{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,2]],"date-time":"2025-11-02T19:59:39Z","timestamp":1762113579297},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,8,25]],"date-time":"2016-08-25T00:00:00Z","timestamp":1472083200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s00291-016-0460-0","type":"journal-article","created":{"date-parts":[[2016,8,25]],"date-time":"2016-08-25T18:17:54Z","timestamp":1472149074000},"page":"447-472","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Stepwise investment and capacity sizing under uncertainty"],"prefix":"10.1007","volume":"39","author":[{"given":"Michail","family":"Chronopoulos","sequence":"first","affiliation":[]},{"given":"Verena","family":"Hagspiel","sequence":"additional","affiliation":[]},{"given":"Stein-Erik","family":"Fleten","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,8,25]]},"reference":[{"issue":"4","key":"460_CR1","doi-asserted-by":"crossref","first-page":"581","DOI":"10.2307\/2297794","volume":"63","author":"AB Abel","year":"1996","unstructured":"Abel AB, Eberly JC (1996) Optimal investment with costly reversibility. Rev Econ Stud 63(4):581\u2013593","journal-title":"Rev Econ Stud"},{"key":"460_CR2","unstructured":"Adkins R, Paxson D (2015) Stepwise Investment Value under Stage Specific Parameters, working paper. Bradford University School of Management, Bradford"},{"key":"460_CR3","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1007\/s00199-002-0349-9","volume":"23","author":"L Alvarez","year":"2004","unstructured":"Alvarez L, Stenbacka R (2004) Optimal risk adoption: a real options approach. Econ Theory 23:123\u2013147","journal-title":"Econ Theory"},{"issue":"5","key":"460_CR4","doi-asserted-by":"crossref","first-page":"697","DOI":"10.1287\/mnsc.1060.0655","volume":"53","author":"KS Anand","year":"2007","unstructured":"Anand KS, Girotra K (2007) The strategic perils of delayed differentiation. Manag Sci 53(5):697\u2013712","journal-title":"Manag Sci"},{"key":"460_CR5","first-page":"312","volume":"88","author":"K Arrow","year":"1974","unstructured":"Arrow K, Fisher AC (1974) Environmental preservation, uncertainty, and irreversibility quarterly. J Econ 88:312\u2013319","journal-title":"J Econ"},{"key":"460_CR6","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1007\/s007800050017","volume":"1","author":"F Baldursson","year":"1997","unstructured":"Baldursson F, Karatzas I (1997) Irreversible investment and industry equilibrium. Financ Stoch 1:69\u201389","journal-title":"Financ Stoch"},{"key":"460_CR7","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/2366.001.0001","volume-title":"Design rules: the power of modularity","author":"CY Baldwin","year":"2000","unstructured":"Baldwin CY, Clark KB (2000) Design rules: the power of modularity. MIT Press, Cambridge"},{"issue":"1","key":"460_CR8","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/j.ejor.2007.05.044","volume":"109","author":"T B\u00f8ckman","year":"2008","unstructured":"B\u00f8ckman T, Fleten SE, Juliussen E, Langhammer HJ, Revdal I (2008) Investment timing and optimal capacity choice for small hydropower projects. Eur J Oper Res 109(1):255\u2013267","journal-title":"Eur J Oper Res"},{"issue":"1","key":"460_CR9","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/j.ejor.2012.01.017","volume":"220","author":"TK Boomsma","year":"2012","unstructured":"Boomsma TK, Meade N, Fleten SE (2012) Renewable energy investments under different support schemes: a real options approach. Eur J Oper Res 220(1):225\u2013237","journal-title":"Eur J Oper Res"},{"issue":"3","key":"460_CR10","doi-asserted-by":"crossref","first-page":"532","DOI":"10.1287\/opre.1040.0191","volume":"53","author":"J Chod","year":"2005","unstructured":"Chod J, Rudi N (2005) Resource flexibility with responsive pricing. Oper Res 53(3):532\u2013548","journal-title":"Oper Res"},{"issue":"2","key":"460_CR11","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1109\/TEM.2012.2211363","volume":"60","author":"M Chronopoulos","year":"2012","unstructured":"Chronopoulos M, De Reyck B, Siddiqui AS (2012) The value of capacity sizing under risk aversion and operational flexibility. IEEE Trans Eng Manag 60(2):272\u2013288","journal-title":"IEEE Trans Eng Manag"},{"key":"460_CR12","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/S0377-2217(98)00274-4","volume":"117","author":"T Dangl","year":"1999","unstructured":"Dangl T (1999) Investment and capacity choice under uncertain demand. Eur J Oper Res 117:415\u2013428","journal-title":"Eur J Oper Res"},{"key":"460_CR13","doi-asserted-by":"crossref","DOI":"10.1515\/9781400830176","volume-title":"Investment under uncertainty","author":"AK Dixit","year":"1994","unstructured":"Dixit AK, Pindyck RS (1994) Investment under uncertainty. Princeton University Press, Princeton"},{"issue":"2","key":"460_CR14","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1007\/s00291-005-0005-4","volume":"28","author":"J Doege","year":"2006","unstructured":"Doege J, Schiltknecht P, L\u00fcthi HJ (2006) Risk management of power portfolios and valuation of flexibility. OR Spectrum 28(2):267\u2013287","journal-title":"OR Spectrum"},{"key":"460_CR15","unstructured":"Gahungu J, Smeers Y (2012) A real options model for electricity capacity expansion. Universit\u00e9 Catholique de Louvain, CORE, B-1348, Louvain-la-Neuve"},{"issue":"11","key":"460_CR16","doi-asserted-by":"crossref","first-page":"1877","DOI":"10.1287\/mnsc.1090.1070","volume":"55","author":"A Gamba","year":"2009","unstructured":"Gamba A, Fusari N (2009) Valuing modularity as a real option. Manag Sci 55(11):1877\u20131896","journal-title":"Manag Sci"},{"key":"460_CR17","doi-asserted-by":"crossref","first-page":"667","DOI":"10.1016\/j.eneco.2005.04.003","volume":"27","author":"C Gollier","year":"2005","unstructured":"Gollier C, Proult D, Thais F, Walgenwitz G (2005) Choice of nuclear power investments under price uncertainty: valuing modularity. Energy Econ 27:667\u2013685","journal-title":"Energy Econ"},{"issue":"2","key":"460_CR18","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1287\/mnsc.1060.0611","volume":"53","author":"M Goyal","year":"2007","unstructured":"Goyal M, Netessine S (2007) Strategic technology choice and capacity investment under demand uncertainty. Manag Sci 53(2):192\u2013207","journal-title":"Manag Sci"},{"key":"460_CR19","doi-asserted-by":"crossref","unstructured":"Hagspiel V, Huisman KJM, Kort PM (2016) Volume Flexibility and Capacity Investment under Demand Uncertainty. Int J Prod Econ 178:95\u2013108","DOI":"10.1016\/j.ijpe.2016.05.007"},{"key":"460_CR20","first-page":"89","volume":"64","author":"C Henry","year":"1974","unstructured":"Henry C (1974) Investment decisions under uncertainty: the irreversibility effect. Am Econ Rev 64:89\u2013104","journal-title":"Am Econ Rev"},{"key":"460_CR21","doi-asserted-by":"crossref","first-page":"575","DOI":"10.1016\/0165-1889(92)90050-O","volume":"16","author":"H He","year":"1992","unstructured":"He H, Pindyck RS (1992) Investments in flexible production capacity. J Econ Dyn Control 16:575\u2013599","journal-title":"J Econ Dyn Control"},{"issue":"2","key":"460_CR22","doi-asserted-by":"crossref","first-page":"376","DOI":"10.1111\/1756-2171.12089","volume":"46","author":"KJM Huisman","year":"2015","unstructured":"Huisman KJM, Kort PM (2015) Strategic capacity investment under uncertainty. RAND J Econ 46(2):376\u2013408","journal-title":"RAND J Econ"},{"key":"460_CR23","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/S0165-1889(06)80008-4","volume":"17","author":"S J\u00f8rgensen","year":"1993","unstructured":"J\u00f8rgensen S, Kort PM (1993) Optimal dynamic investment policies under concave\u2013convex adjustment costs. J Econ Dyn Control 17:153\u2013180","journal-title":"J Econ Dyn Control"},{"issue":"1","key":"460_CR24","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.ejor.2009.05.027","volume":"202","author":"PM Kort","year":"2010","unstructured":"Kort PM, Murto P, Pawlina G (2010) Uncertainty and stepwise investment. Eur J Oper Res 202(1):196\u2013203","journal-title":"Eur J Oper Res"},{"issue":"4","key":"460_CR25","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.2307\/2118461","volume":"108","author":"JV Leahy","year":"1993","unstructured":"Leahy JV (1993) Investment in competitive equilibrium: the optimality of myopic behavior. Q J Econ 108(4):1105\u20131133","journal-title":"Q J Econ"},{"key":"460_CR26","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s11238-012-9331-6","volume":"74","author":"C L\u00f6ffler","year":"2013","unstructured":"L\u00f6ffler C, Pfeiffer T, Schneider G (2013) The irreversibility effect and agency conflicts. Theory Decis 74:219\u2013239","journal-title":"Theory Decis"},{"issue":"1","key":"460_CR27","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1093\/rfs\/14.1.113","volume":"14","author":"FA Longstaff","year":"2001","unstructured":"Longstaff FA, Schwartz ES (2001) Valuing American options by simulation: a simple least-squares approach. Rev Financ Stud 14(1):113\u2013147","journal-title":"Rev Financ Stud"},{"key":"460_CR28","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/j.rfe.2004.10.001","volume":"14","author":"D Lund","year":"2005","unstructured":"Lund D (2005) How to analyse the investment\u2013uncertainty relationship in real option models. Rev Financ Econ 14:311\u2013322","journal-title":"Rev Financ Econ"},{"key":"460_CR29","unstructured":"Mackintosh J (2003) Ford learns to bend with the wind. Financial Times, 14 February"},{"key":"460_CR30","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1016\/0304-405X(87)90059-6","volume":"18","author":"S Majd","year":"1987","unstructured":"Majd S, Pindyck RS (1987) Time to build, option value, and investment decisions. J Financ Econ 18:7\u201327","journal-title":"J Financ Econ"},{"key":"460_CR31","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1016\/j.jedc.2004.08.002","volume":"29","author":"N Malchow-M\u00f8ller","year":"2005","unstructured":"Malchow-M\u00f8ller N, Thorsen BJ (2005) Repeated real options: optimal investment behavior and a good rule of thumb. J Econ Dyna Control 29:1025\u20131041","journal-title":"J Econ Dyna Control"},{"issue":"4","key":"460_CR32","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1007\/s00291-003-0137-3","volume":"25","author":"G Pawlina","year":"2003","unstructured":"Pawlina G, Kort PM (2003) Strategic capital budgeting: asset replacement under market uncertainty. OR Spectrum 25(4):443\u2013479","journal-title":"OR Spectrum"},{"key":"460_CR33","first-page":"969","volume":"79","author":"RS Pindyck","year":"1988","unstructured":"Pindyck RS (1988) Irreversible investment, capacity choice, and the value of the firm. Am Econ Rev 79:969\u2013985","journal-title":"Am Econ Rev"},{"key":"460_CR34","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/j.gfj.2006.10.002","volume":"18","author":"A Rodrigues","year":"2007","unstructured":"Rodrigues A, Armada MJ (2007) The valuation of modular projects: a real options approach to the value of splitting. Global Financ J 18:205\u2013227","journal-title":"Global Financ J"},{"issue":"1","key":"460_CR35","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/j.eneco.2008.08.007","volume":"31","author":"AS Siddiqui","year":"2009","unstructured":"Siddiqui AS, Maribu KM (2009) Investment and upgrade in distributed generation under uncertainty. Energy Econ 31(1):25\u201337","journal-title":"Energy Econ"},{"issue":"3","key":"460_CR36","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1016\/j.ejor.2012.05.034","volume":"222","author":"AS Siddiqui","year":"2012","unstructured":"Siddiqui AS, Takashima R (2012) Capacity switching options under rivalry and uncertainty. Eur J Oper Res 222(3):583\u2013595","journal-title":"Eur J Oper Res"},{"key":"460_CR37","doi-asserted-by":"crossref","unstructured":"Takashima R, Siddiqui AS, Nakada S (2012) Investment timing, capacity sizing, and technology choice of power plants. Handbook of networks in power systems I energy systems, pp 303\u2013321","DOI":"10.1007\/978-3-642-23193-3_12"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0460-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-016-0460-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0460-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0460-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,25]],"date-time":"2020-09-25T14:32:39Z","timestamp":1601044359000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-016-0460-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,8,25]]},"references-count":37,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["460"],"URL":"https:\/\/doi.org\/10.1007\/s00291-016-0460-0","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,8,25]]}}}