{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,24]],"date-time":"2026-06-24T16:02:41Z","timestamp":1782316961290,"version":"3.54.5"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"15-16","license":[{"start":{"date-parts":[[2025,8,1]],"date-time":"2025-08-01T00:00:00Z","timestamp":1754006400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,8,1]],"date-time":"2025-08-01T00:00:00Z","timestamp":1754006400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Soft Comput"],"published-print":{"date-parts":[[2025,8]]},"DOI":"10.1007\/s00500-025-10891-7","type":"journal-article","created":{"date-parts":[[2025,9,15]],"date-time":"2025-09-15T09:51:41Z","timestamp":1757929901000},"page":"5143-5158","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A new optimization model for multi-project scheduling considering dynamic resource allocation"],"prefix":"10.1007","volume":"29","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1605-8381","authenticated-orcid":false,"given":"Sajad","family":"Soltan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0953-6381","authenticated-orcid":false,"given":"Maryam","family":"Ashrafi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2025,9,15]]},"reference":[{"key":"10891_CR1","unstructured":"Ahmeti A, Musliu N (2021) Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling problem. In Proceedings of the 13th international conference on the practice and theory of automated timetabling-patat (Vol. 1, p. 14)"},{"key":"10891_CR2","doi-asserted-by":"publisher","first-page":"152126","DOI":"10.1109\/ACCESS.2019.2948111","volume":"7","author":"N Aihara","year":"2019","unstructured":"Aihara N, Adachi K, Takyu O, Ohta M, Fujii T (2019) Q-learning aided resource allocation and environment recognition in LoRaWAN with CSMA\/CA. IEEE Access 7:152126\u2013152137","journal-title":"IEEE Access"},{"key":"10891_CR3","doi-asserted-by":"publisher","first-page":"104782","DOI":"10.1016\/j.cor.2019.104782","volume":"113","author":"JA Araujo","year":"2020","unstructured":"Araujo JA, Santos HG, Gendron B, Jena SD, Brito SS, Souza DS (2020) Strong bounds for resource constrained project scheduling: preprocessing and cutting planes. Comput Oper Res 113:104782","journal-title":"Comput Oper Res"},{"issue":"1","key":"10891_CR4","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1016\/j.ejor.2014.06.025","volume":"240","author":"U Be\u015fikci","year":"2015","unstructured":"Be\u015fikci U, Bilge \u00dc, Ulusoy G (2015) Multi-mode resource constrained multi-project scheduling and resource portfolio problem. Eur J Oper Res 240(1):22\u201331","journal-title":"Eur J Oper Res"},{"issue":"1","key":"10891_CR5","doi-asserted-by":"publisher","first-page":"54","DOI":"10.1016\/j.ejor.2022.11.009","volume":"308","author":"D Bredael","year":"2023","unstructured":"Bredael D, Vanhoucke M (2023) Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates. Eur J Oper Res 308(1):54\u201375","journal-title":"Eur J Oper Res"},{"issue":"6","key":"10891_CR7","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1504\/IJCSM.2015.073597","volume":"6","author":"T Chen","year":"2015","unstructured":"Chen T, Ju C (2015) Comparative analysis of swarm intelligence and heuristic priority rules for solving multi-project scheduling problem. Int J Comput Sci Math 6(6):581\u2013599","journal-title":"Int J Comput Sci Math"},{"key":"10891_CR6","doi-asserted-by":"publisher","first-page":"106060","DOI":"10.1016\/j.cie.2019.106060","volume":"137","author":"H Chen","year":"2019","unstructured":"Chen H, Ding G, Zhang J, Qin S (2019) Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival. Comput Ind Eng 137:106060","journal-title":"Comput Ind Eng"},{"issue":"2","key":"10891_CR8","first-page":"143","volume":"30","author":"C-B Cheng","year":"2019","unstructured":"Cheng C-B, Lo C-Y, Chu C-P (2019) Solving multi-mode resource-constrained multi-project scheduling problem with combinatorial auction mechanisms. Int J Inf Manage Sci 30(2):143\u2013167","journal-title":"Int J Inf Manage Sci"},{"issue":"1","key":"10891_CR9","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/j.ejor.2011.03.019","volume":"213","author":"J Coelho","year":"2011","unstructured":"Coelho J, Vanhoucke M (2011) Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. Eur J Oper Res 213(1):73\u201382","journal-title":"Eur J Oper Res"},{"key":"10891_CR10","doi-asserted-by":"publisher","first-page":"107480","DOI":"10.1016\/j.asoc.2021.107480","volume":"107","author":"L Cui","year":"2021","unstructured":"Cui L, Liu X, Lu S, Jia Z (2021) A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem. Appl Soft Comput 107:107480","journal-title":"Appl Soft Comput"},{"issue":"1","key":"10891_CR11","first-page":"34","volume":"9","author":"H Davari Ardakani","year":"2022","unstructured":"Davari Ardakani H, Dehghani A (2022) Multi-objective optimization of multi-mode resource-constrained project selection and scheduling problem considering resource leveling and time-varying resource usage. Int J Supply Oper Manage 9(1):34\u201355","journal-title":"Int J Supply Oper Manage"},{"key":"10891_CR12","doi-asserted-by":"crossref","unstructured":"Elkhyari A, Gu\u00e9ret C, Jussien N (2003) Solving dynamic resource constraint project scheduling problems using new constraint programming tools. In Practice and Theory of Automated Timetabling IV: 4th International Conference, PATAT 2002, Gent, Belgium, August 21\u201323, 2002. Selected Revised Papers 4 (pp. 39\u201359). Springer Berlin Heidelberg","DOI":"10.1007\/978-3-540-45157-0_3"},{"key":"10891_CR13","doi-asserted-by":"publisher","first-page":"107402","DOI":"10.1016\/j.asoc.2021.107402","volume":"107","author":"F Fu","year":"2021","unstructured":"Fu F, Zhou H (2021) A combined multi-agent system for distributed multi-project scheduling problems. Appl Soft Comput 107:107402","journal-title":"Appl Soft Comput"},{"issue":"3","key":"10891_CR14","doi-asserted-by":"publisher","first-page":"729","DOI":"10.1016\/j.ejor.2016.07.024","volume":"256","author":"MJ Geiger","year":"2017","unstructured":"Geiger MJ (2017) A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. Eur J Oper Res 256(3):729\u2013741","journal-title":"Eur J Oper Res"},{"key":"10891_CR15","doi-asserted-by":"crossref","unstructured":"Goudarzi E, Esmaeeli H, Parsa K, Asadzadeh S (2023) Proposing new clustering-based algorithms for the multi-skilled resource-constrained multi-project scheduling problem with resource leveling adjustments. Kybernetes","DOI":"10.1108\/K-06-2023-1044"},{"key":"10891_CR16","doi-asserted-by":"publisher","first-page":"106857","DOI":"10.1016\/j.cie.2020.106857","volume":"150","author":"VA Hauder","year":"2020","unstructured":"Hauder VA, Beham A, Raggl S, Parragh SN, Affenzeller M (2020) Resource-constrained multi-project scheduling with activity and time flexibility. Comput Ind Eng 150:106857","journal-title":"Comput Ind Eng"},{"key":"10891_CR17","doi-asserted-by":"crossref","unstructured":"He Y, He Z, Wang N (2021) Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap. J Industrial Manage Optim, 17(5)","DOI":"10.3934\/jimo.2020077"},{"key":"10891_CR18","doi-asserted-by":"crossref","unstructured":"Hu X, Li J, Li F, Wang J, Wang Y (2025) Priority rule-based heuristics for distributed multi-project scheduling considering global resource failures. J Oper Res Soc, 1\u201320","DOI":"10.1080\/01605682.2025.2457655"},{"key":"10891_CR19","doi-asserted-by":"publisher","first-page":"107936","DOI":"10.1016\/j.ijpe.2020.107936","volume":"232","author":"SB Issa","year":"2021","unstructured":"Issa SB, Patterson RA, Tu Y (2021) Solving resource-constrained multi-project environment under different activity assumptions. Int J Prod Econ 232:107936","journal-title":"Int J Prod Econ"},{"key":"10891_CR20","doi-asserted-by":"publisher","first-page":"1131","DOI":"10.1016\/j.cie.2018.05.050","volume":"127","author":"Z Jiang","year":"2019","unstructured":"Jiang Z, Gu J, Fan W, Liu W, Zhu B (2019) Q-learning approach to coordinated optimization of passenger inflow control with train skip-stopping on a urban rail transit line. Comput Ind Eng 127:1131\u20131142","journal-title":"Comput Ind Eng"},{"issue":"4","key":"10891_CR21","doi-asserted-by":"publisher","first-page":"893","DOI":"10.1108\/ECAM-03-2019-0156","volume":"27","author":"M Kannimuthu","year":"2020","unstructured":"Kannimuthu M, Raphael B, Ekambaram P, Kuppuswamy A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Eng Constr Architectural Manage 27(4):893\u2013916","journal-title":"Eng Constr Architectural Manage"},{"issue":"5","key":"10891_CR22","doi-asserted-by":"publisher","first-page":"790","DOI":"10.1007\/s12559-018-9559-8","volume":"10","author":"PV Klaine","year":"2018","unstructured":"Klaine PV, Nadas JP, Souza RD, Imran MA (2018) Distributed drone base station positioning for emergency cellular networks using reinforcement learning. Cogn Comput 10(5):790\u2013804","journal-title":"Cogn Comput"},{"key":"10891_CR23","doi-asserted-by":"publisher","first-page":"106961","DOI":"10.1016\/j.cie.2020.106961","volume":"151","author":"F Li","year":"2021","unstructured":"Li F, Xu Z, Li H (2021) A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation. Comput Ind Eng 151:106961","journal-title":"Comput Ind Eng"},{"issue":"2","key":"10891_CR24","doi-asserted-by":"publisher","first-page":"04018067","DOI":"10.1061\/(ASCE)CP.1943-5487.0000816","volume":"33","author":"J Liu","year":"2019","unstructured":"Liu J, Lu M (2019) Robust dual-level optimization framework for resource-constrained multiproject scheduling for a prefabrication facility in construction. J Comput Civil Eng 33(2):04018067","journal-title":"J Comput Civil Eng"},{"key":"10891_CR25","doi-asserted-by":"crossref","unstructured":"Mao H, Yuan J, Mao Y, Zhang S (2024) Efficient priority rules for resource allocation of stochastic decentralized Multi-Project scheduling problem. IEEE Access","DOI":"10.1109\/ACCESS.2024.3442993"},{"issue":"3","key":"10891_CR26","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1016\/0263-7863(94)00019-9","volume":"13","author":"JH Payne","year":"1995","unstructured":"Payne JH (1995) Management of multiple simultaneous projects: a state-of-the-art review. Int J Project Manage 13(3):163\u2013168","journal-title":"Int J Project Manage"},{"key":"10891_CR27","doi-asserted-by":"publisher","first-page":"857","DOI":"10.1007\/s12351-017-0358-x","volume":"20","author":"M Rostami","year":"2020","unstructured":"Rostami M, Bagherpour M (2020) A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems. Oper Res Int Journal 20:857\u2013897","journal-title":"Oper Res Int Journal"},{"issue":"3","key":"10891_CR28","doi-asserted-by":"publisher","first-page":"1637","DOI":"10.1007\/s10479-023-05403-5","volume":"339","author":"M Sadeghloo","year":"2024","unstructured":"Sadeghloo M, Emami S, Divsalar A (2024) A benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty. Ann Oper Res 339(3):1637\u20131677","journal-title":"Ann Oper Res"},{"issue":"3","key":"10891_CR29","doi-asserted-by":"publisher","first-page":"958","DOI":"10.1016\/j.ejor.2022.09.033","volume":"309","author":"MG S\u00e1nchez","year":"2023","unstructured":"S\u00e1nchez MG, Lalla-Ruiz E, Gil AF, Castro C, Vo\u00df S (2023) Resource-constrained multi-project scheduling problem: A survey. Eur J Oper Res 309(3):958\u2013976","journal-title":"Eur J Oper Res"},{"key":"10891_CR30","doi-asserted-by":"crossref","unstructured":"Satic U, Jacko P, Kirkbride C (2019) October Performance evaluation of scheduling policies for the DRCMPSP. In International Conference on Analytical and Stochastic Modeling Techniques and Applications (pp. 100\u2013114). Cham: Springer International Publishing","DOI":"10.1007\/978-3-030-62885-7_8"},{"issue":"4","key":"10891_CR31","doi-asserted-by":"publisher","first-page":"1411","DOI":"10.1080\/00207543.2020.1857450","volume":"60","author":"U Satic","year":"2022","unstructured":"Satic U, Jacko P, Kirkbride C (2022) Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem. Int J Prod Res 60(4):1411\u20131423","journal-title":"Int J Prod Res"},{"issue":"2","key":"10891_CR32","doi-asserted-by":"publisher","first-page":"10493","DOI":"10.1016\/j.ifacol.2020.12.2794","volume":"53","author":"I Sung","year":"2020","unstructured":"Sung I, Choi B, Nielsen P (2020) Reinforcement learning for resource constrained project scheduling problem with activity iterations and crashing. IFAC-PapersOnLine 53(2):10493\u201310497","journal-title":"IFAC-PapersOnLine"},{"key":"10891_CR33","doi-asserted-by":"crossref","unstructured":"Tayyar SG, Lamothe J, Dupont L (2016), December Genetic algorithm for generalized resource constrained multi project scheduling problem integrated with closed loop supply chain planning. In 2016 IEEE International conference on industrial engineering and engineering management (IEEM) (pp. 1683\u20131687). IEEE","DOI":"10.1109\/IEEM.2016.7798164"},{"issue":"8","key":"10891_CR34","doi-asserted-by":"publisher","first-page":"1243","DOI":"10.1080\/01605682.2019.1609883","volume":"71","author":"M Tian","year":"2020","unstructured":"Tian M, Liu RJ, Zhang GJ (2020) Solving the resource-constrained multi-project scheduling problem with an improved critical chain method. J Oper Res Soc 71(8):1243\u20131258","journal-title":"J Oper Res Soc"},{"key":"10891_CR35","doi-asserted-by":"crossref","unstructured":"Torba R, Dauz\u00e8re-P\u00e9r\u00e8s S, Yugma C, Gallais C, Pouzet J (2024) Solving a real-life multi-skill resource-constrained multi-project scheduling problem. Ann Oper Res, 1\u201346","DOI":"10.1007\/s10479-023-05784-7"},{"key":"10891_CR36","doi-asserted-by":"publisher","first-page":"105163","DOI":"10.1016\/j.cor.2020.105163","volume":"128","author":"M Van Den Eeckhout","year":"2021","unstructured":"Van Den Eeckhout M, Vanhoucke M, Maenhout B (2021) A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing. Comput Oper Res 128:105163","journal-title":"Comput Oper Res"},{"issue":"10","key":"10891_CR37","doi-asserted-by":"publisher","first-page":"3465","DOI":"10.1007\/s00500-017-3003-y","volume":"23","author":"F Villaf\u00e1\u00f1ez","year":"2019","unstructured":"Villaf\u00e1\u00f1ez F, Poza D, L\u00f3pez-Paredes A, Pajares J, Olmo RD (2019) A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP). Soft Comput 23(10):3465\u20133479","journal-title":"Soft Comput"},{"key":"10891_CR38","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/j.cie.2017.10.021","volume":"114","author":"Y Wang","year":"2017","unstructured":"Wang Y, He Z, Kerkhove LP, Vanhoucke M (2017) On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Comput Ind Eng 114:223\u2013234","journal-title":"Comput Ind Eng"},{"issue":"3","key":"10891_CR39","doi-asserted-by":"publisher","first-page":"1631","DOI":"10.1111\/itor.13392","volume":"31","author":"W You","year":"2024","unstructured":"You W, Xu Z, Yu Y, Zhao S (2024) A two-layer approach for solving robust decentralized multiproject scheduling problem with multi\u2010skilled staff. Int Trans Oper Res 31(3):1631\u20131670","journal-title":"Int Trans Oper Res"},{"key":"10891_CR40","doi-asserted-by":"crossref","unstructured":"Zhang Z, Chen M (2018) A bi-level multi-agent system model for decentralized multi-project scheduling of wind power plants. J Renew Sustain Energy, 10(3)","DOI":"10.1063\/1.5021839"}],"container-title":["Soft Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-025-10891-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00500-025-10891-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00500-025-10891-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,25]],"date-time":"2025-09-25T08:39:33Z","timestamp":1758789573000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00500-025-10891-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,8]]},"references-count":40,"journal-issue":{"issue":"15-16","published-print":{"date-parts":[[2025,8]]}},"alternative-id":["10891"],"URL":"https:\/\/doi.org\/10.1007\/s00500-025-10891-7","relation":{},"ISSN":["1432-7643","1433-7479"],"issn-type":[{"value":"1432-7643","type":"print"},{"value":"1433-7479","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,8]]},"assertion":[{"value":"27 September 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"28 August 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 September 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors affirm that there are no financial conflicts of interest or personal relationships that could have influenced the research and findings presented in this paper.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interest"}}]}}