{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,30]],"date-time":"2026-01-30T07:48:39Z","timestamp":1769759319511,"version":"3.49.0"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2013,1,3]],"date-time":"2013-01-03T00:00:00Z","timestamp":1357171200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2014,3]]},"DOI":"10.1007\/s00521-012-1323-5","type":"journal-article","created":{"date-parts":[[2013,1,2]],"date-time":"2013-01-02T12:34:40Z","timestamp":1357130080000},"page":"973-983","source":"Crossref","is-referenced-by-count":53,"title":["A new short-term load forecasting method of power system based on EEMD and SS-PSO"],"prefix":"10.1007","volume":"24","author":[{"given":"Zhigang","family":"Liu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wanlu","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jiajun","family":"Zeng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,1,3]]},"reference":[{"key":"1323_CR1","doi-asserted-by":"crossref","DOI":"10.1002\/047122412X","volume-title":"Market operations in electric power systems: forecasting, scheduling, and risk management","author":"M Shahidehpour","year":"2002","unstructured":"Shahidehpour M, Yamin H, Zuyi L (2002) Market operations in electric power systems: forecasting, scheduling, and risk management. IEEE Press power engineering series, New York, USA"},{"issue":"1","key":"1323_CR2","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1109\/59.910780","volume":"16","author":"HS Hippert","year":"2001","unstructured":"Hippert HS, Pedreira CE, Castro R (2001) Neural networks for short term load forecasting: a review and evaluation. IEEE Trans Power Syst 16(1):44\u201355","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"1323_CR3","doi-asserted-by":"crossref","first-page":"1788","DOI":"10.1109\/59.331433","volume":"9","author":"T Haida","year":"1994","unstructured":"Haida T, Muto S (1994) Regression based peak load forecasting using a transformation technique. IEEE Trans Power Syst 9(4):1788\u20131794","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"1323_CR4","doi-asserted-by":"crossref","first-page":"1535","DOI":"10.1109\/59.99410","volume":"5","author":"AD Papalexopoulos","year":"1990","unstructured":"Papalexopoulos AD, Hesterberg TC (1990) A regression-based approach to short-term system load forecasting. IEEE Trans Power Syst 5(4):1535\u20131547","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"1323_CR5","doi-asserted-by":"crossref","first-page":"508","DOI":"10.1109\/59.260833","volume":"8","author":"S Rahman","year":"1993","unstructured":"Rahman S, Hazim O (1993) A generalized knowledge-based short term load-forecasting technique. IEEE Trans Power Syst 8(2):508\u2013514","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"1323_CR6","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1109\/TPWRS.2003.811010","volume":"18","author":"SJ Huang","year":"2003","unstructured":"Huang SJ, Shih KR (2003) Short-term load forecasting via ARMA model identification including non-Gaussian process considerations. IEEE Trans Power Syst 18(2):673\u2013679","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"1323_CR7","doi-asserted-by":"crossref","first-page":"1195","DOI":"10.1109\/59.260877","volume":"8","author":"TM Peng","year":"1993","unstructured":"Peng TM, Hubele NF, Karady GG (1993) An adaptive neural network approach to one-week ahead load forecasting. IEEE Trans Power Syst 8(3):1195\u20131203","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"1323_CR8","doi-asserted-by":"crossref","first-page":"1716","DOI":"10.1109\/59.466468","volume":"10","author":"A Khotanzad","year":"1995","unstructured":"Khotanzad A, Hwang RC, Abaye A, Maratukulam D (1995) An adaptive modular artificial neural network hourly load forecaster and its implementation at electric utilities. IEEE Trans Power Syst 10(3):1716\u20131722","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"1323_CR9","doi-asserted-by":"crossref","first-page":"907","DOI":"10.1109\/TPWRS.2002.800992","volume":"17","author":"LM Saini","year":"2002","unstructured":"Saini LM, Soni MK (2002) Artificial neural network-based peak load forecasting using conjugate gradient methods. IEEE Trans Power Syst 17(3):907\u2013912","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"1323_CR10","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1109\/59.867141","volume":"15","author":"K Kwang-Ho","year":"2000","unstructured":"Kwang-Ho K, Hyoung-Sun Y, Yong-Cheol K (2000) Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method. IEEE Trans Power Syst 15(2):559\u2013565","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"1323_CR11","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1109\/TEVC.2005.857075","volume":"10","author":"L Gwo-Ching","year":"2006","unstructured":"Gwo-Ching L, Ta-Peng T (2006) Application of a fuzzy neural network combined with a chaos genetic algorithm and simulated annealing to short-term load forecasting. IEEE Trans Evolut Comput 10(3):330\u2013340","journal-title":"IEEE Trans Evolut Comput"},{"issue":"4","key":"1323_CR12","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1016\/S0305-0548(99)00123-9","volume":"28","author":"ZG Peter","year":"2001","unstructured":"Peter ZG, Eddy PB, Michael HY (2001) A simulation study of artificial neural networks for nonlinear time-series forecasting. Comput Oper Res 28(4):381\u2013396","journal-title":"Comput Oper Res"},{"issue":"3","key":"1323_CR13","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0169-2070(99)00002-3","volume":"15","author":"WT James","year":"1999","unstructured":"James WT, Derek WB (1999) Investigating improvements in the accuracy of prediction intervals for combinations of forecasts: a simulation study. Int J Forecast 15(3):325\u2013339","journal-title":"Int J Forecast"},{"issue":"6","key":"1323_CR14","doi-asserted-by":"crossref","first-page":"716","DOI":"10.1109\/3477.809027","volume":"29","author":"Y Liu","year":"1999","unstructured":"Liu Y, Yao X (1999) Simultaneous training of negatively correlated neural networks in an ensemble. IEEE Trans Syst Man Cybern Part B 29(6):716\u2013725","journal-title":"IEEE Trans Syst Man Cybern Part B"},{"issue":"2","key":"1323_CR15","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1109\/72.839015","volume":"11","author":"A Khotanzad","year":"2000","unstructured":"Khotanzad A, Elragal H, Lu TL (2000) Combination of artificial neural-network forecasters for prediction of natural gas consumption. IEEE Trans Neural Netw 11(2):464\u2013473","journal-title":"IEEE Trans Neural Netw"},{"issue":"2","key":"1323_CR16","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1109\/TPWRS.2010.2048585","volume":"26","author":"M Hanmandlu","year":"2011","unstructured":"Hanmandlu M, Chauhan BK (2011) Load forecasting using hybrid models. IEEE Trans Power Syst 26(2):20\u201329","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"1323_CR17","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1109\/TPWRS.2004.831256","volume":"20","author":"T Senjyu","year":"2005","unstructured":"Senjyu T, Mandal P, Uezato K, Funabashi T (2005) Next day load curve forecasting using hybrid correction method. IEEE Trans Power Syst 20(1):102\u2013109","journal-title":"IEEE Trans Power Syst"},{"issue":"6","key":"1323_CR18","doi-asserted-by":"crossref","first-page":"960","DOI":"10.3390\/en4060960","volume":"4","author":"H Wei-Chiang","year":"2011","unstructured":"Wei-Chiang H, Yucheng D, Chien-Yuan L, Li-Yueh C (2011) SVR with hybrid chaotic immune algorithm for seasonal load demand forecasting. Energies 4(6):960\u2013977","journal-title":"Energies"},{"issue":"1","key":"1323_CR19","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.energy.2008.09.020","volume":"34","author":"N Amjady","year":"2009","unstructured":"Amjady N, Keynia F (2009) Short-term load forecasting of power systems by combination of wavelet transform and neuro-evolutionary algorithm. Energy 34(1):46\u201357","journal-title":"Energy"},{"issue":"3","key":"1323_CR20","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1109\/TEVC.2005.857075","volume":"10","author":"GC Liao","year":"2006","unstructured":"Liao GC, Tsao TP (2006) Application of a fuzzy neural network combined with a chaos genetic algorithm and simulated annealing to short term load forecasting. IEEE Trans Evolut Comput 10(3):330\u2013340","journal-title":"IEEE Trans Evolut Comput"},{"issue":"1","key":"1323_CR21","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1109\/TPWRS.2008.2006997","volume":"24","author":"N Amjady","year":"2009","unstructured":"Amjady N, Keynia F (2009) Day-ahead price forecasting of electricity markets by mutual information technique and cascaded neuro-evolutionary algorithm. IEEE Trans Power Syst 24(1):306\u2013318","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"1323_CR22","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1109\/TPWRS.2008.2008606","volume":"24","author":"ZA Bashir","year":"2009","unstructured":"Bashir ZA, Hawary ME (2009) Applying wavelets to short-term load forecasting using PSO-based neural networks. IEEE Trans Power Syst 24(1):20\u201327","journal-title":"IEEE Trans Power Syst"},{"issue":"10","key":"1323_CR23","doi-asserted-by":"crossref","first-page":"1679","DOI":"10.1016\/j.epsr.2008.02.009","volume":"78","author":"WG Bo","year":"2008","unstructured":"Bo WG, Tai NL, Zhai HQ, Ye J (2008) A new ARMAX model based on evolutionary algorithm and particle swarm optimization for short-term load forecasting. Electr Power Syst Res 78(10):1679\u20131685","journal-title":"Electr Power Syst Res"},{"issue":"2","key":"1323_CR24","doi-asserted-by":"crossref","first-page":"1126","DOI":"10.1109\/TPWRS.2005.846106","volume":"20","author":"CM Huang","year":"2005","unstructured":"Huang CM, Huang CJ, Wang ML (2005) A particle swarm optimization to identifying the ARMAX model for short-term load forecasting. IEEE Trans Power Syst 20(2):1126\u20131133","journal-title":"IEEE Trans Power Syst"},{"issue":"1\u20133","key":"1323_CR25","first-page":"449","volume":"73","author":"CM Lee","year":"2009","unstructured":"Lee CM, Ko CN (2009) Time series prediction using RBF neural networks with a nonlinear time-varying evolution PSO algorithm. Neurocomputing 73(1\u20133):449\u2013460","journal-title":"Neurocomputing"},{"issue":"1","key":"1323_CR26","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/j.apenergy.2009.04.024","volume":"87","author":"MR AlRashidi","year":"2010","unstructured":"AlRashidi MR, EL-Naggar KM (2010) Long term electric load forecasting based on particle swarm optimization. Appl Energy 87(1):320\u2013326","journal-title":"Appl Energy"},{"key":"1323_CR27","doi-asserted-by":"crossref","unstructured":"Zhihui Z, Yunlian S, Huangqiang L (2007) Hybrid of EMD and SVMs for short-term load forecasting. In: IEEE international conference on control and automation, 30 May\u20131 June, Huangzhou, pp 1044\u20131047","DOI":"10.1109\/ICCA.2007.4376516"},{"key":"1323_CR28","unstructured":"Fan XQ, Zhu YL (2010) The application of empirical mode decomposition and gene expression programming to short-term load forecasting. In: 2010 sixth international conference on natural computation, 10\u201312 Aug, Yantai, vol 8, pp 4331\u20134334"},{"key":"1323_CR29","unstructured":"Bai WL, Liu ZG, Peng QW, Xie J (2009) Research of the load forecasting model based on HHT and combination of ANN. In: 2009 power and energy engineering conference (APPEEC), pp 1\u20134"},{"key":"1323_CR30","first-page":"55","volume":"2","author":"WL Bai","year":"2011","unstructured":"Bai WL, Liu ZG, Peng QW, Zhou X (2011) A power system short-term load forecasting model based on HHT. Power Syst Prot Control 2:55\u201360 (in Chinese)","journal-title":"Power Syst Prot Control"},{"key":"1323_CR31","doi-asserted-by":"crossref","first-page":"448","DOI":"10.1007\/978-3-642-13318-3_56","volume":"6064","author":"ZG Liu","year":"2010","unstructured":"Liu ZG, Bai WL, Chen G (2010) A new short-term load forecasting model of power system based on HHT and ANN. Lect Notes Comput Sci 6064:448\u2013454","journal-title":"Lect Notes Comput Sci"},{"key":"1323_CR32","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1007\/978-3-642-21105-8_50","volume":"6675","author":"WL Sun","year":"2011","unstructured":"Sun WL, Liu ZG, Li WF (2011) Power system load forecasting based on EEMD and ANN. Lect Notes Comput Sci 6675:429\u2013436","journal-title":"Lect Notes Comput Sci"},{"key":"1323_CR33","doi-asserted-by":"crossref","unstructured":"Huang NE, Shen Z, Long SR, Wu ML (1998) The empirical mode decomposition and Hilbert spectrum for nonlinear and non-stationary time series analysis. Proceedings of the Royal Society. Mathematical, physical and engineering sciences, vol 454, pp 903\u2013995","DOI":"10.1098\/rspa.1998.0193"},{"key":"1323_CR34","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1142\/S1793536909000047","volume":"1","author":"ZH Wu","year":"2009","unstructured":"Wu ZH, Huang NE (2009) Ensemble empirical mode decomposition: a noise assisted data analysis method. Adv Adapt Data Anal 1:1\u201341","journal-title":"Adv Adapt Data Anal"},{"key":"1323_CR35","doi-asserted-by":"crossref","unstructured":"Kennedy J, Eberhart R (1995) Particle swarm optimization. IEEE international conference on neural network vol 4, pp 1942\u20131948","DOI":"10.1109\/ICNN.1995.488968"},{"key":"1323_CR36","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1007\/BFb0040810","volume":"1447","author":"YH Shi","year":"1998","unstructured":"Shi YH, Eberhart R (1998) Parameter selection in particle swarm optimization. Lect Notes Comput Sci 1447:591\u2013600","journal-title":"Lect Notes Comput Sci"},{"key":"1323_CR37","unstructured":"Fang J (2006) Particle swarm algorithm and its applications. Scientific dissertation, University of electronic science and technology of China, Chengdu (in Chinese)"},{"key":"1323_CR38","doi-asserted-by":"crossref","unstructured":"Shi Y, Eberhar R (1998) A modified particle swarm optimizer. The 1998 IEEE international conference on evolutionary computation, 4\u20139 May, pp 69\u201373","DOI":"10.1109\/ICEC.1998.699146"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-012-1323-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-012-1323-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-012-1323-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,7]],"date-time":"2019-07-07T16:40:40Z","timestamp":1562517640000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-012-1323-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,1,3]]},"references-count":38,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2014,3]]}},"alternative-id":["1323"],"URL":"https:\/\/doi.org\/10.1007\/s00521-012-1323-5","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1,3]]}}}