{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T10:40:33Z","timestamp":1777372833430,"version":"3.51.4"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,10,4]],"date-time":"2012-10-04T00:00:00Z","timestamp":1349308800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2013,4]]},"DOI":"10.1007\/s00500-012-0931-4","type":"journal-article","created":{"date-parts":[[2012,10,3]],"date-time":"2012-10-03T08:53:14Z","timestamp":1349254394000},"page":"617-624","source":"Crossref","is-referenced-by-count":44,"title":["Uncertain aggregate production planning"],"prefix":"10.1007","volume":"17","author":[{"given":"Yufu","family":"Ning","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianjun","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Limei","family":"Yan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,10,4]]},"reference":[{"issue":"9","key":"931_CR1","doi-asserted-by":"crossref","first-page":"1124","DOI":"10.1016\/j.advengsoft.2010.07.002","volume":"41","author":"A Baykasoglu","year":"2010","unstructured":"Baykasoglu A, Gocken T (2010) Multi-objective aggregate production planning with fuzzy parameters. Adv Eng Softw 41(9):1124\u20131131","journal-title":"Adv Eng Softw"},{"issue":"10","key":"931_CR2","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/mnsc.16.10.B614","volume":"16","author":"G Bergstrom","year":"1970","unstructured":"Bergstrom G, Smith B (1970) Multi-item production planning-an extension of the HMMS rules. Manag Sci 16(10):614\u2013629","journal-title":"Manag Sci"},{"issue":"5","key":"931_CR3","doi-asserted-by":"crossref","first-page":"999","DOI":"10.1287\/opre.32.5.999","volume":"32","author":"G Bitran","year":"1984","unstructured":"Bitran G, and Yanassee H (1984) Deterministic approximations to stochastic production problems. Oper Res 32(5):999\u20131018","journal-title":"Oper Res"},{"issue":"3","key":"931_CR4","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1109\/TSMCA.2003.817032","volume":"33","author":"R Fung","year":"2003","unstructured":"Fung R, Tang J, Wang D (2003) Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities. IEEE Trans Syst Man Cybern Part A Syst Hum 33(3):302\u2013313","journal-title":"IEEE Trans Syst Man Cybern Part A Syst Hum"},{"issue":"11","key":"931_CR5","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1287\/mnsc.17.11.783","volume":"17","author":"W Hausman","year":"1971","unstructured":"Hausman W, Mcclain J (1971) A note on the Bergstrom-Smith multi-item production planning model. Manag Sci 17(11):783\u2013785","journal-title":"Manag Sci"},{"issue":"1","key":"931_CR6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/mnsc.2.1.1","volume":"2","author":"C Holt","year":"1955","unstructured":"Holt C, Modigliani F, Simon H (1955) A linear decision rule for production and employment scheduling. Manag Sci 2(1):1\u201330","journal-title":"Manag Sci"},{"issue":"1","key":"931_CR7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0020-0255(78)90019-1","volume":"15","author":"H Kwakernaak","year":"1978","unstructured":"Kwakernaak H (1978) Fuzzy random variables-I: definition and theorems. Inf Sci 15(1):1\u201329","journal-title":"Inf Sci"},{"issue":"3","key":"931_CR8","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/0020-0255(79)90020-3","volume":"17","author":"H Kwakernaak","year":"1979","unstructured":"Kwakernaak H (1979) Fuzzy random variables-II: algorithms and examples for the discrete case. Inf Sci 17(3):253\u2013278","journal-title":"Inf Sci"},{"issue":"10","key":"931_CR9","first-page":"6569","volume":"8","author":"X Li","year":"2012","unstructured":"Li X, Chien C, Li L, Gao ZY, Yang L (2012a) Energy-constraint operation strategy for high-speed railway. Int J Innov Comput Inf Control 8(10):6569\u20136583","journal-title":"Int J Innov Comput Inf Control"},{"key":"931_CR10","doi-asserted-by":"crossref","unstructured":"Li X, Wang D, Li K, Gao Z (2012b) A green train scheduling model and fuzzy multi-objective optimization algorithm. Appl Math Model. doi: 10.1016\/j.apm.2012.04.046","DOI":"10.1016\/j.apm.2012.04.046"},{"issue":"5","key":"931_CR11","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1109\/91.963757","volume":"9","author":"B Liu","year":"2001","unstructured":"Liu B (2001a) Fuzzy random chance-constrained programming. IEEE Trans Fuzzy Syst 9(5):713\u2013720","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"5","key":"931_CR12","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1109\/91.963758","volume":"9","author":"B Liu","year":"2001","unstructured":"Liu B (2001b) Fuzzy random dependent-chance programming. IEEE Trans Fuzzy Syst 9(5):721\u2013726","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"931_CR13","doi-asserted-by":"crossref","unstructured":"Liu B (2007) Uncertainty theory, 2nd edn. Springer, Berlin","DOI":"10.1007\/978-3-540-73165-8_5"},{"issue":"1","key":"931_CR14","first-page":"3","volume":"3","author":"B Liu","year":"2009","unstructured":"Liu B (2009a) Some research problems in uncertainty theory. J Uncertain Syst 3(1):3\u201310","journal-title":"J Uncertain Syst"},{"key":"931_CR15","doi-asserted-by":"crossref","unstructured":"Liu B (2009b) Theory and practice of uncertain programming, 2nd edn. Springer, Berlin","DOI":"10.1007\/978-3-540-89484-1"},{"key":"931_CR16","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-13959-8","volume-title":"Uncertainty theory: a branch of mathematics for modeling human uncertainty","author":"B Liu","year":"2010","unstructured":"Liu B (2010a) Uncertainty theory: a branch of mathematics for modeling human uncertainty. Springer, Berlin"},{"issue":"3","key":"931_CR17","first-page":"163","volume":"4","author":"B Liu","year":"2010","unstructured":"Liu B (2010b) Uncertain risk analysis and uncertain reliability analysis. J Uncertain Syst 4(3):163\u2013170","journal-title":"J Uncertain Syst"},{"issue":"1","key":"931_CR18","first-page":"3","volume":"6","author":"B Liu","year":"2012","unstructured":"Liu B (2012) Why is there a need for uncertainty theory? J Uncertain Syst 6(1):3\u201310","journal-title":"J Uncertain Syst"},{"issue":"2","key":"931_CR19","first-page":"336","volume":"8","author":"J Liu","year":"2011","unstructured":"Liu J (2011) Uncertain comprehensive evaluation method. J Inf Comput Sci 8(2):336\u2013344","journal-title":"J Inf Comput Sci"},{"key":"931_CR20","unstructured":"Liu Y, Chen XW (2012) Uncertain currency model and currency option pricing. http:\/\/orsc.edu.cn\/online\/091010.pdf"},{"issue":"3","key":"931_CR21","first-page":"181","volume":"4","author":"Y Liu","year":"2010","unstructured":"Liu Y, and Ha MH (2010) Expected value of function of uncertain variables. J Uncertain Syst 4(3):181\u2013186","journal-title":"J Uncertain Syst"},{"issue":"5","key":"931_CR22","first-page":"312","volume":"2","author":"Y Ning","year":"2006","unstructured":"Ning Y, Tang W, and Zhao R (2006) Multiproduct aggregate production planning in fuzzy random environments. World J Model Simul 2(5):312\u2013321","journal-title":"World J Model Simul"},{"issue":"1","key":"931_CR23","doi-asserted-by":"crossref","first-page":"1256","DOI":"10.1016\/j.eswa.2011.07.134","volume":"39","author":"R Ramezanian","year":"2012","unstructured":"Ramezanian R, Rahmani D, and Barzinpour F (2012) An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search. Expert Syst Appl 39(1):1256\u20131263","journal-title":"Expert Syst Appl"},{"issue":"2","key":"931_CR24","first-page":"280","volume":"8","author":"LX Rong","year":"2011","unstructured":"Rong LX (2011) Two new uncertainty programming models of inventory with uncertain costs. J Inf Comput Sci 8(2):280\u2013288","journal-title":"J Inf Comput Sci"},{"issue":"3","key":"931_CR25","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/S0377-2217(00)00196-X","volume":"133","author":"R Wang","year":"2001","unstructured":"Wang R, and Fang H (2001) Aggregate production planning with multiple objectives in a fuzzy environment. Eur J Oper Res 133(3):521\u2013536","journal-title":"Eur J Oper Res"},{"issue":"3","key":"931_CR26","doi-asserted-by":"crossref","first-page":"328","DOI":"10.1016\/j.ijpe.2004.09.011","volume":"98","author":"R Wang","year":"2005","unstructured":"Wang R, and Liang T (2005) Applying possibilistic linear programming to aggregate production planning. Int J Prod Econ 98(3):328\u2013341","journal-title":"Int J Prod Econ"},{"issue":"8","key":"931_CR27","first-page":"76","volume":"3","author":"LM Yan","year":"2009","unstructured":"Yan LM (2009) Optimal portfolio selection models with uncertain returns. Modern Appl Sci 3(8):76\u201381","journal-title":"Modern Appl Sci"},{"issue":"3","key":"931_CR28","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1109\/TFUZZ.2008.924198","volume":"17","author":"L Yang","year":"2009","unstructured":"Yang L, Li K, Gao Z (2009) Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Trans Fuzzy Syst 17(3):617\u2013629","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"931_CR29","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1016\/j.omega.2011.12.001","volume":"40","author":"L Yang","year":"2012","unstructured":"Yang L, Gao Z, Li K, Li X (2012) Optimizing trains movement on a railway network. Omega Int J Manag Sci 40:619\u2013633","journal-title":"Omega Int J Manag Sci"},{"issue":"2","key":"931_CR30","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1016\/j.cie.2011.10.016","volume":"62","author":"R Zhang","year":"2012","unstructured":"Zhang R, Zhang L, Xiao Y, Kaku I (2012) The activity-based aggregate production planning with capacity expansion in manufacturing systems. Comput Ind Eng 62(2):491\u2013503","journal-title":"Comput Ind Eng"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-012-0931-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00500-012-0931-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-012-0931-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,4]],"date-time":"2019-07-04T11:10:24Z","timestamp":1562238624000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00500-012-0931-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10,4]]},"references-count":30,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2013,4]]}},"alternative-id":["931"],"URL":"https:\/\/doi.org\/10.1007\/s00500-012-0931-4","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,10,4]]}}}