{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T09:08:14Z","timestamp":1762506494018},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2015,2,10]],"date-time":"2015-02-10T00:00:00Z","timestamp":1423526400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s00521-015-1828-9","type":"journal-article","created":{"date-parts":[[2015,2,9]],"date-time":"2015-02-09T01:59:20Z","timestamp":1423447160000},"page":"1709-1723","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":21,"title":["A novel chaotic imperialist competitive algorithm for production and air transportation scheduling problems"],"prefix":"10.1007","volume":"26","author":[{"given":"A.","family":"Mortazavi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A. Arshadi","family":"Khamseh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B.","family":"Naderi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,2,10]]},"reference":[{"key":"1828_CR1","doi-asserted-by":"crossref","first-page":"10095","DOI":"10.1016\/j.amc.2011.05.005","volume":"217","author":"C-H Liu","year":"2011","unstructured":"Liu C-H (2011) Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation. Appl Math Comput 217:10095\u201310104","journal-title":"Appl Math Comput"},{"issue":"1\u20132","key":"1828_CR2","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/S0360-8352(02)00079-7","volume":"43","author":"YH Lee","year":"2002","unstructured":"Lee YH, Jeong CS, Moon C (2002) Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comput Ind Eng 43(1\u20132):351\u2013374","journal-title":"Comput Ind Eng"},{"issue":"3","key":"1828_CR3","doi-asserted-by":"crossref","first-page":"1100","DOI":"10.1016\/j.ejor.2006.06.063","volume":"187","author":"SK Monkman","year":"2008","unstructured":"Monkman SK, Morrice DJ, Bard JF (2008) A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs. Eur J Oper Res 187(3):1100\u20131114","journal-title":"Eur J Oper Res"},{"issue":"6","key":"1828_CR4","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1016\/j.cor.2010.09.018","volume":"39","author":"B Cesaret","year":"2012","unstructured":"Cesaret B, O\u011fuz C, Salman FS (2012) A tabu search algorithm for order acceptance and scheduling. Comput Oper Res 39(6):1197\u20131205","journal-title":"Comput Oper Res"},{"issue":"4","key":"1828_CR5","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1016\/j.tre.2005.09.008","volume":"43","author":"MC Wilson","year":"2007","unstructured":"Wilson MC (2007) The impact of transportation disruptions on supply chain performance. Transp Res Part E Logist Transp Rev 43(4):295\u2013320","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"2","key":"1828_CR6","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/j.tre.2011.10.004","volume":"48","author":"Y-C Tsao","year":"2012","unstructured":"Tsao Y-C, Lu J-C (2012) A supply chain network design considering transportation cost discounts. Transp Res Part E Logist Transp Rev 48(2):401\u2013414","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"3","key":"1828_CR7","doi-asserted-by":"crossref","first-page":"2319","DOI":"10.1016\/j.eswa.2010.08.020","volume":"38","author":"FT Chan","year":"2011","unstructured":"Chan FT, Zhang T (2011) The impact of collaborative transportation management on supply chain performance: a simulation approach. Expert Syst Appl 38(3):2319\u20132329","journal-title":"Expert Syst Appl"},{"issue":"3","key":"1828_CR8","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1016\/j.cirpj.2010.03.003","volume":"2","author":"B Scholz-Reiter","year":"2010","unstructured":"Scholz-Reiter B, Frazzon EM, Makuschewitz T (2010) Integrating manufacturing and logistic systems along global supply chains. CIRP J Manuf Sci Technol 2(3):216\u2013223","journal-title":"CIRP J Manuf Sci Technol"},{"issue":"3","key":"1828_CR9","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/j.rcim.2003.10.004","volume":"20","author":"J Garcia","year":"2004","unstructured":"Garcia J, Lozano S, Canca D (2004) Coordinated scheduling of production and delivery from multiple plants. Robot Comput Integr Manuf 20(3):191\u2013198","journal-title":"Robot Comput Integr Manuf"},{"issue":"1","key":"1828_CR10","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/1099-1425(200101\/02)4:1<3::AID-JOS57>3.0.CO;2-D","volume":"4","author":"C-Y Lee","year":"2001","unstructured":"Lee C-Y, Chen Z-L (2001) Machine scheduling with transportation considerations. J Sched 4(1):3\u201324","journal-title":"J Sched"},{"issue":"6","key":"1828_CR11","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1002\/nav.20100","volume":"52","author":"G Pundoor","year":"2005","unstructured":"Pundoor G, Chen Z-L (2005) Scheduling a production\u2013distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Nav Res Logist 52(6):571\u2013589","journal-title":"Nav Res Logist"},{"issue":"4","key":"1828_CR12","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/mnsc.1040.0325","volume":"51","author":"Z-L Chen","year":"2005","unstructured":"Chen Z-L, Vairaktarakis GL (2005) Integrated scheduling of production and distribution operations. Manag Sci 51(4):614\u2013628","journal-title":"Manag Sci"},{"issue":"1","key":"1828_CR13","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.ejor.2004.12.007","volume":"173","author":"E Selvarajah","year":"2006","unstructured":"Selvarajah E, Steiner G (2006) Batch scheduling in a two-level supply chain\u2014a focus on the supplier. Eur J Oper Res 173(1):226\u2013240","journal-title":"Eur J Oper Res"},{"issue":"6","key":"1828_CR14","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1016\/j.jairtraman.2008.08.006","volume":"14","author":"H Vega","year":"2008","unstructured":"Vega H (2008) Air cargo, trade and transportation costs of perishables and exotics from South America. J Air Transp Manag 14(6):324\u2013328","journal-title":"J Air Transp Manag"},{"issue":"2","key":"1828_CR15","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1016\/j.cie.2006.02.007","volume":"51","author":"K Li","year":"2006","unstructured":"Li K, Ganesan VK, Sivakumar AI (2006) Scheduling of single stage assembly with air transportation in a consumer electronic supply chain. Comput Ind Eng 51(2):264\u2013278","journal-title":"Comput Ind Eng"},{"key":"1828_CR16","doi-asserted-by":"crossref","first-page":"442","DOI":"10.1016\/j.ejor.2007.03.006","volume":"187","author":"K Li","year":"2008","unstructured":"Li K, Sivakumar AI, Ganesan VK (2008) Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation. Eur J Oper Res 187:442\u2013455","journal-title":"Eur J Oper Res"},{"key":"1828_CR17","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1016\/j.cam.2008.12.022","volume":"230","author":"M Zandieh","year":"2009","unstructured":"Zandieh M, Molla-Alizadeh-Zavardehi S (2009) Synchronizing production and air transportation scheduling using mathematical programming models. J Comput Appl Math 230:546\u2013558","journal-title":"J Comput Appl Math"},{"key":"1828_CR18","doi-asserted-by":"crossref","first-page":"8255","DOI":"10.1016\/j.eswa.2010.05.060","volume":"37","author":"M Rostamian Delavar","year":"2010","unstructured":"Rostamian Delavar M, Hajiaghaei-Keshteli M, Molla-Alizadeh-Zavardehi S (2010) Genetic algorithms for coordinated scheduling of production and air transportation. Expert Syst Appl 37:8255\u20138266","journal-title":"Expert Syst Appl"},{"issue":"1","key":"1828_CR19","first-page":"54","volume":"1","author":"B Naderi","year":"2014","unstructured":"Naderi B, Roshanaei V (2014) No-idle time scheduling of open shops: modeling and metaheuristic solution methods. Int J Supply Oper Manag 1(1):54\u201368","journal-title":"Int J Supply Oper Manag"},{"key":"1828_CR20","doi-asserted-by":"crossref","first-page":"946","DOI":"10.1016\/j.tre.2009.05.002","volume":"946\u2013959","author":"SH Zegordi","year":"2009","unstructured":"Zegordi SH, Beheshti Nia MA (2009) A multi-population genetic algorithm for transportation scheduling. Transp Res Part E 946\u2013959:946\u2013959","journal-title":"Transp Res Part E"},{"issue":"3","key":"1828_CR21","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1016\/j.cie.2009.06.012","volume":"58","author":"S Zegordi","year":"2010","unstructured":"Zegordi S, Kamal Abadi I, Beheshti Nia M (2010) A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain. Comput Ind Eng 58(3):373\u2013381","journal-title":"Comput Ind Eng"},{"key":"1828_CR22","doi-asserted-by":"crossref","unstructured":"Atashpaz-Gargari E, Lucas C (2007) Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition. In: Evolutionary computation, Singapore","DOI":"10.1109\/CEC.2007.4425083"},{"key":"1828_CR23","doi-asserted-by":"crossref","first-page":"1312","DOI":"10.1016\/j.cnsns.2011.08.021","volume":"17","author":"S Talatahari","year":"2012","unstructured":"Talatahari S, Farahmand Azar B, Sheikholeslami R, Gandomi AH (2012) Imperialist competitive algorithm combined with chaos for global optimization. Commun Nonlinear Sci Numer Simul 17:1312\u20131319","journal-title":"Commun Nonlinear Sci Numer Simul"},{"key":"1828_CR24","doi-asserted-by":"crossref","first-page":"1868","DOI":"10.1016\/j.patrec.2009.12.005","volume":"31","author":"H Duan","year":"2010","unstructured":"Duan H, Xu C, Liu S, Shao S (2010) Template matching using chaotic imperialist competitive algorithm. Pattern Recogn Lett 31:1868\u20131875","journal-title":"Pattern Recogn Lett"},{"key":"1828_CR25","doi-asserted-by":"crossref","first-page":"7615","DOI":"10.1016\/j.eswa.2010.04.081","volume":"37","author":"S Nazari-Shirkouhi","year":"2010","unstructured":"Nazari-Shirkouhi S, Eivazy H, Ghodsi R, Rezaie K, Atashpaz-Gargari E (2010) Solving the integrated product mix-outsourcing problem using the imperialist competitive algorithm. Expert Syst Appl 37:7615\u20137626","journal-title":"Expert Syst Appl"},{"key":"1828_CR26","doi-asserted-by":"crossref","DOI":"10.1142\/3033","volume-title":"From chaos to order: methodologies, perspectives and applications","author":"G Chen","year":"1998","unstructured":"Chen G, Dong X (1998) From chaos to order: methodologies, perspectives and applications. World Scientific, Singapore"},{"key":"1828_CR27","unstructured":"Lu H-j, Zhang H-m, MA L-h (2006) A new optimization algorithm based on chaos. Sci J Zhejiang Univ 539\u2013542"},{"issue":"3","key":"1828_CR28","first-page":"380","volume":"5","author":"L Gao","year":"2009","unstructured":"Gao L, Liu X (2009) A resilient particle swarm optimization algorithm based on chaos and appling it to optimize the fermentation process. Int J Inf Syst Sci 5(3):380\u2013391","journal-title":"Int J Inf Syst Sci"},{"key":"1828_CR29","doi-asserted-by":"crossref","unstructured":"Bahrami H, Faez K, Abdechiri M (2010) Imperialist competitive algorithm using chaos theory for optimization. In: 12th International conference on computer modelling and simulation","DOI":"10.1109\/UKSIM.2010.26"},{"key":"1828_CR30","doi-asserted-by":"crossref","first-page":"9625","DOI":"10.1016\/j.eswa.2008.09.063","volume":"36","author":"B Naderi","year":"2009","unstructured":"Naderi B, Zandieh M, Ghoshe Balagh AK, Roshanaei V (2009) An improved simulated annealing for hybrid flow shops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness. Expert Syst Appl 36:9625\u20139633","journal-title":"Expert Syst Appl"},{"key":"1828_CR31","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1109\/21.87092","volume":"21","author":"GA Vignaux","year":"1991","unstructured":"Vignaux GA, Michalewicz Z (1991) A genetic algorithm for the linear transportation problem. IEEE Trans Syst Man Cybern 21:445\u2013452","journal-title":"IEEE Trans Syst Man Cybern"},{"issue":"2","key":"1828_CR32","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.amc.2007.12.002","volume":"201","author":"H-H Park","year":"2008","unstructured":"Park H-H, Grings A, dos Santosc MV, Soares AS (2008) Parallel hybrid evolutionary computation: Automatic tuning of parameters for parallel gene expression programming. Appl Math Comput 201(2):108\u2013120","journal-title":"Appl Math Comput"},{"issue":"2","key":"1828_CR33","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1016\/j.ejor.2011.10.024","volume":"218","author":"J Ries","year":"2012","unstructured":"Ries J, Beullens P, Salt D (2012) Instance-specific multi-objective parameter tuning based on fuzzy logic. Eur J Oper Res 218(2):305\u2013315","journal-title":"Eur J Oper Res"},{"issue":"1","key":"1828_CR34","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/j.ejor.2009.07.004","volume":"203","author":"M Tiwari","year":"2010","unstructured":"Tiwari M, Raghavendra N, Agrawal S, Goyal S (2010) A hybrid Taguchi\u2013immune approach to optimize an integrated supply chain design problem with multiple shipping. Eur J Oper Res 203(1):95\u2013106","journal-title":"Eur J Oper Res"},{"issue":"1","key":"1828_CR35","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.asoc.2009.10.019","volume":"11","author":"P Subbaraj","year":"2011","unstructured":"Subbaraj P, Rengaraj R, Salivahanan S (2011) Enhancement of Self-adaptive real-coded genetic algorithm using Taguchi method for Economic dispatch problem. Appl Soft Comput 11(1):83\u201392","journal-title":"Appl Soft Comput"},{"issue":"1","key":"1828_CR36","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1016\/j.asoc.2011.08.004","volume":"12","author":"C-Y Tang","year":"2012","unstructured":"Tang C-Y, Wu Y-L, Peng C-C (2012) Fundamental matrix estimation by multiobjective genetic algorithm with Taguchi\u2019s method. Appl Soft Comput 12(1):553\u2013558","journal-title":"Appl Soft Comput"},{"key":"1828_CR37","unstructured":"Taguchi G (1986) Introduction to quality engineering. White Plains, Asian Productivity Organization\/UNIPUB"},{"key":"1828_CR38","volume-title":"Quality engineering using robust design","author":"M Phadke","year":"1989","unstructured":"Phadke M (1989) Quality engineering using robust design. Prentice-Hall, Englewood Cliffs"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1828-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-015-1828-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1828-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T22:21:18Z","timestamp":1559082078000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-015-1828-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,2,10]]},"references-count":38,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["1828"],"URL":"https:\/\/doi.org\/10.1007\/s00521-015-1828-9","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,2,10]]}}}