{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T07:40:48Z","timestamp":1761896448434},"reference-count":41,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,1,12]],"date-time":"2017-01-12T00:00:00Z","timestamp":1484179200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2017,7]]},"DOI":"10.1007\/s00291-016-0471-x","type":"journal-article","created":{"date-parts":[[2017,1,12]],"date-time":"2017-01-12T07:40:09Z","timestamp":1484206809000},"page":"689-709","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Capacity reservation and utilization for a manufacturer with uncertain capacity and demand"],"prefix":"10.1007","volume":"39","author":[{"given":"Y.","family":"Boulaksil","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J. C.","family":"Fransoo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"T.","family":"Tan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,1,12]]},"reference":[{"key":"471_CR1","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/j.ijpe.2010.11.005","volume":"129","author":"MS Altug","year":"2011","unstructured":"Altug MS, Muharremoglu A (2011) Inventory management with advance supply information. Int J Prod Econ 129:302\u2013313","journal-title":"Int J Prod Econ"},{"issue":"2","key":"471_CR2","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/j.dss.2012.01.005","volume":"53","author":"B Atasoy","year":"2012","unstructured":"Atasoy B, Gullu R, Tan T (2012) Optimal inventory policies with non-stationary supply disruptions and advance supply information. Decis Support Syst 53(2):269\u2013281","journal-title":"Decis Support Syst"},{"issue":"12","key":"471_CR3","doi-asserted-by":"crossref","first-page":"1556","DOI":"10.1287\/mnsc.37.12.1556","volume":"37","author":"Y Bassok","year":"1991","unstructured":"Bassok Y, Akella R (1991) Ordering and production decisions with supply quality and demand uncertainty. Manag Sci 37(12):1556\u20131574","journal-title":"Manag Sci"},{"key":"471_CR4","volume-title":"Dynamic programming and optimal control","author":"DP Bertsekas","year":"2005","unstructured":"Bertsekas DP (2005) Dynamic programming and optimal control. Athena Scientific, Belmont"},{"issue":"6","key":"471_CR5","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1287\/mnsc.47.6.769.9814","volume":"47","author":"JS Bonser","year":"2001","unstructured":"Bonser JS, Wy SD (2001) Procurement planning to maintain both short-term adaptiveness and long-term perspective. Manag Sci 47(6):769\u2013786","journal-title":"Manag Sci"},{"issue":"10","key":"471_CR6","doi-asserted-by":"crossref","first-page":"1059","DOI":"10.1108\/01443571011082526","volume":"30","author":"Y Boulaksil","year":"2010","unstructured":"Boulaksil Y, Fransoo JC (2010) Implications of outsourcing on operations planning: findings from the pharmaceutical industry. Int J Oper Prod Manag 30(10):1059\u20131079","journal-title":"Int J Oper Prod Manag"},{"key":"471_CR7","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/j.ijpe.2009.02.001","volume":"119","author":"Y Boulaksil","year":"2009","unstructured":"Boulaksil Y, Fransoo JC (2009) Order release strategies to control outsourced operations in a supply chain. Int J Prod Econ 119:149\u2013160","journal-title":"Int J Prod Econ"},{"key":"471_CR8","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/S0263-2373(98)00040-1","volume":"16","author":"DJ Bryce","year":"1998","unstructured":"Bryce DJ, Useem M (1998) The impact of corporate outsourcing on company value. Eur Manag J 16:635\u2013643","journal-title":"Eur Manag J"},{"issue":"3","key":"471_CR9","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1057\/jors.1975.110","volume":"26","author":"TA Burgin","year":"1975","unstructured":"Burgin TA (1975) The Gamma distribution and inventory control. Oper Res Q 26(3):507\u2013525","journal-title":"Oper Res Q"},{"key":"471_CR10","volume-title":"Operations management for competitive advantage","author":"RB Chase","year":"2004","unstructured":"Chase RB, Jacobs ER, Aquilano NJ (2004) Operations management for competitive advantage, 10th edn. McGraw-Hill, Bosten","edition":"10"},{"issue":"3","key":"471_CR11","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1287\/mnsc.40.3.320","volume":"40","author":"FW Ciarallo","year":"1994","unstructured":"Ciarallo FW, Akella R, Morton TE (1994) A periodic review, production planning model with uncertain capacity and uncertain demand\u2014optimality of extended myopic policies. Manag Sci 40(3):320\u2013332","journal-title":"Manag Sci"},{"key":"471_CR12","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1007\/BF01540156","volume":"18","author":"D Costa","year":"1996","unstructured":"Costa D, Silver EA (1996) Exact and approximate algorithms for multi-period procurement problem where dedicated supplier capacity can be reserved. OR Spektrum 18:197\u2013207","journal-title":"OR Spektrum"},{"issue":"2","key":"471_CR13","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1111\/j.1937-5956.2005.tb00021.x","volume":"14","author":"M Erkoc","year":"2005","unstructured":"Erkoc M, Wu SD (2005) Managing high-tech capacity expansion via reservation contracts. Prod Oper Manag 14(2):232\u2013251","journal-title":"Prod Oper Manag"},{"key":"471_CR14","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1287\/moor.11.2.193","volume":"11","author":"A Federgruen","year":"1986","unstructured":"Federgruen A, Zipkin P (1986) An inventory model with limited production capacity and uncertain demand. Math Oper Res 11:193\u2013207","journal-title":"Math Oper Res"},{"issue":"10","key":"471_CR15","doi-asserted-by":"crossref","first-page":"1344","DOI":"10.1287\/mnsc.47.10.1344.10261","volume":"47","author":"G Gallego","year":"2001","unstructured":"Gallego G, \u00d6zer \u00d6 (2001) Integrating replenishment decisions with advance demand information. Manag Sci 47(10):1344\u20131360","journal-title":"Manag Sci"},{"issue":"1","key":"471_CR16","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1287\/msom.1070.0201","volume":"11","author":"JP Gayon","year":"2009","unstructured":"Gayon JP, Benjaafar S, De V\u00e9ricourt F (2009) Using imperfect advance demand information in production-inventory systems with multiple customer classes. Manuf Serv Oper Manag 11(1):128\u2013143","journal-title":"Manuf Serv Oper Manag"},{"key":"471_CR17","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0377-2217(97)00037-4","volume":"105","author":"R G\u00fcll\u00fc","year":"1998","unstructured":"G\u00fcll\u00fc R (1998) Base stock policies for production\/inventory problems with uncertain capacity levels. Eur J Oper Res 105:43\u201351","journal-title":"Eur J Oper Res"},{"key":"471_CR18","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/S0925-5273(98)00024-3","volume":"59","author":"R G\u00fcll\u00fc","year":"1999","unstructured":"G\u00fcll\u00fc R, \u00d6nol E, Erkip N (1999) Analysis of an inventory system under supply uncertainty. Int J Prod Econ 59:377\u2013385","journal-title":"Int J Prod Econ"},{"key":"471_CR19","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/j.ejor.2007.10.039","volume":"193","author":"J Hazra","year":"2009","unstructured":"Hazra J, Mahadevan B (2009) A procurement model using capacity reservation. Eur J Oper Res 193:303\u2013316","journal-title":"Eur J Oper Res"},{"key":"471_CR20","volume-title":"Stochastic models in operations research","author":"DP Heyman","year":"2004","unstructured":"Heyman DP, Sobel MJ (2004) Stochastic models in operations research, vol 2. Dover Publications, Mineola"},{"issue":"9","key":"471_CR21","doi-asserted-by":"crossref","first-page":"1279","DOI":"10.1287\/mnsc.44.9.1279","volume":"44","author":"J Hwang","year":"1998","unstructured":"Hwang J, Singh MR (1998) Optimal production policies for multi-stage systems with setup costs and uncertain capacities. Manag Sci 44(9):1279\u20131349","journal-title":"Manag Sci"},{"key":"471_CR22","doi-asserted-by":"crossref","first-page":"670","DOI":"10.1016\/S0377-2217(01)00218-1","volume":"140","author":"T Iida","year":"2002","unstructured":"Iida T (2002) A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand. Eur J Oper Res 140:670\u2013683","journal-title":"Eur J Oper Res"},{"key":"471_CR23","doi-asserted-by":"crossref","first-page":"915","DOI":"10.1002\/1520-6750(199509)42:6<915::AID-NAV3220420605>3.0.CO;2-M","volume":"42","author":"K Jain","year":"1995","unstructured":"Jain K, Silver EA (1995) The single period procurement problem where dedicated supplier capacity can be reserved. Naval Res Logist 42:915\u2013934","journal-title":"Naval Res Logist"},{"issue":"4","key":"471_CR24","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1002\/nav.20450","volume":"58","author":"M Jaksic","year":"2011","unstructured":"Jaksic M, Fransoo JC, Tan T, De Kok AG, Rusjan B (2011) Inventory management with advance capacity information. Naval Res Logist 58(4):355\u2013369","journal-title":"Naval Res Logist"},{"key":"471_CR25","doi-asserted-by":"crossref","first-page":"254","DOI":"10.1016\/j.ijpe.2014.09.015","volume":"159","author":"M Jaksic","year":"2015","unstructured":"Jaksic M, Fransoo JC (2015) Optimal inventory management with supply backordering. Int J Prod Econ 159:254\u2013264","journal-title":"Int J Prod Econ"},{"key":"471_CR26","first-page":"649","volume":"34","author":"F Karaesmen","year":"2002","unstructured":"Karaesmen F, Buzacott JA, Dallery Y (2002) Integrating advance order information in make-to-stock production systems. IIE Trans 34:649\u2013662","journal-title":"IIE Trans"},{"issue":"6","key":"471_CR27","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1108\/13598540610703864","volume":"11","author":"T Kremic","year":"2006","unstructured":"Kremic T, Tukel OI, Rom WO (2006) Outsourcing decision support: a survey of benefits, risks, and decision factors. Supply Chain Manag Int J 11(6):467\u2013482","journal-title":"Supply Chain Manag Int J"},{"issue":"4","key":"471_CR28","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1287\/mnsc.43.4.546","volume":"43","author":"HL Lee","year":"1997","unstructured":"Lee HL, Padmanabhan V, Whang S (1997) Information distortion in a supply chain: the bullwhip effect. Manag Sci 43(4):546\u2013558","journal-title":"Manag Sci"},{"key":"471_CR29","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/j.ejor.2008.04.016","volume":"196","author":"G Mincsovics","year":"2009","unstructured":"Mincsovics G, Tan T, Alp O (2009) Integrated capacity and inventory management with capacity acquisition lead times. Eur J Oper Res 196:949\u2013958","journal-title":"Eur J Oper Res"},{"key":"471_CR30","doi-asserted-by":"crossref","first-page":"988","DOI":"10.1287\/opre.1040.0126","volume":"52","author":"\u00d6 \u00d6zer","year":"2004","unstructured":"\u00d6zer \u00d6, Wei W (2004) Inventory control with limited capacity and advance demand information. Oper Res 52:988\u20131000","journal-title":"Oper Res"},{"issue":"15","key":"471_CR31","doi-asserted-by":"crossref","first-page":"4281","DOI":"10.1080\/00207540801930237","volume":"47","author":"MF Pac","year":"2009","unstructured":"Pac MF, Alp O, Tan T (2009) Integrated workforce capacity and inventory management under labour supply uncertainty. Int J Prod Res 47(15):4281\u20134304","journal-title":"Int J Prod Res"},{"key":"471_CR32","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/0925-5273(95)00115-8","volume":"42","author":"M Parlar","year":"1995","unstructured":"Parlar M, Wang Y, Gerchak Y (1995) A periodic review inventory model with Markovian supply availability. Int J Prod Econ 42:131\u2013136","journal-title":"Int J Prod Econ"},{"key":"471_CR33","doi-asserted-by":"crossref","DOI":"10.1515\/9781503619883","volume-title":"Foundations of stochastic inventory theory","author":"EL Porteus","year":"2002","unstructured":"Porteus EL (2002) Foundations of stochastic inventory theory. Stanford University Press, Palo Alto"},{"key":"471_CR34","doi-asserted-by":"crossref","first-page":"1192","DOI":"10.1016\/j.cor.2005.06.018","volume":"34","author":"D Serel","year":"2007","unstructured":"Serel D (2007) Capacity reservation under supply uncertainty. Comput Oper Res 34:1192\u20131220","journal-title":"Comput Oper Res"},{"key":"471_CR35","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/S0377-2217(00)00106-5","volume":"131","author":"D Serel","year":"2001","unstructured":"Serel D, Dada M, Moskowitz H (2001) Sourcing decisions with capacity reservation contracts. Eur J Oper Res 131:635\u2013648","journal-title":"Eur J Oper Res"},{"key":"471_CR36","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1016\/j.ejor.2005.12.031","volume":"177","author":"T Tan","year":"2007","unstructured":"Tan T, Gullu R, Erkip N (2007) Modelling imperfect advance demand information and analysis of optimal inventory policies. Eur J Oper Res 177:897\u2013923","journal-title":"Eur J Oper Res"},{"issue":"2","key":"471_CR37","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/j.ijpe.2009.04.025","volume":"121","author":"T Tan","year":"2009","unstructured":"Tan T, Gullu R, Erkip N (2009) Using imperfect advance demand information in ordering and rationing decisions. Int J Prod Econ 121(2):665\u2013677","journal-title":"Int J Prod Econ"},{"key":"471_CR38","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.ejor.2003.04.008","volume":"165","author":"L Norden Van","year":"2005","unstructured":"Van Norden L, Van de Velde S (2005) Multi-product lot-sizing with a transportation capacity reservation contract. Eur J Oper Res 165:127\u2013138","journal-title":"Eur J Oper Res"},{"issue":"1","key":"471_CR39","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/mnsc.42.1.130","volume":"42","author":"Y Wang","year":"1996","unstructured":"Wang Y, Gerchak Y (1996) Periodic review production models with variable capacity, random yield, and uncertain demand. Manag Sci 42(1):130\u2013137","journal-title":"Manag Sci"},{"issue":"4","key":"471_CR40","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1007\/s00291-006-0076-x","volume":"29","author":"J Wijngaard","year":"2007","unstructured":"Wijngaard J, Karaesmen F (2007) Advance demand information and a restricted production capacity: on the optimality of order base-stock policies. OR Spectr 29(4):643\u2013660","journal-title":"OR Spectr"},{"key":"471_CR41","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1016\/j.ejor.2006.01.048","volume":"180","author":"X Zhao","year":"2007","unstructured":"Zhao X, Xie J, Wei JC (2007) The value of early order commitment in a two-level supply chain. Eur J Oper Res 180:194\u2013214","journal-title":"Eur J Oper Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-016-0471-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0471-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-016-0471-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,21]],"date-time":"2022-07-21T11:08:18Z","timestamp":1658401698000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-016-0471-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,12]]},"references-count":41,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2017,7]]}},"alternative-id":["471"],"URL":"https:\/\/doi.org\/10.1007\/s00291-016-0471-x","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,12]]}}}