{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T17:16:09Z","timestamp":1770484569984,"version":"3.49.0"},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2015,3,19]],"date-time":"2015-03-19T00:00:00Z","timestamp":1426723200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s00500-015-1647-z","type":"journal-article","created":{"date-parts":[[2015,3,18]],"date-time":"2015-03-18T09:08:20Z","timestamp":1426669700000},"page":"2383-2391","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":33,"title":["Chance-constrained model for uncertain job shop scheduling problem"],"prefix":"10.1007","volume":"20","author":[{"given":"Jiayu","family":"Shen","sequence":"first","affiliation":[]},{"given":"Yuanguo","family":"Zhu","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,3,19]]},"reference":[{"issue":"2","key":"1647_CR1","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1080\/00207546708929772","volume":"6","author":"S Ashour","year":"1967","unstructured":"Ashour S (1967) A decomposition approach for the machine scheduling problem. Int J Prod Res 6(2):109\u2013122","journal-title":"Int J Prod Res"},{"issue":"1","key":"1647_CR2","first-page":"89","volume":"8","author":"K Aphirak","year":"2012","unstructured":"Aphirak K, Sirikarn C, Thatchai T, Peeraya T, Warattapop C, Pupong P (2012) Application of firefly algorithm and its parameter setting for job shop scheduling. J Ind Technol 8(1):89\u201397","journal-title":"J Ind Technol"},{"issue":"8\u20139","key":"1647_CR3","first-page":"847","volume":"13","author":"Q Bin","year":"2009","unstructured":"Bin Q, Ling W, De Xian H, Xiong W (2009) Multi-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution. Soft Comput 13(8\u20139):847\u2013869","journal-title":"Soft Comput"},{"issue":"1","key":"1647_CR4","first-page":"360","volume":"144","author":"C Binchao","year":"2013","unstructured":"Binchao C, Timothy I (2013) A flexible dispatching rule for minimizing tardiness in job shop scheduling. Int J Prod Econ 144(1):360\u2013365","journal-title":"Int J Prod Econ"},{"issue":"3","key":"1647_CR5","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1016\/0167-6377(86)90084-2","volume":"5","author":"O Boxma","year":"1986","unstructured":"Boxma O, Forst F (1986) Minimizing the expected weighted number of tardy jobs in stochastic flow shops. Oper Res Lett 5(3):119\u2013126","journal-title":"Oper Res Lett"},{"key":"1647_CR6","volume-title":"Theory of scheduling","author":"R Conway","year":"1967","unstructured":"Conway R, Maxwell W, Miller L (1967) Theory of scheduling. Addison-Wesltey, Massachusetts"},{"key":"1647_CR7","author":"C Ding","year":"2014","unstructured":"Ding C, Zhu Y (2014) Two empirical uncertain models for project scheduling problem. J Oper Res Soc. doi: 10.1057\/jors.2014.115","journal-title":"J Oper Res Soc"},{"issue":"11","key":"1647_CR8","doi-asserted-by":"crossref","first-page":"2201","DOI":"10.1007\/s00500-013-1194-4","volume":"18","author":"S Ding","year":"2014","unstructured":"Ding S (2014) Uncertain minimum cost flow problem. Soft Comput 18(11):2201\u20132207","journal-title":"Soft Comput"},{"issue":"1","key":"1647_CR9","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1007\/BF01580393","volume":"11","author":"M Fisher","year":"1976","unstructured":"Fisher M (1976) A dual algorithm for the one-machine scheduling problem. Math Program 11(1):229\u2013251","journal-title":"Math Program"},{"issue":"6","key":"1647_CR10","doi-asserted-by":"crossref","first-page":"2592","DOI":"10.1016\/j.apm.2011.09.042","volume":"36","author":"Y Gao","year":"2012","unstructured":"Gao Y (2012) Uncertain models for single facility location problems on networks. Appl Math Model 36(6):2592\u20132599","journal-title":"Appl Math Model"},{"key":"1647_CR11","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.ins.2014.10.048","volume":"296","author":"Y Gao","year":"2015","unstructured":"Gao Y, Yang L, Li S, Kar S (2015) On distribution function of the diameter in uncertain graph. Inf Sci 296:61\u201374","journal-title":"Inf Sci"},{"issue":"2","key":"1647_CR12","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R Graham","year":"1979","unstructured":"Graham R, Lawler E, Lensra J, Rinnooy K (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discret Math 5(2):287\u2013326","journal-title":"Ann Discret Math"},{"issue":"10","key":"1647_CR13","doi-asserted-by":"crossref","first-page":"1144","DOI":"10.1287\/mnsc.23.10.1144","volume":"23","author":"T Hodegson","year":"1977","unstructured":"Hodegson T (1977) A note on single machine sequencing with random processing time. Manag Sci 23(10):1144\u20131146","journal-title":"Manag Sci"},{"issue":"3","key":"1647_CR14","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/0165-0114(92)90372-B","volume":"46","author":"H Ishii","year":"1992","unstructured":"Ishii H, Tada M, Masuda T (1992) Two scheduling problems with fuzzy due-dates. Fuzzy Sets Syst 46(3):339\u2013347","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"1647_CR15","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S Johnson","year":"1954","unstructured":"Johnson S (1954) Optimal two and three-stage production schedules with setup times included. Nav Res Logist Q 1(1):61\u201368","journal-title":"Nav Res Logist Q"},{"key":"1647_CR16","doi-asserted-by":"crossref","unstructured":"Kennedy J, Eberhart R (1995) Particle swarm optimization. In: Proceedings of the 1995 IEEE international conference on neural networks, vol 4, 1942\u20131948","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"6","key":"1647_CR17","doi-asserted-by":"crossref","first-page":"967","DOI":"10.1016\/j.cor.2010.09.015","volume":"38","author":"B Kerem","year":"2011","unstructured":"Kerem B (2011) A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem. Comput Oper Res 38(6):967\u2013983","journal-title":"Comput Oper Res"},{"issue":"12","key":"1647_CR18","doi-asserted-by":"crossref","first-page":"2097","DOI":"10.1007\/s00500-012-0880-y","volume":"16","author":"\u00c1 Miguel","year":"2012","unstructured":"Miguel \u00c1, In\u00e9s G, Camino R, Ramiro V (2012) An efficient hybrid evolutionary algorithm for scheduling with setup times and weighted tardiness minimization. Soft Comput 16(12):2097\u20132113","journal-title":"Soft Comput"},{"issue":"5","key":"1647_CR19","doi-asserted-by":"crossref","first-page":"544","DOI":"10.1287\/mnsc.19.5.544","volume":"19","author":"E Lawler","year":"1973","unstructured":"Lawler E (1973) Optimal sequencing of a single machine subject to precedence constraints. Manag Sci 19(5):544\u2013546","journal-title":"Manag Sci"},{"key":"1647_CR20","unstructured":"Lei D (2007) Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. Int J Adv Manuf Technol 37(1):157C165"},{"key":"1647_CR21","volume-title":"Uncertainty theory","author":"B Liu","year":"2007","unstructured":"Liu B (2007) Uncertainty theory, 2nd edn. Springer-Verlag, Berlin","edition":"2"},{"key":"1647_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-89484-1","volume-title":"Theory and practice of uncertain programming","author":"B Liu","year":"2009","unstructured":"Liu B (2009) Theory and practice of uncertain programming, 2nd edn. Springer-Verlag, Berlin","edition":"2"},{"key":"1647_CR23","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-13959-8","volume-title":"Uncertainty theory: a branch of mathematics for modeling human uncertainty","author":"B Liu","year":"2010","unstructured":"Liu B (2010) Uncertainty theory: a branch of mathematics for modeling human uncertainty. Springer-Verlag, Berlin"},{"issue":"2","key":"1647_CR24","first-page":"72","volume":"14","author":"I Nabeshima","year":"1971","unstructured":"Nabeshima I (1971) General scheduling algorithms with applications to parallel scheduling and multiprogramming scheduling. J Oper Res Soc Jpn 14(2):72\u201399","journal-title":"J Oper Res Soc Jpn"},{"issue":"2","key":"1647_CR25","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/0165-0114(79)90022-8","volume":"2","author":"H Prade","year":"1979","unstructured":"Prade H (1979) Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets Syst 2(2):153\u2013165","journal-title":"Fuzzy Sets Syst"},{"issue":"4","key":"1647_CR26","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.ins.2003.05.012","volume":"1","author":"J Peng","year":"2004","unstructured":"Peng J, Liu B (2004) Parallel machine scheduling models with fuzzy processing times. Inf Sci 1(4):49\u201366","journal-title":"Inf Sci"},{"issue":"3","key":"1647_CR27","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1287\/opre.31.3.559","volume":"31","author":"M Pinedo","year":"1983","unstructured":"Pinedo M (1983) Stochastic scheduling with release dates and due dates. Oper Res 31(3):559\u2013572","journal-title":"Oper Res"},{"key":"1647_CR28","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/j.knosys.2011.11.018","volume":"27","author":"Z Rui","year":"2012","unstructured":"Rui Z, Shiji S, Cheng W (2012) A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem. Knowl-Based Syst 27:393\u2013406","journal-title":"Knowl-Based Syst"},{"issue":"2","key":"1647_CR29","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1016\/0377-2217(91)90249-U","volume":"51","author":"S Sarin","year":"1991","unstructured":"Sarin S, Erel E, Steiner C (1991) Sequencing jobs on a single machine with a common due date and stochastic processing times. Eur J Oper Res 51(2):188\u2013198","journal-title":"Eur J Oper Res"},{"issue":"4","key":"1647_CR30","doi-asserted-by":"crossref","first-page":"463","DOI":"10.1016\/j.cie.2005.06.005","volume":"49","author":"S Thiagarajan","year":"2005","unstructured":"Thiagarajan S, Rajendran C (2005) Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Comput Ind Eng 49(4):463\u2013503","journal-title":"Comput Ind Eng"},{"key":"1647_CR31","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1007\/978-3-642-04944-6_14","volume":"5972","author":"X Yang","year":"2009","unstructured":"Yang X (2009) Firefly algorithms for multimodal optimization. Lect Notes Comput Sci 5972:169\u2013178","journal-title":"Lect Notes Comput Sci"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-015-1647-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00500-015-1647-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-015-1647-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T01:43:46Z","timestamp":1559094226000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00500-015-1647-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3,19]]},"references-count":31,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["1647"],"URL":"https:\/\/doi.org\/10.1007\/s00500-015-1647-z","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3,19]]}}}