{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,4]],"date-time":"2026-06-04T01:13:26Z","timestamp":1780535606624,"version":"3.54.1"},"reference-count":115,"publisher":"Springer Science and Business Media LLC","issue":"24","license":[{"start":{"date-parts":[[2023,10,15]],"date-time":"2023-10-15T00:00:00Z","timestamp":1697328000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,10,15]],"date-time":"2023-10-15T00:00:00Z","timestamp":1697328000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2023,12]]},"DOI":"10.1007\/s00500-023-09304-4","type":"journal-article","created":{"date-parts":[[2023,10,15]],"date-time":"2023-10-15T11:01:26Z","timestamp":1697367686000},"page":"18489-18528","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Review evolution of dual-resource-constrained scheduling problems in manufacturing systems: modeling and scheduling methods\u2019 trends"],"prefix":"10.1007","volume":"27","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9998-7383","authenticated-orcid":false,"given":"Aidin","family":"Delgoshaei","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mohd Khairol Anuar Mohd","family":"Ariffin","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Sepehr","family":"Maleki","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Zulkiflle","family":"Leman","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2023,10,15]]},"reference":[{"key":"9304_CR1","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1007\/s11590-020-01674-0","volume":"16","author":"M Abderrahim","year":"2020","unstructured":"Abderrahim M, Bekrar A, Trentesaux D, Aissani N, Bouamrane K (2020) Bi-local search based variable neighborhood search for job-shop scheduling problem with transport constraints. Optim Lett 16:255\u2013280","journal-title":"Optim Lett"},{"key":"9304_CR2","volume-title":"Extensions of the dual-resource constrained flexible job-shop scheduling problem","author":"KB Adams","year":"2019","unstructured":"Adams KB (2019) Extensions of the dual-resource constrained flexible job-shop scheduling problem. Arizona State University, Tempe"},{"issue":"2","key":"9304_CR3","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1007\/s10845-015-1117-6","volume":"29","author":"M Afzalirad","year":"2018","unstructured":"Afzalirad M, Shafipour M (2018) Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions. J Intell Manuf 29(2):423\u2013437","journal-title":"J Intell Manuf"},{"key":"9304_CR4","doi-asserted-by":"crossref","unstructured":"Ahmeti A, Musliu N (2018) Min-conflicts heuristic for multi-mode resource-constrained projects scheduling. In: Paper presented at the proceedings of the genetic and evolutionary computation conference","DOI":"10.1145\/3205455.3205620"},{"key":"9304_CR5","doi-asserted-by":"crossref","unstructured":"Akbar M, Irohara T (2018a) Dual resource constrained scheduling considering operator working modes and moving in identical parallel machines using a permutation-based genetic algorithm. In: Paper presented at the IFIP international conference on advances in production management systems","DOI":"10.1007\/978-3-319-99704-9_57"},{"key":"9304_CR6","unstructured":"Akbar M, Irohara T (2018b) A social-conscious scheduling model of dual resources constrained identical parallel machine to minimize makespan and operator workload balance. In: Paper presented at the proceedings of the asia pacific industrial engineering & management system conference"},{"key":"9304_CR7","doi-asserted-by":"crossref","unstructured":"Akbar M, Irohara T (2019) A DRC scheduling for social sustainability: trade-off between tardiness and workload balance. In: Paper presented at the IFIP international conference on advances in production management systems","DOI":"10.1007\/978-3-030-30000-5_27"},{"key":"9304_CR8","doi-asserted-by":"crossref","first-page":"104004","DOI":"10.1016\/j.engappai.2020.104004","volume":"96","author":"M Akbar","year":"2020","unstructured":"Akbar M, Irohara T (2020a) Metaheuristics for the multi-task simultaneous supervision dual resource-constrained scheduling problem. Eng Appl Artif Intell 96:104004","journal-title":"Eng Appl Artif Intell"},{"key":"9304_CR9","doi-asserted-by":"crossref","first-page":"113754","DOI":"10.1016\/j.eswa.2020.113754","volume":"162","author":"M Akbar","year":"2020","unstructured":"Akbar M, Irohara T (2020b) NSGA-II variants for solving a social-conscious dual resource-constrained scheduling problem. Expert Syst Appl 162:113754","journal-title":"Expert Syst Appl"},{"issue":"2","key":"9304_CR10","first-page":"23","volume":"2","author":"M Akbari","year":"2017","unstructured":"Akbari M (2017) Mathematical modeling of human factors in dual resourced constraint system. Mod Res Decis Mak 2(2):23\u201349","journal-title":"Mod Res Decis Mak"},{"issue":"2","key":"9304_CR11","doi-asserted-by":"crossref","first-page":"e12455","DOI":"10.1111\/exsy.12455","volume":"39","author":"SS Amelian","year":"2022","unstructured":"Amelian SS, Sajadi SM, Navabakhsh M, Esmaelian M (2022) Multi-objective optimization for stochastic failure-prone job shop scheduling problem via hybrid of NSGA-II and simulation method. Expert Syst 39(2):e12455","journal-title":"Expert Syst"},{"issue":"1","key":"9304_CR12","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10479-019-03196-0","volume":"291","author":"JL Andrade-Pineda","year":"2020","unstructured":"Andrade-Pineda JL, Canca D, Gonzalez-R PL, Calle M (2020) Scheduling a dual-resource flexible job shop with makespan and due date-related criteria. Ann Oper Res 291(1):5\u201335","journal-title":"Ann Oper Res"},{"key":"9304_CR13","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1016\/j.cor.2014.06.002","volume":"51","author":"E Angelelli","year":"2014","unstructured":"Angelelli E, Bianchessi N, Filippi C (2014) Optimal interval scheduling with a resource constraint. Comput Oper Res 51:268\u2013281","journal-title":"Comput Oper Res"},{"key":"9304_CR14","doi-asserted-by":"crossref","unstructured":"Araz OU (2007) Real-time controlled multi-objective scheduling through ANNs and fuzzy inference systems: the case of DRC manufacturing. In: Paper presented at the international conference on computational science","DOI":"10.1007\/978-3-540-72590-9_148"},{"key":"9304_CR15","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.euroecorev.2014.04.008","volume":"70","author":"S Basov","year":"2014","unstructured":"Basov S, King I, Uren L (2014) Worker heterogeneity, the job-finding rate, and technical change. Eur Econ Rev 70:159\u2013177","journal-title":"Eur Econ Rev"},{"key":"9304_CR16","doi-asserted-by":"crossref","first-page":"108151","DOI":"10.1016\/j.ijpe.2021.108151","volume":"237","author":"N Berti","year":"2021","unstructured":"Berti N, Finco S, Batta\u00efa O, Delorme X (2021) Ageing workforce effects in dual-resource constrained job-shop scheduling. Int J Prod Econ 237:108151","journal-title":"Int J Prod Econ"},{"issue":"22","key":"9304_CR17","doi-asserted-by":"crossref","first-page":"6333","DOI":"10.1080\/00207540802350724","volume":"47","author":"JA Bokhorst","year":"2009","unstructured":"Bokhorst JA, Gaalman GJ (2009) Cross-training workers in dual resource constrained systems with heterogeneous processing times. Int J Prod Res 47(22):6333\u20136356","journal-title":"Int J Prod Res"},{"issue":"1\u20132","key":"9304_CR18","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1504\/IJCAT.2006.010084","volume":"26","author":"JA Bokhorst","year":"2006","unstructured":"Bokhorst JA, Slomp J, Gaalman GJ (2006) Cooperation in a distributed dual resource-constrained manufacturing system. Int J Comput Appl Technol 26(1\u20132):83\u201390","journal-title":"Int J Comput Appl Technol"},{"key":"9304_CR19","doi-asserted-by":"crossref","unstructured":"Branke J, Groves MJ, Hildebrandt T (2016) Evolving control rules for a dual-constrained job scheduling scenario. In: Paper presented at the 2016 winter simulation conference (WSC)","DOI":"10.1109\/WSC.2016.7822295"},{"key":"9304_CR20","doi-asserted-by":"crossref","first-page":"106545","DOI":"10.1016\/j.cie.2020.106545","volume":"146","author":"A Costa","year":"2020","unstructured":"Costa A, Fernandez-Viagas V, Frami\u00f1an JM (2020) Solving the hybrid flow shop scheduling problem with limited human resource constraint. Comput Ind Eng 146:106545","journal-title":"Comput Ind Eng"},{"issue":"13","key":"9304_CR21","doi-asserted-by":"crossref","first-page":"1421","DOI":"10.1016\/j.ifacol.2019.11.398","volume":"52","author":"MM Cunha","year":"2019","unstructured":"Cunha MM, Viegas JL, Martins MS, Coito T, Costigliola A, Figueiredo J, Sousa JM, Vieira SM (2019) Dual resource constrained scheduling for quality control laboratories. IFAC-PapersOnLine 52(13):1421\u20131426","journal-title":"IFAC-PapersOnLine"},{"key":"9304_CR22","doi-asserted-by":"crossref","unstructured":"Defersha F, Obimuyiwa D, Yimer AD (2020) Multiple-trial\/best-move simulated annealing for flexible job shop scheduling with scarce setup-operators. In: Paper presented at the 2020 7th international conference on soft computing & machine intelligence (ISCMI)","DOI":"10.1109\/ISCMI51676.2020.9311570"},{"key":"9304_CR23","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/j.asoc.2016.06.025","volume":"49","author":"A Delgoshaei","year":"2016","unstructured":"Delgoshaei A, Gomes C (2016) A multi-layer perceptron for scheduling cellular manufacturing systems in the presence of unreliable machines and uncertain cost. Appl Soft Comput 49:27\u201355","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9304_CR24","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1007\/s12541-016-0017-9","volume":"17","author":"A Delgoshaei","year":"2016","unstructured":"Delgoshaei A, Ariffin MKAM, Leman Z, Baharudin B, Gomes C (2016a) Review of evolution of cellular manufacturing system\u2019s approaches: material transferring models. Int J Precis Eng Manuf 17(1):131\u2013149","journal-title":"Int J Precis Eng Manuf"},{"issue":"2","key":"9304_CR25","doi-asserted-by":"crossref","first-page":"219","DOI":"10.5267\/j.dsl.2015.12.002","volume":"5","author":"A Delgoshaei","year":"2016","unstructured":"Delgoshaei A, Parvin M, Ariffin M (2016b) Evaluating impact of market changes on increasing cell-load variation in dynamic cellular manufacturing systems using a hybrid Tabu search and simulated annealing algorithms. Decis Sci Lett 5(2):219\u2013244","journal-title":"Decis Sci Lett"},{"issue":"4","key":"9304_CR26","doi-asserted-by":"crossref","first-page":"997","DOI":"10.1080\/00207543.2016.1213445","volume":"55","author":"A Delgoshaei","year":"2017","unstructured":"Delgoshaei A, Ariffin M, Ali A (2017) A multi-period scheduling method for trading-off between skilled-workers allocation and outsource service usage in dynamic CMS. Int J Prod Res 55(4):997\u20131039","journal-title":"Int J Prod Res"},{"key":"9304_CR27","doi-asserted-by":"crossref","first-page":"1507","DOI":"10.1016\/j.procs.2018.08.123","volume":"126","author":"M Dhiflaoui","year":"2018","unstructured":"Dhiflaoui M, Nouri HE, Driss OB (2018) Dual-resource constraints in classical and flexible job shop problems: a state-of-the-art review. Procedia Comput Sci 126:1507\u20131515","journal-title":"Procedia Comput Sci"},{"key":"9304_CR28","doi-asserted-by":"crossref","first-page":"108067","DOI":"10.1016\/j.cie.2022.108067","volume":"168","author":"F Dunke","year":"2022","unstructured":"Dunke F, Nickel S (2022) A multi-method approach to scheduling and efficiency analysis in dual-resource constrained job shops with processing time uncertainty. Comput Ind Eng 168:108067","journal-title":"Comput Ind Eng"},{"issue":"7","key":"9304_CR29","doi-asserted-by":"crossref","first-page":"1825","DOI":"10.1080\/00207543.2011.560205","volume":"50","author":"T Ertay","year":"2012","unstructured":"Ertay T, Sato\u011flu SI (2012) System parameter selection with information axiom for the new product introduction to the hybrid manufacturing systems under dual-resource constraint. Int J Prod Res 50(7):1825\u20131839","journal-title":"Int J Prod Res"},{"issue":"14","key":"9304_CR30","doi-asserted-by":"crossref","first-page":"4134","DOI":"10.1080\/00207543.2012.748228","volume":"51","author":"J Fan","year":"2013","unstructured":"Fan J, Feng D (2013) Design of cellular manufacturing system with quasi-dynamic dual resource using multi-objective GA. Int J Prod Res 51(14):4134\u20134154","journal-title":"Int J Prod Res"},{"key":"9304_CR31","doi-asserted-by":"crossref","unstructured":"Fan J, Cao M, Feng D (2010) Multi-objective dual resource-constrained model for cell formation problem. In: Paper presented at the 2010 IEEE international conference on management of innovation & technology","DOI":"10.1109\/ICMIT.2010.5492881"},{"key":"9304_CR32","doi-asserted-by":"crossref","first-page":"104527","DOI":"10.1109\/ACCESS.2020.2999680","volume":"8","author":"K Geng","year":"2020","unstructured":"Geng K, Ye C, Liu L (2020) Research on multi-objective hybrid flow shop scheduling problem with dual resource constraints using improved memetic algorithm. IEEE Access 8:104527\u2013104542","journal-title":"IEEE Access"},{"key":"9304_CR33","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1016\/j.jclepro.2017.10.188","volume":"174","author":"G Gong","year":"2018","unstructured":"Gong G, Deng Q, Gong X, Liu W, Ren Q (2018) A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators. J Clean Prod 174:560\u2013576","journal-title":"J Clean Prod"},{"issue":"14","key":"9304_CR34","doi-asserted-by":"crossref","first-page":"4406","DOI":"10.1080\/00207543.2019.1653504","volume":"58","author":"G Gong","year":"2020","unstructured":"Gong G, Chiong R, Deng Q, Gong X (2020) A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility. Int J Prod Res 58(14):4406\u20134420","journal-title":"Int J Prod Res"},{"key":"9304_CR35","doi-asserted-by":"crossref","first-page":"107430","DOI":"10.1016\/j.knosys.2021.107430","volume":"231","author":"G Gong","year":"2021","unstructured":"Gong G, Deng Q, Gong X, Huang D (2021) A non-dominated ensemble fitness ranking algorithm for multi-objective flexible job-shop scheduling problem considering worker flexibility and green factors. Knowl Based Syst 231:107430","journal-title":"Knowl Based Syst"},{"key":"9304_CR36","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1080\/23080477.2021.1992823","volume":"10","author":"S Gupta","year":"2021","unstructured":"Gupta S, Jain A (2021) Analysis of integrated preventive maintenance and machine failure in stochastic flexible job shop scheduling with sequence-dependent setup time. Smart Sci 10:175\u2013197","journal-title":"Smart Sci"},{"issue":"4","key":"9304_CR37","first-page":"242","volume":"16","author":"M Hajibabaei","year":"2021","unstructured":"Hajibabaei M, Behnamian J (2021) Flexible job-shop scheduling problem with unrelated parallel machines and resources-dependent processing times: a tabu search algorithm. Int J Manag Sci Eng Manag 16(4):242\u2013253","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"1","key":"9304_CR38","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1109\/TSM.2017.2768899","volume":"31","author":"A Ham","year":"2017","unstructured":"Ham A (2017) Scheduling of dual resource constrained lithography production: using CP and MIP\/CP. IEEE Trans Semicond Manuf 31(1):52\u201361","journal-title":"IEEE Trans Semicond Manuf"},{"issue":"2","key":"9304_CR39","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1049\/cim2.12003","volume":"3","author":"L Hongyu","year":"2021","unstructured":"Hongyu L, Xiuli W (2021) A survival duration-guided NSGA-III for sustainable flexible job shop scheduling problem considering dual resources. IET Collab Intell Manuf 3(2):119\u2013130","journal-title":"IET Collab Intell Manuf"},{"key":"9304_CR40","doi-asserted-by":"crossref","unstructured":"Huang Y, Yan XT, Li JY (2014) Dual resource constrained job shop dynamic scheduling with local time window. In: Paper presented at the advanced materials research","DOI":"10.4028\/www.scientific.net\/AMR.933.708"},{"issue":"1","key":"9304_CR41","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.cie.2010.03.001","volume":"59","author":"MY Jaber","year":"2010","unstructured":"Jaber MY, Neumann WP (2010) Modelling worker fatigue and recovery in dual-resource constrained systems. Comput Ind Eng 59(1):75\u201384","journal-title":"Comput Ind Eng"},{"key":"9304_CR42","doi-asserted-by":"crossref","unstructured":"Jingyao L, Shudong S, Yuan H, Ganggang N (2010) Research on double-objective optimal scheduling algorithm for dual resource constrained job shop. In: Paper presented at the international conference on artificial intelligence and computational intelligence","DOI":"10.1007\/978-3-642-16530-6_27"},{"issue":"13","key":"9304_CR43","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.ifacol.2019.11.144","volume":"52","author":"D Kress","year":"2019","unstructured":"Kress D, M\u00fcller D (2019) Mathematical models for a flexible job shop scheduling problem with machine operator constraints. IFAC-PapersOnLine 52(13):94\u201399","journal-title":"IFAC-PapersOnLine"},{"issue":"4","key":"9304_CR44","doi-asserted-by":"crossref","first-page":"448","DOI":"10.1016\/j.compind.2013.02.008","volume":"64","author":"Y Laili","year":"2013","unstructured":"Laili Y, Tao F, Zhang L, Cheng Y, Luo Y, Sarker BR (2013) A ranking chaos algorithm for dual scheduling of cloud service and computing resource in private cloud. Comput Ind 64(4):448\u2013463","journal-title":"Comput Ind"},{"key":"9304_CR45","unstructured":"Lang M, Li H (2011) Research on dual-resource multi-objective flexible job shop scheduling under uncertainty. In: Paper presented at the 2011 2nd international conference on artificial intelligence, management science and electronic commerce (AIMSEC)"},{"issue":"9","key":"9304_CR46","doi-asserted-by":"crossref","first-page":"2519","DOI":"10.1080\/00207543.2013.849822","volume":"52","author":"D Lei","year":"2014","unstructured":"Lei D, Guo X (2014) Variable neighbourhood search for dual-resource constrained flexible job shop scheduling. Int J Prod Res 52(9):2519\u20132529","journal-title":"Int J Prod Res"},{"key":"9304_CR47","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1016\/j.ijpe.2014.07.026","volume":"159","author":"D Lei","year":"2015","unstructured":"Lei D, Guo X (2015) An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective. Int J Prod Econ 159:296\u2013303","journal-title":"Int J Prod Econ"},{"key":"9304_CR48","doi-asserted-by":"crossref","unstructured":"Lei D, Tan X (2016) Local search with controlled deterioration for multi-objective scheduling in dual-resource constrained flexible job shop. In: Paper presented at the 2016 Chinese control and decision conference (CCDC)","DOI":"10.1109\/CCDC.2016.7531874"},{"issue":"3","key":"9304_CR49","doi-asserted-by":"crossref","first-page":"1097","DOI":"10.1109\/TCYB.2018.2796119","volume":"49","author":"D Lei","year":"2018","unstructured":"Lei D, Li M, Wang L (2018) A two-phase meta-heuristic for multiobjective flexible job shop scheduling problem with total energy consumption threshold. IEEE Trans Cybern 49(3):1097\u20131109","journal-title":"IEEE Trans Cybern"},{"key":"9304_CR50","doi-asserted-by":"crossref","unstructured":"Li J, Huang Y (2015) Improved genetic algorithm for extension dual resource constrained job shop scheduling problem. In: LISS 2014. Springer, pp 1105\u20131110","DOI":"10.1007\/978-3-662-43871-8_159"},{"key":"9304_CR51","doi-asserted-by":"crossref","unstructured":"Li J, Huang Y (2016) A hybrid genetic algorithm for dual-resource constrained job shop scheduling problem. In: Paper presented at the international conference on intelligent computing","DOI":"10.1007\/978-3-319-42291-6_47"},{"issue":"6","key":"9304_CR52","doi-asserted-by":"crossref","first-page":"916","DOI":"10.23940\/ijpe.20.06.p10.916929","volume":"16","author":"H Li","year":"2020","unstructured":"Li H, Zhu H (2020) Modified water wave optimization for energy-conscious dual-resource constrained flexible job shop scheduling. Int J Perform Eng 16(6):916","journal-title":"Int J Perform Eng"},{"key":"9304_CR53","doi-asserted-by":"crossref","unstructured":"Li J, Sun S, Huang Y, Wang N (2010a) A hybrid algorithm for scheduling of dual-resource constrained job shop. In: Paper presented at the 2010 international conference on computing, control and industrial engineering","DOI":"10.1109\/CCIE.2010.67"},{"key":"9304_CR54","doi-asserted-by":"crossref","unstructured":"Li J, Sun S, Huang Y, Wang N (2010b) Research into self-adaptive hybrid ant colony algorithm based on flow control. Paper presented at the 2010 2nd international workshop on intelligent systems and applications","DOI":"10.1109\/IWISA.2010.5473446"},{"issue":"4","key":"9304_CR55","first-page":"584","volume":"6","author":"J Li","year":"2011","unstructured":"Li J, Sun S, Huang Y (2011) Adaptive hybrid ant colony optimization for solving dual resource constrained job shop scheduling problem. J Softw 6(4):584\u2013594","journal-title":"J Softw"},{"key":"9304_CR56","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/j.cie.2016.10.012","volume":"102","author":"J Li","year":"2016","unstructured":"Li J, Huang Y, Niu X (2016) A branch population genetic algorithm for dual-resource constrained job shop scheduling problem. Comput Ind Eng 102:113\u2013131","journal-title":"Comput Ind Eng"},{"issue":"4","key":"9304_CR57","doi-asserted-by":"crossref","first-page":"1282","DOI":"10.1016\/j.engappai.2012.10.006","volume":"26","author":"D Lin","year":"2013","unstructured":"Lin D, Lee CK, Ho W (2013) Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop. Eng Appl Artif Intell 26(4):1282\u20131290","journal-title":"Eng Appl Artif Intell"},{"issue":"4","key":"9304_CR58","doi-asserted-by":"crossref","first-page":"765","DOI":"10.1080\/18756891.2016.1204123","volume":"9","author":"C Liu","year":"2016","unstructured":"Liu C, Wang J (2016) Cell formation and task scheduling considering multi-functional resource and part movement using hybrid simulated annealing. Int J Comput Intell Syst 9(4):765\u2013777","journal-title":"Int J Comput Intell Syst"},{"issue":"13","key":"9304_CR59","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.ifacol.2019.11.134","volume":"52","author":"M Liu","year":"2019","unstructured":"Liu M, Liu X (2019) Satisfaction-driven bi-objective multi-skill workforce scheduling problem. IFAC-PapersOnLine 52(13):229\u2013234","journal-title":"IFAC-PapersOnLine"},{"issue":"19","key":"9304_CR60","doi-asserted-by":"crossref","first-page":"6491","DOI":"10.1080\/00207543.2017.1363428","volume":"56","author":"C Liu","year":"2018","unstructured":"Liu C, Xiang X, Zheng L, Ma J (2018) An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing. Int J Prod Res 56(19):6491\u20136511","journal-title":"Int J Prod Res"},{"key":"9304_CR61","doi-asserted-by":"crossref","first-page":"1460","DOI":"10.1109\/TCYB.2021.3102642","volume":"53","author":"S-C Liu","year":"2021","unstructured":"Liu S-C, Chen Z-G, Zhan Z-H, Jeon S-W, Kwong S, Zhang J (2021) Many-objective job-shop scheduling: a multiple populations for multiple objectives-based genetic algorithm approach. IEEE Trans Cybern 53:1460\u20131474","journal-title":"IEEE Trans Cybern"},{"issue":"11","key":"9304_CR62","doi-asserted-by":"crossref","first-page":"1209","DOI":"10.1080\/0740817X.2014.892231","volume":"46","author":"BJ Lobo","year":"2014","unstructured":"Lobo BJ, Wilson JR, Thoney KA, Hodgson TJ, King RE (2014) A practical method for evaluating worker allocations in large-scale dual resource constrained job shops. IIE Trans 46(11):1209\u20131226","journal-title":"IIE Trans"},{"issue":"2","key":"9304_CR63","doi-asserted-by":"crossref","first-page":"10810","DOI":"10.1016\/j.ifacol.2020.12.2866","volume":"53","author":"MS Martins","year":"2020","unstructured":"Martins MS, Viegas JL, Coito T, Firme BM, Sousa JM, Figueiredo J, Vieira SM (2020) Reinforcement learning for dual-resource constrained scheduling. IFAC-PapersOnLine 53(2):10810\u201310815","journal-title":"IFAC-PapersOnLine"},{"issue":"13","key":"9304_CR64","doi-asserted-by":"crossref","first-page":"5061","DOI":"10.1016\/j.eswa.2013.03.007","volume":"40","author":"Y Mehravaran","year":"2013","unstructured":"Mehravaran Y, Logendran R (2013) Non-permutation flowshop scheduling with dual resources. Expert Syst Appl 40(13):5061\u20135076","journal-title":"Expert Syst Appl"},{"key":"9304_CR65","doi-asserted-by":"crossref","first-page":"68043","DOI":"10.1109\/ACCESS.2019.2916468","volume":"7","author":"L Meng","year":"2019","unstructured":"Meng L, Zhang C, Zhang B, Ren Y (2019) Mathematical modeling and optimization of energy-conscious flexible job shop scheduling problem with worker flexibility. IEEE Access 7:68043\u201368059","journal-title":"IEEE Access"},{"key":"9304_CR66","doi-asserted-by":"crossref","unstructured":"Mlekusch J, Hartl R (2022) Solution methods for the dual-resource-constrained re-entrant flexible flow shop. Available at SSRN 4120101 1(1):1\u201325","DOI":"10.2139\/ssrn.4120101"},{"key":"9304_CR67","doi-asserted-by":"crossref","unstructured":"Mohan J, Lanka K, Rao NA, Manupati VK (2022) Sustainable flexible job shop scheduling: a systematic literature review. In: Paper presented at the global congress on manufacturing and management","DOI":"10.1007\/978-3-030-90532-3_18"},{"key":"9304_CR68","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1007\/978-3-030-94683-8_3","volume-title":"Intelligent engineering and management for industry 4.0","author":"K Morikawa","year":"2022","unstructured":"Morikawa K, Nagasawa K, Takahashi K (2022) Interactive scheduling for a dual resource constrained job shop with manual and automated work units. In: Kuo YH, Fu Y, Chen PC, Or CKL, Huang GG, Wang J (eds) Intelligent engineering and management for industry 4.0. Springer, Berlin, pp 25\u201334"},{"issue":"1","key":"9304_CR69","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1177\/0954405417711734","volume":"233","author":"D Morillo Torres","year":"2019","unstructured":"Morillo Torres D, Barber F, Salido MA (2019) A new model and metaheuristic approach for the energy-based resource-constrained scheduling problem. Proc Inst Mech Eng Part b: J Eng Manuf 233(1):293\u2013305","journal-title":"Proc Inst Mech Eng Part b: J Eng Manuf"},{"key":"9304_CR70","doi-asserted-by":"crossref","first-page":"105787","DOI":"10.1016\/j.cor.2022.105787","volume":"143","author":"L Munoz","year":"2022","unstructured":"Munoz L, Villalobos JR, Fowler JW (2022) Exact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup times. Comput Oper Res 143:105787","journal-title":"Comput Oper Res"},{"key":"9304_CR71","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/j.cor.2019.05.009","volume":"109","author":"S Nguyen","year":"2019","unstructured":"Nguyen S, Thiruvady D, Ernst AT, Alahakoon D (2019) A hybrid differential evolution algorithm with column generation for resource constrained job scheduling. Comput Oper Res 109:273\u2013287","journal-title":"Comput Oper Res"},{"key":"9304_CR72","doi-asserted-by":"crossref","unstructured":"Paksi A, Ma'ruf A (2016) Flexible job-shop scheduling with dual-resource constraints to minimize tardiness using genetic algorithm. In: Paper presented at the IOP conference series: materials science and engineering","DOI":"10.1088\/1757-899X\/114\/1\/012060"},{"key":"9304_CR73","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.omega.2017.12.003","volume":"82","author":"J Pei","year":"2019","unstructured":"Pei J, Liu X, Fan W, Pardalos PM, Lu S (2019) A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers. Omega 82:55\u201369","journal-title":"Omega"},{"key":"9304_CR74","doi-asserted-by":"crossref","unstructured":"Qin S, Liu S, Kuang H (2016) Piecewise linear model for multiskilled workforce scheduling problems considering learning effect and project quality. Math Probl Eng 2016","DOI":"10.1155\/2016\/3728934"},{"key":"9304_CR75","doi-asserted-by":"crossref","unstructured":"Schwemmer J, K\u00fchn M, V\u00f6lker M, Schmidt T (2022) Scheduling workforce in decentrally controlled production systems: a literature review. In: Paper presented at the international conference on dynamics in logistics","DOI":"10.1007\/978-3-031-05359-7_32"},{"issue":"10","key":"9304_CR76","doi-asserted-by":"crossref","first-page":"3020","DOI":"10.1080\/00207543.2018.1524165","volume":"57","author":"M Shahgholi Zadeh","year":"2019","unstructured":"Shahgholi Zadeh M, Katebi Y, Doniavi A (2019) A heuristic model for dynamic flexible job shop scheduling problem considering variable processing times. Int J Prod Res 57(10):3020\u20133035","journal-title":"Int J Prod Res"},{"key":"9304_CR77","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/j.asoc.2017.08.014","volume":"61","author":"O Shahvari","year":"2017","unstructured":"Shahvari O, Logendran R (2017) A bi-objective batch processing problem with dual-resources on unrelated-parallel machines. Appl Soft Comput 61:174\u2013192","journal-title":"Appl Soft Comput"},{"key":"9304_CR78","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/j.cor.2013.07.015","volume":"41","author":"H-M Song","year":"2014","unstructured":"Song H-M, Yang H, Bensoussan A, Zhang D (2014) Optimal decision making in multi-product dual sourcing procurement with demand forecast updating. Comput Oper Res 41:299\u2013308","journal-title":"Comput Oper Res"},{"key":"9304_CR79","doi-asserted-by":"crossref","first-page":"155740","DOI":"10.1109\/ACCESS.2021.3126820","volume":"9","author":"P Soofi","year":"2021","unstructured":"Soofi P, Yazdani M, Amiri M, Adibi MA (2021) Robust fuzzy-stochastic programming model and meta-heuristic algorithms for dual-resource constrained flexible job-shop scheduling problem under machine breakdown. IEEE Access 9:155740\u2013155762","journal-title":"IEEE Access"},{"key":"9304_CR80","doi-asserted-by":"crossref","first-page":"108130","DOI":"10.1016\/j.cie.2022.108130","volume":"168","author":"RLC Souza","year":"2022","unstructured":"Souza RLC, Ghasemi A, Saif A, Gharaei A (2022) Robust job-shop scheduling under deterministic and stochastic unavailability constraints due to preventive and corrective maintenance. Comput Ind Eng 168:108130","journal-title":"Comput Ind Eng"},{"key":"9304_CR81","doi-asserted-by":"crossref","first-page":"107557","DOI":"10.1016\/j.cie.2021.107557","volume":"160","author":"W Tan","year":"2021","unstructured":"Tan W, Yuan X, Wang J, Zhang X (2021) A fatigue-conscious dual resource constrained flexible job shop scheduling problem by enhanced NSGA-II: An application from casting workshop. Comput Ind Eng 160:107557","journal-title":"Comput Ind Eng"},{"key":"9304_CR82","doi-asserted-by":"crossref","unstructured":"Tao Z, Liu X (2019) Dynamic scheduling of dual-resource constrained blocking job shop. In: Paper presented at the international conference on intelligent robotics and applications","DOI":"10.1007\/978-3-030-27529-7_38"},{"issue":"10","key":"9304_CR83","doi-asserted-by":"crossref","first-page":"256","DOI":"10.3390\/a13100256","volume":"13","author":"D Thiruvady","year":"2020","unstructured":"Thiruvady D, Blum C, Ernst AT (2020) Solution merging in metaheuristics for resource constrained job scheduling. Algorithms 13(10):256","journal-title":"Algorithms"},{"key":"9304_CR84","doi-asserted-by":"crossref","unstructured":"Th\u00fcrer M (2018) Dual resource constrained (DRC) shops: literature review and analysis. In: Paper presented at the IFIP international conference on advances in production management systems","DOI":"10.1007\/978-3-319-99704-9_10"},{"key":"9304_CR85","doi-asserted-by":"crossref","first-page":"3669","DOI":"10.1080\/00207543.2021.1930240","volume":"60","author":"M Th\u00fcrer","year":"2021","unstructured":"Th\u00fcrer M, Stevenson M (2021) Order release, dispatching and resource assignment in multiple resource-constrained job shops: an assessment by simulation. Int J Prod Res 60:3669\u20133681","journal-title":"Int J Prod Res"},{"issue":"3","key":"9304_CR86","doi-asserted-by":"crossref","first-page":"931","DOI":"10.1080\/00207543.2018.1497313","volume":"57","author":"M Th\u00fcrer","year":"2019","unstructured":"Th\u00fcrer M, Stevenson M, Renna P (2019) Workload control in dual-resource constrained high-variety shops: an assessment by simulation. Int J Prod Res 57(3):931\u2013947","journal-title":"Int J Prod Res"},{"issue":"20","key":"9304_CR87","doi-asserted-by":"crossref","first-page":"6336","DOI":"10.1080\/00207543.2019.1677963","volume":"58","author":"M Th\u00fcrer","year":"2020","unstructured":"Th\u00fcrer M, Zhang H, Stevenson M, Costa F, Ma L (2020) Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation. Int J Prod Res 58(20):6336\u20136349","journal-title":"Int J Prod Res"},{"key":"9304_CR88","doi-asserted-by":"crossref","first-page":"107897","DOI":"10.1016\/j.cie.2021.107897","volume":"167","author":"Y Tian","year":"2022","unstructured":"Tian Y, Xiong T, Liu Z, Mei Y, Wan L (2022) Multi-objective multi-skill resource-constrained project scheduling problem with skill switches: model and evolutionary approaches. Comput Ind Eng 167:107897","journal-title":"Comput Ind Eng"},{"key":"9304_CR89","doi-asserted-by":"crossref","first-page":"626","DOI":"10.1007\/s10696-022-09446-x","volume":"35","author":"A Vital-Soto","year":"2022","unstructured":"Vital-Soto A, Baki MF, Azab A (2022) A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility. Flex Serv Manuf J 35:626\u2013668","journal-title":"Flex Serv Manuf J"},{"key":"9304_CR90","doi-asserted-by":"crossref","unstructured":"Wang W, Ma C, Bao Z, Ren X (2016) A multi-objective model of integrated collaborative planning and scheduling for dual-resource and its algorithm. In: Paper presented at the 2016 8th international conference on intelligent human\u2013machine systems and cybernetics (IHMSC)","DOI":"10.1109\/IHMSC.2016.154"},{"key":"9304_CR91","doi-asserted-by":"crossref","unstructured":"Wang W, Wang J, Ma C, Bao Z, Yin R (2016) A multi-objective dual-resource shop scheduling model considering the differences between operational efficiency. In: Paper presented at the proceedings of the 2015 Chinese intelligent systems conference","DOI":"10.1007\/978-3-662-48386-2_15"},{"issue":"2","key":"9304_CR92","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1080\/00051144.2019.1603264","volume":"60","author":"J Wang","year":"2019","unstructured":"Wang J, Liu C, Li K (2019) A hybrid simulated annealing for scheduling in dual-resource cellular manufacturing system considering worker movement. Automatika: \u010casopis Za Automatiku, Mjerenje, Elektroniku, Ra\u010dunarstvo i Komunikacije 60(2):172\u2013180","journal-title":"Automatika: \u010casopis Za Automatiku, Mjerenje, Elektroniku, Ra\u010dunarstvo i Komunikacije"},{"key":"9304_CR93","doi-asserted-by":"crossref","first-page":"409","DOI":"10.3233\/JIFS-212258","volume":"43","author":"J Wang","year":"2022","unstructured":"Wang J, Zhu K, Peng Y, Zhu K (2022) Energy-efficient scheduling for flexible job shop under multi-resource constraints using non-dominated sorting teaching-learning-based optimization algorithm. J Intell Fuzzy Syst 43:409\u2013423","journal-title":"J Intell Fuzzy Syst"},{"issue":"10","key":"9304_CR94","doi-asserted-by":"crossref","first-page":"168781401880409","DOI":"10.1177\/1687814018804096","volume":"10","author":"R Wu","year":"2018","unstructured":"Wu R, Li Y, Guo S, Xu W (2018) Solving the dual-resource constrained flexible job shop scheduling problem with learning effect by a hybrid genetic algorithm. Adv Mech Eng 10(10):1687814018804096","journal-title":"Adv Mech Eng"},{"issue":"3","key":"9304_CR95","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1007\/s10845-020-01697-5","volume":"32","author":"X Wu","year":"2021","unstructured":"Wu X, Peng J, Xiao X, Wu S (2021) An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading. J Intell Manuf 32(3):707\u2013728","journal-title":"J Intell Manuf"},{"issue":"13","key":"9304_CR96","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1016\/j.ifacol.2019.11.092","volume":"52","author":"S Xiao","year":"2019","unstructured":"Xiao S, Wu Z, Yu S (2019) A two-stage assignment strategy for the robust scheduling of dual-resource constrained stochastic job shop scheduling problems. IFAC-PapersOnLine 52(13):421\u2013426","journal-title":"IFAC-PapersOnLine"},{"issue":"7","key":"9304_CR97","doi-asserted-by":"crossref","first-page":"75","DOI":"10.3991\/ijoe.v14i07.8966","volume":"14","author":"L Xixing","year":"2018","unstructured":"Xixing L, Yi L (2018) Approach of solving dual resource constrained multi-objective flexible job shop scheduling problem based on MOEA\/D. Int J Online Eng 14(7):75","journal-title":"Int J Online Eng"},{"key":"9304_CR98","doi-asserted-by":"crossref","unstructured":"Xu J, Xu X, Xie S (2010) An integrated dual resource management and production planning system. In: Paper presented at the 2010 IEEE 17th international conference on industrial engineering and engineering management","DOI":"10.1109\/ICIEEM.2010.5646518"},{"issue":"2","key":"9304_CR99","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.ejor.2011.03.004","volume":"215","author":"J Xu","year":"2011","unstructured":"Xu J, Xu X, Xie SQ (2011) Recent developments in dual resource constrained (DRC) system research. Eur J Oper Res 215(2):309\u2013318","journal-title":"Eur J Oper Res"},{"issue":"19","key":"9304_CR100","doi-asserted-by":"crossref","first-page":"4005","DOI":"10.3390\/app9194005","volume":"9","author":"G Yang","year":"2019","unstructured":"Yang G, Chung BD, Lee SJ (2019) Limited search space-based algorithm for dual resource constrained scheduling problem with multilevel product structure. Appl Sci 9(19):4005","journal-title":"Appl Sci"},{"issue":"3","key":"9304_CR101","first-page":"1242","volume":"22","author":"M Yazdani","year":"2015","unstructured":"Yazdani M, Zandieh M, Tavakkoli-Moghaddam R, Jolai F (2015) Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem. Sci Iran 22(3):1242\u20131257","journal-title":"Sci Iran"},{"issue":"3","key":"9304_CR102","doi-asserted-by":"crossref","first-page":"983","DOI":"10.1007\/s12597-019-00395-y","volume":"56","author":"M Yazdani","year":"2019","unstructured":"Yazdani M, Zandieh M, Tavakkoli-Moghaddam R (2019) Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem. Opsearch 56(3):983\u20131006","journal-title":"Opsearch"},{"key":"9304_CR103","doi-asserted-by":"crossref","unstructured":"Yildiz G, Eski O (2006) An artificial neural network based simulation metamodeling approach for dual resource constrained assembly line. Paper presented at the international conference on artificial neural networks","DOI":"10.1007\/11840930_104"},{"issue":"11","key":"9304_CR104","doi-asserted-by":"crossref","first-page":"1051","DOI":"10.1007\/s00170-006-0920-9","volume":"36","author":"G Yildiz","year":"2008","unstructured":"Yildiz G, Tunali S (2008) Response surface methodology based simulation optimization of a CONWIP controlled dual resource constrained system. Int J Adv Manuf Technol 36(11):1051\u20131060","journal-title":"Int J Adv Manuf Technol"},{"key":"9304_CR105","doi-asserted-by":"crossref","first-page":"108238","DOI":"10.1016\/j.cie.2022.108238","volume":"169","author":"K-C Ying","year":"2022","unstructured":"Ying K-C, Lin S-W (2022) Minimizing total completion time in the no-wait jobshop scheduling problem using a backtracking metaheuristic. Comput Ind Eng 169:108238","journal-title":"Comput Ind Eng"},{"issue":"2","key":"9304_CR106","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1080\/00207540601138510","volume":"46","author":"H Yue","year":"2008","unstructured":"Yue H, Slomp J, Molleman E, Van Der Zee D (2008) Worker flexibility in a parallel dual resource constrained job shop. Int J Prod Res 46(2):451\u2013467","journal-title":"Int J Prod Res"},{"key":"9304_CR107","doi-asserted-by":"crossref","DOI":"10.1007\/978-981-13-0568-9","volume-title":"How nations succeed: Manufacturing, trade, industrial policy, and economic development","author":"MA Y\u00fclek","year":"2018","unstructured":"Y\u00fclek MA (2018) How nations succeed: Manufacturing, trade, industrial policy, and economic development. Springer, Berlin"},{"issue":"3","key":"9304_CR108","doi-asserted-by":"crossref","first-page":"1507","DOI":"10.1016\/j.ejor.2005.04.018","volume":"177","author":"JR Zamiska","year":"2007","unstructured":"Zamiska JR, Jaber MY, Kher HV (2007) Worker deployment in dual resource constrained systems with a task-type factor. Eur J Oper Res 177(3):1507\u20131519","journal-title":"Eur J Oper Res"},{"key":"9304_CR109","doi-asserted-by":"crossref","unstructured":"Zhang J, Wang W, Xu X, Jie J (2013) A multi-objective particle swarm optimization for dual-resource constrained shop scheduling with resource flexibility. In: Paper presented at the 2013 IEEE symposium on computational intelligence for engineering solutions (CIES)","DOI":"10.1109\/CIES.2013.6611725"},{"issue":"6","key":"9304_CR110","doi-asserted-by":"crossref","first-page":"526","DOI":"10.1504\/IJCSM.2017.088956","volume":"8","author":"J Zhang","year":"2017","unstructured":"Zhang J, Jie J, Wang W, Xu X (2017) A hybrid particle swarm optimisation for multi-objective flexible job-shop scheduling problem with dual-resources constrained. Int J Comput Sci Math 8(6):526\u2013532","journal-title":"Int J Comput Sci Math"},{"issue":"3","key":"9304_CR111","doi-asserted-by":"crossref","first-page":"1334","DOI":"10.3934\/mbe.2019065","volume":"16","author":"G Zhang","year":"2019","unstructured":"Zhang G, Sun J, Liu X, Wang G, Yang Y (2019) Solving flexible job shop scheduling problems with transportation time based on improved genetic algorithm. Math Biosci Eng 16(3):1334\u20131347","journal-title":"Math Biosci Eng"},{"issue":"6","key":"9304_CR112","doi-asserted-by":"crossref","first-page":"108","DOI":"10.3390\/machines9060108","volume":"9","author":"S Zhang","year":"2021","unstructured":"Zhang S, Du H, Borucki S, Jin S, Hou T, Li Z (2021) Dual resource constrained flexible job shop scheduling based on improved quantum genetic algorithm. Machines 9(6):108","journal-title":"Machines"},{"issue":"18","key":"9304_CR113","doi-asserted-by":"crossref","first-page":"5554","DOI":"10.1080\/00207543.2016.1170226","volume":"54","author":"X-L Zheng","year":"2016","unstructured":"Zheng X-L, Wang L (2016) A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem. Int J Prod Res 54(18):5554\u20135566","journal-title":"Int J Prod Res"},{"key":"9304_CR114","doi-asserted-by":"crossref","unstructured":"Zheng F, Sui Y (2019) A bi-objective model for dual-resource constrained job shop scheduling with the consideration of energy consumption. In: Paper presented at the 2019 international conference on industrial engineering and systems management (IESM)","DOI":"10.1109\/IESM45758.2019.8948171"},{"key":"9304_CR115","doi-asserted-by":"crossref","unstructured":"Zhongjie W, Mingming Z, Miao H (2013) Study of the immune simulated annealing algorithm and dual-resource job shop order scheduling. In: Paper presented at the 2013 25th Chinese control and decision conference (CCDC)","DOI":"10.1109\/CCDC.2013.6561335"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09304-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-023-09304-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09304-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,13]],"date-time":"2023-11-13T18:13:19Z","timestamp":1699899199000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-023-09304-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,15]]},"references-count":115,"journal-issue":{"issue":"24","published-print":{"date-parts":[[2023,12]]}},"alternative-id":["9304"],"URL":"https:\/\/doi.org\/10.1007\/s00500-023-09304-4","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,10,15]]},"assertion":[{"value":"15 September 2023","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 October 2023","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no relevant financial or non-financial interests to disclose.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}