{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,26]],"date-time":"2026-01-26T16:00:43Z","timestamp":1769443243137,"version":"3.49.0"},"reference-count":47,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2019,3,15]],"date-time":"2019-03-15T00:00:00Z","timestamp":1552608000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,3,15]],"date-time":"2019-03-15T00:00:00Z","timestamp":1552608000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/100009910","name":"Naval Postgraduate School","doi-asserted-by":"publisher","award":["N00244-12-1-0069"],"award-info":[{"award-number":["N00244-12-1-0069"]}],"id":[{"id":"10.13039\/100009910","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2020,1]]},"DOI":"10.1007\/s00500-019-03914-7","type":"journal-article","created":{"date-parts":[[2019,3,15]],"date-time":"2019-03-15T14:03:14Z","timestamp":1552658594000},"page":"351-366","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Scheduling multi-component maintenance with a greedy heuristic local search algorithm"],"prefix":"10.1007","volume":"24","author":[{"given":"Seyedmohsen","family":"Hosseini","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sifat","family":"Kalam","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kash","family":"Barker","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jose E.","family":"Ramirez-Marquez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,3,15]]},"reference":[{"key":"3914_CR1","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1016\/j.asoc.2014.03.015","volume":"21","author":"M Abirami","year":"2015","unstructured":"Abirami M, Ganesan S, Subramanian S, Anandhakumar R (2015) Source and transmission line maintenance outage scheduling in a power system using teaching learning based optimization algorithm. Appl Soft Comput 21:72\u201383","journal-title":"Appl Soft Comput"},{"issue":"4","key":"3914_CR2","doi-asserted-by":"crossref","first-page":"813","DOI":"10.1007\/s00521-014-1752-4","volume":"26","author":"A Al Khaled","year":"2015","unstructured":"Al Khaled A, Hosseini S (2015) Fuzzy adaptive imperialist competitive algorithm for global optimization. Neural Comput Appl 26(4):813\u2013825","journal-title":"Neural Comput Appl"},{"issue":"1","key":"3914_CR3","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/S0925-5273(02)00380-8","volume":"84","author":"B Al-Najjar","year":"2003","unstructured":"Al-Najjar B, Alsyouf I (2003) Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. Int J Prod Econ 84(1):85\u2013100","journal-title":"Int J Prod Econ"},{"key":"3914_CR4","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1016\/j.cie.2016.12.038","volume":"105","author":"JE Arroyo","year":"2017","unstructured":"Arroyo JE, Leung Y-T (2017) An effective iterated greedy algorithm for scheduling unrelated parallel batch machines with non-identical capacities and unequal ready times. Comput Ind Eng 105:84\u2013100","journal-title":"Comput Ind Eng"},{"key":"3914_CR5","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/j.asoc.2015.01.003","volume":"29","author":"J Behnamian","year":"2015","unstructured":"Behnamian J, Fatemi Ghomi SMT (2015) Minimizing cost-related objective in synchronous scheduling of parallel factories in the virtual production network. Appl Soft Comput 29:221\u2013232","journal-title":"Appl Soft Comput"},{"issue":"1","key":"3914_CR6","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/S0951-8320(00)00047-8","volume":"70","author":"M Bevilacqua","year":"2000","unstructured":"Bevilacqua M, Braglia M (2000) The analytic hierarchy process applied to maintenance strategy selection. Reliab Eng Syst Saf 70(1):71\u201383","journal-title":"Reliab Eng Syst Saf"},{"key":"3914_CR7","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ress.2014.08.002","volume":"132","author":"VuH Canh","year":"2014","unstructured":"Canh VuH, Barros A, Berenguer C (2014) Maintenance grouping strategy for multi component systems with dynamic context. Reliab Eng Syst Saf 132:233\u2013249","journal-title":"Reliab Eng Syst Saf"},{"issue":"3","key":"3914_CR8","first-page":"543","volume":"29","author":"W-J Chen","year":"2008","unstructured":"Chen W-J (2008) Single-machine scheduling with maintenance in a manufacturing system. J Inf Optim Sci 29(3):543\u2013556","journal-title":"J Inf Optim Sci"},{"issue":"4","key":"3914_CR9","doi-asserted-by":"crossref","first-page":"778","DOI":"10.1016\/j.cie.2010.08.003","volume":"59","author":"M Czapinski","year":"2010","unstructured":"Czapinski M (2010) Parallel simulated annealing with genetic enhancement for flowshop problem with Csum. Comput Ind Eng 59(4):778\u2013785","journal-title":"Comput Ind Eng"},{"issue":"3","key":"3914_CR10","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1007\/BF01194788","volume":"45","author":"R Dekker","year":"1997","unstructured":"Dekker R, Wildeman RE, van der Duyn Schouten FA (1997) A review of multi-component maintenance models with economic dependence. Math Methods Oper Res 45(3):411\u2013435","journal-title":"Math Methods Oper Res"},{"key":"3914_CR11","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1016\/j.ress.2015.04.022","volume":"142","author":"P Do","year":"2015","unstructured":"Do P, Vu HC, Barros A, Berenguer C (2015) Maintenance grouping for multi-component systems with availability constraints and limited teams. Reliab Eng Syst Saf 142:56\u201367","journal-title":"Reliab Eng Syst Saf"},{"key":"3914_CR12","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.ijepes.2017.08.013","volume":"95","author":"J Eygelaar","year":"2018","unstructured":"Eygelaar J, Lotter DP, Van Vuuren JH (2018) Generator maintenance scheduling based on the risk of power generating unit failure. Electr Power Energy Syst 95:83\u201395","journal-title":"Electr Power Energy Syst"},{"issue":"1\u20132","key":"3914_CR13","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/s12190-013-0736-3","volume":"46","author":"Y-P Fan","year":"2014","unstructured":"Fan Y-P, Zhao C-L (2014) Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration. J Appl Math Comput 46(1\u20132):51\u201366","journal-title":"J Appl Math Comput"},{"key":"3914_CR14","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/BF01096763","volume":"6","author":"TA Feo","year":"1995","unstructured":"Feo TA, Resende MGC (1995) Greedy randomized adaptive search procedures. J Global Optim 6:109\u2013133","journal-title":"J Global Optim"},{"key":"3914_CR15","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/j.cor.2017.07.001","volume":"88","author":"A Froger","year":"2017","unstructured":"Froger A, Gendreau M, Mendoza JE, Rousseau L-M (2017) A branch-and-check approach for a wind turbine maintenance scheduling problem. Comput Oper Res 88:117\u2013136","journal-title":"Comput Oper Res"},{"key":"3914_CR16","unstructured":"Government Accountability Office (2007) Defense budget: trends in operation and maintenance costs and support services contracting. GAO-07-631"},{"key":"3914_CR17","unstructured":"Government Accountability Office (2011) Defense logistics: DOD input needed on implementing depot maintenance study recommendations. GAO-13-267"},{"key":"3914_CR18","unstructured":"Government Accountability Office (2013) Defense business transformation: improvements made but additional steps needed to strengthen strategic planning and assess progress. GAO-13-267"},{"key":"3914_CR19","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1016\/j.ejor.2004.11.013","volume":"172","author":"A Grigoriev","year":"2015","unstructured":"Grigoriev A, Van de Klundert J, Spieksma FCR (2015) Modeling and solving the periodic maintenance problem. Eur J Oper Res 172:783\u2013797","journal-title":"Eur J Oper Res"},{"issue":"2","key":"3914_CR20","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/S0951-8320(01)00125-9","volume":"76","author":"\u00dc G\u00fcrler","year":"2002","unstructured":"G\u00fcrler \u00dc, Kaya A (2002) A maintenance policy for a system with multi-state components: an approximate solution. Reliab Eng Syst Saf 76(2):117\u2013127","journal-title":"Reliab Eng Syst Saf"},{"key":"3914_CR21","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/j.cie.2014.02.009","volume":"76","author":"E Gustavsson","year":"2014","unstructured":"Gustavsson E, Pattriksson M, Stromberg A-B, Wojciechowski A, Onnheim M (2014) Preventive maintenance scheduling of multi-component systems with interval costs. Comput Ind Eng 76:390\u2013400","journal-title":"Comput Ind Eng"},{"key":"3914_CR22","doi-asserted-by":"crossref","first-page":"1078","DOI":"10.1016\/j.asoc.2014.08.024","volume":"24","author":"S Hosseini","year":"2014","unstructured":"Hosseini S, Al Khaled A (2014) A survey on the imperialist competitive algorithm metaheuristic: implementation in engineering domain and directions for future research. Appl Soft Comput 24:1078\u20131094","journal-title":"Appl Soft Comput"},{"issue":"7\u20138","key":"3914_CR23","doi-asserted-by":"crossref","first-page":"1871","DOI":"10.1007\/s00521-014-1678-x","volume":"25","author":"S Hosseini","year":"2014","unstructured":"Hosseini S, Al Khaled A, Vadlamani S (2014) Hybrid imperialist competitive algorithm, variable neighborhood search, and simulated annealing for dynamic facility layout problem. Neural Comput Appl 25(7\u20138):1871\u20131885","journal-title":"Neural Comput Appl"},{"key":"3914_CR24","unstructured":"Kalam S, Barker K, Ramirez-Marquez JE (2013) Improving multi-component maintenance acquisition with a greedy heuristic local search algorithm. In: Proceedings of the naval postgraduate school acquisition research symposium, Monterrey, CA"},{"key":"3914_CR25","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.asoc.2014.06.020","volume":"23","author":"V Kaplanoglu","year":"2014","unstructured":"Kaplanoglu V (2014) Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance. Appl Soft Comput 23:165\u2013179","journal-title":"Appl Soft Comput"},{"key":"3914_CR26","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/j.asoc.2014.10.015","volume":"27","author":"M Karimi-Nasab","year":"2015","unstructured":"Karimi-Nasab M, Modarres M, Seyedhoseini SM (2015) A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times. Appl Soft Comput 27:137\u2013147","journal-title":"Appl Soft Comput"},{"key":"3914_CR27","doi-asserted-by":"crossref","first-page":"1499","DOI":"10.1016\/j.compchemeng.2009.03.003","volume":"33","author":"R Laggoune","year":"2009","unstructured":"Laggoune R, Chateauneuf A, Aissani D (2009) Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units. Comput Chem Eng 33:1499\u20131510","journal-title":"Comput Chem Eng"},{"issue":"8","key":"3914_CR28","doi-asserted-by":"crossref","first-page":"2237","DOI":"10.1016\/j.asoc.2012.03.025","volume":"12","author":"D Lei","year":"2012","unstructured":"Lei D (2012) Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling. Appl Soft Comput 12(8):2237\u20132245","journal-title":"Appl Soft Comput"},{"issue":"9","key":"3914_CR29","doi-asserted-by":"crossref","first-page":"2896","DOI":"10.1016\/j.asoc.2012.04.012","volume":"12","author":"J-Q Li","year":"2012","unstructured":"Li J-Q, Pan Q-K (2012) Chemical-reaction optimization for flexible job-shop scheduling problems with maintenance activity. Appl Soft Comput 12(9):2896\u20132912","journal-title":"Appl Soft Comput"},{"key":"3914_CR30","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-018-1400-4","author":"H Li","year":"2018","unstructured":"Li H, Mi S, Wen X, Qiao D, Luo G (2018) A scheduling optimization method for maintenance, repair and operations service resources of complex products. J Intell Manuf. \nhttps:\/\/doi.org\/10.1007\/s10845-018-1400-4","journal-title":"J Intell Manuf"},{"key":"3914_CR31","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","volume":"21","author":"W Liao","year":"2010","unstructured":"Liao W, Pan E, Xi L (2010) Preventive maintenance scheduling for repairable system with deterioration. J Intell Manuf 21:875\u2013884","journal-title":"J Intell Manuf"},{"key":"3914_CR32","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ress.2015.01.002","volume":"137","author":"X Liu","year":"2015","unstructured":"Liu X, Wang W, Peng R (2015) An integrated production, inventory, and preventive maintenance model for a multi-product production system. Reliab Eng Syst Saf 137:76\u201386","journal-title":"Reliab Eng Syst Saf"},{"key":"3914_CR33","doi-asserted-by":"crossref","first-page":"2094","DOI":"10.1016\/j.asoc.2010.07.008","volume":"11","author":"B Naderi","year":"2011","unstructured":"Naderi B, Zandieh M, Aminnayeri M (2011) Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl Soft Comput 11:2094\u20132101","journal-title":"Appl Soft Comput"},{"issue":"1\u20134","key":"3914_CR34","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1007\/s00170-009-2514-9","volume":"50","author":"E Pan","year":"2010","unstructured":"Pan E, Liao W, Xi L (2010) Single machine based production scheduling model integrated preventive maintenance planning. Int J Adv Manuf Technol 50(1\u20134):365\u2013375","journal-title":"Int J Adv Manuf Technol"},{"issue":"9\u201312","key":"3914_CR35","doi-asserted-by":"crossref","first-page":"1049","DOI":"10.1007\/s00170-011-3652-4","volume":"60","author":"E Pan","year":"2012","unstructured":"Pan E, Liao W, Xi L (2012) A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int J Adv Manuf Technol 60(9\u201312):1049\u20131061","journal-title":"Int J Adv Manuf Technol"},{"key":"3914_CR36","volume-title":"Optimization and probability in systems engineering","author":"JG Rau","year":"1970","unstructured":"Rau JG (1970) Optimization and probability in systems engineering. Von Nostrand Reinhold Company, New York"},{"issue":"10","key":"3914_CR37","first-page":"3155","volume":"2","author":"S Sahu","year":"2014","unstructured":"Sahu S, Pathak VK, Mehta K, Namedo A (2014) Estimation of mean time failure in two unit parallel repairable system. Int J Recent Innov Trends Comput Commun 2(10):3155\u20133160","journal-title":"Int J Recent Innov Trends Comput Commun"},{"issue":"3","key":"3914_CR38","doi-asserted-by":"crossref","first-page":"1440","DOI":"10.1016\/j.asoc.2012.04.032","volume":"13","author":"R Sarker","year":"2013","unstructured":"Sarker R, Omar M, Hasan K, Essam D (2013) Hybrid evolutionary algorithm for job scheduling under machine maintenance. Appl Soft Comput 13(3):1440\u20131447","journal-title":"Appl Soft Comput"},{"key":"3914_CR39","doi-asserted-by":"crossref","first-page":"2123","DOI":"10.1016\/j.promfg.2017.07.342","volume":"11","author":"Patr\u00edcia Senra","year":"2017","unstructured":"Senra P, Lopes I, Oliveria JA (2017) Supporting maintenance scheduling: a case study. In: 27th international conference on flexible automation and intelligent manufacturing, FAIM 2017, 27\u201330 June 2017, Modena, Italy","journal-title":"Procedia Manufacturing"},{"issue":"1","key":"3914_CR40","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.ijpe.2010.05.003","volume":"127","author":"L-Y Tseng","year":"2010","unstructured":"Tseng L-Y, Lin Y-T (2010) A genetic local search algorithm for minimizing total flow time in the permutation flowshop scheduling problem. Int J Prod Econ 127(1):121\u2013128","journal-title":"Int J Prod Econ"},{"key":"3914_CR41","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1016\/j.jairtraman.2014.06.009","volume":"40","author":"S Vadlamani","year":"2014","unstructured":"Vadlamani S, Hosseini S (2014) A novel heuristic approach for solving aircraft landing problem with single runway. J Air Transp Manag 40:144\u2013148","journal-title":"J Air Transp Manag"},{"issue":"1","key":"3914_CR42","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.ijpe.2006.08.005","volume":"107","author":"L Wang","year":"2007","unstructured":"Wang L, Chu J, Wu J (2007) Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. Int J Prod Econ 107(1):151\u2013163","journal-title":"Int J Prod Econ"},{"issue":"1","key":"3914_CR43","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","volume":"19","author":"Z Yang","year":"2008","unstructured":"Yang Z, Djurdjanovic D, Ni J (2008a) Maintenance scheduling in manufacturing systems based on predicted machine degradation. J Intell Manuf 19(1):87\u201398","journal-title":"J Intell Manuf"},{"issue":"1","key":"3914_CR44","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","volume":"19","author":"Z Yang","year":"2008","unstructured":"Yang Z, Djurdjanovic D, Ni J (2008b) Maintenance scheduling in manufacturing systems based on predicted machine degradation. J Intell Manuf 19(1):87\u201398","journal-title":"J Intell Manuf"},{"key":"3914_CR45","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/j.cie.2016.09.020","volume":"101","author":"J Yoo","year":"2016","unstructured":"Yoo J, Lee IS (2016) Parallel machine scheduling with maintenance activities. Comput Ind Eng 101:361\u2013371","journal-title":"Comput Ind Eng"},{"key":"3914_CR46","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1016\/j.ress.2015.03.030","volume":"140","author":"X Zhang","year":"2015","unstructured":"Zhang X, Zeng J (2015) A general modeling method for opportunistic maintenance modeling of multi-unit systems. Reliab Eng Syst Saf 140:176\u2013190","journal-title":"Reliab Eng Syst Saf"},{"issue":"2012","key":"3914_CR47","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.ress.2012.01.005","volume":"101","author":"X Zhou","year":"2012","unstructured":"Zhou X, Lu Z, Xi L (2012) Preventive maintenance optimization for a multi-component system under changing job shop schedule. Reliab Eng Syst Saf 101(2012):14\u201320","journal-title":"Reliab Eng Syst Saf"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-019-03914-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00500-019-03914-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-019-03914-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,16]],"date-time":"2020-05-16T15:18:29Z","timestamp":1589642309000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00500-019-03914-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,3,15]]},"references-count":47,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,1]]}},"alternative-id":["3914"],"URL":"https:\/\/doi.org\/10.1007\/s00500-019-03914-7","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,3,15]]},"assertion":[{"value":"15 March 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors do not have conflicts of interest to disclose.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}