{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,4]],"date-time":"2026-05-04T04:13:34Z","timestamp":1777868014616,"version":"3.51.4"},"reference-count":57,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2025,7,8]],"date-time":"2025-07-08T00:00:00Z","timestamp":1751932800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2025,7,8]],"date-time":"2025-07-08T00:00:00Z","timestamp":1751932800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100018696","name":"R\u00e9 Normandie","doi-asserted-by":"publisher","award":["31029-20E03978"],"award-info":[{"award-number":["31029-20E03978"]}],"id":[{"id":"10.13039\/501100018696","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Universit\u00e9 Le Havre Normandie"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2026,3]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>The accidental release of dangerous substances from industrial sources into the environment is a recurring problem. Despite the regulations implemented to prevent these accidents and mitigate their consequences, managing operations in the aftermath of industrial disasters remains a complex challenge. This paper investigates post-catastrophe operations in the event of industrial disasters, where a group of specialized teams are deployed to clean up areas contaminated by dangerous substances, with the objective of minimizing the overall risk of the operation. To this end, we propose a new optimization problem named Resource Constrained Project Scheduling Problem with Risk and Priorities (RCPSP-RP), which is composed of an integrated scheduling-routing model with different schemes of task prioritization. Two integer linear models and an Iterated Local Search (ILS) metaheuristic are proposed and applied to solve several theoretical instances. A first contribution of this study is the introduction of a new problem that is highly relevant in the context of industrial disasters. In addition, several experiments have been conducted that reveal that relaxation of priority constraints generally leads to solutions with a lower overall risk. Furthermore, the results highlight the limitations of the mathematical formulation, which can only solve instances with up to 16 tasks. In contrast, the ILS approach consistently provides solutions in seconds for all instances.<\/jats:p>","DOI":"10.1007\/s00291-025-00822-1","type":"journal-article","created":{"date-parts":[[2025,7,8]],"date-time":"2025-07-08T05:24:47Z","timestamp":1751952287000},"page":"293-323","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["The resource-constrained project scheduling problem for risk reduction after industrial disasters involving dangerous substances"],"prefix":"10.1007","volume":"48","author":[{"given":"Thiago J.","family":"Barbalho","sequence":"first","affiliation":[]},{"given":"Juan Luis Jim\u00e9nez","family":"Laredo","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2497-4072","authenticated-orcid":false,"given":"Andr\u00e9a Cynthia","family":"Santos","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2025,7,8]]},"reference":[{"issue":"2","key":"822_CR1","doi-asserted-by":"publisher","first-page":"625","DOI":"10.1016\/j.ejor.2016.07.043","volume":"257","author":"V Akbari","year":"2017","unstructured":"Akbari V, Salman FS (2017) Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity. Eur J Oper Res 257(2):625\u2013640","journal-title":"Eur J Oper Res"},{"issue":"102","key":"822_CR2","first-page":"854","volume":"95","author":"V Akbari","year":"2021","unstructured":"Akbari V, Sadati MEH, Kian R (2021) A decomposition-based heuristic for a multicrew coordinated road restoration problem. Transp Res Part D Transp Environ 95(102):854","journal-title":"Transp Res Part D Transp Environ"},{"issue":"3","key":"822_CR3","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi A, Ng C, Cheng T et al (2008) A survey of scheduling problems with setup times or costs. Eur J Oper Res 187(3):985\u20131032. https:\/\/doi.org\/10.1016\/j.ejor.2006.06.060","journal-title":"Eur J Oper Res"},{"issue":"1","key":"822_CR4","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/0377-2217(94)00164-2","volume":"88","author":"E Anderson","year":"1996","unstructured":"Anderson E (1996) Mechanisms for local search. Eur J Oper Res 88(1):139\u2013151. https:\/\/doi.org\/10.1016\/0377-2217(94)00164-2","journal-title":"Eur J Oper Res"},{"issue":"2","key":"822_CR5","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.orl.2017.02.001","volume":"45","author":"C Artigues","year":"2017","unstructured":"Artigues C (2017) On the strength of time-indexed formulations for the resource-constrained project scheduling problem. Oper Res Lett 45(2):154\u2013159. https:\/\/doi.org\/10.1016\/j.orl.2017.02.001","journal-title":"Oper Res Lett"},{"key":"822_CR6","doi-asserted-by":"publisher","unstructured":"Barbalho TJ (2022) The optlis package: v0.1.0. https:\/\/doi.org\/10.5281\/zenodo.7386793","DOI":"10.5281\/zenodo.7386793"},{"issue":"2","key":"822_CR7","doi-asserted-by":"publisher","first-page":"892","DOI":"10.1111\/itor.12925","volume":"30","author":"TJ Barbalho","year":"2023","unstructured":"Barbalho TJ, Santos AC, Aloise DJ (2023) Metaheuristics for the work-troops scheduling problem. Int Trans Oper Res 30(2):892\u2013914. https:\/\/doi.org\/10.1111\/itor.12925","journal-title":"Int Trans Oper Res"},{"issue":"3","key":"822_CR8","doi-asserted-by":"publisher","first-page":"347","DOI":"10.1016\/j.ecolmodel.2007.03.041","volume":"206","author":"CPD Birch","year":"2007","unstructured":"Birch CPD, Oom SP, Beecham JA (2007) Rectangular and hexagonal grids used for observation, experiment and simulation in ecology. Ecol Model 206(3):347\u2013359. https:\/\/doi.org\/10.1016\/j.ecolmodel.2007.03.041","journal-title":"Ecol Model"},{"issue":"1","key":"822_CR9","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz J, Lenstra J, Kan A (1983) Scheduling subject to resource constraints: classification and complexity. Discret Appl Math 5(1):11\u201324. https:\/\/doi.org\/10.1016\/0166-218X(83)90012-4","journal-title":"Discret Appl Math"},{"issue":"101","key":"822_CR10","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1016\/j.compenvurbsys.2020.101479","volume":"81","author":"B Bodaghi","year":"2020","unstructured":"Bodaghi B, Palaneeswaran E, Shahparvari S et al (2020) Probabilistic allocation and scheduling of multiple resources for emergency operations; a Victorian bushfire case study. Comput Environ Urban Syst 81(101):479. https:\/\/doi.org\/10.1016\/j.compenvurbsys.2020.101479","journal-title":"Comput Environ Urban Syst"},{"issue":"1","key":"822_CR11","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker P, Drexl A, M\u00f6hring R et al (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112(1):3\u201341. https:\/\/doi.org\/10.1016\/S0377-2217(98)00204-5","journal-title":"Eur J Oper Res"},{"issue":"3","key":"822_CR12","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/0377-2217(87)90240-2","volume":"29","author":"N Christofides","year":"1987","unstructured":"Christofides N, Alvarez-Valdes R, Tamarit J (1987) Project scheduling with resource constraints: a branch and bound approach. Eur J Oper Res 29(3):262\u2013273. https:\/\/doi.org\/10.1016\/0377-2217(87)90240-2","journal-title":"Eur J Oper Res"},{"issue":"1","key":"822_CR13","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1007\/s10479-019-03248-5","volume":"285","author":"AA Coco","year":"2020","unstructured":"Coco AA, Duhamel C, Santos AC (2020) Modeling and solving the multi-period disruptions scheduling problem on urban networks. Ann Oper Res 285(1):427\u2013443","journal-title":"Ann Oper Res"},{"issue":"12","key":"822_CR14","doi-asserted-by":"publisher","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E Demeulemeester","year":"1992","unstructured":"Demeulemeester E, Herroelen W (1992) A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage Sci 38(12):1803\u20131818. https:\/\/doi.org\/10.1287\/mnsc.38.12.1803","journal-title":"Manage Sci"},{"issue":"11","key":"822_CR15","doi-asserted-by":"publisher","first-page":"1485","DOI":"10.1287\/mnsc.43.11.1485","volume":"43","author":"E Demeulemeester","year":"1997","unstructured":"Demeulemeester E, Herroelen W (1997) New benchmark results for the resource-constrained project scheduling problem. Manage Sci 43(11):1485\u20131492","journal-title":"Manage Sci"},{"key":"822_CR16","volume-title":"Project scheduling: a research handbook","author":"E Demeulemeester","year":"2002","unstructured":"Demeulemeester E, Herroelen W (2002) Project scheduling: a research handbook. Springer, New York"},{"issue":"100","key":"822_CR17","doi-asserted-by":"publisher","first-page":"039","DOI":"10.1016\/j.ejtl.2021.100039","volume":"10","author":"TT Doan","year":"2021","unstructured":"Doan TT, Bostel N, H\u00e0 MH (2021) The vehicle routing problem with relaxed priority rules. EURO J Transp Logist 10(100):039. https:\/\/doi.org\/10.1016\/j.ejtl.2021.100039","journal-title":"EURO J Transp Logist"},{"key":"822_CR18","unstructured":"eMARS (2019) Fire in a plant manufacturing additives for oils and lubricants Oct., 2019. Available in: https:\/\/emars.jrc.ec.europa.eu\/en\/emars\/accident\/view\/923dc1f3-f4a6-11e9-9637-005056ad0167. Accessed 6 Oct 2022"},{"key":"822_CR19","unstructured":"European Commission (2021) On the implementation and efficient functioning of directive 2012\/18\/eu on the control of major-accident hazards involving dangerous substances for the period 2015-2018 https:\/\/ec.europa.eu\/environment\/pdf\/industrial-accidents\/seveso_implementation_report.pdf"},{"issue":"3","key":"822_CR20","doi-asserted-by":"publisher","first-page":"787","DOI":"10.1016\/j.ejor.2020.03.005","volume":"287","author":"RZ Farahani","year":"2020","unstructured":"Farahani RZ, Lotfi MM, Baghaian A et al (2020) Mass casualty management in disaster scene: a systematic review of OR &MS research in humanitarian operations. Eur J Oper Res 287(3):787\u2013819. https:\/\/doi.org\/10.1016\/j.ejor.2020.03.005","journal-title":"Eur J Oper Res"},{"key":"822_CR21","doi-asserted-by":"publisher","unstructured":"Graham R, Lawler E, Lenstra J, et\u00a0al (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. In: Hammer P, Johnson E, Korte B (eds.) Discrete optimization II, Annals of discrete mathematics, vol\u00a05. Elsevier, pp. 287\u2013326, https:\/\/doi.org\/10.1016\/S0167-5060(08)70356-X","DOI":"10.1016\/S0167-5060(08)70356-X"},{"issue":"2","key":"822_CR22","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/0167-6423(89)90039-7","volume":"12","author":"D Gries","year":"1989","unstructured":"Gries D, Martin AJ, Van De Snepscheut JL et al (1989) An algorithm for transitive reduction of an acyclic graph. Sci Comput Program 12(2):151\u2013155. https:\/\/doi.org\/10.1016\/0167-6423(89)90039-7 (https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/0167642389900397)","journal-title":"Sci Comput Program"},{"issue":"10","key":"822_CR23","doi-asserted-by":"publisher","first-page":"4429","DOI":"10.1021\/es104218h","volume":"45","author":"L G\u00f6rlitz","year":"2011","unstructured":"G\u00f6rlitz L, Gao Z, Schmitt W (2011) Statistical analysis of chemical transformation kinetics using Markov-Chain Monte Carlo methods. Environ Sci Technol 45(10):4429\u20134437. https:\/\/doi.org\/10.1021\/es104218h","journal-title":"Environ Sci Technol"},{"issue":"1","key":"822_CR24","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1\u201314. https:\/\/doi.org\/10.1016\/j.ejor.2009.11.005","journal-title":"Eur J Oper Res"},{"issue":"1","key":"822_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2021.05.004","volume":"297","author":"S Hartmann","year":"2022","unstructured":"Hartmann S, Briskorn D (2022) An updated survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 297(1):1\u201314. https:\/\/doi.org\/10.1016\/j.ejor.2021.05.004","journal-title":"Eur J Oper Res"},{"issue":"5","key":"822_CR26","doi-asserted-by":"publisher","first-page":"441","DOI":"10.1016\/j.jtte.2019.07.001","volume":"6","author":"H Hu","year":"2019","unstructured":"Hu H, He J, He X et al (2019) Emergency material scheduling optimization model and algorithms: a review. J Traffic Transp Eng 6(5):441\u2013454. https:\/\/doi.org\/10.1016\/j.jtte.2019.07.001","journal-title":"J Traffic Transp Eng"},{"issue":"6","key":"822_CR27","doi-asserted-by":"publisher","first-page":"2715","DOI":"10.1111\/itor.12641","volume":"27","author":"Y Huang","year":"2020","unstructured":"Huang Y, Santos AC, Duhamel C (2020) Model and methods to address urban road network problems with disruptions. Int Trans Oper Res 27(6):2715\u20132739. https:\/\/doi.org\/10.1111\/itor.12641","journal-title":"Int Trans Oper Res"},{"issue":"5","key":"822_CR28","doi-asserted-by":"publisher","first-page":"265","DOI":"10.5055\/ajdm.2011.0065","volume":"6","author":"MEMD Keim","year":"2011","unstructured":"Keim MEMD (2011) The public health impact of industrial disasters. Am J Disaster Med 6(5):265\u2013272. https:\/\/doi.org\/10.5055\/ajdm.2011.0065","journal-title":"Am J Disaster Med"},{"issue":"7","key":"822_CR29","doi-asserted-by":"publisher","first-page":"1198","DOI":"10.1080\/0305215X.2017.1419345","volume":"50","author":"S Kim","year":"2018","unstructured":"Kim S, Shin Y, Lee GM et al (2018) Early stage response problem for post-disaster incidents. Eng Optim 50(7):1198\u20131211. https:\/\/doi.org\/10.1080\/0305215X.2017.1419345","journal-title":"Eng Optim"},{"key":"822_CR30","unstructured":"Kochetov YA, Stolyar AA (2003) Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. In: in: proceedings of the 3rd international workshop of computer science and information technologies"},{"key":"822_CR31","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-50296-5","author":"R Kolisch","year":"1995","unstructured":"Kolisch R (1995) Project scheduling under resource constraints: efficient heuristics for several problem classes. Phys Heidelb. https:\/\/doi.org\/10.1007\/978-3-642-50296-5","journal-title":"Phys Heidelb"},{"issue":"1","key":"822_CR32","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch R, Hartmann S (2006) Experimental investigation of heuristics for resource-constrained project scheduling: an update. Eur J Oper Res 174(1):23\u201337. https:\/\/doi.org\/10.1016\/j.ejor.2005.01.065","journal-title":"Eur J Oper Res"},{"key":"822_CR33","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1007\/0-306-48056-5_11","volume-title":"Iterated local search","author":"HR Louren\u00e7o","year":"2003","unstructured":"Louren\u00e7o HR, Martin OC, St\u00fctzle T (2003) Iterated local search. Springer, US, Boston, pp 320\u2013353. https:\/\/doi.org\/10.1007\/0-306-48056-5_11"},{"key":"822_CR34","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1007\/978-1-4419-1665-5_12","volume-title":"Iterated local search: framework and applications","author":"HR Louren\u00e7o","year":"2010","unstructured":"Louren\u00e7o HR, Martin OC, St\u00fctzle T (2010) Iterated local search: framework and applications. Springer, US, Boston, pp 363\u2013397. https:\/\/doi.org\/10.1007\/978-1-4419-1665-5_12"},{"key":"822_CR35","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/j.orp.2016.09.002","volume":"3","author":"M L\u00f3pez-Ib\u00e1\u00f1ez","year":"2016","unstructured":"L\u00f3pez-Ib\u00e1\u00f1ez M, Dubois-Lacoste J, P\u00e9rez C\u00e1ceres L et al (2016) The irace package: iterated racing for automatic algorithm configuration. Oper Res Perspect 3:43\u201358. https:\/\/doi.org\/10.1016\/j.orp.2016.09.002","journal-title":"Oper Res Perspect"},{"issue":"3","key":"822_CR36","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1007\/s00291-011-0247-2","volume":"33","author":"P Maya Duque","year":"2011","unstructured":"Maya Duque P, S\u00f6rensen K (2011) A GRASP metaheuristic to improve accessibility after a disaster. OR Spectr 33(3):525\u2013542. https:\/\/doi.org\/10.1007\/s00291-011-0247-2","journal-title":"OR Spectr"},{"issue":"1","key":"822_CR37","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1016\/j.ejor.2015.06.026","volume":"248","author":"PA Maya Duque","year":"2016","unstructured":"Maya Duque PA, Dolinskaya IS, S\u00f6rensen K (2016) Network repair crew scheduling and routing for emergency relief distribution problem. Eur J Oper Res 248(1):272\u2013285. https:\/\/doi.org\/10.1016\/j.ejor.2015.06.026","journal-title":"Eur J Oper Res"},{"issue":"1","key":"822_CR38","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1016\/j.cor.2007.07.001","volume":"36","author":"J Mendes","year":"2009","unstructured":"Mendes J, Gon\u00e7alves J, Resende M (2009) A random key based genetic algorithm for the resource constrained project scheduling problem. Comput Oper Res 36(1):92\u2013109. https:\/\/doi.org\/10.1016\/j.cor.2007.07.001","journal-title":"Comput Oper Res"},{"issue":"5","key":"822_CR39","doi-asserted-by":"publisher","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","volume":"44","author":"A Mingozzi","year":"1998","unstructured":"Mingozzi A, Maniezzo V, Ricciardelli S et al (1998) An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Manag Sci 44(5):714\u2013729. https:\/\/doi.org\/10.1287\/mnsc.44.5.714","journal-title":"Manag Sci"},{"key":"822_CR40","doi-asserted-by":"publisher","unstructured":"Mora AM, Merelo JJ, Millan C et al (2007) Enhancing a MOACO for solving the bi-criteria pathfinding problem for a military unit in a realistic battlefield. In: Giacobini M (ed.) Applications of evolutionary computing. Springer, Berlin, Heidelberg, Lecture notes in computer science, pp. 712\u2013721. https:\/\/doi.org\/10.1007\/978-3-540-71805-5_77","DOI":"10.1007\/978-3-540-71805-5_77"},{"issue":"1","key":"822_CR41","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1023\/B:ANOR.0000039521.26237.62","volume":"131","author":"M Palpant","year":"2004","unstructured":"Palpant M, Artigues C, Michelon P (2004) LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search. Ann Oper Res 131(1):237\u2013257. https:\/\/doi.org\/10.1023\/B:ANOR.0000039521.26237.62","journal-title":"Ann Oper Res"},{"issue":"7","key":"822_CR42","doi-asserted-by":"publisher","first-page":"1517","DOI":"10.1007\/s11590-012-0553-x","volume":"7","author":"K Panchamgam","year":"2013","unstructured":"Panchamgam K, Xiong Y, Golden B et al (2013) The hierarchical traveling salesman problem. Optim Lett 7(7):1517\u20131524. https:\/\/doi.org\/10.1007\/s11590-012-0553-x","journal-title":"Optim Lett"},{"key":"822_CR43","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2022.07.005","author":"GC Pena","year":"2022","unstructured":"Pena GC, Santos AC, Prins C (2022) Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters. Eur J Oper Res. https:\/\/doi.org\/10.1016\/j.ejor.2022.07.005","journal-title":"Eur J Oper Res"},{"issue":"6","key":"822_CR44","doi-asserted-by":"publisher","first-page":"753","DOI":"10.1002\/tee.22300","volume":"11","author":"Y Ren","year":"2016","unstructured":"Ren Y, Tian G (2016) Emergency scheduling for forest fires subject to limited rescue team resources and priority disaster areas. IEEE J Trans Electr Electron Eng 11(6):753\u2013759. https:\/\/doi.org\/10.1002\/tee.22300","journal-title":"IEEE J Trans Electr Electron Eng"},{"key":"822_CR45","unstructured":"Reuters (2019) Over 5,250 tonnes of chemicals burned in Rouen, France, industrial fire. Reuters Oct., 2019. Available in: https:\/\/www.reuters.com\/article\/france-fire-rouen-idUSL5N26M68E. Accessed 12 Sep 2022"},{"issue":"3","key":"822_CR46","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1007\/s13675-016-0070-2","volume":"4","author":"CS Sakuraba","year":"2016","unstructured":"Sakuraba CS, Santos AC, Prins C et al (2016) Road network emergency accessibility planning after a major earthquake. EURO J Comput Optim 4(3):381\u2013402","journal-title":"EURO J Comput Optim"},{"issue":"3","key":"822_CR47","doi-asserted-by":"publisher","first-page":"528","DOI":"10.14488\/BJOPM.2019.v16.n3.a14","volume":"16","author":"AC Santos","year":"2019","unstructured":"Santos AC (2019) New trends and opportunities in post-disaster relief optimization problems. Braz J Oper Prod Manag 16(3):528. https:\/\/doi.org\/10.14488\/BJOPM.2019.v16.n3.a14","journal-title":"Braz J Oper Prod Manag"},{"key":"822_CR48","unstructured":"Seine-Maritime (2019) Incendie Lubrizol et NL Logistique du 26 septembre 2019 Dec., 2019. Available in: https:\/\/www.seine-maritime.gouv.fr\/Actualites\/Incendie-Lubrizol-et-NL-Logistique-du-26-septembre-2019\/Incendie-Lubrizol-et-NL-Logistique-du-26-septembre-2019. Accessed 6 Oct 2022"},{"key":"822_CR49","unstructured":"Seveso-III Directive (2018) The seveso-iii directive. Available in: https:\/\/ec.europa.eu\/environment\/seveso\/. Accessed 29 Oct 2021"},{"issue":"5","key":"822_CR50","doi-asserted-by":"publisher","first-page":"710","DOI":"10.1287\/mnsc.46.5.710.12044","volume":"46","author":"A Sprecher","year":"2000","unstructured":"Sprecher A (2000) Scheduling resource-constrained projects competitively at modest memory requirements. Manag Sci 46(5):710\u2013723. https:\/\/doi.org\/10.1287\/mnsc.46.5.710.12044","journal-title":"Manag Sci"},{"issue":"106","key":"822_CR51","doi-asserted-by":"publisher","first-page":"790","DOI":"10.1016\/j.cie.2020.106790","volume":"149","author":"EB Tirkolaee","year":"2020","unstructured":"Tirkolaee EB, Ayd\u0131n NS, Ranjbar-Bourani M et al (2020) A robust bi-objective mathematical model for disaster rescue units allocation and scheduling with learning effect. Comput Ind Eng 149(106):790. https:\/\/doi.org\/10.1016\/j.cie.2020.106790","journal-title":"Comput Ind Eng"},{"issue":"1","key":"822_CR52","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1023\/A:1010997814183","volume":"102","author":"P Tormos","year":"2001","unstructured":"Tormos P, Lova A (2001) A competitive heuristic solution technique for resource-constrained project scheduling. Ann Oper Res 102(1):65\u201381. https:\/\/doi.org\/10.1023\/A:1010997814183","journal-title":"Ann Oper Res"},{"key":"822_CR53","doi-asserted-by":"publisher","first-page":"1092","DOI":"10.1016\/j.ijdrr.2018.04.004","volume":"31","author":"R Vod\u00e1k","year":"2018","unstructured":"Vod\u00e1k R, B\u00edl M, K\u0159iv\u00e1nkov\u00e1 Z (2018) A modified ant colony optimization algorithm to increase the speed of the road network recovery process after disasters. Int J Disaster Risk Reduct 31:1092\u20131106","journal-title":"Int J Disaster Risk Reduct"},{"key":"822_CR54","doi-asserted-by":"publisher","unstructured":"Wang L, Wu P, Chu F (2020) A multi-objective emergency scheduling model for forest fires with priority areas. In: 2020 IEEE international conference on industrial engineering and engineering management (IEEM), pp. 610\u2013614, https:\/\/doi.org\/10.1109\/IEEM45057.2020.9309821","DOI":"10.1109\/IEEM45057.2020.9309821"},{"issue":"3","key":"822_CR55","doi-asserted-by":"publisher","first-page":"04014","DOI":"10.1061\/(ASCE)WR.1943-5452.0000460","volume":"141","author":"Q Wang","year":"2015","unstructured":"Wang Q, Guidolin M, Savic D et al (2015) Two-objective design of benchmark problems of a water distribution system via MOEAs: towards the best-known approximation of the true pareto front. J Water Resour Plan Manag 141(3):04014. https:\/\/doi.org\/10.1061\/(ASCE)WR.1943-5452.0000460","journal-title":"J Water Resour Plan Manag"},{"issue":"3","key":"822_CR56","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1016\/j.ejor.2013.10.029","volume":"235","author":"F Wex","year":"2014","unstructured":"Wex F, Schryen G, Feuerriegel S et al (2014) Emergency response in natural disaster management: allocation and scheduling of rescue units. Eur J Oper Res 235(3):697\u2013708. https:\/\/doi.org\/10.1016\/j.ejor.2013.10.029","journal-title":"Eur J Oper Res"},{"issue":"2","key":"822_CR57","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1002\/tee.22805","volume":"14","author":"P Wu","year":"2019","unstructured":"Wu P, Cheng J, Feng C (2019) Resource-constrained emergency scheduling for forest fires with priority areas: an efficient integer-programming approach. IEEJ Trans Electr Electron Eng 14(2):261\u2013270. https:\/\/doi.org\/10.1002\/tee.22805. (publisher: John Wiley & Sons Ltd)","journal-title":"IEEJ Trans Electr Electron Eng"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-025-00822-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00291-025-00822-1","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-025-00822-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,30]],"date-time":"2026-04-30T11:20:02Z","timestamp":1777548002000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00291-025-00822-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,7,8]]},"references-count":57,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2026,3]]}},"alternative-id":["822"],"URL":"https:\/\/doi.org\/10.1007\/s00291-025-00822-1","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,7,8]]},"assertion":[{"value":"18 December 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 April 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 July 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no Conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}