{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,23]],"date-time":"2026-06-23T15:24:59Z","timestamp":1782228299079,"version":"3.54.5"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"8","license":[{"start":{"date-parts":[[2015,2,22]],"date-time":"2015-02-22T00:00:00Z","timestamp":1424563200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1007\/s00521-015-1854-7","type":"journal-article","created":{"date-parts":[[2015,2,21]],"date-time":"2015-02-21T07:40:15Z","timestamp":1424504415000},"page":"1813-1825","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["A fuzzy back-propagation network approach for planning actions to shorten the cycle time of a job in dynamic random access memory manufacturing"],"prefix":"10.1007","volume":"26","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,2,22]]},"reference":[{"key":"1854_CR1","unstructured":"Browning TR (1998) Use of dependency structure matrices for product development cycle time reduction. In: Proceedings of fifth ISPE international conference on concurrent engineering: research and applications, Tokyo, Japan"},{"issue":"2","key":"1854_CR2","doi-asserted-by":"crossref","first-page":"8","DOI":"10.2307\/41165830","volume":"38","author":"RA Burgelman","year":"1996","unstructured":"Burgelman RA, Grove AS (1996) Strategic dissonance. Calif Manag Rev 38(2):8\u201328","journal-title":"Calif Manag Rev"},{"key":"1854_CR3","doi-asserted-by":"crossref","unstructured":"Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the international conference on case-based reasoning, Vancouver, BC, Canada","DOI":"10.1007\/3-540-44593-5_46"},{"key":"1854_CR4","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1016\/j.cie.2009.11.006","volume":"58","author":"T Chen","year":"2010","unstructured":"Chen T (2010) An optimized tailored nonlinear fluctuation smoothing rule for scheduling a semiconductor manufacturing factory. Comput Ind Eng 58:317\u2013325","journal-title":"Comput Ind Eng"},{"key":"1854_CR5","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2","author":"T Chen","year":"2003","unstructured":"Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2:211\u2013222","journal-title":"Appl Soft Comput"},{"key":"1854_CR6","doi-asserted-by":"crossref","first-page":"834","DOI":"10.1016\/j.cie.2013.09.010","volume":"66","author":"T Chen","year":"2013","unstructured":"Chen T (2013) An effective fuzzy collaborative forecasting approach for predicting the job cycle time in wafer fabrication. Comput Ind Eng 66:834\u2013848","journal-title":"Comput Ind Eng"},{"key":"1854_CR7","doi-asserted-by":"crossref","first-page":"251","DOI":"10.3390\/su6010251","volume":"6","author":"T Chen","year":"2014","unstructured":"Chen T (2014) Strengthening the competitiveness and sustainability of a semiconductor manufacturer with cloud manufacturing. Sustainability 6:251\u2013268","journal-title":"Sustainability"},{"key":"1854_CR8","doi-asserted-by":"crossref","unstructured":"Chen T, Romanowski R (2013) Precise and accurate job cycle time forecasting in a wafer fabrication factory with a fuzzy data mining approach. Math Prob Eng, Article ID 496816, 1\u201314","DOI":"10.1155\/2013\/496826"},{"key":"1854_CR9","first-page":"2125","volume":"5","author":"T Chen","year":"2009","unstructured":"Chen T, Wang YC, Wu HC (2009) A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory\u2014a simulation study. Int J Innov Comput Inf Control 5:2125\u20132139","journal-title":"Int J Innov Comput Inf Control"},{"key":"1854_CR10","unstructured":"Lin E, Minis I, Nau DS, Regli WC (1997) Virtual manufacturing. http:\/\/www.isr.umd.edu\/Labs\/CIM\/virtual.html"},{"issue":"11\u201312","key":"1854_CR11","doi-asserted-by":"crossref","first-page":"1731","DOI":"10.1016\/j.camwa.2004.11.014","volume":"49","author":"X-W Liu","year":"2005","unstructured":"Liu X-W, Han S-L (2005) Ranking fuzzy numbers with preference weighting function expectations. Comput Math Appl 49(11\u201312):1731\u20131753","journal-title":"Comput Math Appl"},{"key":"1854_CR12","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"SCH Lu","year":"1994","unstructured":"Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Trans Semicond Manuf 7:374\u2013388","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1854_CR13","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1016\/j.ijpe.2004.12.026","volume":"100","author":"D Nazzal","year":"2006","unstructured":"Nazzal D, Mollaghasemi M, Anderson D (2006) A simulation-based evaluation of the cost of cycle time reduction in Agere systems wafer fabrication facility\u2014a case study. Int J Prod Econ 100:300\u2013313","journal-title":"Int J Prod Econ"},{"key":"1854_CR14","doi-asserted-by":"crossref","first-page":"574","DOI":"10.1108\/01443579710167267","volume":"17","author":"B Ng","year":"1997","unstructured":"Ng B, Ferrin BG, Pearson JN (1997) The role of purchasing\/transportation in cycle time reduction. Int J Oper Prod Manag 17:574\u2013591","journal-title":"Int J Oper Prod Manag"},{"key":"1854_CR15","volume-title":"Numerical optimization","author":"J Nocedal","year":"2006","unstructured":"Nocedal J, Wright SJ (2006) Numerical optimization. Springer, Berlin"},{"issue":"2","key":"1854_CR16","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1109\/TSM.2007.895215","volume":"20","author":"WL Pearn","year":"2007","unstructured":"Pearn WL, Chung SL, Lai CM (2007) Due-date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165\u2013175","journal-title":"IEEE Trans Semicond Manuf"},{"issue":"1","key":"1854_CR17","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/09537280512331325281","volume":"16","author":"D Seth","year":"2005","unstructured":"Seth D, Gupta V (2005) Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Prod Plan Control Manag Oper 16(1):44\u201359","journal-title":"Prod Plan Control Manag Oper"},{"issue":"3","key":"1854_CR18","doi-asserted-by":"crossref","first-page":"436","DOI":"10.1109\/TSM.2003.815636","volume":"16","author":"Y Shimada","year":"2003","unstructured":"Shimada Y, Sakurai K (2003) A new accurate yield prediction method for system-LSI embedded memories. IEEE Trans Semicond Manuf 16(3):436\u2013445","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1854_CR19","unstructured":"Vanguard International Semiconductor Corporation (2014) Corporate overview. http:\/\/www.vis.com.tw\/visCom\/english\/a_about\/a0101_overview.htm"},{"key":"1854_CR20","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"LM Wein","year":"1998","unstructured":"Wein LM (1998) Scheduling semiconductor wafer fabrication. IEEE Trans Semicond Manuf 1:115\u2013130","journal-title":"IEEE Trans Semicond Manuf"},{"key":"1854_CR21","unstructured":"wiseGEEK (2014) What are the benefits of virtual manufacturing? http:\/\/www.wisegeek.com\/what-are-the-benefits-of-virtual-manufacturing.htm"},{"key":"1854_CR22","unstructured":"Yi-Tzer E (1995) What virtual manufacturing is. http:\/\/www.isr.umd.edu\/Labs\/CIM\/vm\/vmdesc.html"},{"key":"1854_CR23","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-015-7949-0","volume-title":"Fuzzy set theory and its applications","author":"HJ Zimmermann","year":"1991","unstructured":"Zimmermann HJ (1991) Fuzzy set theory and its applications. Kluwer Academic, Boston"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1854-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-015-1854-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1854-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,21]],"date-time":"2019-08-21T04:13:07Z","timestamp":1566360787000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-015-1854-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,2,22]]},"references-count":23,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2015,11]]}},"alternative-id":["1854"],"URL":"https:\/\/doi.org\/10.1007\/s00521-015-1854-7","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,2,22]]}}}