{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,4]],"date-time":"2025-04-04T07:46:07Z","timestamp":1743752767999},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2008,8,1]],"date-time":"2008-08-01T00:00:00Z","timestamp":1217548800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["New Gener. Comput."],"published-print":{"date-parts":[[2008,8]]},"DOI":"10.1007\/s00354-008-0048-6","type":"journal-article","created":{"date-parts":[[2008,9,10]],"date-time":"2008-09-10T09:53:04Z","timestamp":1221040384000},"page":"313-327","source":"Crossref","is-referenced-by-count":7,"title":["Double Layer ACO Algorithm for the Multi-Objective FJSSP"],"prefix":"10.1007","volume":"26","author":[{"given":"Li-Ning","family":"Xing","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ying-Wu","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ke-Wei","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,9,11]]},"reference":[{"issue":"1","key":"48_CR1","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/S0377-2217(97)00420-7","volume":"113","author":"M. Kolonko","year":"1999","unstructured":"Kolonko, M., \u201cSome new results on simulated annealing applied to the job shop scheduling problem,\u201d European Journal of Operational Research 113, 1, pp. 123\u2013136, 1999.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"48_CR2","first-page":"847","volume":"11","author":"D.W. Wu","year":"2005","unstructured":"Wu, D.W., Lu, T.D. and Liu, X.B., et al., \u201cParallel simulated annealing algorithm for solving job-shop scheduling problem,\u201d Computer Integrated Manufacturing Systems 11, 6, pp. 847\u2013850, 2005.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"2","key":"48_CR3","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0377-2217(99)00158-7","volume":"120","author":"F. Pezzella","year":"2000","unstructured":"Pezzella, F. and Merelli, E., \u201cA tabu search method guided by shifting bottleneck for the job shop scheduling problem,\u201d European Journal of Operational Research 120, 2, pp. 297\u2013310, 2000.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"48_CR4","first-page":"678","volume":"11","author":"X. Liang","year":"2005","unstructured":"Liang, X. and Huang, M. \u201cApplication of tabu search-parallel genetic algorithm for job-shop scheduling,\u201d Computer Integrated Manufacturing Systems 11, 5, pp. 678\u2013681, 2005.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"4","key":"48_CR5","doi-asserted-by":"crossref","first-page":"597","DOI":"10.1016\/S0360-8352(03)00077-9","volume":"45","author":"B.J. Park","year":"2003","unstructured":"Park, B.J., Choi, H.R. and Kim, H.S., \u201cA hybrid genetic algorithm for the job shop scheduling problems,\u201d Computers and Industrial Engineering 45, 4, pp. 597\u2013613, 2003.","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"48_CR6","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1016\/S0377-2217(03)00016-X","volume":"155","author":"D.C. Mattfeld","year":"2004","unstructured":"Mattfeld, D.C. and Bierwirth, C., \u201cAn efficient genetic algorithm for job shop scheduling with tardiness objectives,\u201d European Journal of Operational Research 155, 3, pp. 616\u2013630, 2004.","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"48_CR7","first-page":"1114","volume":"10","author":"X.M. Yang","year":"2004","unstructured":"Yang, X.M. and Zeng, J.C., \u201cMulti-individual-crossover genetic algorithm for job shop scheduling problem,\u201d Computer Integrated Manufacturing Systems 10, 9, pp. 1114\u20131119, 2004.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"1","key":"48_CR8","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.ejor.2004.03.012","volume":"167","author":"J.F. Goncalves","year":"2005","unstructured":"Goncalves, J.F., et al., \u201cA hybrid genetic algorithm for the job shop scheduling problem,\u201d European Journal of Operational Research 167, 1, pp. 77\u201395, 2005.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"48_CR9","doi-asserted-by":"crossref","first-page":"743","DOI":"10.1016\/j.cie.2004.12.008","volume":"48","author":"M. Watanabe","year":"2005","unstructured":"Watanabe, M., Ida, K. and Gen, M., \u201cA genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem,\u201d Computers and Industrial Engineering 48, 4, pp. 743\u2013752, 2005.","journal-title":"Computers and Industrial Engineering"},{"issue":"7","key":"48_CR10","first-page":"820","volume":"10","author":"C.Q. Wang","year":"2005","unstructured":"Wang, C.Q., Cao, Y.F. and Dai, G.Z., \u201cBi-directional convergence ACO for job-shop scheduling,\u201d Computer Integrated Manufacturing Systems 10, 7, pp. 820\u2013824, 2005.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"4","key":"48_CR11","doi-asserted-by":"crossref","first-page":"1030","DOI":"10.1016\/j.cor.2006.07.003","volume":"35","author":"K.L. Huang","year":"2008","unstructured":"Huang, K.L. and Liao, C.J., \u201cAnt colony optimization combined with taboo search for the job shop scheduling problem,\u201d Computers and Operations Research 35, 4, pp. 1030\u20131046, 2008.","journal-title":"Computers and Operations Research"},{"issue":"3","key":"48_CR12","first-page":"43","volume":"19","author":"X.H. Wang","year":"2001","unstructured":"Wang, X.H., Qiao, Q.L. and Wang, Z.O., \u201cA Method to Solve Job-shop Schedule Problems by Neural Network with Transient Chaos,\u201d System Engineering 19, 3, pp. 43\u201348, 2001.","journal-title":"System Engineering"},{"issue":"4","key":"48_CR13","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/S1474-0346(03)00005-3","volume":"16","author":"D.J. Fonseca","year":"2002","unstructured":"Fonseca, D.J. and Navaresse, D., \u201cArtificial neural networks for job shop simulation,\u201d Advanced Engineering Informatics 16, 4, pp. 241\u2013246, 2002.","journal-title":"Advanced Engineering Informatics"},{"issue":"1","key":"48_CR14","first-page":"47","volume":"7","author":"T. He","year":"2001","unstructured":"He T., Liu W.H., and Liang L.P., \u201cA Class of Job Shop Scheduling Based on the Evolutionary Algorithm,\u201d Computer Integrated Manufacturing Systems 7, 1, pp. 47\u201350, 2001.","journal-title":"Computer Integrated Manufacturing Systems"},{"issue":"1","key":"48_CR15","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.asoc.2004.03.013","volume":"5","author":"I.T. Tanev","year":"2004","unstructured":"Tanev, I.T., Uozumi, T. and Morotome, Y., \u201cHybrid evolutionary algorithmbased real-world flexible job shop scheduling problem: application service provider approach,\u201d Applied Soft Computing 5, 1, pp. 87\u2013100, 2004.","journal-title":"Applied Soft Computing"},{"issue":"2-4","key":"48_CR16","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/S0360-8352(02)00019-0","volume":"42","author":"M. Asano","year":"2002","unstructured":"Asano, M. and Ohta, H., \u201cA Heuristic for Job Shop Scheduling to Minimize Total Weighted Tardiness,\u201d Computers and Industrial Engineering 42, 2\u20134, pp. 137-147, 2002.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"48_CR17","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/S0925-5273(01)00231-6","volume":"77","author":"C.D. Tarantilis","year":"2002","unstructured":"Tarantilis, C.D. and Kiranoudis, C.T., \u201cA list-based threshold accepting method for job shop scheduling problems,\u201d International Journal of Production Economics 77, 2, pp. 159\u2013171, 2002.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"48_CR18","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/S0377-2217(02)00470-8","volume":"149","author":"H. Chen","year":"2003","unstructured":"Chen, H. and Luh, P.B., \u201cAn alternative framework to Lagrangian relaxation approach for job shop scheduling,\u201d European Journal of Operational Research 149, 3, pp. 499\u2013512, 2003.","journal-title":"European Journal of Operational Research"},{"issue":"12","key":"48_CR19","doi-asserted-by":"crossref","first-page":"2093","DOI":"10.1016\/S0305-0548(03)00243-0","volume":"31","author":"W.Q. Huang","year":"2004","unstructured":"Huang, W.Q. and Yin A.H., \u201cAn improved shifting bottleneck procedure for the job shop scheduling problem,\u201d Computers and Operations Research 31, 12, pp. 2093\u20132110, 2004.","journal-title":"Computers and Operations Research"},{"issue":"2","key":"48_CR20","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/j.ejor.2004.03.025","volume":"167","author":"K. Jansen","year":"2005","unstructured":"Jansen, K., Mastrolilli, M. and Solis-Oba R., \u201cApproximation schemes for job shop scheduling problems with controllable processing times,\u201d European Journal of Operational Research 167, 2, pp. 297\u2013319, 2005.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"48_CR21","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1007\/BF02238804","volume":"45","author":"P. Bruker","year":"1990","unstructured":"Bruker, P. and Schlie, R., \u201cJob-shop scheduling with multi-purpose machines,\u201d Computing 45, 4, pp. 369\u2013375, 1990.","journal-title":"Computing"},{"issue":"2","key":"48_CR22","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.cie.2005.01.018","volume":"48","author":"W.J. Xia","year":"2005","unstructured":"Xia, W.J. and Wu, Z.M., \u201cAn effective hybrid optimization approach for multiobjective flexible job-shop scheduling problems,\u201d Computers and Industrial Engineering 48, 2, pp. 409\u2013425, 2005.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"48_CR23","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/BF02023073","volume":"22","author":"P. Brandimarte","year":"1993","unstructured":"Brandimarte, P., \u201cRouting and scheduling in a flexible job shop by taboo search,\u201d Annals of Operations Research 22, 2, pp. 157\u2013183, 1993.","journal-title":"Annals of Operations Research"},{"issue":"4","key":"48_CR24","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1023\/A:1008183330452","volume":"11","author":"L.F. Tung","year":"1999","unstructured":"Tung, L.F., Li, L. and Nagi, R., \u201cMulti-objective scheduling for the hierarchical control of flexible manufacturing systems,\u201d The International Journal of Flexible Manufacturing Systems 11, 4, pp. 379\u2013409, 1999.","journal-title":"The International Journal of Flexible Manufacturing Systems"},{"issue":"1","key":"48_CR25","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","volume":"32","author":"I. Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S. and Borne, P., \u201cApproach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems,\u201d IEEE Transactions on Systems, Man, and Cybernetics, Part C 32, 1, pp. 1\u201313, 2002.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics, Part C"},{"issue":"3-5","key":"48_CR26","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0378-4754(02)00019-8","volume":"60","author":"I. Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S. and Borne, P., \u201cPareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic,\u201d Mathematics and Computers in Simulation 60, 3-5, pp. 245\u2013276, 2002.","journal-title":"Mathematics and Computers in Simulation"},{"key":"48_CR27","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1007\/BF01719451","volume":"15","author":"E. Hurink","year":"1994","unstructured":"Hurink, E., Jurisch, B. and Thole, M., \u201cTabu search for the job shop scheduling problem with multi-purpose machines,\u201d Operations Research Spektrum 15, pp. 205\u2013215, 1994.","journal-title":"Operations Research Spektrum"},{"issue":"1","key":"48_CR28","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.0.CO;2-Y","volume":"3","author":"M. Mastrolilli","year":"2002","unstructured":"Mastrolilli, M. and Gambardella, L.M., \u201cEffective neighborhood functions for the flexible job shop problem,\u201d Journal of Scheduling 3, 1, pp. 3\u201320, 2002.","journal-title":"Journal of Scheduling"},{"key":"48_CR29","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1023\/A:1018930406487","volume":"70","author":"S. Dauzere-Peres","year":"1997","unstructured":"Dauzere-Peres, S. and Paulli, J., \u201cAn integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search,\u201d Annals of Operations Research 70, pp. 281\u2013306, 1997.","journal-title":"Annals of Operations Research"},{"key":"48_CR30","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/0020-0255(83)90029-4","volume":"31","author":"R.R. Yager","year":"1983","unstructured":"Yager R.R., \u201cQuantifiers in the Formulation of Multiple Objective Decision Functions,\u201d Information Sciences 31, pp. 107\u2013139, 1983.","journal-title":"Information Sciences"},{"key":"48_CR31","doi-asserted-by":"crossref","first-page":"1527","DOI":"10.1016\/j.dss.2006.06.006","volume":"43","author":"D. Petrovic","year":"2007","unstructured":"Petrovic D., Duenas A. and Petrovic S., \u201cDecision support tool for multiobjective job shop scheduling problems with linguistically quantified decision functions,\u201d Decision Support Systems 43, pp. 1527\u20131538, 2007.","journal-title":"Decision Support Systems"},{"key":"48_CR32","doi-asserted-by":"crossref","DOI":"10.1007\/b99492","volume-title":"Ant colony optimization","author":"M. Dorigo","year":"2004","unstructured":"Dorigo M. and Stutzle T., Ant colony optimization, Cambridge, MA: MIT Press, 2004."},{"key":"48_CR33","doi-asserted-by":"crossref","unstructured":"Ho N.B., Tay J.C. and Lai E.M.K., \u201cAn Effective Architecture for Learning and Evolving Flexible Job-shop Schedules,\u201d European Journal of Operational Research 179, pp. 316\u2013333, 3007.","DOI":"10.1016\/j.ejor.2006.04.007"}],"container-title":["New Generation Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00354-008-0048-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00354-008-0048-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00354-008-0048-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T14:27:50Z","timestamp":1559053670000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00354-008-0048-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,8]]},"references-count":33,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2008,8]]}},"alternative-id":["48"],"URL":"https:\/\/doi.org\/10.1007\/s00354-008-0048-6","relation":{},"ISSN":["0288-3635","1882-7055"],"issn-type":[{"value":"0288-3635","type":"print"},{"value":"1882-7055","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,8]]}}}