{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T09:31:48Z","timestamp":1775727108605,"version":"3.50.1"},"reference-count":41,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2019,2,8]],"date-time":"2019-02-08T00:00:00Z","timestamp":1549584000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2019,6]]},"DOI":"10.1007\/s00291-019-00546-z","type":"journal-article","created":{"date-parts":[[2019,2,8]],"date-time":"2019-02-08T01:22:24Z","timestamp":1549588944000},"page":"513-548","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":30,"title":["An optimisation model for scheduling the decommissioning of an offshore wind farm"],"prefix":"10.1007","volume":"41","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2369-364X","authenticated-orcid":false,"given":"Chandra Ade","family":"Irawan","sequence":"first","affiliation":[]},{"given":"Graham","family":"Wall","sequence":"additional","affiliation":[]},{"given":"Dylan","family":"Jones","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,2,8]]},"reference":[{"key":"546_CR1","unstructured":"Ait-Alla A, Quandt M, L\u00fctjen M (2013) Aggregate installation planning of offshore wind farms. In: Proceedings of the 7th international conference on communications and information technology (CIT\u201913), Cambridge, pp 130\u2013135"},{"issue":"3","key":"546_CR2","doi-asserted-by":"publisher","first-page":"894","DOI":"10.1016\/j.ejor.2017.05.043","volume":"264","author":"E Barlow","year":"2018","unstructured":"Barlow E, \u00d6zt\u00fcrk DT, Revie M, Akartunali K, Day AH, Boulougouris E (2018) A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations. Eur J Oper Res 264(3):894\u2013906","journal-title":"Eur J Oper Res"},{"key":"546_CR3","first-page":"174","volume":"89","author":"T Benmessaoud","year":"2013","unstructured":"Benmessaoud T, Mohammedi K, Smaili Y (2013) Influence of maintenance on the performance of a wind farm. Przegla\u0327 Elektrotechniczny 89:174\u2013178","journal-title":"Przegla\u0327 Elektrotechniczny"},{"key":"546_CR4","doi-asserted-by":"crossref","unstructured":"Besnard F, Patriksson M, Str\u00f6mberg A, Wojciechowski A, Bertling L (2009) An optimization framework for opportunistic maintenance of offshore wind power system. In: Proceedings of IEEE Bucharest Powertech conference, Bucharest, Romania","DOI":"10.1109\/PTC.2009.5281868"},{"key":"546_CR5","doi-asserted-by":"crossref","unstructured":"Besnard F, Patriksson M, Str\u00f6mberg A, Wojciechowski A, Bertling L (2011) A stochastic model for opportunistic service maintenance planning of offshore wind farms. In: Proceedings of the IEEE Powertech conference, Trondheim, Norway","DOI":"10.1109\/PTC.2011.6019376"},{"key":"546_CR6","unstructured":"Bradley, S (2013) Offshore wind\u2014end of life opportunities. Energy Institute Evening Lecture. Technical Report, London"},{"issue":"12","key":"546_CR7","doi-asserted-by":"publisher","first-page":"1093","DOI":"10.1177\/0037549710376841","volume":"87","author":"E Byon","year":"2011","unstructured":"Byon E, P\u00e9rez E, Ding Y, Ntaimo L (2011) Simulation of wind farm operations and maintenance using discrete event system specification. Simulation 87(12):1093\u20131117","journal-title":"Simulation"},{"issue":"2","key":"546_CR8","doi-asserted-by":"publisher","first-page":"506","DOI":"10.1016\/j.ejor.2015.03.023","volume":"245","author":"F Camci","year":"2015","unstructured":"Camci F (2015) Maintenance scheduling of geographically distributed assets with prognostics information. Eur J Oper Res 245(2):506\u2013516","journal-title":"Eur J Oper Res"},{"key":"546_CR9","unstructured":"CCC (2010) Offshore renewable energy installation decommissioning study: Final report. Technical report. Climate Change Capital Ltd"},{"key":"546_CR10","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1260\/0309-524X.39.1.15","volume":"39","author":"L Dai","year":"2015","unstructured":"Dai L, St\u00e5lhane M, Utne I (2015) Routing and scheduling of maintenance fleet for offshore wind farms. Wind Eng 39:15\u201330","journal-title":"Wind Eng"},{"key":"546_CR11","unstructured":"DECC (2011) Decommissioning of offshore renewable energyinstallations under the energy act 2004: guidance notes forindustry. Technical report, DECC"},{"key":"546_CR12","doi-asserted-by":"crossref","unstructured":"Dos Santos F, Teixeira A, Soares C (2013) Maintenance planning of an offshore wind turbine using stochastic petri nets with predicates. In: Proceedings of the international conference on offshore mechanics and arctic engineering (OMAE), Nantes, France","DOI":"10.1115\/OMAE2013-11639"},{"issue":"3","key":"546_CR13","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1007\/s00291-012-0301-8","volume":"35","author":"C Garcia","year":"2013","unstructured":"Garcia C, Rabadi G (2013) Exact and approximate methods for parallel multiple-area spatial scheduling with release times. OR Spectr 35(3):639\u2013657","journal-title":"OR Spectr"},{"key":"546_CR14","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/j.cor.2015.09.010","volume":"78","author":"CA Irawan","year":"2017","unstructured":"Irawan CA, Jones D, Ouelhadj D (2017a) Bi-objective optimisation model for installation scheduling in offshore wind farms. Comput Oper Res 78:393\u2013407","journal-title":"Comput Oper Res"},{"issue":"1","key":"546_CR15","doi-asserted-by":"publisher","first-page":"76","DOI":"10.1016\/j.ejor.2016.05.059","volume":"256","author":"CA Irawan","year":"2017","unstructured":"Irawan CA, Ouelhadj D, Jones D, St\u00e5lhane M, Sperstad IB (2017b) Optimisation of maintenance routing and scheduling for offshore wind farms. Eur J Oper Res 256(1):76\u201389","journal-title":"Eur J Oper Res"},{"key":"546_CR16","unstructured":"Januario C, Semino S, Bell M (2007) Offshore windfarm decommissioning: a proposal for guidelines to be included in the European maritime policy. In: Conference proceedings EWEC, Milan"},{"key":"546_CR17","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1016\/j.marpol.2011.04.008","volume":"36","author":"J Kaiser","year":"2012","unstructured":"Kaiser J, Snyder B (2012) Modelling the decommissioning cost of offshore wind development on the U.S. outer continental shelf mark. Mar Policy 36:153\u2013164","journal-title":"Mar Policy"},{"key":"546_CR18","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1016\/j.cirp.2011.03.049","volume":"60","author":"A Kovacs","year":"2011","unstructured":"Kovacs A, Erdos G, Viharos Z, Monostori L (2011) A system for the detailed scheduling of wind farm maintenance. CIRP Ann Manuf Technol 60:497\u2013501","journal-title":"CIRP Ann Manuf Technol"},{"key":"546_CR19","unstructured":"L\u00fctjen M, Karimi H (2012) Approach of a port inventory control system for the offshore installation of wind turbines. In: Proceedings of the 22nd international offshore and polar engineering conference (ISOPE), Rhodes, Greek, pp 502\u2013508"},{"key":"546_CR20","doi-asserted-by":"crossref","unstructured":"Maniezzo V, St\u00fctzle T, Vo\u00df S (2010) Matheuristics, hybridizing metaheuristics and mathematical programming. Annals of information systems, vol 10. Springer, New York","DOI":"10.1007\/978-1-4419-1306-7"},{"key":"546_CR21","first-page":"1033","volume":"732","author":"K Pan","year":"2013","unstructured":"Pan K, You D, Wang K (2013) Long-term multi-objective optimization dispatch and its evaluation in wind integrated power systems. Adv Mater Res 732:1033\u20131037","journal-title":"Adv Mater Res"},{"key":"546_CR22","unstructured":"Parikh N (2012) Optimizing maintenance cost of wind farms by scheduling preventive maintenance and replacement of critical components using mathematical approach. Master thesis, Texas A&M University"},{"key":"546_CR23","doi-asserted-by":"crossref","unstructured":"Pattison D, Xie W, Quail F (2013) The windy domain\u2014a challenging real-world application of integrated planning and scheduling. In: Proceedings of the 23rd international conference on automated planning and scheduling (ICAPS), Rome, Italy, pp 462\u2013466","DOI":"10.1609\/icaps.v23i1.13586"},{"key":"546_CR24","unstructured":"Pearson D (2001) Decommissioning wind turbines in the UK offshore zone. In: BWEA23: turning things around\u2013annual conference and exhibition, Brighton"},{"key":"546_CR25","doi-asserted-by":"crossref","unstructured":"Per\u00e9z E, Ntaimo L, Byon E, Ding Y (2010) A stochastic DEVS wind turbine component model for wind farm simulation. In: Proceeding of the spring simulation multi-conference (SpringSim), Florida","DOI":"10.1145\/1878537.1878681"},{"key":"546_CR26","doi-asserted-by":"crossref","unstructured":"Per\u00e9z E, Ntaimo L, Ding Y (2013) Simulation of wind farm operations and maintenance. In: Proceedings of the ASME turbine technical conference and exposition, San Antonio","DOI":"10.1115\/GT2013-94300"},{"key":"546_CR27","unstructured":"Renewable UK (2015) Offshore wind energy figures. Technical report. http:\/\/www.renewableuk.com\/page\/UKWEDhome . Accessed on 20 Nov, 2017"},{"key":"546_CR28","unstructured":"RWE (2011) Decommissioning strategy: Gwynt y m\u00f4r offshore wind farm ltd. Technical report. https:\/\/www.innogy.com\/web\/cms\/mediablob\/en\/3171308\/data\/3171562\/1\/rwe-innogy\/rwe-innogy-uk\/sites\/wind-offshore\/in-operation\/gwynt-y-mr\/English.pdf . Accessed on 30, Nov 2017"},{"key":"546_CR29","doi-asserted-by":"publisher","first-page":"667","DOI":"10.1016\/j.renene.2016.09.014","volume":"101","author":"BR Sarker","year":"2017","unstructured":"Sarker BR, Faiz TI (2017) Minimizing transportation and installation costs for turbines in offshore wind farms. Renew Energy 101:667\u2013679","journal-title":"Renew Energy"},{"key":"546_CR30","first-page":"371","volume":"5","author":"B Scholz-Reiter","year":"2010","unstructured":"Scholz-Reiter B, Heger J, Lutjen M, Schweizer A (2010) A milp for installation scheduling of offshore wind farms. Int J Math Models Methods Appl Sci 5:371\u2013378","journal-title":"Int J Math Models Methods Appl Sci"},{"key":"546_CR31","unstructured":"Scholz-Reiter B, Karimi H, Lutjen M, Heger J, Schweizer A (2011) Towards a heuristic for scheduling offshore installation processes. In: Proceedings of the 24th international congress on condition monitoring (COMADEM) Stavanger, Norway, pp 999\u20131008"},{"issue":"1","key":"546_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00291-017-0486-y","volume":"40","author":"S Schwerdfeger","year":"2018","unstructured":"Schwerdfeger S, Boysen N, Briskorn D (2018) Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal. OR Spectr 40(1):1\u201321","journal-title":"OR Spectr"},{"key":"546_CR33","unstructured":"St\u00e5lhane M, Hvattum L, Skaar V (2014) Optimization of routing and scheduling of vessels to perform maintenance at offshore wind farms. In: Proceedings of the 12th deep sea offshore wind R&D conference, EERA DeepWind\u20192015"},{"key":"546_CR34","unstructured":"Stecky-Efantis A (2013) Evaluating Ontario wind turbine decommissioning plans. Technical report. School of Urban and Regional Planning, Queen\u2019s University, Kingston"},{"issue":"2","key":"546_CR35","doi-asserted-by":"publisher","first-page":"703","DOI":"10.1016\/j.ejor.2016.08.057","volume":"258","author":"E Ursavas","year":"2017","unstructured":"Ursavas E (2017) A benders decomposition approach for solving the offshore wind farm installation planning at the north sea. Eur J Oper Res 258(2):703\u2013714","journal-title":"Eur J Oper Res"},{"key":"546_CR36","unstructured":"Van Horenbeek A, Van Ostaeyen J, Duflou J, Pintelon L (2012) Prognostic maintenance scheduling for offshore wind turbine farms. In: Proceedings of the 4th production & operations management world conference, Amsterdam"},{"key":"546_CR37","unstructured":"Vattenfall (2016) The first decommission of an offshore wind farm is now complete. Technical report. https:\/\/corporate.vattenfall.com\/press-and-media\/press-releases\/2016\/the-first-decommission-in-the-world-of-an-offshore-wind-farm-is-now-complete\/ . Accessed on 30 Nov, 2017"},{"key":"546_CR38","unstructured":"Wang K, Zhang B, Wu X, Zhai J, Shao W, Duan Y (2012) Multi-time scales coordination scheduling of wind power integrated system. In: Proceedings of the IEEE innovative smart grid technologies (ISGT)-Asia, Tianjin, China"},{"key":"546_CR39","first-page":"94","volume":"36","author":"Y Wu","year":"2012","unstructured":"Wu Y, Bing H, Lou S (2012) A unit maintenance scheduling model considering peak regulation pressure balance for power system containing wind farms. Power Syst Technol 36:94\u2013100","journal-title":"Power Syst Technol"},{"key":"546_CR40","first-page":"25","volume":"36","author":"H Zhang","year":"2012","unstructured":"Zhang H, Yin Y, Shen H, He J, Zhao S (2012a) Generator maintenance scheduling of large-scale wind power integration considering peak shaving. Autom Electr Power Syst 36:25\u201330","journal-title":"Autom Electr Power Syst"},{"key":"546_CR41","doi-asserted-by":"crossref","unstructured":"Zhang J, Chowdhury S, Zhang J (2012b) Optimal preventive maintenance time windows for offshore wind farms subject to wake losses. In: Proceedings of the 14th AIAA\/ISSMO multidisciplinary analysis and optimization conference, Indianapolis","DOI":"10.2514\/6.2012-5435"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-019-00546-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-019-00546-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-019-00546-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,13]],"date-time":"2023-09-13T13:34:18Z","timestamp":1694612058000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-019-00546-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,2,8]]},"references-count":41,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,6]]}},"alternative-id":["546"],"URL":"https:\/\/doi.org\/10.1007\/s00291-019-00546-z","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,2,8]]},"assertion":[{"value":"5 February 2018","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 January 2019","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 February 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}