{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,5]],"date-time":"2026-06-05T05:42:58Z","timestamp":1780638178529,"version":"3.54.1"},"reference-count":64,"publisher":"Springer Science and Business Media LLC","issue":"24","license":[{"start":{"date-parts":[[2023,8,18]],"date-time":"2023-08-18T00:00:00Z","timestamp":1692316800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,8,18]],"date-time":"2023-08-18T00:00:00Z","timestamp":1692316800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2023,12]]},"DOI":"10.1007\/s00500-023-09099-4","type":"journal-article","created":{"date-parts":[[2023,8,18]],"date-time":"2023-08-18T15:58:48Z","timestamp":1692374328000},"page":"18651-18666","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":15,"title":["Comparative performance of the NSGA-II and MOPSO algorithms and simulations for evaluating time\u2013cost\u2013quality\u2013risk trade-off in multi-modal PERT networks"],"prefix":"10.1007","volume":"27","author":[{"given":"Seyyed Jalaladdin","family":"Hosseini Dehshiri","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ahmad","family":"Yousefi Hanoomarvar","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Maghsoud","family":"Amiri","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2023,8,18]]},"reference":[{"issue":"11\u201312","key":"9099_CR1","doi-asserted-by":"crossref","first-page":"1051","DOI":"10.1007\/s00170-009-2051-6","volume":"45","author":"A Aghaie","year":"2009","unstructured":"Aghaie A, Mokhtari H (2009) Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation. Int J Adv Manuf Technol 45(11\u201312):1051","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"9099_CR2","first-page":"30","volume":"6","author":"G Albayrak","year":"2017","unstructured":"Albayrak G, \u00d6zdemir \u0130 (2017) A state of art review on metaheuristic methods in time-cost trade-off problems. Int J Struct Civ Eng Res 6(1):30\u201334","journal-title":"Int J Struct Civ Eng Res"},{"key":"9099_CR3","doi-asserted-by":"crossref","unstructured":"Alzarrad MA, Moynihan GP, Hatamleh MT, Song S (2019) Fuzzy multicriteria decision-making model for time-cost-risk trade-off optimization in construction projects. Adv Civ Eng","DOI":"10.1155\/2019\/7852301"},{"issue":"3","key":"9099_CR4","first-page":"355","volume":"14","author":"M Amiri","year":"2013","unstructured":"Amiri M, Abtahi AR, Khalili-Damghani K (2013) Solving a generalised precedence multi-objective multi-mode time-cost-quality trade-off project scheduling problem using a modified NSGA-II algorithm. Int J Serv Oper Manag 14(3):355\u2013372","journal-title":"Int J Serv Oper Manag"},{"issue":"1","key":"9099_CR5","first-page":"260","volume":"217","author":"KP Anagnostopoulos","year":"2010","unstructured":"Anagnostopoulos KP, Kotsikas L (2010) Experimental evaluation of simulated annealing algorithms for the time\u2013cost trade-off problem. Appl Math Comput 217(1):260\u2013270","journal-title":"Appl Math Comput"},{"issue":"3","key":"9099_CR6","doi-asserted-by":"crossref","first-page":"1186","DOI":"10.1016\/j.ejor.2006.05.014","volume":"180","author":"A Azaron","year":"2007","unstructured":"Azaron A, Tavakkoli-Moghaddam R (2007) Multi-objective time\u2013cost trade-off in dynamic PERT networks using an interactive approach. Eur J Oper Res 180(3):1186\u20131200","journal-title":"Eur J Oper Res"},{"issue":"2","key":"9099_CR7","first-page":"1317","volume":"168","author":"A Azaron","year":"2005","unstructured":"Azaron A, Perkgoz C, Sakawa M (2005) A genetic algorithm approach for the time-cost trade-off in PERT networks. Appl Math Comput 168(2):1317\u20131339","journal-title":"Appl Math Comput"},{"issue":"2","key":"9099_CR8","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/0377-2217(94)00202-9","volume":"88","author":"AJG Babu","year":"1996","unstructured":"Babu AJG, Suresh N (1996) Project management with time, cost, and quality considerations. Eur J Oper Res 88(2):320\u2013327","journal-title":"Eur J Oper Res"},{"key":"9099_CR9","unstructured":"Banihashemi SA, Mohammad M (2022) Time-cost-quality-risk trade-off project scheduling problem in oil and gas construction projects: fuzzy logic and genetic algorithm. Jordan J Civ Eng 16(2)"},{"issue":"3","key":"9099_CR10","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1002\/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO;2-7","volume":"38","author":"CE Bell","year":"1991","unstructured":"Bell CE, Han J (1991) A new heuristic solution method in resource-constrained project scheduling. Naval Res Logist 38(3):315\u2013331","journal-title":"Naval Res Logist"},{"issue":"8","key":"9099_CR11","doi-asserted-by":"crossref","first-page":"2335","DOI":"10.1080\/00207549608905028","volume":"34","author":"FF Boctor","year":"1996","unstructured":"Boctor FF (1996) Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34(8):2335\u20132351","journal-title":"Int J Prod Res"},{"key":"9099_CR12","doi-asserted-by":"crossref","unstructured":"D\u2019Angelo G, Palmieri F (2023) A Co-evolutionary genetic algorithm for robust and balanced controller placement in software-defined networks. J Netw Comput Appl 103583","DOI":"10.1016\/j.jnca.2023.103583"},{"issue":"4","key":"9099_CR13","doi-asserted-by":"crossref","first-page":"1779","DOI":"10.1007\/s00500-022-06757-x","volume":"26","author":"G D\u2019Angelo","year":"2022","unstructured":"D\u2019Angelo G, Palmieri F, Robustelli A (2022a) Artificial neural networks for resources optimization in energetic environment. Soft Comput 26(4):1779\u20131792","journal-title":"Soft Comput"},{"issue":"19","key":"9099_CR14","doi-asserted-by":"crossref","first-page":"10063","DOI":"10.1007\/s00500-022-07383-3","volume":"26","author":"G D\u2019Angelo","year":"2022","unstructured":"D\u2019Angelo G, Scoppettuolo MN, Cammarota AL, Rosati A, Palmieri F (2022b) A genetic programming-based approach for classifying pancreatic adenocarcinoma: the SICED experience. Soft Comput 26(19):10063\u201310074","journal-title":"Soft Comput"},{"key":"9099_CR15","volume":"206","author":"SJH Dehshiri","year":"2022","unstructured":"Dehshiri SJH, Amiri M, Olfat L, Pishvaee MS (2022) Multi-objective closed-loop supply chain network design: a novel robust stochastic, possibilistic, and flexible approach. Expert Syst Appl 206:117807","journal-title":"Expert Syst Appl"},{"issue":"1","key":"9099_CR16","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1023\/A:1022283403119","volume":"6","author":"E Demeulemeester","year":"2003","unstructured":"Demeulemeester E, Vanhoucke M, Herroelen W (2003) RanGen: a random network generator for activity-on-the-node networks. J Sched 6(1):17\u201338","journal-title":"J Sched"},{"issue":"2","key":"9099_CR17","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/0377-2217(93)90177-O","volume":"64","author":"SE Elmaghraby","year":"1993","unstructured":"Elmaghraby SE (1993) Resource allocation via dynamic programming in activity networks. Eur J Oper Res 64(2):199\u2013215","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9099_CR18","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1061\/(ASCE)0887-3801(1997)11:3(184)","volume":"11","author":"CW Feng","year":"1997","unstructured":"Feng CW, Liu L, Burns SA (1997) Using genetic algorithms to solve construction time-cost trade-off problems. J Comput Civ Eng 11(3):184\u2013189","journal-title":"J Comput Civ Eng"},{"key":"9099_CR19","unstructured":"Fondahl JW (1962) A non-computer approach to the critical path method for the construction industry"},{"issue":"3","key":"9099_CR20","doi-asserted-by":"crossref","first-page":"729","DOI":"10.1016\/j.ejor.2016.07.024","volume":"256","author":"MJ Geiger","year":"2017","unstructured":"Geiger MJ (2017) A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. Eur J Oper Res 256(3):729\u2013741","journal-title":"Eur J Oper Res"},{"key":"9099_CR21","unstructured":"Ghamginzadeh A, Najafi AA (2013) Solving resource-constrained discrete time-cost trade-off problem by memetic algorithm"},{"issue":"2","key":"9099_CR22","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1287\/ijoc.12.2.125.11894","volume":"12","author":"WJ Gutjahr","year":"2000","unstructured":"Gutjahr WJ, Strauss C, Wagner E (2000) A stochastic branch-and-bound approach to activity crashing in project management. INFORMS J Comput 12(2):125\u2013135","journal-title":"INFORMS J Comput"},{"issue":"2","key":"9099_CR23","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1177\/875697280403500205","volume":"35","author":"WA Haga","year":"2004","unstructured":"Haga WA, Marold KA (2004) A simulation approach to the PERT\/CPM time-cost trade-off problem. Proj Manag J 35(2):31\u201337","journal-title":"Proj Manag J"},{"key":"9099_CR24","doi-asserted-by":"crossref","unstructured":"Hong KR, Huang X, Kim JS, Kim NH (2023) A multi-objective mean-semivariance model for project selection using reinvestment and synergy under uncertainty. Expert Syst Appl 119586","DOI":"10.1016\/j.eswa.2023.119586"},{"key":"9099_CR25","doi-asserted-by":"crossref","unstructured":"Hooshyar B, Tahmani A, Shenasa M (2008) A genetic algorithm to time-cost trade off in project scheduling. In: 2008 IEEE congress on evolutionary computation (IEEE world congress on computational intelligence), pp 3081\u20133086. IEEE","DOI":"10.1109\/CEC.2008.4631214"},{"key":"9099_CR26","doi-asserted-by":"crossref","unstructured":"Hosny O, Elbassuony M (2018) Stochastic time-cost-quality trade-off analysis: the PERT approach. In: Construction research congress 2018, pp 346\u2013355","DOI":"10.1061\/9780784481271.034"},{"key":"9099_CR27","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2022.109944","volume":"134","author":"SJH Hosseini Dehshiri","year":"2023","unstructured":"Hosseini Dehshiri SJH, Amiri M, Olfat L, Pishvaee MS (2023) A robust fuzzy stochastic multi-objective model for stone paper closed-loop supply chain design considering the flexibility of soft constraints based on Me measure. Appl Soft Comput 134:109944","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9099_CR28","first-page":"346","volume":"40","author":"H Iranmanesh","year":"2008","unstructured":"Iranmanesh H, Skandari MR, Allahverdiloo M (2008) Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling. World Acad Sci Eng Technol 40(1):346\u2013350","journal-title":"World Acad Sci Eng Technol"},{"issue":"5","key":"9099_CR29","doi-asserted-by":"crossref","first-page":"965","DOI":"10.1080\/10556788.2015.1005838","volume":"30","author":"K Khalili-Damghani","year":"2015","unstructured":"Khalili-Damghani K, Tavana M, Abtahi AR, Santos Arteaga FJ (2015) Solving multi-mode time\u2013cost\u2013quality trade-off problems under generalized precedence relations. Optim Methods Softw 30(5):965\u20131001","journal-title":"Optim Methods Softw"},{"issue":"4","key":"9099_CR30","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0263-7863(98)00043-X","volume":"17","author":"DB Khang","year":"1999","unstructured":"Khang DB, Myint YM (1999) Time, cost and quality trade-off in project management: a case study. Int J Project Manag 17(4):249\u2013256","journal-title":"Int J Project Manag"},{"key":"9099_CR31","doi-asserted-by":"crossref","unstructured":"Lova A, Tormos P, Barber F (2006) Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules. Inteligencia Artificial Revista Iberoamericana de Inteligencia Artificial 10(30):69\u201386","DOI":"10.4114\/ia.v10i30.947"},{"issue":"3","key":"9099_CR32","first-page":"271","volume":"21","author":"DL Luong","year":"2021","unstructured":"Luong DL, Tran DH, Nguyen PT (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. Int J Constr Manag 21(3):271\u2013283","journal-title":"Int J Constr Manag"},{"key":"9099_CR33","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/j.compchemeng.2016.02.018","volume":"88","author":"H Maghsoudlou","year":"2016","unstructured":"Maghsoudlou H, Afshar-Nadjafi B, Niaki STA (2016) A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem. Comput Chem Eng 88:157\u2013169","journal-title":"Comput Chem Eng"},{"key":"9099_CR34","doi-asserted-by":"crossref","unstructured":"Mahmoudi A, Feylizadeh MR (2018) A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns. Grey Syst Theory Appl","DOI":"10.1108\/GS-12-2017-0042"},{"key":"9099_CR35","doi-asserted-by":"crossref","unstructured":"Maniezzo V, Mingozzi A (1999) A heuristic procedure for the multi-mode project scheduling problem based on Benders\u2019 decomposition. In: Project scheduling, pp 179\u2013196. Springer, Boston","DOI":"10.1007\/978-1-4615-5533-9_8"},{"key":"9099_CR36","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.cie.2016.02.025","volume":"95","author":"F Mohammadipour","year":"2016","unstructured":"Mohammadipour F, Sadjadi SJ (2016) Project cost\u2013quality\u2013risk tradeoff analysis in a time-constrained problem. Comput Ind Eng 95:111\u2013121","journal-title":"Comput Ind Eng"},{"issue":"5\u20138","key":"9099_CR37","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1007\/s00170-010-2543-4","volume":"50","author":"H Mokhtari","year":"2010","unstructured":"Mokhtari H, Aghaie A, Rahimi J, Mozdgir A (2010) Project time\u2013cost trade-off scheduling: a hybrid optimization approach. Int J Adv Manuf Technol 50(5\u20138):811\u2013822","journal-title":"Int J Adv Manuf Technol"},{"issue":"5","key":"9099_CR38","first-page":"770","volume":"31","author":"HR Mollaei","year":"2018","unstructured":"Mollaei HR, Tavakkoli-Moghaddam R, Toloie-Eshlaghy A (2018) A new multi-objective model for multi-mode project planning with risk. Int J Eng 31(5):770\u2013779","journal-title":"Int J Eng"},{"issue":"1","key":"9099_CR39","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1139\/l93-007","volume":"20","author":"O Moselhi","year":"1993","unstructured":"Moselhi O (1993) Schedule compression using the direct stiffness method. Can J Civ Eng 20(1):65\u201372","journal-title":"Can J Civ Eng"},{"key":"9099_CR40","doi-asserted-by":"crossref","first-page":"32453","DOI":"10.1109\/ACCESS.2019.2903229","volume":"7","author":"M Mrad","year":"2019","unstructured":"Mrad M, Al-Gahtani KS, Hulchafo R, Souayah N, Bamatraf K (2019) Risk assessment for discrete stochastic time-cost-quality trade-off problem using simulation-based integer linear programming approach. IEEE Access 7:32453\u201332463","journal-title":"IEEE Access"},{"issue":"8","key":"9099_CR41","doi-asserted-by":"crossref","first-page":"1953","DOI":"10.1016\/j.engappai.2013.05.006","volume":"26","author":"S Mungle","year":"2013","unstructured":"Mungle S, Benyoucef L, Son YJ, Tiwari MK (2013) A fuzzy clustering-based genetic algorithm approach for time\u2013cost\u2013quality trade-off problems: a case study of highway construction project. Eng Appl Artif Intell 26(8):1953\u20131966","journal-title":"Eng Appl Artif Intell"},{"issue":"2","key":"9099_CR42","doi-asserted-by":"crossref","first-page":"1499","DOI":"10.1016\/j.aej.2021.06.058","volume":"61","author":"DT Nguyen","year":"2022","unstructured":"Nguyen DT, Le-Hoai L, Tarigan PB, Tran DH (2022) Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm. Alex Eng J 61(2):1499\u20131518","journal-title":"Alex Eng J"},{"key":"9099_CR43","doi-asserted-by":"crossref","unstructured":"Nwaneri SC, Anyaeche CO (2018) Application of time-cost-quality-risk trade-off model in magnetic resonance imaging installation project","DOI":"10.4314\/njt.v37i2.13"},{"issue":"4","key":"9099_CR44","first-page":"484","volume":"22","author":"B Paryzad","year":"2016","unstructured":"Paryzad B, Pour NS (2016) Time-cost-quality-risk trade-off in GIGA projects using specific techniques of hunting dolphins. Int J Ind Syst Eng 22(4):484\u2013499","journal-title":"Int J Ind Syst Eng"},{"issue":"42","key":"9099_CR45","first-page":"2081","volume":"4","author":"NS Pour","year":"2010","unstructured":"Pour NS, Modarres M, Aryanejad M, Moghadam RT (2010) The discrete time-cost-quality trade-off problem using a novel hybrid genetic algorithm. Appl Math Sci 4(42):2081\u20132094","journal-title":"Appl Math Sci"},{"issue":"3","key":"9099_CR46","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1287\/mnsc.9.3.394","volume":"9","author":"W Prager","year":"1963","unstructured":"Prager W (1963) A structural method of computing project cost polygons. Manag Sci 9(3):394\u2013404","journal-title":"Manag Sci"},{"key":"9099_CR47","unstructured":"Project Management Institute (2018) A guide to the project management body of knowledge (PMBOK\u00ae Guide)-(JAPANESE). Project Management Institute"},{"issue":"2","key":"9099_CR48","first-page":"270","volume":"4","author":"M Rahimi","year":"2008","unstructured":"Rahimi M, Iranmanesh H (2008) Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem. World Appl Sci J 4(2):270\u2013276","journal-title":"World Appl Sci J"},{"key":"9099_CR49","unstructured":"Rasmy MH, Abdelsalam HM, Hussein RR (2008) Multi-objective time-cost trade-off analysis in critical chain project networks using Pareto simulated annealing. In: Proceeding Presented at the sixth international conference on informatics and systems (INFOS2008), Cairo, Egypt"},{"issue":"2","key":"9099_CR50","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1287\/mnsc.22.2.158","volume":"22","author":"DR Robinson","year":"1975","unstructured":"Robinson DR (1975) A dynamic programming solution to cost-time tradeoff for CPM. Manag Sci 22(2):158\u2013166","journal-title":"Manag Sci"},{"key":"9099_CR51","doi-asserted-by":"crossref","unstructured":"Sadeghi R, Heidari A, Zahedi F, Khordehbinan MW, Khalilzadeh M (2023) Application of NSGA-II and fuzzy TOPSIS to time\u2013cost\u2013quality trade-off resource leveling for scheduling an agricultural water supply project. Int J Environ Sci Technol 1\u201328","DOI":"10.1007\/s13762-022-04743-2"},{"key":"9099_CR52","doi-asserted-by":"crossref","first-page":"930","DOI":"10.1016\/j.procs.2015.09.065","volume":"65","author":"A Saif","year":"2015","unstructured":"Saif A, Abbas S, Fayed Z (2015) The PDBO algorithm for discrete time, cost and quality trade-off in software projects with expressing quality by defects. Procedia Comput Sci 65:930\u2013939","journal-title":"Procedia Comput Sci"},{"issue":"3","key":"9099_CR53","first-page":"355","volume":"10","author":"N Shahsavari-Pour","year":"2010","unstructured":"Shahsavari-Pour N, Modarres M, Tavakoli-Moghadam R, Najafi E (2010) Optimizing a multi-objectives time-cost-quality trade-off problem by a new hybrid genetic algorithm. World Appl Sci J 10(3):355\u2013363","journal-title":"World Appl Sci J"},{"issue":"6","key":"9099_CR54","doi-asserted-by":"crossref","first-page":"B-354","DOI":"10.1287\/mnsc.17.6.B354","volume":"17","author":"N Siemens","year":"1971","unstructured":"Siemens N (1971) A simple CPM time-cost tradeoff algorithm. Manag Sci 17(6):B-354","journal-title":"Manag Sci"},{"issue":"4","key":"9099_CR55","doi-asserted-by":"crossref","first-page":"909","DOI":"10.1287\/moor.23.4.909","volume":"23","author":"M Skutella","year":"1998","unstructured":"Skutella M (1998) Approximation algorithms for the discrete time-cost tradeoff problem. Math Oper Res 23(4):909\u2013929","journal-title":"Math Oper Res"},{"issue":"8","key":"9099_CR56","first-page":"711","volume":"31","author":"R S\u0142owi\u0144ski","year":"1980","unstructured":"S\u0142owi\u0144ski R (1980) Two approaches to problems of resource allocation among project activities\u2014a comparative study. J Oper Res Soc 31(8):711\u2013723","journal-title":"J Oper Res Soc"},{"issue":"10","key":"9099_CR57","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"FB Talbot","year":"1982","unstructured":"Talbot FB (1982) Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Manag Sci 28(10):1197\u20131210","journal-title":"Manag Sci"},{"issue":"2","key":"9099_CR58","first-page":"1136","volume":"190","author":"HR Tareghian","year":"2007","unstructured":"Tareghian HR, Taheri SH (2007) A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Appl Math Comput 190(2):1136\u20131145","journal-title":"Appl Math Comput"},{"key":"9099_CR59","doi-asserted-by":"crossref","unstructured":"Tran DH, Long LD (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Eng Constr Archit Manag","DOI":"10.1108\/ECAM-05-2017-0085"},{"key":"9099_CR60","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1016\/j.knosys.2014.11.018","volume":"74","author":"DH Tran","year":"2015","unstructured":"Tran DH, Cheng MY, Cao MT (2015) Hybrid multiple objective artificial bee colony with differential evolution for the time\u2013cost\u2013quality tradeoff problem. Knowl Based Syst 74:176\u2013186","journal-title":"Knowl Based Syst"},{"issue":"3","key":"9099_CR61","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1080\/00207549408956961","volume":"32","author":"G Ulusoy","year":"1994","unstructured":"Ulusoy G, \u00d6zdamar L (1994) A constraint-based perspective in resource constrained project scheduling. Int J Prod Res 32(3):693\u2013705","journal-title":"Int J Prod Res"},{"issue":"2","key":"9099_CR62","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/j.ejor.2004.04.007","volume":"165","author":"M Vanhoucke","year":"2005","unstructured":"Vanhoucke M (2005) New computational results for the discrete time\/cost trade-off problem with time-switch constraints. Eur J Oper Res 165(2):359\u2013374","journal-title":"Eur J Oper Res"},{"issue":"7\u20138","key":"9099_CR63","doi-asserted-by":"crossref","first-page":"1205","DOI":"10.1016\/j.enconman.2003.08.008","volume":"45","author":"AW Yao","year":"2004","unstructured":"Yao AW, Chi SC (2004) Analysis and design of a Taguchi-Grey based electricity demand predictor for energy management systems. Energy Convers Manag 45(7\u20138):1205\u20131217","journal-title":"Energy Convers Manag"},{"issue":"6","key":"9099_CR64","doi-asserted-by":"crossref","first-page":"601","DOI":"10.1016\/j.ijproman.2007.03.001","volume":"25","author":"PX Zou","year":"2007","unstructured":"Zou PX, Zhang G, Wang J (2007) Understanding the key risks in construction projects in China. Int J Project Manag 25(6):601\u2013614","journal-title":"Int J Project Manag"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09099-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-023-09099-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09099-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,13]],"date-time":"2023-11-13T18:07:51Z","timestamp":1699898871000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-023-09099-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,8,18]]},"references-count":64,"journal-issue":{"issue":"24","published-print":{"date-parts":[[2023,12]]}},"alternative-id":["9099"],"URL":"https:\/\/doi.org\/10.1007\/s00500-023-09099-4","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,8,18]]},"assertion":[{"value":"2 August 2023","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 August 2023","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}},{"value":"This research does not involve any human participants or animals.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}