{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T03:27:46Z","timestamp":1780457266849,"version":"3.54.1"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,10,5]],"date-time":"2012-10-05T00:00:00Z","timestamp":1349395200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2013,4]]},"DOI":"10.1007\/s00500-012-0934-1","type":"journal-article","created":{"date-parts":[[2012,10,4]],"date-time":"2012-10-04T11:33:45Z","timestamp":1349350425000},"page":"605-616","source":"Crossref","is-referenced-by-count":28,"title":["Rescheduling trains with scenario-based fuzzy recovery time representation on two-way double-track railways"],"prefix":"10.1007","volume":"17","author":[{"given":"Lixing","family":"Yang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xuesong","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ziyou","family":"Gao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2012,10,5]]},"reference":[{"issue":"(1","key":"934_CR1","first-page":"65","volume":"144","author":"V Cacchiani","year":"2012","unstructured":"Cacchiani V, Caprara A, Fischetti M (2012) A Lagrangian heuristic for robustness with an application to train timetabling. Transp Sci 144((1):65\u201373","journal-title":"Transp Sci"},{"key":"934_CR2","unstructured":"Caprara A, Galli L, Kroon L, Maroti G, Toth P (2010) Robust Train routing and online re-scheduling. In: Proceedings of 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS\u201910), pp 24\u201333"},{"issue":"(1","key":"934_CR3","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/S0191-2615(03)00006-7","volume":"38","author":"MJ Dorfman","year":"2004","unstructured":"Dorfman MJ, Medanic J (2004) Scheduling trains on a railway network using a discrete event model of railway traffic. Transp Res B: Methodological 38((1):81\u201398","journal-title":"Transp Res B: Methodological"},{"key":"934_CR4","unstructured":"Fischetti M, Salvagnin D, Zanette A (2007) Fast approaches to robust railway timetabling. In: Proceedings of 7th workshop on algorithmic approaches for transportation modeling, optimization, and systems, pp 142\u2013157"},{"issue":"2","key":"934_CR5","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1007\/s00500-008-0310-3","volume":"13","author":"J Gao","year":"2009","unstructured":"Gao J, Liu ZQ, Shen P (2009) On characterization of credibilistic equilibria of fuzzy-payoff two-player zero-sum game. Soft Comput 13(2):127\u2013132","journal-title":"Soft Comput"},{"issue":"4","key":"934_CR6","first-page":"107","volume":"8","author":"J Gao","year":"2011","unstructured":"Gao J, Zhang Q, Shen P (2011) Coalitional game with fuzzy payoffs and credibilistic Shapley value. Iran J Fuzzy Syst 8(4):107\u2013117","journal-title":"Iran J Fuzzy Syst"},{"issue":"(10","key":"934_CR7","doi-asserted-by":"crossref","first-page":"927","DOI":"10.1016\/j.trb.2004.02.004","volume":"38","author":"K Ghoseiri","year":"2004","unstructured":"Ghoseiri K, Szidarovszky F, Asgharpour MJ (2004) A multi-objective train scheduling model and solution. Transp Res B: Methodological 38((10):927\u2013952","journal-title":"Transp Res B: Methodological"},{"issue":"2","key":"934_CR8","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1016\/0191-2615(95)00022-4","volume":"30","author":"A Higgins","year":"1996","unstructured":"Higgins A, Kozan E, Ferreira L (1996) Optimal scheduling of trains on a single line track. Transp Res B: Methodological 30(2):147\u2013161","journal-title":"Transp Res B: Methodological"},{"issue":"3","key":"934_CR9","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1016\/S0305-0548(96)00042-1","volume":"24","author":"A Higgins","year":"1997","unstructured":"Higgins A, Kozan E, Ferreira L (1997) Modelling the number and location of siding on a single line railway. Comput Oper Res 24(3):209\u2013220","journal-title":"Comput Oper Res"},{"key":"934_CR10","unstructured":"Iida Y (1988) Timetable preparation by A.I. approach. In: Proceedings of European simulation multiconference, Nice, France, pp 163\u2013168"},{"key":"934_CR11","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1287\/trsc.25.1.46","volume":"25","author":"D Jovanovic","year":"1991","unstructured":"Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46\u201364","journal-title":"Transp Sci"},{"key":"934_CR12","doi-asserted-by":"crossref","unstructured":"Li F, Gao Z, Li K, Yang L (2008) Efficient scheduling of railway traffic based on global information of train. Transp Res B: Methodological 42:1008\u20131030","DOI":"10.1016\/j.trb.2008.03.003"},{"issue":"4","key":"934_CR13","first-page":"77","volume":"8","author":"X Li","year":"2011","unstructured":"Li X, Ralescu D, Tang T (2011) Fuzzy train energy consumption minimization model and algorithm. Iranian J Fuzzy Syst 8(4):77\u201391","journal-title":"Iranian J Fuzzy Syst"},{"issue":"10","key":"934_CR14","first-page":"6569","volume":"8","author":"X Li","year":"2012","unstructured":"Li X, Chien C, Li L, Gao ZY, Yang L (2012a) Energy-constraint operation strategy for high-speed railway. Int J Innov Comput Inf Control 8(10):6569\u20136583","journal-title":"Int J Innov Comput Inf Control"},{"key":"934_CR15","doi-asserted-by":"crossref","unstructured":"Li X, Wang D, Li K, Gao Z (2012b) A green train scheduling model and fuzzy multi-objective optimization algorithm. Appl Math Model. doi: 10.1016\/j.apm.2012.04.046","DOI":"10.1016\/j.apm.2012.04.046"},{"key":"934_CR17","unstructured":"Liu B (2004) Uncertainty theory: an introduction to its axiomatic foundations. Springer, Berlin"},{"issue":"4","key":"934_CR16","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1109\/TFUZZ.2002.800692","volume":"10","author":"B Liu","year":"2002","unstructured":"Liu B, Liu YK (2002) Expected value of fuzzy variable and fuzzy expected value model. IEEE Trans Fuzzy Syst 10(4):445\u2013450","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"934_CR18","doi-asserted-by":"crossref","first-page":"1080","DOI":"10.1016\/j.trb.2011.05.001","volume":"45","author":"L Meng","year":"2011","unstructured":"Meng L, Zhou X (2011) Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach. Transp Res B: Methodological 45:1080\u20131102","journal-title":"Transp Res B: Methodological"},{"key":"934_CR19","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/0165-0114(78)90011-8","volume":"1","author":"S Nahmias","year":"1978","unstructured":"Nahmias S (1978) Fuzzy variable. Fuzzy Sets Syst 1:97\u2013110","journal-title":"Fuzzy Sets Syst"},{"issue":"7","key":"934_CR20","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1016\/S0191-2615(99)00004-1","volume":"33","author":"I Sahin","year":"1999","unstructured":"Sahin I (1999) Railway traffic control and train scheduling based on inter-train conflict management. Transp Res B: Methodological 33(7):511\u2013534","journal-title":"Transp Res B: Methodological"},{"issue":"4","key":"934_CR21","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1007\/s00500-010-0632-9","volume":"15","author":"P Shen","year":"2011","unstructured":"Shen P, Gao J (2011) Coalitional game with fuzzy information and credibilistic core. Soft Comput 15(4):781\u2013786","journal-title":"Soft Comput"},{"issue":"3","key":"934_CR22","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1109\/TFUZZ.2008.924198","volume":"17","author":"L Yang","year":"2009","unstructured":"Yang L, Li K, Gao Z (2009) Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Trans Fuzzy Syst 17(3):617\u2013629","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"934_CR23","doi-asserted-by":"crossref","first-page":"1003","DOI":"10.1080\/03052151003596717","volume":"42","author":"L Yang","year":"2010","unstructured":"Yang L, Gao Z, Li K (2010) Passenger train scheduling on single or partially double lines railway with stochastic information. Eng Optim 42:1003\u20131022","journal-title":"Eng Optim"},{"key":"934_CR24","first-page":"39","volume":"8","author":"L Yang","year":"2011","unstructured":"Yang L, Li X, Gao Z, Li K (2011a) A fuzzy minimum risk model for the railway transportation planning problem. Iranian J Fuzzy Syst 8:39\u201360","journal-title":"Iranian J Fuzzy Syst"},{"key":"934_CR25","doi-asserted-by":"crossref","first-page":"778","DOI":"10.1016\/j.asoc.2009.12.039","volume":"11","author":"L Yang","year":"2011","unstructured":"Yang L, Gao Z, Li K (2011b) Railway freight transportation planning with mixed uncertainty of randomness and fuzziness. Appl Soft Comput 11:778\u2013792","journal-title":"Appl Soft Comput"},{"key":"934_CR26","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1016\/j.omega.2011.12.001","volume":"40","author":"L Yang","year":"2012","unstructured":"Yang L, Li K, Gao Z, Li X (2012) Optimizing trains movement on a railway network. Omega: Int J Manag Sci 40:619\u2013633","journal-title":"Omega: Int J Manag Sci"},{"key":"934_CR27","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh LA (1965) Fuzzy sets. Inf Control 8:338\u2013353","journal-title":"Inf Control"},{"key":"934_CR28","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/0165-0114(78)90029-5","volume":"1","author":"LA Zadeh","year":"1978","unstructured":"Zadeh LA (1978) Fuzzy sets as a basis for a theory possibility. Fuzzy Sets Syst 1:3\u201328","journal-title":"Fuzzy Sets Syst"},{"issue":"3","key":"934_CR29","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/j.trb.2006.05.003","volume":"41","author":"X Zhou","year":"2007","unstructured":"Zhou X, Zhong M (2007) Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transp Res B: Methodological 41(3):320\u2013341","journal-title":"Transp Res B: Methodological"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-012-0934-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00500-012-0934-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-012-0934-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T01:40:11Z","timestamp":1559094011000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00500-012-0934-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10,5]]},"references-count":29,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2013,4]]}},"alternative-id":["934"],"URL":"https:\/\/doi.org\/10.1007\/s00500-012-0934-1","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,10,5]]}}}