{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,31]],"date-time":"2025-12-31T20:08:16Z","timestamp":1767211696682,"version":"3.37.3"},"reference-count":49,"publisher":"Springer Science and Business Media LLC","issue":"7-8","license":[{"start":{"date-parts":[[2023,12,23]],"date-time":"2023-12-23T00:00:00Z","timestamp":1703289600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,12,23]],"date-time":"2023-12-23T00:00:00Z","timestamp":1703289600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2024,4]]},"DOI":"10.1007\/s00500-023-09466-1","type":"journal-article","created":{"date-parts":[[2023,12,23]],"date-time":"2023-12-23T10:02:16Z","timestamp":1703325736000},"page":"5921-5936","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Goal programming models for high-speed train crew scheduling problem"],"prefix":"10.1007","volume":"28","author":[{"given":"Hac\u0131 Mehmet","family":"Alaka\u015f","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5282-3138","authenticated-orcid":false,"given":"Tamer","family":"Eren","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ay\u015fe","family":"Yelek","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Emir H\u00fcseyin","family":"\u00d6zder","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,12,23]]},"reference":[{"issue":"5","key":"9466_CR1","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1287\/inte.1050.0158","volume":"35","author":"E Abbink","year":"2005","unstructured":"Abbink E, Fischetti M, Kroon L, Timmer G, Vromans M (2005) Reinventing crew scheduling at Netherlands Railways. Interfaces 35(5):393\u2013401","journal-title":"Interfaces"},{"issue":"4","key":"9466_CR2","doi-asserted-by":"publisher","first-page":"1337","DOI":"10.1287\/trsc.2016.0707","volume":"50","author":"A Balakrishnan","year":"2016","unstructured":"Balakrishnan A, Kuo A, Si X (2016) Real-Time decision support for crew assignment in double-ended districts for US freight railways. Transp Sci 50(4):1337\u20131359","journal-title":"Transp Sci"},{"key":"9466_CR3","unstructured":"Breugem T, Dollevoet T, Huisman DA (2019) Column Generation Approach for the Integrated Crew Re-Planning Problem. Econometric Institute Report Series. EI2019-31:1-30"},{"issue":"1\u20133","key":"9466_CR4","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1007\/BF02614314","volume":"79","author":"A Caprara","year":"1997","unstructured":"Caprara A, Fischetti M, Toth P, Vigo D, Guida PL (1997) Algorithms for railway crew management. Math Program 79(1\u20133):125\u2013141","journal-title":"Math Program"},{"issue":"2","key":"9466_CR5","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1007\/BF01581106","volume":"81","author":"S Ceria","year":"1998","unstructured":"Ceria S, Nobili P, Sassano A (1998) A Lagrangian-based heuristic for large-scale set covering problems. Math Program 81(2):215\u2013228","journal-title":"Math Program"},{"issue":"5","key":"9466_CR6","first-page":"331","volume":"4","author":"C Chen","year":"2008","unstructured":"Chen C (2008) Using Integer Programming to Solve the Crew Scheduling Problem in the Taipei Rapid Transit Corporation. WSEAS Trans Inf Sci Appl 4(5):331\u2013341","journal-title":"WSEAS Trans Inf Sci Appl"},{"issue":"3","key":"9466_CR7","doi-asserted-by":"publisher","first-page":"1010","DOI":"10.35378\/gujs.871473","volume":"35","author":"A C\u00fcrebal","year":"2022","unstructured":"C\u00fcrebal A, Ko\u00e7tepe S, Eren T, \u00d6zder EH (2022) Scheduling and Rostering of Temporary Staff to Deal with Periodically Increasing Demand in Retail Sector: An Application. Gazi Univ J Sci 35(3):1010\u20131020","journal-title":"Gazi Univ J Sci"},{"key":"9466_CR8","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1016\/j.trb.2015.01.008","volume":"74","author":"S Dauz\u00e8re-P\u00e9r\u00e8s","year":"2015","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s S, De Almeida D, Guyon O, Benhizia F (2015) A Lagrangian heuristic framework for a real-life integrated planning problem of railway transportation resources. Transport Res Part b: Methodol 74:138\u2013150","journal-title":"Transport Res Part b: Methodol"},{"key":"9466_CR9","first-page":"1","volume":"8","author":"B Demirel","year":"2018","unstructured":"Demirel B, Yelek A, Ala\u011fas HM, Eren T (2018) ANKARAY G\u00fcvenlik Personelinin Vardiya \u00c7izelgeleme Probleminin Hedef Programlama Y\u00f6ntemi ile \u00c7\u00f6z\u00fcm\u00fc. Demiryolu M\u00fchendisli\u011fi Dergisi 8:1\u201317","journal-title":"Demiryolu M\u00fchendisli\u011fi Dergisi"},{"issue":"2","key":"9466_CR10","first-page":"25","volume":"4","author":"T Eren","year":"2016","unstructured":"Eren T, Gencer MA (2016) Ankara Metrosu M1 (K\u0131z\u0131lay-Bat\u0131kent) Hatt\u0131 Hareket Saatlerinin \u00c7izelgelenmesi. Acad Platform-J Eng Sci 4(2):25\u201336","journal-title":"Acad Platform-J Eng Sci"},{"key":"9466_CR11","unstructured":"Froger A, Guyon O, Pinson E (2015) A set packing approach for scheduling passenger train drivers: the French experience. RailTokyo2015 - 6th International Conference on Railway Operations Modelling and Analysis 1\u201315"},{"key":"9466_CR12","doi-asserted-by":"publisher","first-page":"248","DOI":"10.1016\/j.trb.2019.05.007","volume":"125","author":"M Fuentes","year":"2019","unstructured":"Fuentes M, Cadarso L, Mar\u00edn \u00c1 (2019) A hybrid model for crew scheduling in rail rapid transit networks. Transport Res Part B Methodol 125:248\u2013265","journal-title":"Transport Res Part B Methodol"},{"issue":"11","key":"9466_CR13","doi-asserted-by":"publisher","first-page":"265","DOI":"10.3390\/math6110265","volume":"6","author":"\u015e G\u00fcr","year":"2018","unstructured":"G\u00fcr \u015e, Eren T (2018) Scheduling and Planning in Service Systems with Goal Programming: Literature Review. Mathematics 6(11):265","journal-title":"Mathematics"},{"key":"9466_CR14","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/j.cie.2014.01.002","volume":"70","author":"R Hanafi","year":"2014","unstructured":"Hanafi R, Kozan E (2014) A hybrid constructive heuristic and simulated annealing for railway crew scheduling. Comput Ind Eng 70:11\u201319","journal-title":"Comput Ind Eng"},{"key":"9466_CR15","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107132","volume":"154","author":"P Hanczar","year":"2021","unstructured":"Hanczar P, Zand A (2021) A novel model and solution algorithm to improve crew scheduling in railway transportation: A real world case study. Comput Ind Eng 154:107132","journal-title":"Comput Ind Eng"},{"key":"9466_CR16","doi-asserted-by":"crossref","unstructured":"Heil J (2019) Decomposition Strategies for Multi-network Crew Scheduling with Attendance Rates for Conductors. Logistics Management. Springer, Cham pp 298\u2013313","DOI":"10.1007\/978-3-030-29821-0_20"},{"key":"9466_CR17","unstructured":"IBM. IBM ILOG CPLEX Optimization Software. https:\/\/www.ibm.com\/tr-tr\/products\/ilog-cplex-optimization-studio."},{"key":"9466_CR18","doi-asserted-by":"publisher","DOI":"10.4135\/9781412984669","volume-title":"Introduction to goal programming","author":"JP Ignizio","year":"1985","unstructured":"Ignizio JP (1985) Introduction to goal programming. Sage Publications Inc; Beverley Hills, California"},{"issue":"2","key":"9466_CR19","doi-asserted-by":"publisher","first-page":"214","DOI":"10.1016\/j.ejor.2011.12.038","volume":"219","author":"S J\u00fctte","year":"2012","unstructured":"J\u00fctte S, Thonemann UW (2012) Divide-and-price: A decomposition algorithm for solving large railway crew scheduling problems. Eur J Oper Res 219(2):214\u2013223","journal-title":"Eur J Oper Res"},{"issue":"2","key":"9466_CR20","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1287\/inte.1100.0549","volume":"41","author":"S J\u00fctte","year":"2011","unstructured":"J\u00fctte S, Albers M, Thonemann UW, Haase K (2011) Optimizing railway crew scheduling at DB Schenker. Interfaces 41(2):109\u2013122","journal-title":"Interfaces"},{"key":"9466_CR21","unstructured":"Kaya YB (2018) Ekip \u00c7izelgeleme Probleminde \u0130nsani Fakt\u00f6r Etkilerinin \u0130ncelenmesi ve Bir Karar Destek Sistemi \u00d6nerisi. Master Thesis; Gazi University; Ankara (Turkey)"},{"issue":"1","key":"9466_CR22","doi-asserted-by":"publisher","first-page":"118","DOI":"10.1108\/K-05-2017-0189","volume":"47","author":"VS Kayvanfar","year":"2018","unstructured":"Kayvanfar VS, Sajadieh M, Moattar Husseini SM, Karimi B (2018) Analysis of a multi-echelon supply chain problem using revised multi-choice goal programming approach. Kybernetes 47(1):118\u2013141. https:\/\/doi.org\/10.1108\/K-05-2017-0189","journal-title":"Kybernetes"},{"issue":"2","key":"9466_CR23","first-page":"11","volume":"4","author":"A Khosravi Bizhaem","year":"2017","unstructured":"Khosravi Bizhaem A, Tamannaei M (2017) Two Mathematical Models for Railway Crew Scheduling Problem. Int J Railway Res 4(2):11\u201322","journal-title":"Int J Railway Res"},{"key":"9466_CR24","doi-asserted-by":"crossref","unstructured":"Kokubo T, Fukuyama Y (2017) Generation methods of neighborhood schedules for practical train crew scheduling problems using tabu search. 2017 IEEE 10th International Workshop on Computational Intelligence and Applications (IWCIA). IEEE November, 39\u201344","DOI":"10.1109\/IWCIA.2017.8203558"},{"key":"9466_CR25","doi-asserted-by":"publisher","first-page":"56","DOI":"10.1016\/j.procs.2016.09.011","volume":"98","author":"NA Kuznetsov","year":"2016","unstructured":"Kuznetsov NA, Minashina IK, Ryabykh NG, Zakharova EM, Pashchenko FF (2016) Design and comparison of freight scheduling algorithms for intelligent control systems. Proc Comput Sci 98:56\u201363","journal-title":"Proc Comput Sci"},{"key":"9466_CR26","first-page":"292","volume":"5","author":"C Lee","year":"2003","unstructured":"Lee C, Chen C (2003) Scheduling of Train Driver for Taiwan Railway Administration. J Eastern Asia Soc Transport Stud 5:292\u2013306","journal-title":"J Eastern Asia Soc Transport Stud"},{"issue":"5","key":"9466_CR27","doi-asserted-by":"publisher","first-page":"42","DOI":"10.6106\/KJCEM.2015.16.5.042","volume":"20","author":"J Lee","year":"2019","unstructured":"Lee J, Park S, Kang L (2019) A Study on the Generation of Crew Scheduling Diagram Using Neighborhood Search Method for Improving Railway Operation Management. Korean J Construction Eng Manag 20(5):42\u201351","journal-title":"Korean J Construction Eng Manag"},{"issue":"10","key":"9466_CR28","doi-asserted-by":"publisher","first-page":"1173","DOI":"10.1057\/palgrave.jors.2602088","volume":"57","author":"M Lezaun","year":"2006","unstructured":"Lezaun M, P\u00e9rez G, De La Maza ES (2006) Crew rostering problem in a public transport company. J Operat Res Soc 57(10):1173\u20131179","journal-title":"J Operat Res Soc"},{"key":"9466_CR29","doi-asserted-by":"publisher","first-page":"27362","DOI":"10.1109\/ACCESS.2019.2900028","volume":"7","author":"DY Lin","year":"2019","unstructured":"Lin DY, Tsai MR (2019) Integrated crew scheduling and roster problem for trainmasters of passenger railway transportation. IEEE Access 7:27362\u201327375","journal-title":"IEEE Access"},{"key":"9466_CR30","first-page":"275","volume":"130","author":"Y Muroi","year":"2010","unstructured":"Muroi Y, Nishi T, Inuiguchi M (2010) Improvement of column generation method for railway crew scheduling problems. IEEJ Transact Electron Inform Syst 130:275\u2013283","journal-title":"IEEJ Transact Electron Inform Syst"},{"key":"9466_CR31","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1080\/2058802X.2019.1664072","volume":"2","author":"JS Neufeld","year":"2019","unstructured":"Neufeld JS (2019) Efficient Railway Crew Scheduling in German Regional Passenger Transport. Impact 2:7\u201310","journal-title":"Impact"},{"key":"9466_CR32","doi-asserted-by":"publisher","first-page":"1113","DOI":"10.1016\/j.ejor.2020.12.058","volume":"293","author":"JS Neufeld","year":"2021","unstructured":"Neufeld JS, Scheffler M, Tamke F, Hoffmann K, Buscher U (2021) An efficient column generation approach for practical railway crew scheduling with attendance rates. Eur J Oper Res 293:1113\u20131130","journal-title":"Eur J Oper Res"},{"key":"9466_CR33","doi-asserted-by":"publisher","unstructured":"\u00d6zder EH, G\u00fcm\u00fc\u015f M (2023) Solution for the Problem of Sustainable Staff Scheduling in Semi-Automated Dock Container Terminals in Ports. Transportation Research Record: Journal of the Transportation Research Board. In press, https:\/\/doi.org\/10.1177\/03611981221147211","DOI":"10.1177\/03611981221147211"},{"key":"9466_CR34","doi-asserted-by":"publisher","first-page":"102406","DOI":"10.1016\/j.tre.2021.102406","volume":"152","author":"H Pan","year":"2021","unstructured":"Pan H, Liu Z, Yang L, Liang Z, Wu Q, Li S (2021) A column generation-based approach for integrated vehicle and crew scheduling on a single metro line with the fully automatic operation system by partial supervision. Transp Res Part E Logist Transp Rev 152:102406","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"9","key":"9466_CR35","first-page":"133","volume":"20","author":"SM Park","year":"2019","unstructured":"Park SM, Kim HS, Kang LS (2019) Application of Genetic Algorithm for Railway Crew Rostering. J Korea Academia-Indus Cooperat Soc 20(9):133\u2013141","journal-title":"J Korea Academia-Indus Cooperat Soc"},{"key":"9466_CR36","volume-title":"Planning and scheduling in manufacturing and services","author":"M Pinedo","year":"2005","unstructured":"Pinedo M (2005) Planning and scheduling in manufacturing and services. Springer, New York"},{"key":"9466_CR37","doi-asserted-by":"crossref","unstructured":"R\u00e4hlmann C, Thonemann UW (2020) Railway crew scheduling with semi-flexible timetables. OR Spectrum 42:835\u2013862","DOI":"10.1007\/s00291-020-00592-y"},{"key":"9466_CR38","doi-asserted-by":"crossref","unstructured":"Saemi S, Komijan AR, Tavakkoli-Moghaddam R, Fallah M (2021) A new mathematical model to cover crew pairing and rostering problems simultaneously. J Eng Res 9(2):218\u2013233","DOI":"10.36909\/jer.v9i2.8709"},{"issue":"6","key":"9466_CR39","doi-asserted-by":"publisher","first-page":"1221","DOI":"10.1016\/j.tre.2011.05.013","volume":"47","author":"G \u015eahin","year":"2011","unstructured":"\u015eahin G, Y\u00fcceo\u011flu B (2011) Tactical crew planning in railways. Transport Res Part e: Logistics Transport Rev 47(6):1221\u20131243","journal-title":"Transport Res Part e: Logistics Transport Rev"},{"key":"9466_CR40","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1016\/j.trc.2019.05.045","volume":"105","author":"Z Su","year":"2019","unstructured":"Su Z, Jamshidi A, N\u00fa\u00f1ez A, Baldi S, De Schutter B (2019) Integrated condition-based track maintenance planning and crew scheduling of railway networks. Transport Res Part c: Emerg Technol 105:359\u2013384","journal-title":"Transport Res Part c: Emerg Technol"},{"key":"9466_CR41","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/j.tre.2015.10.003","volume":"84","author":"A\u00c7 Suyabatmaz","year":"2015","unstructured":"Suyabatmaz A\u00c7, \u015eahin G (2015) Railway crew capacity planning problem with connectivity of schedules. Transport Res Part e: Logist Transport Rev 84:88\u2013100","journal-title":"Transport Res Part e: Logist Transport Rev"},{"issue":"3","key":"9466_CR42","first-page":"953","volume":"33","author":"P Tapkan","year":"2018","unstructured":"Tapkan P, \u00d6zbak\u0131r L, Kulluk S, Telcio\u011flu B (2018) Rayl\u0131 sistemlerde g\u00f6rev \u00e7izelgeleme probleminin modellenmesi ve \u00e7\u00f6z\u00fcm\u00fc. J Faculty Eng Architect Gazi Univ 33(3):953\u2013965","journal-title":"J Faculty Eng Architect Gazi Univ"},{"key":"9466_CR43","doi-asserted-by":"publisher","first-page":"1443","DOI":"10.1016\/j.sbspro.2013.08.164","volume":"96","author":"Z Tian","year":"2013","unstructured":"Tian Z, Songa Q (2013) Modeling and algorithms of the crew scheduling problem on high-speed railway lines. Procedia Soc Behav Sci 96:1443\u20131452","journal-title":"Procedia Soc Behav Sci"},{"key":"9466_CR44","unstructured":"T\u00fcrkiye Cumhuriyeti Devlet Demiryollar\u0131 (2019) RTST 2019\u20132023 Stratejik Plan. Ankara; T\u00fcrkiye Cumhuriyeti Devlet Demiryollar\u0131."},{"key":"9466_CR45","unstructured":"Varl\u0131 E, Eren T, Gencer MA, \u00c7etin S (2016) Ankara Metrosu M1 Hatt\u0131ndaki Vatmanlar\u0131n Vardiya Saatlerinin \u00c7izelgelenmesi. 3. Uluslararas\u0131 Rayl\u0131 Sistemler M\u00fchendisli\u011fi Sempozyumu; Karab\u00fck; 279\u2013285."},{"key":"9466_CR46","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2021.102304","volume":"149","author":"X Wen","year":"2021","unstructured":"Wen X, Sun X, Sun Y, Yue X (2021) Airline crew scheduling: Models and algorithms. Transp Res Part E Logist Transp Rev 149:102304","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"3","key":"9466_CR47","doi-asserted-by":"publisher","first-page":"636","DOI":"10.1007\/s10878-013-9612-1","volume":"29","author":"M Yaghini","year":"2015","unstructured":"Yaghini M, Karimi M, Rahbar M (2015) A set covering approach for multi-depot train driver scheduling. J Comb Optim 29(3):636\u2013654","journal-title":"J Comb Optim"},{"key":"9466_CR48","first-page":"17","volume":"10","author":"A Yelek","year":"2019","unstructured":"Yelek A, Eren T, G\u00fcr \u015e, Alaka\u015f HM (2019) Metro \u0130stasyon \u0130\u015fletme \u015eeflerinin Vardiyalar\u0131n\u0131n Hedef Programlama ile \u00c7izelgelenmesi. Demiryolu M\u00fchendisli\u011fi Dergisi 10:17\u201330","journal-title":"Demiryolu M\u00fchendisli\u011fi Dergisi"},{"key":"9466_CR49","doi-asserted-by":"publisher","first-page":"491","DOI":"10.3390\/su14010491","volume":"14","author":"C Zhao","year":"2022","unstructured":"Zhao C, Chen J, Zhang X, Cui Z (2022) Solution of Multi-Crew Depots Railway Crew Scheduling Problems: The Chinese High-Speed Railway Case. Sustainability 14:491. https:\/\/doi.org\/10.3390\/su14010491","journal-title":"Sustainability"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09466-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-023-09466-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-023-09466-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,26]],"date-time":"2024-06-26T18:30:32Z","timestamp":1719426632000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-023-09466-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,12,23]]},"references-count":49,"journal-issue":{"issue":"7-8","published-print":{"date-parts":[[2024,4]]}},"alternative-id":["9466"],"URL":"https:\/\/doi.org\/10.1007\/s00500-023-09466-1","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"type":"print","value":"1432-7643"},{"type":"electronic","value":"1433-7479"}],"subject":[],"published":{"date-parts":[[2023,12,23]]},"assertion":[{"value":"13 November 2023","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 December 2023","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"There is no conflict of interest in the study.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"The study does not require an ethics approval and consent to participate.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval and consent to participate"}},{"value":"In this study, there is no need to obtain informed consent as the personal rights of the patients were not shared.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}