{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:43:17Z","timestamp":1760708597381},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"S1","license":[{"start":{"date-parts":[[2013,7,26]],"date-time":"2013-07-26T00:00:00Z","timestamp":1374796800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1007\/s00521-013-1460-5","type":"journal-article","created":{"date-parts":[[2013,7,25]],"date-time":"2013-07-25T11:27:44Z","timestamp":1374751664000},"page":"353-367","source":"Crossref","is-referenced-by-count":8,"title":["A fuzzy-neural approach for supporting three-objective job scheduling in a wafer fabrication factory"],"prefix":"10.1007","volume":"23","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yu-Cheng","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,7,26]]},"reference":[{"issue":"1","key":"1460_CR1","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.ejor.2003.08.029","volume":"161","author":"T Loukil","year":"2005","unstructured":"Loukil T, Teghem J, Tuyttens D (2005) Solving multi-objective production scheduling problems using metaheuristics. Eur J Oper Res 161(1):42\u201361","journal-title":"Eur J Oper Res"},{"key":"1460_CR2","doi-asserted-by":"crossref","unstructured":"Grimme C, Lepping J (2011) Combining basic heuristics for solving multi-objective scheduling problems. In: 2011 IEEE symposium on computational intelligence in scheduling, pp 9\u201316","DOI":"10.1109\/SCIS.2011.5976543"},{"key":"1460_CR3","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1243\/09596518JSCE625","volume":"223","author":"T Chen","year":"2009","unstructured":"Chen T (2009) A tailored nonlinear fluctuation smoothing rule for semiconductor manufacturing factory scheduling. Proc Inst Mech Eng Part I J Syst Control Eng 223:149\u2013160","journal-title":"Proc Inst Mech Eng Part I J Syst Control Eng"},{"issue":"4","key":"1460_CR4","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/0377-2217(78)90043-7","volume":"2","author":"LN Wassenhove van","year":"1980","unstructured":"van Wassenhove LN, Gelders F (1980) Solving a bicriterion scheduling problem. Eur J Oper Res 2(4):281\u2013290","journal-title":"Eur J Oper Res"},{"issue":"3","key":"1460_CR5","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/S0167-6377(97)00025-4","volume":"21","author":"C Stein","year":"1997","unstructured":"Stein C, Wein J (1997) On the existence of schedules that are nearoptimal for both makespan and total weighted completion time. Oper Res Lett 21(3):115\u2013122","journal-title":"Oper Res Lett"},{"issue":"7","key":"1460_CR6","doi-asserted-by":"crossref","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"JK Cochran","year":"2003","unstructured":"Cochran JK, Horng S-M, Fowler JW (2003) A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput Oper Res 30(7):1087\u20131102","journal-title":"Comput Oper Res"},{"key":"1460_CR7","volume-title":"Multi-objective optimization using evolutionary algorithms","author":"K Deb","year":"2001","unstructured":"Deb K (2001) Multi-objective optimization using evolutionary algorithms. Wiley, Chichester"},{"key":"1460_CR8","volume-title":"Evolutionary algorithms for solving multi-objective problems (Genetic and Evolutionary Computation)","author":"CAC Coello","year":"2007","unstructured":"Coello CAC, Lamont GB, Veldhuizen DAV (2007) Evolutionary algorithms for solving multi-objective problems (Genetic and Evolutionary Computation). Springer, Berlin"},{"key":"1460_CR9","doi-asserted-by":"crossref","first-page":"1081","DOI":"10.1243\/09596518JSCE849","volume":"223","author":"T Chen","year":"2009","unstructured":"Chen T (2009) Dynamic fuzzy-neural fluctuation smoothing rule for jobs scheduling in a wafer fabrication factory. Proc Inst Mech Eng Part I J Syst Control Eng 223:1081\u20131094","journal-title":"Proc Inst Mech Eng Part I J Syst Control Eng"},{"key":"1460_CR10","doi-asserted-by":"crossref","first-page":"1033","DOI":"10.1243\/09544054JEM1459","volume":"223","author":"T Chen","year":"2009","unstructured":"Chen T (2009) Fuzzy-neural-network-based fluctuation smoothing rule for reducing the cycle times of jobs with various priorities in a wafer fabrication factory: a simulation study. Proc Inst Mech Eng Part B J Eng Manuf 223:1033\u20131044","journal-title":"Proc Inst Mech Eng Part B J Eng Manuf"},{"issue":"1\u20132","key":"1460_CR11","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1007\/s00170-008-1462-0","volume":"41","author":"H Zhang","year":"2009","unstructured":"Zhang H, Jiang Z, Guo C (2009) Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. Int J Adv Manuf Technol 41(1\u20132):110\u2013121","journal-title":"Int J Adv Manuf Technol"},{"issue":"10","key":"1460_CR12","first-page":"4289","volume":"6","author":"T Chen","year":"2009","unstructured":"Chen T, Wang YC, Lin YC (2009) A bi-criteria four-factor fluctuation smoothing rule for scheduling jobs in a wafer fabrication factory. Int J Innov Comput Inform Control 6(10):4289\u20134304","journal-title":"Int J Innov Comput Inform Control"},{"issue":"8","key":"1460_CR13","first-page":"2125","volume":"5","author":"T Chen","year":"2009","unstructured":"Chen T, Wang YC, Wu HC (2009) A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory: a simulation study. Int J Innov Comput Inform Control 5(8):2125\u20132139","journal-title":"Int J Innov Comput Inform Control"},{"key":"1460_CR14","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.rcim.2009.04.001","volume":"26","author":"T Chen","year":"2010","unstructured":"Chen T, Wang YC (2010) Incorporating the FCM-BPN approach with nonlinear programming for internal due date assignment in a wafer fabrication plant. Robot Comput Integrated Manuf 26:83\u201391","journal-title":"Robot Comput Integrated Manuf"},{"issue":"1","key":"1460_CR15","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1504\/IJMR.2011.037911","volume":"6","author":"K Pal","year":"2011","unstructured":"Pal K, Pal SK (2011) Soft computing methods used for the modelling and optimisation of Gas Metal Arc Welding: a review. Int J Manuf Res 6(1):15\u201329","journal-title":"Int J Manuf Res"},{"key":"1460_CR16","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1109\/34.85677","volume":"13","author":"XL Xie","year":"1991","unstructured":"Xie XL, Beni G (1991) A validity measure for fuzzy clustering. IEEE Trans Pattern Anal Mach Intell 13:841\u2013847","journal-title":"IEEE Trans Pattern Anal Mach Intell"},{"key":"1460_CR17","volume-title":"Numerical optimization","author":"J Nocedal","year":"2006","unstructured":"Nocedal J, Wright SJ (2006) Numerical optimization. Springer, Berlin"},{"key":"1460_CR18","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1007\/s00170-009-1941-y","volume":"45","author":"T Chen","year":"2009","unstructured":"Chen T, Wang YC (2009) A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory. Int J Adv Manuf Technol 45:110\u2013121","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"1460_CR19","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"SCH Lu","year":"1994","unstructured":"Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Trans Semicond Manuf 7(3):374\u2013388","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1460_CR20","doi-asserted-by":"crossref","first-page":"709","DOI":"10.1007\/s00170-009-2424-x","volume":"49","author":"T Chen","year":"2009","unstructured":"Chen T, Wang YC (2009) A bi-criteria nonlinear fluctuation smoothing rule incorporating the SOM-FBPN remaining cycle time estimator for scheduling a wafer fab - a simulation study. Int J Adv Manuf Technol 49:709\u2013721","journal-title":"Int J Adv Manuf Technol"},{"key":"1460_CR21","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1007\/s10845-005-1663-4","volume":"16","author":"PC Chang","year":"2005","unstructured":"Chang PC, Hsieh JC, Liao TW (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. J Intell Manuf 16:549\u2013557","journal-title":"J Intell Manuf"},{"key":"1460_CR22","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.asoc.2004.12.004","volume":"6","author":"PC Chang","year":"2006","unstructured":"Chang PC, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6:198\u2013206","journal-title":"Appl Soft Comput"},{"issue":"3","key":"1460_CR23","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1504\/IJMR.2011.041126","volume":"6","author":"AM Deif","year":"2011","unstructured":"Deif AM, ElMaraghy HA (2011) A multiple performance analysis of market-capacity integration policies. Int J Manuf Res 6(3):191\u2013214","journal-title":"Int J Manuf Res"},{"key":"1460_CR24","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.ejor.2003.08.042","volume":"161","author":"A Thomas","year":"2005","unstructured":"Thomas A, Charpentier P (2005) Reducing simulation models for scheduling manufacturing facilities. Eur J Oper Res 161:111\u2013125","journal-title":"Eur J Oper Res"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-013-1460-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-013-1460-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-013-1460-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T22:21:04Z","timestamp":1559082064000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-013-1460-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,7,26]]},"references-count":24,"journal-issue":{"issue":"S1","published-print":{"date-parts":[[2013,12]]}},"alternative-id":["1460"],"URL":"https:\/\/doi.org\/10.1007\/s00521-013-1460-5","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,7,26]]}}}