{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T09:24:01Z","timestamp":1768555441017,"version":"3.49.0"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,9,26]],"date-time":"2014-09-26T00:00:00Z","timestamp":1411689600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2015,1]]},"DOI":"10.1007\/s00521-014-1739-1","type":"journal-article","created":{"date-parts":[[2014,9,25]],"date-time":"2014-09-25T06:35:42Z","timestamp":1411626942000},"page":"223-236","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["Combining statistical analysis and artificial neural network for classifying jobs and estimating the cycle times in wafer fabrication"],"prefix":"10.1007","volume":"26","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,9,26]]},"reference":[{"issue":"2","key":"1739_CR1","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1109\/66.136277","volume":"5","author":"LM Wein","year":"1992","unstructured":"Wein LM (1992) On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans Semicond Manuf 5(2):156\u2013158","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1739_CR2","doi-asserted-by":"crossref","unstructured":"Inoue T, Ishii Y, Igarashi K, Takagi H, Muneta T, Imaoka K (2006) Conveyer belt model to analyze cycle time conditions in a semiconductor manufacturing line. In: IEEE international symposium on semiconductor manufacturing conference proceedings, pp 74\u201377","DOI":"10.1109\/ISSM.2006.4493026"},{"key":"1739_CR3","unstructured":"Johnson RT, Yang F, Ankenman BE, Nelson BL (2004) Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 winter simulation conference, vol 2, pp 1951\u20131955"},{"key":"1739_CR4","doi-asserted-by":"crossref","first-page":"4637","DOI":"10.3390\/su5114637","volume":"5","author":"T Chen","year":"2013","unstructured":"Chen T (2013) A systematic cycle time reduction procedure for enhancing the competitiveness and sustainability of a semiconductor manufacturer. Sustainability 5:4637\u20134652","journal-title":"Sustainability"},{"key":"1739_CR5","doi-asserted-by":"crossref","unstructured":"Raddon A, Rio Rancho NM, Grigsby B (1997) Throughput time forecasting model. In: 1997 IEEE\/SEMI advanced semiconductor manufacturing conference, pp 430\u2013433","DOI":"10.1109\/ASMC.1997.630775"},{"issue":"1","key":"1739_CR6","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/S0166-3615(01)00081-1","volume":"45","author":"AI Sivakumar","year":"2001","unstructured":"Sivakumar AI, Chong CS (2001) A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Comput Ind 45(1):59\u201378","journal-title":"Comput Ind"},{"key":"1739_CR7","doi-asserted-by":"crossref","unstructured":"Fronckowiak D, Peikert A, Nishinohara K (1996) Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing. In: Advanced semiconductor manufacturing conference and workshop 1996, pp 151\u2013155","DOI":"10.1109\/ASMC.1996.557987"},{"key":"1739_CR8","doi-asserted-by":"crossref","unstructured":"Beeg T (2004) Wafer fab cycle forecast under changing loading situations. In: 2004 IEEE advanced semiconductor manufacturing conference, pp 339\u2013343","DOI":"10.1109\/ASMC.2004.1309593"},{"issue":"3","key":"1739_CR9","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2","author":"T Chen","year":"2003","unstructured":"Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211\u2013222","journal-title":"Appl Soft Comput"},{"key":"1739_CR10","doi-asserted-by":"crossref","unstructured":"Tirkel I (2011) Cycle time prediction in wafer fabrication line by applying data mining methods. In: Proceedings of the 22nd annual IEEE\/SEMI advanced semiconductor manufacturing conference (ASMC\u201911), p 5","DOI":"10.1109\/ASMC.2011.5898218"},{"issue":"2","key":"1739_CR11","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1109\/TSM.2007.895215","volume":"20","author":"WL Pearn","year":"2007","unstructured":"Pearn WL, Chung SL, Lai CM (2007) Due-date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165\u2013175","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1739_CR12","doi-asserted-by":"crossref","unstructured":"Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the international conference on case-based reasoning (ICCBR 2001), Vancouver, British Columbia, Canada","DOI":"10.1007\/3-540-44593-5_46"},{"issue":"1","key":"1739_CR13","first-page":"55","volume":"10","author":"P-C Chang","year":"2003","unstructured":"Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55\u201361","journal-title":"Int J Ind Eng"},{"issue":"3","key":"1739_CR14","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s11063-006-9027-4","volume":"24","author":"T Chen","year":"2006","unstructured":"Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271\u2013288","journal-title":"Neural Process Lett"},{"issue":"2","key":"1739_CR15","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.asoc.2004.12.004","volume":"6","author":"PC Chang","year":"2006","unstructured":"Chang PC, Liao TW (2006) Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6(2):198\u2013206","journal-title":"Appl Soft Comput"},{"key":"1739_CR16","doi-asserted-by":"crossref","first-page":"575","DOI":"10.1007\/s00170-006-0741-x","volume":"35","author":"T Chen","year":"2007","unstructured":"Chen T (2007) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol 35:575\u2013586","journal-title":"Int J Adv Manuf Technol"},{"key":"1739_CR17","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.aei.2006.10.002","volume":"21","author":"T Chen","year":"2007","unstructured":"Chen T (2007) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21:55\u201365","journal-title":"Adv Eng Inform"},{"issue":"4","key":"1739_CR18","doi-asserted-by":"crossref","first-page":"784","DOI":"10.1109\/TSMCB.2007.895364","volume":"37","author":"T Chen","year":"2007","unstructured":"Chen T (2007) Predicting wafer lot output time with a hybrid FCM-FBPN approach. IEEE Trans Syst Man Cybern B Cybern 37(4):784\u2013793","journal-title":"IEEE Trans Syst Man Cybern B Cybern"},{"key":"1739_CR19","doi-asserted-by":"crossref","first-page":"1225","DOI":"10.1016\/j.asoc.2009.03.006","volume":"9","author":"T Chen","year":"2009","unstructured":"Chen T, Wu HC, Wang YC (2009) Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab. Appl Soft Comput 9:1225\u20131231","journal-title":"Appl Soft Comput"},{"issue":"9","key":"1739_CR20","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1007\/s00170-011-3228-3","volume":"56","author":"T Chen","year":"2011","unstructured":"Chen T (2011) Job cycle time estimation in a wafer fabrication factory with a bi-directional classifying fuzzy-neural approach. Int J Adv Manuf Technol 56(9):1007\u20131018","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"1739_CR21","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1287\/opre.9.3.383","volume":"9","author":"JDC Little","year":"1961","unstructured":"Little JDC (1961) A proof for the queuing formula: L\u00a0=\u00a0\u03bbW. Oper Res 9(3):383\u2013387","journal-title":"Oper Res"},{"key":"1739_CR22","doi-asserted-by":"crossref","unstructured":"Chen T, Wang YC (2013) An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory. Math Probl Eng. Article ID 740478","DOI":"10.1155\/2013\/740478"},{"issue":"5\u20136","key":"1739_CR23","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0736-5845(02)00005-4","volume":"18","author":"PG Benardos","year":"2002","unstructured":"Benardos PG, Vosniakos GC (2002) Prediciton of surface roughness in CNC face milling using neural networks and Taguchi\u2019s design of experiments. Robot Comput Integr Manuf 18(5\u20136):343\u2013354","journal-title":"Robot Comput Integr Manuf"},{"issue":"4","key":"1739_CR24","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1007\/s00521-005-0470-3","volume":"14","author":"W Sukthomya","year":"2005","unstructured":"Sukthomya W, Tannock J (2005) The optimization of neural network parameters using Taguchi\u2019s design of experiments approach: an application in manufacturing process modeling. Neural Comput Appl 14(4):337\u2013344","journal-title":"Neural Comput Appl"},{"key":"1739_CR25","unstructured":"Ranganathan A (2004). The Levenberg\u2013Marquardt algorithm. http:\/\/www.scribd.com\/doc\/10093320\/Levenberg-Marquardt-Algorithm"},{"key":"1739_CR26","volume-title":"Numerical optimization: theoretical and practical aspects","author":"JF Bonnans","year":"2006","unstructured":"Bonnans JF, Gilbert JC, Lemar\u00e9chal C, Sagastiz\u00e1bal CA (2006) Numerical optimization: theoretical and practical aspects. Springer, Berlin"},{"issue":"3","key":"1739_CR27","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1145\/203330.203343","volume":"38","author":"G Tesauro","year":"1995","unstructured":"Tesauro G (1995) Temporal difference learning and TD-Gammon. Commun ACM 38(3):58\u201368","journal-title":"Commun ACM"},{"issue":"6","key":"1739_CR28","doi-asserted-by":"crossref","first-page":"851","DOI":"10.1016\/S0890-6955(99)00094-2","volume":"40","author":"Raj K Hans","year":"2000","unstructured":"Hans Raj K, Sharma RS, Srivastava S, Patvardhan C (2000) Modeling of manufacturing processes with ANNs for intelligent manufacturing. Int J Mach Tools Manuf 40(6):851\u2013868","journal-title":"Int J Mach Tools Manuf"},{"key":"1739_CR29","doi-asserted-by":"crossref","unstructured":"Firoze A, Arifin MS, Rahman RM (2013) Bangla user adaptive word speech recognition: approaches and comparisons. Int J Fuzzy Syst Appl 3(3):1\u201336","DOI":"10.4018\/ijfsa.2013070101"},{"key":"1739_CR30","volume-title":"Classification and regression trees","author":"L Breiman","year":"1984","unstructured":"Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and regression trees. Wadsworth & Brooks\/Cole Advanced Books & Software, Monterey"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-014-1739-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-014-1739-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-014-1739-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,15]],"date-time":"2019-08-15T10:56:59Z","timestamp":1565866619000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-014-1739-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,26]]},"references-count":30,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,1]]}},"alternative-id":["1739"],"URL":"https:\/\/doi.org\/10.1007\/s00521-014-1739-1","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,26]]}}}