{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,21]],"date-time":"2026-04-21T21:56:17Z","timestamp":1776808577804,"version":"3.51.2"},"reference-count":57,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2022,9,19]],"date-time":"2022-09-19T00:00:00Z","timestamp":1663545600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,9,19]],"date-time":"2022-09-19T00:00:00Z","timestamp":1663545600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2023,3]]},"DOI":"10.1007\/s00500-022-07485-y","type":"journal-article","created":{"date-parts":[[2022,9,19]],"date-time":"2022-09-19T17:02:41Z","timestamp":1663606961000},"page":"3065-3081","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A pollution sensitive fuzzy EPQ model with endogenous reliability and product deterioration based on lock fuzzy game theoretic approach"],"prefix":"10.1007","volume":"27","author":[{"given":"Kousik","family":"Bhattacharya","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4889-8043","authenticated-orcid":false,"given":"Sujit Kumar","family":"De","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2022,9,19]]},"reference":[{"issue":"8","key":"7485_CR1","first-page":"1353","volume":"8","author":"HT Aarthi","year":"2017","unstructured":"Aarthi HT (2017) Review on mitigation of air pollution in sponge iron industries. Int J Civil Eng Technol 8(8):1353\u20131356","journal-title":"Int J Civil Eng Technol"},{"issue":"2","key":"7485_CR120","first-page":"1","volume":"13","author":"A Abdel-Aleem","year":"2017","unstructured":"Abdel-Aleem A, El-Sharief M, Hassan MA, El-Sebaie MG (2017) Optimization of reliability-based model for production inventory system. Int J Manage Sci Eng Manage 13(2):1\u201311","journal-title":"Int J Manag Sci Eng Manag"},{"key":"7485_CR2","first-page":"169","volume":"5","author":"I Ahmed","year":"2014","unstructured":"Ahmed I, Sultana I (2014) A literature review on inventory modelling with reliability consideration. Int J Ind Eng Comput 5:169\u2013178","journal-title":"Int J Ind Eng Comput"},{"key":"7485_CR3","doi-asserted-by":"publisher","DOI":"10.1080\/17509653.2017.1292156","author":"AA Ahmed","year":"2017","unstructured":"Ahmed AA, Mahmoud AES, Mohsen AH, Mohamed GES (2017) Optimization of reliability-based model for production inventory system. Int J Manag Sci Eng Manag. https:\/\/doi.org\/10.1080\/17509653.2017.1292156","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"4","key":"7485_CR4","doi-asserted-by":"crossref","first-page":"5249","DOI":"10.15666\/aeer\/1604_52495267","volume":"16","author":"M Akten","year":"2018","unstructured":"Akten M, Akyol A (2018) Determination of environmental perceptions and awareness towards reducing carbon footprint. Appl Ecol Environ Res 16(4):5249\u20135267","journal-title":"Appl Ecol Environ Res"},{"key":"7485_CR5","doi-asserted-by":"crossref","first-page":"636","DOI":"10.1016\/j.jclepro.2017.08.177","volume":"170","author":"SM Aljazzar","year":"2018","unstructured":"Aljazzar SM, Gurtu A, Jaber MY (2018) Delay-in-payments-A strategy to reduce carbon emissions from supply chains. J Clean Prod 170:636\u2013644","journal-title":"J Clean Prod"},{"issue":"1","key":"7485_CR6","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1177\/0022002705284708","volume":"50","author":"B Arfi","year":"2006","unstructured":"Arfi B (2006) Linguistic fuzzy-logic game theory. J Conflict Resolut 50(1):28\u201357","journal-title":"J Conflict Resolut"},{"key":"7485_CR7","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.cie.2008.07.001","volume":"56","author":"S Bag","year":"2009","unstructured":"Bag S, Chakraborty D, Roy AR (2009) A production inventory model with fuzzy random demand and with flexibility and reliability considerations. Comput Ind Eng 56:411\u2013416","journal-title":"Comput Ind Eng"},{"key":"7485_CR8","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2012.2203304","author":"S Benjaafar","year":"2010","unstructured":"Benjaafar S, Li Y, Daskin M (2010) Carbon footprint and the management of supply chains: insights from simple models. IEEE Trans Autom Sci Eng. https:\/\/doi.org\/10.1109\/TASE.2012.2203304","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"7485_CR9","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.107005","author":"K Bhattacharya","year":"2020","unstructured":"Bhattacharya K, De SK (2020) A robust two layer green supply chain modelling under performance based fuzzy game theoretic approach. Comput Ind Eng. https:\/\/doi.org\/10.1016\/j.cie.2020.107005","journal-title":"Comput Ind Eng"},{"key":"7485_CR10","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1016\/j.ejor.2007.01.011","volume":"185","author":"T Chakraborty","year":"2008","unstructured":"Chakraborty T, Giri BC, Chaudhuri KS (2008) Production lot sizing with process deterioration and machine breakdown. Eur J Oper Res 185:606\u2013618","journal-title":"Eur J Oper Res"},{"issue":"2","key":"7485_CR11","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1016\/j.orl.2012.12.003","volume":"41","author":"X Chen","year":"2013","unstructured":"Chen X, Benjaafar S, Elomri A (2013) The carbon-constrained EOQ. Oper Res Lett 41(2):172\u2013179","journal-title":"Oper Res Lett"},{"key":"7485_CR12","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/0377-2217(89)90190-2","volume":"39","author":"T Cheng","year":"1989","unstructured":"Cheng T (1989) An economic production quantity model with flexibility and reliability consideration. Eur J Oper Res 39:174\u2013179","journal-title":"Eur J Oper Res"},{"key":"7485_CR13","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1057\/jors.1991.137","volume":"42","author":"T Cheng","year":"1991","unstructured":"Cheng T (1991) EPQ with process reliability and quality assurance considerations. J Oper Res Soc 42:713\u2013720","journal-title":"J Oper Res Soc"},{"key":"7485_CR14","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1080\/00207540903460232","volume":"49","author":"CJ Chung","year":"2011","unstructured":"Chung CJ, Widyadana GA, Wee HM (2011) Economic production quantity model for deteriorating inventory with random machine unavailability and shortage. Int J Prod Res 49:883\u2013902","journal-title":"Int J Prod Res"},{"key":"7485_CR15","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106694","author":"Y Chunhai","year":"2020","unstructured":"Chunhai Y, Zebin Q, Thomas WA, Zhaoning L (2020) An inventory model of a deteriorating product considering carbon emissions. Comput Ind Eng. https:\/\/doi.org\/10.1016\/j.cie.2020.106694","journal-title":"Comput Ind Eng"},{"key":"7485_CR16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2018.10.006","author":"F Ciardiello","year":"2018","unstructured":"Ciardiello F, Genovese A, Simpson A (2018) Pollution responsibility allocation in supply networks: a game-theoretic approach and a case study. Int J Prod Econ. https:\/\/doi.org\/10.1016\/j.ijpe.2018.10.006","journal-title":"Int J Prod Econ"},{"key":"7485_CR17","first-page":"6","volume":"5","author":"SK De","year":"2017","unstructured":"De SK (2017) Triangular dense fuzzy lock sets. Soft Comput 5:6\u20139","journal-title":"Soft Comput"},{"issue":"1","key":"7485_CR18","first-page":"469","volume":"31","author":"SK De","year":"2016","unstructured":"De SK, Beg I (2016) Triangular dense fuzzy sets and new defuzzification methods. Int J Intell Fuzzy Syst 31(1):469\u2013477","journal-title":"Int J Intell Fuzzy Syst"},{"key":"7485_CR19","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-019-04254-2","author":"SK De","year":"2019","unstructured":"De SK, Mahata GC (2019) A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach. Soft Comput. https:\/\/doi.org\/10.1007\/s00500-019-04254-2","journal-title":"Soft Comput"},{"key":"7485_CR20","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2020.106397","author":"S De","year":"2020","unstructured":"De S, Nayak PK, Khan A, Bhattacharya K, Smarandache F (2020) Solution of an EPQ model for imperfect production process under game and neutrosophic fuzzy approach. Appl Soft Comput. https:\/\/doi.org\/10.1016\/j.asoc.2020.106397","journal-title":"Appl Soft Comput"},{"key":"7485_CR21","doi-asserted-by":"publisher","DOI":"10.1002\/int2.20210424","author":"SK De","year":"2021","unstructured":"De SK, Bhattacharya K, Roy B (2021) Solution of a pollution sensitive supply chain model under fuzzy approximate reasoning. Int J Intell Syst. https:\/\/doi.org\/10.1002\/int2.20210424","journal-title":"Int J Intell Syst"},{"issue":"2","key":"7485_CR22","first-page":"1","volume":"25","author":"MHR Doust","year":"2014","unstructured":"Doust MHR, Gholizade S (2014) An analysis of the modified Lotka-Volterra predator-prey model. Gen Meth Notes 25(2):1\u20135","journal-title":"Gen Meth Notes"},{"key":"7485_CR24","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1016\/j.cie.2013.07.018","volume":"66","author":"CH Glock","year":"2013","unstructured":"Glock CH (2013) The machine breakdown paradox: how random shifts in the production rate may increase company profits. Comput Ind Eng 66:1171\u20131176","journal-title":"Comput Ind Eng"},{"key":"7485_CR25","first-page":"1","volume":"2010","author":"Y He","year":"2010","unstructured":"He Y, He J (2010) A production model for deteriorating inventory items with production disruptions. Discret Dyn Nat Soc 2010:1\u201314","journal-title":"Discret Dyn Nat Soc"},{"key":"7485_CR26","doi-asserted-by":"publisher","DOI":"10.1111\/itor.12311","author":"H Huang","year":"2017","unstructured":"Huang H, He Y, Li D (2017) EPQ for an unreliable production system with endogenous reliability and product deterioration. Int Trans Oper Res. https:\/\/doi.org\/10.1111\/itor.12311","journal-title":"Int Trans Oper Res"},{"key":"7485_CR27","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1480070","author":"H Huang","year":"2018","unstructured":"Huang H, He Y, Li D (2018) Coordination of pricing, inventory and production reliability decisions in deteriorating product supply chains. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2018.1480070","journal-title":"Int J Prod Res"},{"key":"7485_CR28","doi-asserted-by":"crossref","first-page":"774","DOI":"10.1016\/j.omega.2011.12.005","volume":"40","author":"A Jeang","year":"2012","unstructured":"Jeang A (2012) Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown. Omega 40:774\u2013781","journal-title":"Omega"},{"key":"7485_CR29","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2017.03.080","author":"S Karmakar","year":"2017","unstructured":"Karmakar S, De SK, Goswami A (2017) A pollution sensitive dense fuzzy economic production quantity model with cycle time dependent production rate. J Clean Prod. https:\/\/doi.org\/10.1016\/j.jclepro.2017.03.080","journal-title":"J Clean Prod"},{"key":"7485_CR30","doi-asserted-by":"publisher","DOI":"10.1088\/1742-6596\/1000\/1\/0120174","author":"G Krishnaveni","year":"2018","unstructured":"Krishnaveni G, Ganesan K (2018) A new approach for the solution of fuzzy games. J Phys Conf Ser. https:\/\/doi.org\/10.1088\/1742-6596\/1000\/1\/0120174","journal-title":"J Phys Conf Ser"},{"key":"7485_CR31","doi-asserted-by":"crossref","first-page":"240","DOI":"10.1016\/j.ejor.2005.06.049","volume":"176","author":"KNF Leung","year":"2007","unstructured":"Leung KNF (2007) A generalized geometric programming solution to an economic production quantity model with flexibility and reliability considerations. Eur J Oper Res 176:240\u2013251","journal-title":"Eur J Oper Res"},{"issue":"23","key":"7485_CR32","doi-asserted-by":"crossref","first-page":"6930","DOI":"10.1080\/00207543.2011.638939","volume":"50","author":"YK Lin","year":"2012","unstructured":"Lin YK, Chang PC (2012) System reliability of a manufacturing network with reworking action and different failure rates. Int J Prod Res 50(23):6930\u20136944","journal-title":"Int J Prod Res"},{"issue":"6","key":"7485_CR33","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1057\/jors.2010.49","volume":"62","author":"D Louit","year":"2011","unstructured":"Louit D, Pascual R, Banjevic D, Jardine KS (2011) Optimization models for critical spare parts inventories-A reliability Approach. J Oper Res Soc 62(6):992\u20131004","journal-title":"J Oper Res Soc"},{"key":"7485_CR34","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1504173","author":"F L\u00fccker","year":"2018","unstructured":"L\u00fccker F, Seifert RW, Bicer I (2018) Roles of inventory and reserve capacity in mitigating supply chain disruption risk. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2018.1504173","journal-title":"Int J Prod Res"},{"issue":"3","key":"7485_CR36","first-page":"223","volume":"7","author":"GS Mahapatra","year":"2012","unstructured":"Mahapatra GS, Mandal TK, Samanta GP (2012) Fuzzy parametric geometric programming with application in fuzzy EPQ model under flexibility and reliability consideration. J Inf CompuT Sci 7(3):223\u2013234","journal-title":"J Inf CompuT Sci"},{"key":"7485_CR37","doi-asserted-by":"crossref","first-page":"396","DOI":"10.1016\/j.geb.2019.04.001","volume":"115","author":"LP Metzger","year":"2019","unstructured":"Metzger LP, Rieger MO (2019) Non-cooperative games with prospect theory players and dominated strategies. Games Econ Behav 115:396\u2013409","journal-title":"Games Econ Behav"},{"issue":"8","key":"7485_CR38","doi-asserted-by":"crossref","first-page":"799","DOI":"10.1287\/mnsc.25.8.799","volume":"25","author":"RR Meyer","year":"1979","unstructured":"Meyer RR, Rothkopf MH, Smith SA (1979) Reliability and inventory in a production-storage system. Manag Sci 25(8):799\u2013807","journal-title":"Manag Sci"},{"key":"7485_CR39","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1016\/j.ejor.2011.04.035","volume":"214","author":"M Mirzahosseinian","year":"2011","unstructured":"Mirzahosseinian M, Piplani R (2011) A study of repairable parts inventory system operating under performance-based contract. Eur J Oper Res 214:256\u2013261","journal-title":"Eur J Oper Res"},{"key":"7485_CR40","doi-asserted-by":"crossref","first-page":"1733","DOI":"10.1016\/j.mcm.2008.10.019","volume":"49","author":"D Panda","year":"2009","unstructured":"Panda D, Maiti M (2009) Multi-item inventory models with price dependent demand under flexibility and reliability consideration and imprecise space constraint: a geometric programming approach. Math Comput Model 49:1733\u20131749","journal-title":"Math Comput Model"},{"key":"7485_CR41","doi-asserted-by":"publisher","DOI":"10.1007\/s11081-013-9218-6","author":"SK Paul","year":"2013","unstructured":"Paul SK, Azeem A, Sarker R, Essam D (2013) Development of a production inventory model with uncertainty and reliability considerations. Optim Eng. https:\/\/doi.org\/10.1007\/s11081-013-9218-6","journal-title":"Optim Eng"},{"key":"7485_CR42","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/0167-6377(89)90020-5","volume":"8","author":"MJM Posner","year":"1989","unstructured":"Posner MJM, Berg M (1989) Analysis of a production-inventory system with unreliable production facility. Oper Res Lett 8:339\u2013345","journal-title":"Oper Res Lett"},{"key":"7485_CR43","first-page":"57","volume":"3","author":"V Preda","year":"1989","unstructured":"Preda V (1989) Convex optimization with nested maxima and matrix game equivalence. Ann Bucharest Univ 3:57\u201360","journal-title":"Ann Bucharest Univ"},{"key":"7485_CR44","first-page":"317","volume":"1","author":"A Prekopa","year":"1965","unstructured":"Prekopa A (1965) Reliability equation for an inventory problem and its asymptotic solutions. Colloq Appl Math Econ 1:317\u2013327","journal-title":"Colloq Appl Math Econ"},{"key":"7485_CR45","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1007\/BFb0120825","volume":"9","author":"A Prekopa","year":"1978","unstructured":"Prekopa A, Kelly P (1978) Reliability type inventory modelling based on stochastic programming. Math Program Study 9:43\u201358","journal-title":"Math Program Study"},{"issue":"3","key":"7485_CR46","first-page":"359","volume":"3","author":"NV Rao","year":"2014","unstructured":"Rao NV, Rajasekhar M, Rao GC (2014) Detrimental effect of air pollution, corrosion on building materials and historical structures. Am J Eng Res 3(3):359\u2013364","journal-title":"Am J Eng Res"},{"key":"7485_CR47","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.ejor.2009.02.027","volume":"201","author":"SS Sana","year":"2010","unstructured":"Sana SS (2010) An economic production lot size model in an imperfect production system. Eur J Oper Res 201:158\u2013170","journal-title":"Eur J Oper Res"},{"key":"7485_CR48","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/j.jclepro.2017.09.138","volume":"170","author":"H Song","year":"2018","unstructured":"Song H, Gao X (2018) Green supply chain game model and analysis under revenue-sharing contract. J Clean Prod 170:183\u2013192","journal-title":"J Clean Prod"},{"key":"7485_CR49","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-020-03639-z","author":"M Tariqul-Islam","year":"2020","unstructured":"Tariqul-Islam M, Azeem A, Jabir M, Paul A, Paul SK (2020) An inventory model for a three-stage supply chain with random capacities considering disruptions and supplier reliability. Ann Oper Res. https:\/\/doi.org\/10.1007\/s10479-020-03639-z","journal-title":"Ann Oper Res"},{"issue":"6","key":"7485_CR50","first-page":"67","volume":"114","author":"M Thirucheran","year":"2017","unstructured":"Thirucheran M, Meena-kumari ER, Lavanya S (2017) A new approach for solving fuzzy game problem. Int J Pure Appl Math 114(6):67\u201375","journal-title":"Int J Pure Appl Math"},{"issue":"6","key":"7485_CR51","first-page":"413","volume":"6","author":"PK Tripathy","year":"2011","unstructured":"Tripathy PK, Pattnaik M (2011) Optimal inventory policy with reliability consideration and instantaneous receipt under imperfect production process. Int J Manag Sci Eng Manag 6(6):413\u2013420","journal-title":"Int J Manag Sci Eng Manag"},{"key":"7485_CR52","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1057\/palgrave.jors.2601540","volume":"54","author":"P Tripathy","year":"2003","unstructured":"Tripathy P, Wee W, Majhi P (2003) An EOQ model with process reliability consideration. J Oper Res Soc 54:549\u2013554","journal-title":"J Oper Res Soc"},{"key":"7485_CR53","doi-asserted-by":"crossref","first-page":"2940","DOI":"10.1080\/00207543.2011.578159","volume":"50","author":"HM Wee","year":"2012","unstructured":"Wee HM, Widyadana GA (2012) Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. Int J Prod Res 50:2940\u20132952","journal-title":"Int J Prod Res"},{"key":"7485_CR54","doi-asserted-by":"crossref","first-page":"1870","DOI":"10.1080\/00207721.2011.555009","volume":"43","author":"GA Widyadana","year":"2012","unstructured":"Widyadana GA, Wee HM (2012) An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown. Int J Syst Sci 43:1870\u20131882","journal-title":"Int J Syst Sci"},{"key":"7485_CR55","first-page":"1","volume-title":"Ecological Economics Research Trends","author":"T Wiedmann","year":"2008","unstructured":"Wiedmann T, Minx J (2008) A Definition of \u2018Carbon Footprint.\u2019 In: Pertsova CC (ed) Ecological Economics Research Trends. Nova Science Publishers, Hauppauge NY, pp 1\u201311"},{"key":"7485_CR56","doi-asserted-by":"crossref","first-page":"4093","DOI":"10.1016\/j.jclepro.2015.08.081","volume":"112","author":"X Xu","year":"2016","unstructured":"Xu X, Xu X, He P (2016) Joint production and pricing decisions for multiple products with cap-and trade and carbon tax regulations. J Clean Prod 112:4093\u20134106","journal-title":"J Clean Prod"},{"key":"7485_CR57","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/0020-0255(81)90017-7","volume":"24","author":"RR Yager","year":"1981","unstructured":"Yager RR (1981) A procedure for ordering fuzzy subsets of the unit interval. Inf Sci 24:143\u2013161","journal-title":"Inf Sci"},{"issue":"3","key":"7485_CR58","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338\u2013356","journal-title":"Inf Control"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-022-07485-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-022-07485-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-022-07485-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,25]],"date-time":"2023-02-25T13:10:26Z","timestamp":1677330626000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-022-07485-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,9,19]]},"references-count":57,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2023,3]]}},"alternative-id":["7485"],"URL":"https:\/\/doi.org\/10.1007\/s00500-022-07485-y","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,9,19]]},"assertion":[{"value":"26 August 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 September 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that there is no conflict of interest regarding the publication of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}