{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,14]],"date-time":"2026-02-14T10:32:24Z","timestamp":1771065144747,"version":"3.50.1"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"18","license":[{"start":{"date-parts":[[2021,3,24]],"date-time":"2021-03-24T00:00:00Z","timestamp":1616544000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,3,24]],"date-time":"2021-03-24T00:00:00Z","timestamp":1616544000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2021,9]]},"DOI":"10.1007\/s00500-021-05708-2","type":"journal-article","created":{"date-parts":[[2021,3,24]],"date-time":"2021-03-24T10:02:47Z","timestamp":1616580167000},"page":"12031-12041","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["An efficient method of disturbance analysis and train rescheduling using MWDLNN and BMW-SSO algorithms"],"prefix":"10.1007","volume":"25","author":[{"given":"Neeraj","family":"Kumar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abhishek","family":"Mishra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,3,24]]},"reference":[{"issue":"5","key":"5708_CR1","doi-asserted-by":"publisher","first-page":"04016006","DOI":"10.1061\/(ASCE)CP.1943-5487.0000559","volume":"30","author":"J Huo","year":"2016","unstructured":"Huo J, Wu J, Kang L, Wang B (2016) Railway timetable rescheduling based on priority and train order entropy. J Comput Civ Eng 30(5):04016006","journal-title":"J Comput Civ Eng"},{"key":"5708_CR2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jrtpm.2019.100173","author":"A Toletti","year":"2019","unstructured":"Toletti A, Laumanns M, Weidmann U (2019) Coordinated railway traffic rescheduling with the Resource Conflict Graph model. J Rail Transp Plan Manag. https:\/\/doi.org\/10.1016\/j.jrtpm.2019.100173","journal-title":"J Rail Transp Plan Manag"},{"key":"5708_CR3","doi-asserted-by":"publisher","unstructured":"Ning L, Li Y, Zhou M, Song H, Dong H (2019) A deep reinforcement learning approach to high-speed train timetable rescheduling under disturbances. In: IEEE intelligent transportation systems conference (ITSC), IEEE, pp 3469\u20133474. https:\/\/doi.org\/10.1109\/ITSC.2019.8917180.","DOI":"10.1109\/ITSC.2019.8917180"},{"key":"5708_CR4","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1016\/j.cor.2016.08.011","volume":"78","author":"T Dollevoet","year":"2017","unstructured":"Dollevoet T, Huisman D, Kroon LG, Veelenturf LP, Wagenaar JC (2017) Application of an iterative framework for real-time railway rescheduling. Comput Oper Res 78:203\u2013217. https:\/\/doi.org\/10.1016\/j.cor.2016.08.011","journal-title":"Comput Oper Res"},{"key":"5708_CR5","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1016\/j.trc.2016.10.009","volume":"73","author":"W-H Lee","year":"2016","unstructured":"Lee W-H, Yen L-H, Chou C-M (2016) A delay root cause discovery and timetable adjustment model for enhancing the punctuality of railway services. Transp Res Part C EmergTechnol 73:49\u201364. https:\/\/doi.org\/10.1016\/j.trc.2016.10.009","journal-title":"Transp Res Part C EmergTechnol"},{"key":"5708_CR6","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1016\/j.trc.2017.02.001","volume":"78","author":"S Binder","year":"2017","unstructured":"Binder S, Maknoon Y, Bierlaire M (2017) The multi-objective railway timetable rescheduling problem. Transp Res Part C EmergTechnol 78:78\u201394. https:\/\/doi.org\/10.1016\/j.trc.2017.02.001","journal-title":"Transp Res Part C EmergTechnol"},{"key":"5708_CR7","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/j.trb.2014.01.009","volume":"63","author":"V Cacchiani","year":"2014","unstructured":"Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transp Res Part B Methodol 63:15\u201337. https:\/\/doi.org\/10.1016\/j.trb.2014.01.009","journal-title":"Transp Res Part B Methodol"},{"key":"5708_CR8","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.trb.2019.02.015","volume":"123","author":"Y Zhu","year":"2019","unstructured":"Zhu Y, Goverde RMP (2019) Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions. Transp Res Part B Methodol 123:149\u2013181. https:\/\/doi.org\/10.1016\/j.trb.2019.02.015","journal-title":"Transp Res Part B Methodol"},{"key":"5708_CR9","doi-asserted-by":"publisher","unstructured":"Fabio D, del Cacho Estil-les M, Bersani C, Sacile R, Zero L (2018) Train scheduling and rescheduling model based on customer satisfaction. Application to Genoa railway network. In: 13th annual conference on system of systems engineering (SoSE), IEEE, pp 593\u2013600. https:\/\/doi.org\/10.1109\/SYSOSE.2018.8428780","DOI":"10.1109\/SYSOSE.2018.8428780"},{"key":"5708_CR10","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-017-0316-7","author":"M Shakibayifar","year":"2017","unstructured":"Shakibayifar M, Sheikholeslami A, Corman F, Hassannayebi E (2017) An integrated rescheduling model for minimizing train delays in the case of line blockage. Oper Res Int Journal. https:\/\/doi.org\/10.1007\/s12351-017-0316-7","journal-title":"Oper Res Int Journal"},{"key":"5708_CR11","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.apm.2017.07.030","volume":"52","author":"G Cavone","year":"2017","unstructured":"Cavone G, Dotoli M, Epicoco N, Seatzu C (2017) A decision making procedure for robust train rescheduling based on mixed integer linear programming and Data Envelopment Analysis. Appl Math Model 52:255\u2013273. https:\/\/doi.org\/10.1016\/j.apm.2017.07.030","journal-title":"Appl Math Model"},{"key":"5708_CR12","doi-asserted-by":"publisher","first-page":"781","DOI":"10.1016\/j.sbspro.2012.04.152","volume":"43","author":"M Xie","year":"2012","unstructured":"Xie M, Li X (2012) Railway timetable rescheduling based on the feedback of train-set circulation. ProcediaSocBehavSci 43:781\u2013789. https:\/\/doi.org\/10.1016\/j.sbspro.2012.04.152","journal-title":"ProcediaSocBehavSci"},{"issue":"3\u20134","key":"5708_CR13","first-page":"167","volume":"8","author":"S Herrigel","year":"2018","unstructured":"Herrigel S, Laumanns M, Szabo J, Weidmann U (2018) Periodic railway timetabling with sequential decomposition in the PESP model. J Rail Transp Plan Manag 8(3\u20134):167\u2013183","journal-title":"J Rail Transp Plan Manag"},{"issue":"9","key":"5708_CR14","doi-asserted-by":"publisher","first-page":"1216","DOI":"10.1109\/TSMC.2014.2301140","volume":"44","author":"X Li","year":"2014","unstructured":"Li X, Shou B, Ralescu D (2014) Train rescheduling with stochastic recovery time: a new track-backup approach. IEEE Trans Syst Man CybernSyst 44(9):1216\u20131233","journal-title":"IEEE Trans Syst Man CybernSyst"},{"issue":"11","key":"5708_CR15","doi-asserted-by":"publisher","first-page":"2980","DOI":"10.1109\/TITS.2017.2665042","volume":"18","author":"J Eaton","year":"2017","unstructured":"Eaton J, Yang S, Gongora M (2017) Ant colony optimization for simulated dynamic multi-objective railway junction rescheduling. IEEE Trans Intell Transp Syst 18(11):2980\u20132992","journal-title":"IEEE Trans Intell Transp Syst"},{"issue":"1","key":"5708_CR16","doi-asserted-by":"publisher","first-page":"258","DOI":"10.1016\/j.ejor.2017.04.057","volume":"263","author":"M Fischetti","year":"2017","unstructured":"Fischetti M, Monaci M (2017) Using a general-purpose mixed-integer linear programming solver for the practical solution of real-time train rescheduling. Eur J Oper Res 263(1):258\u2013264","journal-title":"Eur J Oper Res"},{"key":"5708_CR17","doi-asserted-by":"publisher","first-page":"638","DOI":"10.1016\/j.trb.2017.05.008","volume":"104","author":"P Xu","year":"2017","unstructured":"Xu P, Corman F, Peng Q, Luan X (2017) A train rescheduling model integrating speed management during disruptions of high-speed traffic under a quasi-moving block system. Transp Res Part B Methodol 104:638\u2013666. https:\/\/doi.org\/10.1016\/j.trb.2017.05.008","journal-title":"Transp Res Part B Methodol"},{"key":"5708_CR18","doi-asserted-by":"publisher","DOI":"10.1016\/j.phycom.2020.101131","author":"P Kuppusamy","year":"2020","unstructured":"Kuppusamy P, Venkatraman S, Rishikeshan CA, Padmanabha Reddy YCA (2020) Deep learning based energy efficient optimal timetable rescheduling model for intelligent metro transportation systems. PhysCommun. https:\/\/doi.org\/10.1016\/j.phycom.2020.101131","journal-title":"PhysCommun"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-021-05708-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-021-05708-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-021-05708-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,17]],"date-time":"2021-08-17T11:08:28Z","timestamp":1629198508000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-021-05708-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,3,24]]},"references-count":18,"journal-issue":{"issue":"18","published-print":{"date-parts":[[2021,9]]}},"alternative-id":["5708"],"URL":"https:\/\/doi.org\/10.1007\/s00500-021-05708-2","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,3,24]]},"assertion":[{"value":"17 February 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 March 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"All authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human and animals rights"}},{"value":"This is not applicable for the study presented.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}