{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,23]],"date-time":"2024-07-23T20:29:53Z","timestamp":1721766593831},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2019,11,25]],"date-time":"2019-11-25T00:00:00Z","timestamp":1574640000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,11,25]],"date-time":"2019-11-25T00:00:00Z","timestamp":1574640000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2019,12]]},"DOI":"10.1007\/s00291-019-00569-6","type":"journal-article","created":{"date-parts":[[2019,12,2]],"date-time":"2019-12-02T10:35:47Z","timestamp":1575282947000},"page":"867-870","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Quantitative approaches in production management"],"prefix":"10.1007","volume":"41","author":[{"given":"Stefan","family":"Helber","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ton","family":"de Kok","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Heinrich","family":"Kuhn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Michael","family":"Manitz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andrea","family":"Matta","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Raik","family":"Stolletz","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,11,25]]},"reference":[{"key":"569_CR1","doi-asserted-by":"crossref","unstructured":"Benda F, Braune R, D\u00f6rner KF, Hartl RF (2019) A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking. OR Spectr 41(4) (to appear in this issue)","DOI":"10.1007\/s00291-019-00567-8"},{"key":"569_CR2","doi-asserted-by":"publisher","unstructured":"Briskorn D, Zeise P (2019) A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand. OR Spectr. https:\/\/doi.org\/10.1007\/s00291-019-00555-y","DOI":"10.1007\/s00291-019-00555-y"},{"issue":"1","key":"569_CR3","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00291-015-0429-4","volume":"39","author":"K Copil","year":"2017","unstructured":"Copil K, W\u00f6rbelauer M, Meyr H, Tempelmeier H (2017) Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectr 39(1):1\u201364","journal-title":"OR Spectr"},{"issue":"4","key":"569_CR4","doi-asserted-by":"publisher","first-page":"849","DOI":"10.1007\/s00291-016-0441-3","volume":"38","author":"T Hilger","year":"2016","unstructured":"Hilger T, Sahling F, Tempelmeier H (2016) Capacitated dynamic production and remanufacturing planning under demand and return uncertainty. OR Spectr 38(4):849\u2013876","journal-title":"OR Spectr"},{"key":"569_CR5","doi-asserted-by":"publisher","unstructured":"Hottenrott A, Grunow M (2019) Flexible layouts for the mixed-model assembly of heterogeneous vehicles. OR Spectr. https:\/\/doi.org\/10.1007\/s00291-019-00556-x","DOI":"10.1007\/s00291-019-00556-x"},{"key":"569_CR6","doi-asserted-by":"crossref","unstructured":"Kloos K, Pibernik R, Schulte B (2019) Allocation planning in sales hierarchies with stochastic demand and service-level targets. OR Spectr 41(4) (to appear in this issue, published online 2018-12-28)","DOI":"10.1007\/s00291-018-0531-5"},{"issue":"5","key":"569_CR7","doi-asserted-by":"publisher","first-page":"502","DOI":"10.1080\/0740817X.2012.705450","volume":"45","author":"S Lagershausen","year":"2013","unstructured":"Lagershausen S, Manitz M, Tempelmeier H (2013) Performance analysis of closed-loop automotive assembly lines with general processing times and finite buffer spaces. IIE Trans 45(5):502\u2013515","journal-title":"IIE Trans"},{"issue":"20","key":"569_CR8","first-page":"1","volume":"54","author":"G Liberopoulos","year":"2010","unstructured":"Liberopoulos G, Papadopoulos C, Smith JM, Tempelmeier H, Tolio T (2010) New developments in stochastic models of manufacturing and service operations. Int J Prod Res 54(20):1\u20133","journal-title":"Int J Prod Res"},{"issue":"1","key":"569_CR9","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1007\/s00291-010-0216-1","volume":"34","author":"M Manitz","year":"2012","unstructured":"Manitz M, Tempelmeier H (2012) The variance of inter-departure times of the output of an assembly line with finite buffers, converging flow of material, and general service times. OR Spectr 34(1):273\u2013291","journal-title":"OR Spectr"},{"issue":"9","key":"569_CR10","doi-asserted-by":"publisher","first-page":"2546","DOI":"10.1016\/j.cor.2008.10.009","volume":"36","author":"F Sahling","year":"2009","unstructured":"Sahling F, Buschk\u00fchl L, Tempelmeier H, Helber S (2009) Solving a multilevel capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic. Comput Oper Res 36(9):2546\u20132553","journal-title":"Comput Oper Res"},{"key":"569_CR11","doi-asserted-by":"publisher","unstructured":"Stadtler H, Meistering M (2019) Model formulations for the capacitated lot-sizing problem with service-level constraints. OR Spectr. https:\/\/doi.org\/10.1007\/s00291-019-00552-1","DOI":"10.1007\/s00291-019-00552-1"},{"key":"569_CR12","doi-asserted-by":"crossref","unstructured":"Tan B (2019) Production control with price, cost, and demand uncertainty. OR Spectr 41(4) (to appear in this issue, published online 2018-12-28)","DOI":"10.1007\/s00291-018-0542-2"},{"issue":"3","key":"569_CR13","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/0377-2217(85)90127-4","volume":"19","author":"H Tempelmeier","year":"1985","unstructured":"Tempelmeier H (1985) Inventory control using a service constraint on the expected customer order waiting time. Eur J Oper Res 19(3):313\u2013323","journal-title":"Eur J Oper Res"},{"key":"569_CR14","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1016\/0377-2217(93)90146-E","volume":"65","author":"H Tempelmeier","year":"1993","unstructured":"Tempelmeier H (1993) Safety stock allocation in a two-echelon distribution system. Eur J Oper Res 65:96\u2013117","journal-title":"Eur J Oper Res"},{"issue":"5","key":"569_CR15","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1080\/095372897235028","volume":"8","author":"H Tempelmeier","year":"1997","unstructured":"Tempelmeier H (1997) Resource-constrained materials requirements planning-MRP$$^\\text{ rc }$$. Prod Plan Control 8(5):451\u2013461","journal-title":"Prod Plan Control"},{"issue":"3","key":"569_CR16","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1007\/s002910000044","volume":"22","author":"H Tempelmeier","year":"2000","unstructured":"Tempelmeier H (2000) Inventory service-levels in the customer supply chain. OR Spectr 22(3):361\u2013380","journal-title":"OR Spectr"},{"issue":"4","key":"569_CR17","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1111\/j.1937-5956.2002.tb00474.x","volume":"11","author":"H Tempelmeier","year":"2002","unstructured":"Tempelmeier H (2002) A simple heuristic for dynamic order sizing and supplier selection with time-varying data. Prod Oper Manag 11(4):499\u2013515","journal-title":"Prod Oper Manag"},{"issue":"1","key":"569_CR18","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1080\/00207540210161641","volume":"41","author":"H Tempelmeier","year":"2003","unstructured":"Tempelmeier H (2003) Practical considerations in the optimization of flow production systems. Int J Prod Res 41(1):149\u2013170","journal-title":"Int J Prod Res"},{"issue":"1","key":"569_CR19","doi-asserted-by":"publisher","first-page":"600","DOI":"10.1016\/j.ejor.2005.01.044","volume":"174","author":"H Tempelmeier","year":"2006","unstructured":"Tempelmeier H (2006) Supply chain inventory optimization with two customer classes. Eur J Oper Res 174(1):600\u2013621","journal-title":"Eur J Oper Res"},{"issue":"1","key":"569_CR20","doi-asserted-by":"publisher","first-page":"184","DOI":"10.1016\/j.ejor.2006.06.009","volume":"181","author":"H Tempelmeier","year":"2007","unstructured":"Tempelmeier H (2007) On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints. Eur J Oper Res 181(1):184\u2013194","journal-title":"Eur J Oper Res"},{"issue":"6","key":"569_CR21","doi-asserted-by":"publisher","first-page":"627","DOI":"10.1016\/j.omega.2011.01.003","volume":"39","author":"H Tempelmeier","year":"2011","unstructured":"Tempelmeier H (2011a) A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint. Omega 39(6):627\u2013633","journal-title":"Omega"},{"key":"569_CR22","volume-title":"Inventory management in supply networks\u2014problems, models, solutions","author":"H Tempelmeier","year":"2011","unstructured":"Tempelmeier H (2011b) Inventory management in supply networks\u2014problems, models, solutions, 2nd edn. Books on Demand, Norderstedt","edition":"2"},{"key":"569_CR23","doi-asserted-by":"publisher","first-page":"6880","DOI":"10.1080\/00207543.2013.776190","volume":"51","author":"H Tempelmeier","year":"2013","unstructured":"Tempelmeier H (2013a) A multi-level inventory system with a make-to-order supplier. Int J Prod Res 51:6880\u20136890","journal-title":"Int J Prod Res"},{"key":"569_CR24","first-page":"113","volume-title":"Handbook of stochastic models and analysis of manufacturing system operations","author":"H Tempelmeier","year":"2013","unstructured":"Tempelmeier H (2013b) Stochastic lot sizing problems. In: Smith JM, Tan B (eds) Handbook of stochastic models and analysis of manufacturing system operations. Springer, Berlin, pp 113\u2013143"},{"issue":"1","key":"569_CR25","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.ejor.2015.05.069","volume":"247","author":"H Tempelmeier","year":"2015","unstructured":"Tempelmeier H, Bantel O (2015) Integrated optimization of safety stock and transportation capacity. Eur J Oper Res 247(1):101\u2013112","journal-title":"Eur J Oper Res"},{"issue":"4","key":"569_CR26","first-page":"293","volume":"33","author":"H Tempelmeier","year":"2001","unstructured":"Tempelmeier H, B\u00fcrger M (2001) Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production. IIE Trans 33(4):293\u2013302","journal-title":"IIE Trans"},{"issue":"1","key":"569_CR27","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.ijpe.2007.10.001","volume":"113","author":"H Tempelmeier","year":"2008","unstructured":"Tempelmeier H, Buschk\u00fchl L (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. Int J Prod Econ 113(1):401\u2013412","journal-title":"Int J Prod Econ"},{"issue":"2","key":"569_CR28","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1007\/s00291-008-0130-y","volume":"31","author":"H Tempelmeier","year":"2009","unstructured":"Tempelmeier H, Buschk\u00fchl L (2009) A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures. OR Spectr 31(2):385\u2013404","journal-title":"OR Spectr"},{"issue":"4","key":"569_CR29","doi-asserted-by":"publisher","first-page":"810","DOI":"10.1007\/s00291-015-0410-2","volume":"38","author":"H Tempelmeier","year":"2016","unstructured":"Tempelmeier H, Copil K (2016) Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator. OR Spectr 38(4):810\u2013847","journal-title":"OR Spectr"},{"issue":"5","key":"569_CR30","doi-asserted-by":"publisher","first-page":"738","DOI":"10.1287\/mnsc.42.5.738","volume":"42","author":"H Tempelmeier","year":"1996","unstructured":"Tempelmeier H, Derstroff M (1996) A lagrangean-based heuristic for dynamic multilevel multi-item constrained lot sizing. Manag Sci 42(5):738\u2013757","journal-title":"Manag Sci"},{"issue":"21","key":"569_CR31","doi-asserted-by":"publisher","first-page":"6275","DOI":"10.1080\/00207540903317531","volume":"48","author":"H Tempelmeier","year":"2010","unstructured":"Tempelmeier H, Fischer L (2010) Approximation of the probability distribution of the customer waiting time under an $$(r, s, q)$$ inventory policy in discrete time. Int J Prod Res 48(21):6275\u20136291","journal-title":"Int J Prod Res"},{"issue":"5","key":"569_CR32","doi-asserted-by":"publisher","first-page":"1413","DOI":"10.1080\/00207543.2018.1489157","volume":"57","author":"H Tempelmeier","year":"2018","unstructured":"Tempelmeier H, Fischer L (2018) A procedure for the approximation of the waiting time distribution in a discrete-time $$(r, S)$$ inventory system. Int J Prod Res 57(5):1413\u20131426","journal-title":"Int J Prod Res"},{"issue":"2","key":"569_CR33","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1016\/0377-2217(94)90076-0","volume":"75","author":"H Tempelmeier","year":"1994","unstructured":"Tempelmeier H, Helber S (1994) A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures. Eur J Oper Res 75(2):296\u2013311","journal-title":"Eur J Oper Res"},{"issue":"17","key":"569_CR34","doi-asserted-by":"publisher","first-page":"5181","DOI":"10.1080\/00207540903179782","volume":"48","author":"H Tempelmeier","year":"2010","unstructured":"Tempelmeier H, Herpers S (2010) ABC$$_{\\beta }$$-a heuristic for dynamic capacitated lot sizing with random demand under a fillrate constraint. Int J Prod Res 48(17):5181\u20135193","journal-title":"Int J Prod Res"},{"issue":"3","key":"569_CR35","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1016\/j.ejor.2011.02.012","volume":"212","author":"H Tempelmeier","year":"2011","unstructured":"Tempelmeier H, Herpers S (2011) Dynamic uncapacitated lot sizing with random demand under a fillrate constraint. Eur J Oper Res 212(3):497\u2013507","journal-title":"Eur J Oper Res"},{"key":"569_CR36","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/j.cor.2015.01.007","volume":"59","author":"H Tempelmeier","year":"2015","unstructured":"Tempelmeier H, Hilger T (2015) Linear programming models for a stochastic dynamic capacitated lot sizing problem. Comput Oper Res 59:119\u2013125","journal-title":"Comput Oper Res"},{"issue":"4","key":"569_CR37","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1007\/BF01733401","volume":"14","author":"H Tempelmeier","year":"1992","unstructured":"Tempelmeier H, Kuhn H (1992) OR-Modelle zur Planung flexibler Fertigungssysteme\u2014Ein \u00dcberblick. OR Spectr 14(4):177\u2013192","journal-title":"OR Spectr"},{"key":"569_CR38","volume-title":"Flexible manufacturing systems\u2014decision support for design and operation","author":"H Tempelmeier","year":"1993","unstructured":"Tempelmeier H, Kuhn H (1993) Flexible manufacturing systems\u2014decision support for design and operation. Wiley, New York"},{"key":"569_CR39","first-page":"349","volume-title":"Advanced purchasing and order optimization","author":"H Tempelmeier","year":"2004","unstructured":"Tempelmeier H, Reith-Ahlemeier G (2004) Supply chain management and reverse logistics. In: Lackes R, Reese J, Dyckhoff H (eds) Advanced purchasing and order optimization. Springer, Berlin, pp 349\u2013370"},{"issue":"11","key":"569_CR40","doi-asserted-by":"publisher","first-page":"1963","DOI":"10.1080\/00207548908942667","volume":"27","author":"H Tempelmeier","year":"1989","unstructured":"Tempelmeier H, Kuhn H, Tetzlaff U (1989) Performance evaluation of flexible manufacturing systems with blocking. Int J Prod Res 27(11):1963\u20131979","journal-title":"Int J Prod Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-019-00569-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-019-00569-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-019-00569-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,24]],"date-time":"2020-11-24T01:41:17Z","timestamp":1606182077000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-019-00569-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11,25]]},"references-count":40,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2019,12]]}},"alternative-id":["569"],"URL":"https:\/\/doi.org\/10.1007\/s00291-019-00569-6","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,11,25]]},"assertion":[{"value":"25 November 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}