Stadtler H, Tempelmeier H (1994) Konzeptionelle Grundlagen kapazit\u00e4tsorientierter PPS-Systeme. Zeitschrift f\u00fcr betriebswirtschaftliche Forschung 12:1022\u20131945","journal-title":"Zeitschrift f\u00fcr betriebswirtschaftliche Forschung"},{"issue":"9","key":"450_CR10","doi-asserted-by":"crossref","first-page":"874","DOI":"10.1287\/mnsc.11.9.874","volume":"11","author":"BP Dziellinski","year":"1965","unstructured":"Dziellinski BP, Gomory RE (1965) Optimal programming of lot sizes, inventory and labor allocations. Manag Sci 11(9):874\u2013890","journal-title":"Manag Sci"},{"key":"450_CR11","doi-asserted-by":"crossref","unstructured":"Fleischmann B, Meyr H (2003) Planning hierarchy, modeling and advanced planning systems. In: Graves SC, De\u00a0Kok AG (eds) Handbooks in operations research and management science, vol\u00a011. Elsevier, pp 457\u2013523","DOI":"10.1016\/S0927-0507(03)11009-2"},{"key":"450_CR12","first-page":"161","volume-title":"Logistikmanagement: Analyse, Bewertung und Gestaltung logistischer Systeme","author":"M Gebhard","year":"2007","unstructured":"Gebhard M, Kuhn H (2007) Robuste hierarchische Produktionsplanung mit Bedarfsszenarien. In: Otto A, Obermaier A (eds) Logistikmanagement: Analyse, Bewertung und Gestaltung logistischer Systeme. Deutscher Universit\u00e4ts-Verlag, Wiesbaden, pp 161\u2013183"},{"issue":"1","key":"450_CR13","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0272-6963(82)90019-5","volume":"3","author":"LF Gelders","year":"1982","unstructured":"Gelders LF, Van Wassenhove LN (1982) Hierarchical integration in production planning: theory and practice. J Oper Manag 3(1):27\u201335","journal-title":"J Oper Manag"},{"issue":"3","key":"450_CR14","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1287\/mnsc.28.3.260","volume":"28","author":"SC Graves","year":"1982","unstructured":"Graves SC (1982) Using lagrangean techniques to solve hierarchical production planning problems. Manag Sci 28(3):260\u2013275","journal-title":"Manag Sci"},{"key":"450_CR15","unstructured":"Guimaraes L (2013) Advanced production planning optimization in the beverage industry. Dissertation, Faculdade de Engenharia Universidade do Porto"},{"key":"450_CR16","unstructured":"Hax AC, Meal HC (1975) Hierarchical integration of production planning and scheduling. TIMS Studies in Management Sciences, vol 1, Logistics, pp 656\u2013673"},{"key":"450_CR17","doi-asserted-by":"crossref","unstructured":"Herrmann JW, Mehra A, Minis I, Proth J (1994) Hierarchical production planning with part, spatial and time aggregation. In: Proceedings of the fourth international conference on computer integrated manufacturing and automation technology, Troy, New York, 10\u201312 October 1994. IEEE Computer Society Press, pp 430\u2013435","DOI":"10.1109\/CIMAT.1994.389037"},{"key":"450_CR18","doi-asserted-by":"crossref","first-page":"386","DOI":"10.1016\/j.ejor.2004.09.050","volume":"172","author":"H Jodlbauer","year":"2006","unstructured":"Jodlbauer H (2006) An approach for integrated scheduling and lot-sizing. Eur J Oper Res 172:386\u2013400","journal-title":"Eur J Oper Res"},{"key":"450_CR19","unstructured":"Kr\u00f6ger F (2014) Antizipationsfunktionen f\u00fcr die hierarchische Planung am Beispiel der Koordination von langfristiger Standort- und mittelfristiger Produktionsplanung. Dissertation, Universit\u00e4t Hamburg"},{"issue":"4","key":"450_CR20","doi-asserted-by":"crossref","first-page":"946","DOI":"10.1287\/opre.19.4.946","volume":"19","author":"LS Lasdon","year":"1971","unstructured":"Lasdon LS, Terjung RC (1971) An efficient algorithm for multi-item scheduling. Oper Res 19(4):946\u2013969","journal-title":"Oper Res"},{"key":"450_CR21","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1287\/mnsc.4.2.115","volume":"4","author":"AS Manne","year":"1958","unstructured":"Manne AS (1958) Programming of economic lot sizes. Manag Sci 4:115\u2013135","journal-title":"Manag Sci"},{"issue":"5","key":"450_CR22","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1080\/09537289508930295","volume":"6","author":"KN McKay","year":"1995","unstructured":"McKay KN, Safayeni FR, Buzacott JA (1995) A review of hierarchical production planning and its applicability for modern manufacturing. Prod Plan Control 6(5):384\u2013394","journal-title":"Prod Plan Control"},{"issue":"5","key":"450_CR23","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1108\/01443579510083631","volume":"15","author":"MZ Meybodi","year":"1995","unstructured":"Meybodi MZ (1995) Integrating production activity control into a hierarchical production-planning model. Int J Oper Prod Man 15(5):4\u201325","journal-title":"Int J Oper Prod Man"},{"key":"450_CR24","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1007\/BF02031750","volume":"59","author":"MZ Meybodi","year":"1995","unstructured":"Meybodi MZ, Foote BL (1995) Hierarchical production planning and scheduling with random demand and production failure. Ann Oper Res 59:259\u2013280","journal-title":"Ann Oper Res"},{"issue":"20","key":"450_CR25","doi-asserted-by":"crossref","first-page":"5857","DOI":"10.1080\/00207540802130803","volume":"47","author":"MK Omar","year":"2009","unstructured":"Omar MK, Bennell JA (2009) Revising the master production schedule in a HPP framework context. Int J Prod Res 47(20):5857\u20135878","journal-title":"Int J Prod Res"},{"issue":"5","key":"450_CR26","doi-asserted-by":"crossref","first-page":"1029","DOI":"10.1080\/00207540600724989","volume":"45","author":"MK Omar","year":"2007","unstructured":"Omar MK, Teo SC (2007) Hierarchical production planning and scheduling in a multi-product, batch process environment. Int J Prod Res 45(5):1029\u20131047","journal-title":"Int J Prod Res"},{"issue":"2","key":"450_CR27","first-page":"14","volume":"16","author":"V Ortiz-Araya","year":"2012","unstructured":"Ortiz-Araya V, Albornoz VM (2012) Hierarchical planning methodology for a supply chain management. Inf Econ 16(2):14\u201318","journal-title":"Inf Econ"},{"key":"450_CR28","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1016\/S0377-2217(97)00016-7","volume":"104","author":"L \u00d6zdamar","year":"1998","unstructured":"\u00d6zdamar L, Bozyel MA, Birbil SI (1998) A hierarchical decision support system for production planning (with case study). Eur J Oper Res 104:403\u2013422","journal-title":"Eur J Oper Res"},{"issue":"13","key":"450_CR29","doi-asserted-by":"crossref","first-page":"2803","DOI":"10.1080\/00207540110052571","volume":"39","author":"MM Qiu","year":"2001","unstructured":"Qiu MM, Fredendall LD, Zhu Z (2001) Application of hierarchical production planning in a multiproduct, multimachine environment. Int J Prod Res 39(13):2803\u20132816","journal-title":"Int J Prod Res"},{"key":"450_CR30","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1007\/s00291-004-0170-x","volume":"26","author":"J Rohde","year":"2004","unstructured":"Rohde J (2004) Hierarchical supply chain planning using artificial neural networks to anticipate base-level outcomes. OR Spectr 26:471\u2013492","journal-title":"OR Spectr"},{"issue":"1","key":"450_CR31","first-page":"10","volume":"5","author":"J Rohde","year":"2000","unstructured":"Rohde J, Meyr H, Wagner M (2000) Die supply chain planning matrix. PPS Manag 5(1):10\u201315","journal-title":"PPS Manag"},{"issue":"21","key":"450_CR32","doi-asserted-by":"crossref","first-page":"5881","DOI":"10.1080\/00207540802193181","volume":"47","author":"T Sawik","year":"2009","unstructured":"Sawik T (2009) Monolithic versus hierarchical approach to integrated scheduling in a supply chain. Int J Prod Res 47(21):5881\u20135910","journal-title":"Int J Prod Res"},{"key":"450_CR33","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/0377-2217(95)00058-X","volume":"86","author":"C Schneeweiss","year":"1995","unstructured":"Schneeweiss C (1995) Hierarchical structures in organisations: a conceptual framework. Eur J Oper Res 86:4\u201331","journal-title":"Eur J Oper Res"},{"issue":"2","key":"450_CR34","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/S0377-2217(02)00501-5","volume":"150","author":"C Schneeweiss","year":"2003","unstructured":"Schneeweiss C (2003) Distributed decision making\u2014a unified approach. Eur J Oper Res 150(2):237\u2013252","journal-title":"Eur J Oper Res"},{"issue":"2","key":"450_CR35","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1016\/j.ijpe.2005.04.005","volume":"104","author":"B Sel\u00e7uk","year":"2006","unstructured":"Sel\u00e7uk B, Fransoo JC, De Kok AG (2006) The effect of updating lead times on the performance of hierarchical planning systems. Int J Prod Econ 104(2):427\u2013440","journal-title":"Int J Prod Econ"},{"key":"450_CR36","unstructured":"Silver EA, Peterson R (1985) Decision systems for inventory management and production planning, 2nd edn. Wiley, New York"},{"issue":"2","key":"450_CR37","doi-asserted-by":"crossref","first-page":"318","DOI":"10.1287\/mnsc.46.2.318.11924","volume":"46","author":"H Stadtler","year":"2000","unstructured":"Stadtler H (2000) Improved rolling schedules for the dynamic single-level lot-sizing problem. Manag Sci 46(2):318\u2013326","journal-title":"Manag Sci"},{"issue":"12","key":"450_CR38","doi-asserted-by":"crossref","first-page":"3431","DOI":"10.1080\/00207543.2010.495735","volume":"49","author":"T Timm","year":"2011","unstructured":"Timm T, Blecken A (2011) A method for the hierarchical planning of the structure, dimension and material requirements of manufacturing systems. Int J Prod Res 49(12):3431\u20133453","journal-title":"Int J Prod Res"},{"issue":"6","key":"450_CR39","doi-asserted-by":"crossref","first-page":"1517","DOI":"10.1080\/00207549608904982","volume":"24","author":"R Venkataraman","year":"1996","unstructured":"Venkataraman R, Smith SB (1996) Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions. Int J Prod Res 24(6):1517\u20131537","journal-title":"Int J Prod Res"},{"key":"450_CR40","volume-title":"Manufacturing planning and control systems","author":"TE Vollmann","year":"1973","unstructured":"Vollmann TE, Berry WL, Whybark DC (1973) Manufacturing planning and control systems. Richard D Irwin, Inc., Homewood"},{"key":"450_CR41","doi-asserted-by":"crossref","first-page":"40","DOI":"10.2507\/IJSIMM11(1)4.199","volume":"11","author":"LR White","year":"2012","unstructured":"White LR (2012) A hierarchical production planning system simulator. Int J Simul Model 11:40\u201357","journal-title":"Int J Simul Model"},{"key":"450_CR42","doi-asserted-by":"crossref","first-page":"674","DOI":"10.1016\/j.ijpe.2011.02.012","volume":"131","author":"G Xue","year":"2011","unstructured":"Xue G, Offodile OF, Zhou H, Troutt MD (2011) Integrated production planning with sequence-dependent family setup times. Int J Prod Econ 131:674\u2013681","journal-title":"Int J Prod Econ"},{"key":"450_CR43","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/0925-5273(95)00192-1","volume":"46\u201347","author":"G Z\u00e4pfel","year":"1996","unstructured":"Z\u00e4pfel G (1996) Production planning in the case of uncertain individual demand\u2014extension for an MRP II concept. Int J Prod Econ 46\u201347:153\u2013164","journal-title":"Int J Prod Econ"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0450-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-016-0450-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0450-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0450-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,24]],"date-time":"2017-06-24T16:04:42Z","timestamp":1498320282000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-016-0450-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,6,10]]},"references-count":43,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,1]]}},"alternative-id":["450"],"URL":"https:\/\/doi.org\/10.1007\/s00291-016-0450-2","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,6,10]]}}}