{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,26]],"date-time":"2026-02-26T15:24:04Z","timestamp":1772119444351,"version":"3.50.1"},"reference-count":46,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T00:00:00Z","timestamp":1734480000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T00:00:00Z","timestamp":1734480000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2025,1]]},"DOI":"10.1007\/s00500-024-10365-2","type":"journal-article","created":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T07:01:16Z","timestamp":1734505276000},"page":"213-235","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["A multi-objective Fuzzy Robust Optimization model for open-pit mine planning under uncertainty"],"prefix":"10.1007","volume":"29","author":[{"given":"Sayed Abolghasem","family":"Soleimani Bafghi","sequence":"first","affiliation":[]},{"given":"Hasan","family":"Hosseini Nasab","sequence":"additional","affiliation":[]},{"given":"Mohammad Bagher","family":"Fakhrzad","sequence":"additional","affiliation":[]},{"given":"Roya","family":"Soltani","sequence":"additional","affiliation":[]},{"given":"Ali reza","family":"Yarahmadi Bafghi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,12,18]]},"reference":[{"key":"10365_CR1","doi-asserted-by":"crossref","unstructured":"Aksoy M, Yal\u00e7in E (2018). A computer program for open pit mine equipment selection: TruckMac. In: Mine planning and equipment selection, 2000. Routledge 499\u2013503","DOI":"10.1201\/9780203747124-95"},{"key":"10365_CR2","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1076\/ijsm.16.1.59.3408","volume":"16","author":"S Alarie","year":"2002","unstructured":"Alarie S, Gamache M (2002) Overview of solution strategies used in truck dispatching systems for open pit mines. Int J Surf Min Reclam Environ 16:59\u201376","journal-title":"Int J Surf Min Reclam Environ"},{"issue":"6","key":"10365_CR3","doi-asserted-by":"publisher","first-page":"460","DOI":"10.1080\/17480930.2023.2196918","volume":"37","author":"SY Amponsah","year":"2023","unstructured":"Amponsah SY, Takouda PM, Ben-Awuah E (2023) A Multiple Objective Genetic Algorithm Approach for Stochastic Open Pit Production Scheduling Optimisation. Int J Min Reclam Environ 37(6):460\u2013487","journal-title":"Int J Min Reclam Environ"},{"issue":"3","key":"10365_CR4","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1080\/25726668.2023.2233230","volume":"132","author":"MG Anaraki","year":"2023","unstructured":"Anaraki MG, Moradi Afrapoli A (2023) Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation. Min Technol 132(3):153\u2013163","journal-title":"Min Technol"},{"key":"10365_CR5","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2021.102086","volume":"72","author":"M Armstrong","year":"2021","unstructured":"Armstrong M, Lagos T, Emery X, Homem-de-Mello T, Lagos G, Saur\u00e9 D (2021) Adaptive open-pit mining planning under geological uncertainty. Resour Policy 72:102086","journal-title":"Resour Policy"},{"key":"10365_CR6","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1016\/j.renene.2017.09.020","volume":"116","author":"S Bairamzadeh","year":"2018","unstructured":"Bairamzadeh S, Saidi-Mehrabad M, Pishvaee MS (2018) Modelling different types of uncertainty in biofuel supply network design and planning: A robust optimization approach. Renew Energy 116:500\u2013517","journal-title":"Renew Energy"},{"key":"10365_CR7","doi-asserted-by":"publisher","first-page":"104539","DOI":"10.1016\/j.cor.2018.08.003","volume":"115","author":"E Bakhtavar","year":"2020","unstructured":"Bakhtavar E, Mahmoudi H (2020) Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining. Computers & Oper Res 115:104539","journal-title":"Computers & Oper Res"},{"key":"10365_CR8","doi-asserted-by":"publisher","first-page":"2005","DOI":"10.1007\/s10098-019-01757-2","volume":"21","author":"E Bakhtavar","year":"2019","unstructured":"Bakhtavar E, Lotfian R, Sadiq R, Hewage K (2019) Planning of cement plants for environmentally friendly production: a fuzzy-weighted stochastic multi-objective model. Clean Technol Environ Policy 21:2005\u20132014","journal-title":"Clean Technol Environ Policy"},{"issue":"6","key":"10365_CR9","doi-asserted-by":"publisher","first-page":"4789","DOI":"10.1007\/s11053-021-09935-0","volume":"30","author":"E Bakhtavar","year":"2021","unstructured":"Bakhtavar E, Sadiq R, Hewage K (2021) Optimization of blasting-associated costs in surface mines using risk-based probabilistic integer programming and firefly algorithm. Nat Resour Res 30(6):4789\u20134806","journal-title":"Nat Resour Res"},{"key":"10365_CR10","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2023.104095","volume":"86","author":"E Bakhtavar","year":"2023","unstructured":"Bakhtavar E, Saberi S, Hu G, Sadiq R, Hewage K (2023) Fuzzy cognitive-based goal programming for waste rock management with in-pit dumping priority: towards sustainable mining. Resour Policy 86:104095","journal-title":"Resour Policy"},{"key":"10365_CR11","doi-asserted-by":"publisher","DOI":"10.1016\/j.envres.2021.111064","volume":"197","author":"S Batterman","year":"2021","unstructured":"Batterman S, Warner SC, Xia T, Sagovac S, Roberts B, Vial B, Godwin C (2021) A community noise survey in Southwest Detroit and the value of supplemental metrics for truck noise. Environ Res 197:111064","journal-title":"Environ Res"},{"issue":"8","key":"10365_CR12","doi-asserted-by":"publisher","first-page":"608","DOI":"10.1093\/occmed\/kqu126","volume":"64","author":"K Davis","year":"2014","unstructured":"Davis K, Dunning K, Jewell G, Lockey J (2014) Cost and disability trends of work-related musculoskeletal disorders in Ohio. Occup Med 64(8):608\u2013615","journal-title":"Occup Med"},{"key":"10365_CR13","doi-asserted-by":"publisher","DOI":"10.1016\/j.apergo.2021.103588","volume":"98","author":"JT Dennerlein","year":"2022","unstructured":"Dennerlein JT, Cavallari JM, Kim JHJ, Green NH (2022) The effects of a new seat suspension system on whole body vibration exposure and driver low back pain and disability: Results from a randomized controlled trial in truck drivers. Appl Ergon 98:103588","journal-title":"Appl Ergon"},{"key":"10365_CR14","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2023.103885","volume":"85","author":"S Esmailzadeh","year":"2023","unstructured":"Esmailzadeh S, Bakhtavar E, Mokhtarian-Asl M, Sadiq R, Hewage K (2023) Mathematical modelling of waste rock management through incorporating open-pit waste rocks in underground stope filling: An environmental approach. Resour Policy 85:103885","journal-title":"Resour Policy"},{"key":"10365_CR15","doi-asserted-by":"publisher","DOI":"10.1016\/j.jpowsour.2020.227948","volume":"454","author":"Y Feng","year":"2020","unstructured":"Feng Y, Dong Z (2020) Optimal energy management with balanced fuel economy and battery life for large hybrid electric mining truck. J Power Sources 454:227948","journal-title":"J Power Sources"},{"key":"10365_CR16","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.cageo.2015.11.008","volume":"87","author":"S-O Gilani","year":"2016","unstructured":"Gilani S-O, Sattarvand J (2016) Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization. Comput Geosci 87:31\u201340","journal-title":"Comput Geosci"},{"key":"10365_CR17","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2020.101738","volume":"68","author":"SO Gilani","year":"2020","unstructured":"Gilani SO, Sattarvand J, Hajihassani M, Abdullah SS (2020) A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty. Resour Policy 68:101738","journal-title":"Resour Policy"},{"key":"10365_CR18","doi-asserted-by":"publisher","first-page":"706","DOI":"10.1016\/j.trd.2018.07.010","volume":"63","author":"I Han","year":"2018","unstructured":"Han I, Samarneh L, Stock TH, Symanski E (2018) Impact of transient truck and train traffic on ambient air and noise levels in underserved communities. Transp Res Part D: Transp Environ 63:706\u2013717","journal-title":"Transp Res Part D: Transp Environ"},{"issue":"1","key":"10365_CR19","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1016\/S0301-7516(01)00071-0","volume":"64","author":"G Hilson","year":"2002","unstructured":"Hilson G, Nayee V (2002) Environmental management system implementation in the mining industry: a key to achieving cleaner production. Int J Miner Process 64(1):19\u201341","journal-title":"Int J Miner Process"},{"key":"10365_CR20","unstructured":"Hodkiewicz M, Richardson S, Durham R (2010) Challenges and opportunities for simulation modelling integrating mine haulage and truck shop operations. Proceedings of 2010 Australian Mining Technology Conference. (pp. 163-172). Perth, Western Australia. CRC Mining."},{"issue":"3","key":"10365_CR21","doi-asserted-by":"publisher","first-page":"483","DOI":"10.1016\/j.ijmst.2018.04.016","volume":"29","author":"M Jamshidi","year":"2019","unstructured":"Jamshidi M, Osanloo M (2019) Reliability analysis of production schedule in multi-element deposits under grade-tonnage uncertainty with multi-destinations for the run of mine material. Int J Min Sci Technol 29(3):483\u2013489","journal-title":"Int J Min Sci Technol"},{"issue":"12","key":"10365_CR22","first-page":"44","volume":"62","author":"V Kecojevic","year":"2010","unstructured":"Kecojevic V, Komljenovic D (2010) Haul truck fuel consumption and CO2 emission under various engine load conditions. Min Eng 62(12):44\u201348","journal-title":"Min Eng"},{"key":"10365_CR23","doi-asserted-by":"publisher","first-page":"428","DOI":"10.1016\/j.asoc.2018.02.010","volume":"66","author":"A Khan","year":"2018","unstructured":"Khan A, Niemann-Delius C (2018) A differential evolution based approach for the production scheduling of open pit mines with or without the condition of grade uncertainty. Appl Soft Comput 66:428\u2013437","journal-title":"Appl Soft Comput"},{"key":"10365_CR24","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.resourpol.2014.10.011","volume":"46","author":"S Kusi-Sarpong","year":"2015","unstructured":"Kusi-Sarpong S, Bai C, Sarkis J, Wang X (2015) Green supply chain practices evaluation in the mining industry using a joint rough sets and fuzzy TOPSIS methodology. Resour Policy 46:86\u2013100","journal-title":"Resour Policy"},{"issue":"3","key":"10365_CR25","doi-asserted-by":"publisher","first-page":"642","DOI":"10.1016\/j.ejor.2012.05.029","volume":"222","author":"A Lamghari","year":"2012","unstructured":"Lamghari A, Dimitrakopoulos R (2012) A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. Eur J Oper Res 222(3):642\u2013652","journal-title":"Eur J Oper Res"},{"key":"10365_CR26","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2018.11.010","volume":"115","author":"A Lamghari","year":"2020","unstructured":"Lamghari A, Dimitrakopoulos R (2020) Hyper-heuristic approaches for strategic mine planning under uncertainty. Comput Oper Res 115:104590","journal-title":"Comput Oper Res"},{"issue":"3","key":"10365_CR29","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/0167-9031(90)90543-2","volume":"10","author":"Z Li","year":"1990","unstructured":"Li Z (1990) A methodology for the optimum control of shovel and truck operations in open-pit mining. Min Sci Technol 10(3):337\u2013340","journal-title":"Min Sci Technol"},{"issue":"3","key":"10365_CR30","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1016\/S0959-6526(03)00102-1","volume":"12","author":"RA Luken","year":"2004","unstructured":"Luken RA, Navratil J (2004) A programmatic review of UNIDO\/UNEP national cleaner production centres. J Clean Prod 12(3):195\u2013205","journal-title":"J Clean Prod"},{"issue":"3","key":"10365_CR31","doi-asserted-by":"publisher","first-page":"911","DOI":"10.1016\/j.ejor.2016.05.050","volume":"255","author":"MEV Matamoros","year":"2016","unstructured":"Matamoros MEV, Dimitrakopoulos R (2016) Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. Eur J Oper Res 255(3):911\u2013921","journal-title":"Eur J Oper Res"},{"issue":"10","key":"10365_CR32","doi-asserted-by":"publisher","first-page":"709","DOI":"10.1080\/17480930.2021.1949861","volume":"35","author":"M Mohtasham","year":"2021","unstructured":"Mohtasham M, Mirzaei-Nasirabad H, Askari-Nasab H, Alizadeh B (2021) A multi-objective model for fleet allocation schedule in open-pit mines considering the impact of prioritising objectives on transportation system performance. Int J Min Reclam Environ 35(10):709\u2013727","journal-title":"Int J Min Reclam Environ"},{"issue":"2","key":"10365_CR33","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.ijsbe.2014.10.001","volume":"3","author":"NK Mondal","year":"2014","unstructured":"Mondal NK, Dey M, Datta JK (2014) Vulnerability of bus and truck drivers affected from vehicle engine noise. Int J Sustain Built Environ 3(2):199\u2013206","journal-title":"Int J Sustain Built Environ"},{"issue":"3","key":"10365_CR34","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1080\/0305215X.2022.2153840","volume":"56","author":"A Moradi Afrapoli","year":"2022","unstructured":"Moradi Afrapoli A, Upadhyay S P, Askari-Nasab H (2022) A nested multiple-objective optimization algorithm for managing production fleets in surface mines.\u00a0Eng Optim 56(3):378\u2013391.","journal-title":"Eng Optim"},{"key":"10365_CR35","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1016\/j.resconrec.2013.03.006","volume":"76","author":"K Muduli","year":"2013","unstructured":"Muduli K, Govindan K, Barve A, Kannan D, Geng Y (2013) Role of behavioural factors in green supply chain management implementation in Indian mining industries. Resour Conserv Recycl 76:50\u201360","journal-title":"Resour Conserv Recycl"},{"key":"10365_CR36","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106716","volume":"148","author":"S Nayeri","year":"2020","unstructured":"Nayeri S, Paydar MM, Asadi-Gangraj E, Emami S (2020) Multi-objective fuzzy robust optimization approach to sustainable closed-loop supply chain network design. Comput Ind Eng 148:106716","journal-title":"Comput Ind Eng"},{"issue":"3","key":"10365_CR37","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1287\/inte.1090.0492","volume":"40","author":"AM Newman","year":"2010","unstructured":"Newman AM, Rubio E, Caro R, Weintraub A, Eurek K (2010) A review of operations research in mine planning. Interfaces 40(3):222\u2013245","journal-title":"Interfaces"},{"key":"10365_CR38","unstructured":"Oraee K, Asi B (2004). Fuzzy model for truck allocation in surface mines. In: Mine planning and equipment selection, Thirteenth International Symposium on Mine Planning and Equipment Selection (MPES 2004) Taylor & Fancis (Routledge, USA), pp 585\u2013593"},{"key":"10365_CR39","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/j.simpat.2018.09.015","volume":"89","author":"M Paricheh","year":"2018","unstructured":"Paricheh M, Osanloo M (2018) A simulation-based risk management approach to locating facilities in open-pit mines under price and grade uncertainties. Simul Model Pract Theory 89:119\u2013134","journal-title":"Simul Model Pract Theory"},{"key":"10365_CR40","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2019.101570","volume":"65","author":"A Rimele","year":"2020","unstructured":"Rimele A, Dimitrakopoulos R, Gamache M (2020) A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resour Policy 65:101570","journal-title":"Resour Policy"},{"key":"10365_CR41","doi-asserted-by":"publisher","first-page":"1382","DOI":"10.1016\/j.apenergy.2013.08.058","volume":"113","author":"LK Sahoo","year":"2014","unstructured":"Sahoo LK, Bandyopadhyay S, Banerjee R (2014) Benchmarking energy consumption for dump trucks in mines. Appl Energy 113:1382\u20131396","journal-title":"Appl Energy"},{"issue":"3","key":"10365_CR42","doi-asserted-by":"publisher","first-page":"162","DOI":"10.1080\/13895260500128914","volume":"19","author":"CH Ta","year":"2005","unstructured":"Ta CH, Kresta JV, Forbes JF, Marquez HJ (2005) A stochastic optimization approach to mine truck allocation. Int J Surf Min Reclam Environ 19(3):162\u2013175","journal-title":"Int J Surf Min Reclam Environ"},{"key":"10365_CR43","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2022.103167","volume":"80","author":"M Tabesh","year":"2023","unstructured":"Tabesh M, Afrapoli AM, Askari-Nasab H (2023) A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines. Resour Policy 80:103167","journal-title":"Resour Policy"},{"key":"10365_CR44","doi-asserted-by":"publisher","first-page":"662","DOI":"10.1016\/j.jclepro.2015.10.074","volume":"113","author":"M Talaei","year":"2016","unstructured":"Talaei M, Farhang Moghaddam B, Pishvaee MS, Bozorgi-Amiri A, Gholamnejad SA (2016) robust fuzzy optimization model for carbon-efficient closed-loop supply chain network design problem: a numerical illustration in electronics industry. J Clean Prod 113:662\u2013673","journal-title":"J Clean Prod"},{"issue":"4","key":"10365_CR45","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1080\/09208119708944093","volume":"11","author":"VA Temeng","year":"1997","unstructured":"Temeng VA, O OF, O FJJ, (1997) Real-time truck dispatching using a transportation algorithm. Int J Surf Min Reclam Environ 11(4):203\u2013207","journal-title":"Int J Surf Min Reclam Environ"},{"key":"10365_CR47","doi-asserted-by":"publisher","first-page":"1779","DOI":"10.1016\/j.egypro.2015.07.469","volume":"75","author":"L Zhang","year":"2015","unstructured":"Zhang L, Xia X (2015) An integer programming approach for truck-shovel dispatching problem in open-pit mines. Energy Proc 75:1779\u20131784","journal-title":"Energy Proc"},{"key":"10365_CR48","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2023.104080","volume":"150","author":"L Zhang","year":"2023","unstructured":"Zhang L, Shan W, Zhou B, Yu B (2023) A dynamic dispatching problem for autonomous mine trucks in open-pit mines considering endogenous congestion. Transport Res Part C Emerg Technol 150:104080","journal-title":"Transport Res Part C Emerg Technol"},{"key":"10365_CR49","doi-asserted-by":"publisher","DOI":"10.1016\/j.apacoust.2020.107697","volume":"173","author":"Y Zhao","year":"2021","unstructured":"Zhao Y, Alashmori M, Bi F, Wang X (2021) Parameter identification and robust vibration control of a truck driver\u2019s seat system using multi-objective optimization and genetic algorithm. Appl Acoust 173:107697","journal-title":"Appl Acoust"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-024-10365-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-024-10365-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-024-10365-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,11]],"date-time":"2025-02-11T22:56:59Z","timestamp":1739314619000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-024-10365-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,12,18]]},"references-count":46,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2025,1]]}},"alternative-id":["10365"],"URL":"https:\/\/doi.org\/10.1007\/s00500-024-10365-2","relation":{"has-preprint":[{"id-type":"doi","id":"10.21203\/rs.3.rs-3296876\/v1","asserted-by":"object"}]},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,12,18]]},"assertion":[{"value":"31 May 2024","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 December 2024","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"This is to certify that the research materials in the paper submitted to this Journal has neither been published elsewhere nor is being considered elsewhere for publication.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"The authors certify that all the contents are related to their own scientific work, and are mentioned the sources related to the ideas of others.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical statement"}}]}}