{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,24]],"date-time":"2026-06-24T12:39:37Z","timestamp":1782304777584,"version":"3.54.5"},"reference-count":42,"publisher":"Springer Science and Business Media LLC","issue":"9","license":[{"start":{"date-parts":[[2019,12,18]],"date-time":"2019-12-18T00:00:00Z","timestamp":1576627200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,12,18]],"date-time":"2019-12-18T00:00:00Z","timestamp":1576627200000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"the Fundamental Research Funds for the Central Universities","award":["2018YJS044"],"award-info":[{"award-number":["2018YJS044"]}]},{"name":"the Fundamental Research Funds for the Central Universities","award":["2018JBM019"],"award-info":[{"award-number":["2018JBM019"]}]},{"name":"National Key R&D Program of China","award":["2018YFB1201401"],"award-info":[{"award-number":["2018YFB1201401"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2020,5]]},"DOI":"10.1007\/s00500-019-04617-9","type":"journal-article","created":{"date-parts":[[2019,12,18]],"date-time":"2019-12-18T15:02:42Z","timestamp":1576681362000},"page":"6467-6482","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":21,"title":["Optimizing stop plan and tickets allocation for high-speed railway based on uncertainty theory"],"prefix":"10.1007","volume":"24","author":[{"given":"Bing","family":"Han","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shuang","family":"Ren","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2019,12,18]]},"reference":[{"key":"4617_CR1","unstructured":"Bum HP, Kimz CS, Rhox HL (2010) On the railway line planning models considering the various halting patterns. Lecture Notes in Engineering and Computer Science 2182(1)"},{"issue":"4","key":"4617_CR2","first-page":"123","volume":"30","author":"HP Bum","year":"2013","unstructured":"Bum HP, Seo YI, Hong SP, Rho HL (2013) Column generation approach to line planning with various halting patterns\u2014application to the Korean high-speed railway. Asia Pac J Oper Res 30(4):123\u2013142","journal-title":"Asia Pac J Oper Res"},{"key":"4617_CR3","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1016\/j.omega.2015.04.006","volume":"58","author":"V Cacchiani","year":"2016","unstructured":"Cacchiani V, Furini MK (2016) Approaches to a real-world train timetabling problem in a railway node. Omega 58:97\u2013110","journal-title":"Omega"},{"key":"4617_CR4","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1016\/j.trb.2015.01.008","volume":"74","author":"S Dauz\u00e8re-P\u00e9r\u00e8s","year":"2015","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s S, Almeida DD, Guyon O, Benhizia F (2015) A lagrangian heuristic framework for a real-life integrated planning problem of railway transportation resources. Transp Res Part B 74:138\u2013150","journal-title":"Transp Res Part B"},{"issue":"1\u20132","key":"4617_CR5","first-page":"145","volume":"246","author":"C David","year":"2016","unstructured":"David C, Eva B, Gilbert L, Francisco A (2016) A short-turning policy for the management of demand disruptions in rapid transit systems. J Railw Sci Eng 246(1\u20132):145\u2013166","journal-title":"J Railw Sci Eng"},{"issue":"9\u201310","key":"4617_CR6","doi-asserted-by":"publisher","first-page":"2432","DOI":"10.1016\/j.mcm.2012.07.003","volume":"57","author":"LB Deng","year":"2013","unstructured":"Deng LB, Zhu YG (2013) Uncertain optimal control of linear quadratic models with jump. Math Comput Modell 57(9\u201310):2432\u20132441","journal-title":"Math Comput Modell"},{"key":"4617_CR7","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/j.amc.2013.07.083","volume":"223","author":"SB Ding","year":"2013","unstructured":"Ding SB (2013) Uncertain multi-product newsboy problem with chance constraint. Appl Math Comput 223:139\u2013146","journal-title":"Appl Math Comput"},{"key":"4617_CR8","first-page":"399","volume":"11","author":"H Everett III","year":"1963","unstructured":"Everett H III (1963) Generalized Lagrange multiplier method for solving problems of optimum allocation of resources. Transp Sci 11:399\u2013417","journal-title":"Transp Sci"},{"issue":"4","key":"4617_CR9","doi-asserted-by":"publisher","first-page":"534","DOI":"10.1137\/0307039","volume":"7","author":"JE Falk","year":"1969","unstructured":"Falk JE (1969) Lagrange multipliers and nonconvex programs. SIAM J Control 7(4):534\u2013545","journal-title":"SIAM J Control"},{"key":"4617_CR10","doi-asserted-by":"crossref","unstructured":"Fan ZP, Ni SQ, Chen DJ (2012) The collaborative optimization of stop plan with train working diagram of high-speed railway passenger trains. In: International conference of logistics engineering and management, pp 152\u2013156","DOI":"10.1061\/9780784412602.0025"},{"key":"4617_CR11","first-page":"123","volume":"4","author":"HL Fu","year":"2012","unstructured":"Fu HL, Nie L, Benjamin RS, He ZH (2012) Train stop scheduling in a high-speed rail network by utilizing a two-stage approach. Math Probl Eng 4:123\u2013132","journal-title":"Math Probl Eng"},{"key":"4617_CR12","first-page":"1","volume":"4","author":"HL Fu","year":"2013","unstructured":"Fu HL, Benjamin RS, Nie L (2013) Operational impacts of using restricted passenger flow assignment in high-speed train stop scheduling problem. J Railw Sci Eng 4:1\u20138","journal-title":"J Railw Sci Eng"},{"key":"4617_CR13","first-page":"61","volume":"75","author":"H Fu","year":"2015","unstructured":"Fu H, Nie L, Meng L, Sperry BR, He Z (2015) A hierarchical line planning approach for a large-scale high speed rail network: the China case. Transp Research Part A: Policy Pract 75:61\u201383","journal-title":"Transp Research Part A: Policy Pract"},{"issue":"6","key":"4617_CR14","doi-asserted-by":"publisher","first-page":"2591","DOI":"10.1016\/j.camwa.2011.07.058","volume":"62","author":"Y Gao","year":"2011","unstructured":"Gao Y (2011) Shortest path problem with uncertain arc lengths. Comput Math Appl 62(6):2591\u20132600","journal-title":"Comput Math Appl"},{"issue":"6","key":"4617_CR15","doi-asserted-by":"publisher","first-page":"2592","DOI":"10.1016\/j.apm.2011.09.042","volume":"36","author":"Y Gao","year":"2012","unstructured":"Gao Y (2012) Uncertain models for single facility location problems on networks. Appl Math Model 36(6):2592\u20132599","journal-title":"Appl Math Model"},{"issue":"6","key":"4617_CR16","doi-asserted-by":"publisher","first-page":"945","DOI":"10.1142\/S0218488513500438","volume":"21","author":"Y Gao","year":"2013","unstructured":"Gao Y, Wen ML, Ding SB (2013) The (s, s) policy for uncertain single-peorid inventory problem. Int J Uncertain Fuzziness Knowl-Based Syst 21(6):945\u2013953","journal-title":"Int J Uncertain Fuzziness Knowl-Based Syst"},{"key":"4617_CR17","doi-asserted-by":"publisher","first-page":"82","DOI":"10.1007\/BFb0120690","volume":"2","author":"AM Geoffrion","year":"1974","unstructured":"Geoffrion AM (1974) Lagrangean relaxation for integer programming. Math Program Study 2:82\u2013114","journal-title":"Math Program Study"},{"issue":"1","key":"4617_CR18","first-page":"233","volume":"15","author":"K Ghoseiri","year":"2004","unstructured":"Ghoseiri K, Szidarovszky F, Asgharpour MJ (2004) Design and evaluation on operational plan of express and local trains for urban rail transit. J Railw Sci Eng 15(1):233\u2013239","journal-title":"J Railw Sci Eng"},{"issue":"2","key":"4617_CR19","first-page":"403","volume":"168","author":"JW Goossens","year":"2002","unstructured":"Goossens JW, Hoesel S, Leo K (2002) On solving multi-type line planning problems. Res Memo 168(2):403\u2013424","journal-title":"Res Memo"},{"issue":"5","key":"4617_CR20","doi-asserted-by":"publisher","first-page":"1121","DOI":"10.4304\/jsw.9.5.1121-1128","volume":"9","author":"Z He","year":"2014","unstructured":"He Z, Nie L, Fu H (2014) Service planning system for large-scale high speed railway network. J Softw 9(5):1121\u20131128","journal-title":"J Softw"},{"issue":"2","key":"4617_CR21","doi-asserted-by":"publisher","first-page":"403","DOI":"10.1016\/j.ejor.2004.04.036","volume":"168","author":"WG Jan","year":"2006","unstructured":"Jan WG, Hoesel S, Leo K (2006) On solving multi-type railway line planning problems. Eur J Oper Res 168(2):403\u2013424","journal-title":"Eur J Oper Res"},{"issue":"8","key":"4617_CR22","doi-asserted-by":"publisher","first-page":"539","DOI":"10.7782\/JKSR.2017.20.4.539","volume":"20","author":"JH Joo","year":"2017","unstructured":"Joo JH, Kim KM, Oh SM, Lim KM, Park OS (2017) Station capacity calculation on high-speed railway considering the number of sidings and train halting patterns. J Korean Soc Railw 20(8):539\u2013549","journal-title":"J Korean Soc Railw"},{"key":"4617_CR23","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-45586-8_4","volume-title":"Lagrangian relaxation","author":"C Lemar\u00e9chal","year":"2001","unstructured":"Lemar\u00e9chal C (2001) Lagrangian relaxation. Springer, Berlin"},{"key":"4617_CR24","volume-title":"Uncertainty theory","author":"BD Liu","year":"2007","unstructured":"Liu BD (2007) Uncertainty theory, 2nd edn. Springer, Berlin","edition":"2"},{"issue":"1","key":"4617_CR25","first-page":"3","volume":"3","author":"BD Liu","year":"2009","unstructured":"Liu BD (2009) Some research problems in uncertainty theory. J Uncertain Syst 3(1):3\u201310","journal-title":"J Uncertain Syst"},{"key":"4617_CR26","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-13959-8","volume-title":"Uncertainty theory: a branch of mathematics for modeling human uncertainty","author":"BD Liu","year":"2010","unstructured":"Liu BD (2010) Uncertainty theory: a branch of mathematics for modeling human uncertainty. Springer, Berlin"},{"key":"4617_CR27","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/j.tre.2017.11.003","volume":"109","author":"JG Qi","year":"2018","unstructured":"Qi JG, Yang LX, Di Z, Li SK, Yang K, Gao Y (2018) Integrated optimization for train operation zone and stop plan with passenger distributions. Transp Res Part E Logist Transp Rev 109:151\u2013173","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"9","key":"4617_CR28","first-page":"7","volume":"39","author":"LX Qiang","year":"2017","unstructured":"Qiang LX, He ZH (2017) Study on train ticket allocation based on passenger flow assignment technology. Railw Transp Econ 39(9):7\u201311","journal-title":"Railw Transp Econ"},{"issue":"18","key":"4617_CR29","doi-asserted-by":"crossref","first-page":"9630","DOI":"10.1016\/j.amc.2013.02.015","volume":"219","author":"ZF Qin","year":"2013","unstructured":"Qin ZF, Kar S (2013) Single-period inventory problem under uncertain environment. Appl Math Comput 219(18):9630\u20139638","journal-title":"Appl Math Comput"},{"issue":"1","key":"4617_CR30","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1287\/trsc.1060.0161","volume":"41","author":"B Ralf","year":"2007","unstructured":"Ralf B, Martin G, Marc EP (2007) A column-generation approach to line planning in public transport. Transp Sci 41(1):123\u2013132","journal-title":"Transp Sci"},{"issue":"1","key":"4617_CR31","first-page":"151","volume":"21","author":"S Roberto","year":"2017","unstructured":"Roberto S, Jose LM, Ruben C, Angel I (2017) Optimal stopping location of a high speed train using GIS and multicriteria decision-making. Transp Res Part B 21(1):151\u2013168","journal-title":"Transp Res Part B"},{"issue":"5","key":"4617_CR32","first-page":"1062","volume":"47","author":"WB Song","year":"2017","unstructured":"Song WB, Zhao P, Li B, Wang P (2017) High-speed railway ticket allocation considering passenger travel time. J Southeast Univ 47(5):1062\u20131068","journal-title":"J Southeast Univ"},{"issue":"1","key":"4617_CR33","first-page":"233","volume":"15","author":"YG Sun","year":"2018","unstructured":"Sun YG, Ran XC, Yang FH, Chen SK (2018) Design and evaluation on operational plan of express and local trains for urban rail transit. J Railw Sci Eng 15(1):233\u2013239","journal-title":"J Railw Sci Eng"},{"issue":"3","key":"4617_CR34","doi-asserted-by":"publisher","first-page":"1128","DOI":"10.1287\/trsc.2015.0630","volume":"50","author":"WJ Xie","year":"2016","unstructured":"Xie WJ, Ouyang YF (2016) Reliable location-routing design under probabilistic facility disruptions. Transp Sci 50(3):1128\u20131138","journal-title":"Transp Sci"},{"issue":"10","key":"4617_CR35","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.omega.2013.11.004","volume":"48","author":"LX Yang","year":"2014","unstructured":"Yang LX, Zhou XS, Gao ZY (2014) Credibility-based rescheduling model in a double-track railway network: a fuzzy reliable optimization approach. Omega 48(10):75\u201393","journal-title":"Omega"},{"issue":"1\u20132","key":"4617_CR36","first-page":"145","volume":"246","author":"LX Yang","year":"2015","unstructured":"Yang LX, Qi JG, Li SK, Gao Y (2015) Collaborative optimization for train scheduling and train stop planning on high-speed railways. Omega 246(1\u20132):145\u2013166","journal-title":"Omega"},{"key":"4617_CR37","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1016\/j.trb.2017.01.001","volume":"97","author":"JT Yin","year":"2017","unstructured":"Yin JT, Yang LX, Tang T, Gao ZY, Ran B (2017) Dynamic passenger demand oriented metro train scheduling with energy-efficiency and waiting time minimization: mixed-integer linear programming approaches. Transp Res Part B 97:182\u2013213","journal-title":"Transp Res Part B"},{"issue":"2","key":"4617_CR38","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0191-2615(99)00013-2","volume":"34","author":"HC Yu","year":"2000","unstructured":"Yu HC, Chung HY, Ching CS (2000) A multi objective model for passenger train services planning: application to taiwan\u2019s high-speed rail line. Transp Res Part B 34(2):91\u2013106","journal-title":"Transp Res Part B"},{"issue":"1","key":"4617_CR39","first-page":"18","volume":"11","author":"B Zhang","year":"2012","unstructured":"Zhang B, Peng J (2012) Uncertain programming model for chinese postman problem with uncertain weights. Ind Eng Manag Syst 11(1):18\u201325","journal-title":"Ind Eng Manag Syst"},{"key":"4617_CR40","unstructured":"Zhang X, Fu H L, Tong L (2014) Optimizing the high speed train stop scheduling using flexible stopping patterns combination. In: IEEE 17th international conference on intelligent transportation systems (ITSC), pp 2398\u20132403"},{"issue":"C","key":"4617_CR41","doi-asserted-by":"publisher","first-page":"186","DOI":"10.1016\/j.cie.2016.10.030","volume":"102","author":"B Zhang","year":"2016","unstructured":"Zhang B, Peng J, Li S, Chen L (2016) Fixed charge solid transportation problem in uncertain environment and its algorithm. Comput Ind Eng 102(C):186\u2013197","journal-title":"Comput Ind Eng"},{"issue":"11","key":"4617_CR42","first-page":"57","volume":"39","author":"LQ Zhang","year":"2017","unstructured":"Zhang LQ, Nie L, Fu HL, Han PW (2017) Optimization model for high-speed railway line planning during holidays. Railw Transp Econ 39(11):57\u201366","journal-title":"Railw Transp Econ"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-019-04617-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00500-019-04617-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-019-04617-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,2,13]],"date-time":"2021-02-13T02:38:42Z","timestamp":1613183922000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00500-019-04617-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,18]]},"references-count":42,"journal-issue":{"issue":"9","published-print":{"date-parts":[[2020,5]]}},"alternative-id":["4617"],"URL":"https:\/\/doi.org\/10.1007\/s00500-019-04617-9","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,12,18]]},"assertion":[{"value":"18 December 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}},{"value":"Informed consent was obtained from all individual participants included in the study.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}