{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,14]],"date-time":"2026-05-14T05:48:56Z","timestamp":1778737736161,"version":"3.51.4"},"reference-count":44,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2015,7,29]],"date-time":"2015-07-29T00:00:00Z","timestamp":1438128000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1007\/s00521-015-1993-x","type":"journal-article","created":{"date-parts":[[2015,7,28]],"date-time":"2015-07-28T07:56:55Z","timestamp":1438070215000},"page":"1993-2000","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine"],"prefix":"10.1007","volume":"27","author":[{"given":"Yuan-Yuan","family":"Lu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jian","family":"Jin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ping","family":"Ji","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ji-Bo","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,7,29]]},"reference":[{"key":"1993_CR1","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1287\/opre.37.1.118","volume":"37","author":"UB Bagchi","year":"1989","unstructured":"Bagchi UB (1989) Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems. Oper Res 37:118\u2013125","journal-title":"Oper Res"},{"key":"1993_CR2","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/j.ejor.2007.05.040","volume":"188","author":"D Biskup","year":"2008","unstructured":"Biskup D (2008) A state-of-the-art review on scheduling with learning effects. Eur J Oper Res 188:315\u2013329","journal-title":"Eur J Oper Res"},{"key":"1993_CR3","doi-asserted-by":"crossref","first-page":"972","DOI":"10.1016\/j.cie.2007.11.006","volume":"54","author":"TCE Cheng","year":"2008","unstructured":"Cheng TCE, Wu C-C, Lee W-C (2008) Some scheduling problems with deteriorating jobs and learning effects. Comput Ind Eng 54:972\u2013982","journal-title":"Comput Ind Eng"},{"key":"1993_CR4","doi-asserted-by":"crossref","first-page":"1141","DOI":"10.1016\/j.apm.2008.01.010","volume":"33","author":"T Eren","year":"2009","unstructured":"Eren T (2009) A bicriteria parallel machine scheduling with a learning effect of setup and removal times. Appl Math Model 33:1141\u20131150","journal-title":"Appl Math Model"},{"key":"1993_CR5","volume-title":"Time-dependent scheduling","author":"S Gawiejnowicz","year":"2008","unstructured":"Gawiejnowicz S (2008) Time-dependent scheduling. Springer, Berlin"},{"key":"1993_CR6","doi-asserted-by":"crossref","first-page":"1631","DOI":"10.1007\/s00521-012-1119-7","volume":"23","author":"F Geyik","year":"2013","unstructured":"Geyik F, Dosdo\u01e7ru AT (2013) Process plan and part routing optimization in a dynamic flexible job shop scheduling environment: an optimization via simulation approach. Neural Comput Appl 23:1631\u20131641","journal-title":"Neural Comput Appl"},{"key":"1993_CR7","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5:287\u2013326","journal-title":"Ann Discrete Math"},{"key":"1993_CR8","doi-asserted-by":"crossref","first-page":"1492","DOI":"10.1016\/j.apm.2010.09.026","volume":"35","author":"C-J Hsu","year":"2011","unstructured":"Hsu C-J, Kuo W-H, Yang D-L (2011) Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects. Appl Math Model 35:1492\u20131496","journal-title":"Appl Math Model"},{"key":"1993_CR9","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1007\/s11590-012-0594-1","volume":"8","author":"C-J Hsu","year":"2014","unstructured":"Hsu C-J, Yang D-L (2014) Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time. Optim Lett 8:519\u2013531","journal-title":"Optim Lett"},{"key":"1993_CR10","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1016\/j.cie.2011.01.017","volume":"60","author":"C-J Hsu","year":"2011","unstructured":"Hsu C-J, Yang S-J, Yang D-L (2011) Two due date assignment problems with position-dependent processing time on a single-machine. Comput Ind Eng 60:796\u2013800","journal-title":"Comput Ind Eng"},{"key":"1993_CR11","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1007\/s11590-012-0490-8","volume":"8","author":"X Huang","year":"2014","unstructured":"Huang X, Wang M-Z, Ji P (2014) Parallel machines scheduling with deteriorating and learning effects. Optim Lett 8:493\u2013500","journal-title":"Optim Lett"},{"key":"1993_CR12","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ejor.2012.12.007","volume":"227","author":"Z Jiang","year":"2013","unstructured":"Jiang Z, Chen F, Kang H (2013) Single-machine scheduling problems with actual time-dependent and job-dependent learning effect. Eur J Oper Res 227:76\u201380","journal-title":"Eur J Oper Res"},{"key":"1993_CR13","doi-asserted-by":"crossref","first-page":"1453","DOI":"10.1287\/mnsc.27.12.1453","volume":"27","author":"JJ Kanet","year":"1981","unstructured":"Kanet JJ (1981) Minimizing variation of flow time in single machine systems. Manag Sci 27:1453\u20131459","journal-title":"Manag Sci"},{"key":"1993_CR14","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1016\/j.amc.2014.01.168","volume":"234","author":"Y-Y Lu","year":"2014","unstructured":"Lu Y-Y, Wang J-J, Wang J-B (2014) Single machine group scheduling with decreasing time-dependent processing times subject to release dates. Appl Math Comput 234:286\u2013292","journal-title":"Appl Math Comput"},{"key":"1993_CR15","doi-asserted-by":"crossref","first-page":"660","DOI":"10.1016\/j.cor.2010.08.005","volume":"38","author":"B Mor","year":"2011","unstructured":"Mor B, Mosheiov G (2011) Total absolute deviation of job completion times on uniform and unrelated machines. Comput Oper Res 38:660\u2013665","journal-title":"Comput Oper Res"},{"key":"1993_CR16","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1016\/j.cie.2010.04.008","volume":"59","author":"D Oko\u0142owski","year":"2010","unstructured":"Oko\u0142owski D, Gawiejnowicz S (2010) Exact and heuristic algorithms for parallel-machine scheduling with DeJong\u2019s learning effect. Comput Ind Eng 59:272\u2013279","journal-title":"Comput Ind Eng"},{"key":"1993_CR17","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/0377-2217(92)90144-X","volume":"59","author":"SS Panwalkar","year":"1992","unstructured":"Panwalkar SS, Rajagopalan R (1992) Single machine sequencing with controllable processing times. Eur J Oper Res 59:298\u2013302","journal-title":"Eur J Oper Res"},{"key":"1993_CR18","volume-title":"Scheduling: theory, algorithms, and systems, upper saddle river","author":"M Pinedo","year":"2002","unstructured":"Pinedo M (2002) Scheduling: theory, algorithms, and systems, upper saddle river. Prentice-hall, Upper Saddle River"},{"key":"1993_CR19","doi-asserted-by":"crossref","first-page":"2799","DOI":"10.1016\/j.eswa.2012.11.005","volume":"40","author":"R Rudek","year":"2013","unstructured":"Rudek R, Rudek A, Kozik A (2013) The solution algorithms for the multiprocessor scheduling with workspan criterion. Expert Syst Appl 40:2799\u20132806","journal-title":"Expert Syst Appl"},{"key":"1993_CR20","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.dam.2007.02.003","volume":"155","author":"D Shabtay","year":"2007","unstructured":"Shabtay D, Steiner G (2007) A survey of scheduling with controllable processing times. Discrete Appl Math 155:1643\u20131666","journal-title":"Discrete Appl Math"},{"issue":"1","key":"1993_CR21","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1007\/s10479-007-0269-y","volume":"159","author":"D Shabtay","year":"2008","unstructured":"Shabtay D, Steiner G (2008) The single-machine earlinesstardiness scheduling problem with due date assignment and resource-dependent processing times. Ann Oper Res 159(1):25\u201340","journal-title":"Ann Oper Res"},{"key":"1993_CR22","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1080\/00207720600879260","volume":"37","author":"J-B Wang","year":"2006","unstructured":"Wang J-B (2006) A note on scheduling problems with learning effect and deteriorating jobs. Int J Syst Sci 37:827\u2013833","journal-title":"Int J Syst Sci"},{"key":"1993_CR23","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1057\/jors.2008.146","volume":"61","author":"J-B Wang","year":"2010","unstructured":"Wang J-B (2010) Single-machine scheduling with a sum-of-actual-processing-time-based learning effect. J Oper Res Soc 61:172\u2013177","journal-title":"J Oper Res Soc"},{"key":"1993_CR24","doi-asserted-by":"crossref","first-page":"2293","DOI":"10.1016\/j.apm.2012.05.022","volume":"37","author":"J-B Wang","year":"2013","unstructured":"Wang J-B, Hsu C-J, Yang D-L (2013) Single-machine scheduling with effects of exponential learning and general deterioration. Appl Math Model 37:2293\u20132299","journal-title":"Appl Math Model"},{"key":"1993_CR25","doi-asserted-by":"crossref","first-page":"8394","DOI":"10.1016\/j.apm.2013.03.041","volume":"37","author":"J-B Wang","year":"2013","unstructured":"Wang J-B, Liu L, Wang C (2013) Single machine SLK\/DIF due window assignment problem with learning effect and deteriorating jobs. Appl Math Model 37:8394\u20138400","journal-title":"Appl Math Model"},{"key":"1993_CR26","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1007\/s10479-011-0923-2","volume":"191","author":"J-B Wang","year":"2011","unstructured":"Wang J-B, Wang M-Z (2011) Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects. Ann Oper Res 191:155\u2013169","journal-title":"Ann Oper Res"},{"key":"1993_CR27","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s11590-010-0253-3","volume":"6","author":"J-B Wang","year":"2012","unstructured":"Wang J-B, Wang M-Z (2012) Single-machine scheduling with nonlinear deterioration. Optim Lett 6:87\u201398","journal-title":"Optim Lett"},{"key":"1993_CR28","doi-asserted-by":"crossref","first-page":"492","DOI":"10.1016\/j.cor.2011.05.026","volume":"39","author":"J-B Wang","year":"2012","unstructured":"Wang J-B, Wang M-Z (2012) Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time. Comput Oper Res 39:492\u2013497","journal-title":"Comput Oper Res"},{"key":"1993_CR29","doi-asserted-by":"crossref","first-page":"2388","DOI":"10.1016\/j.apm.2012.05.025","volume":"37","author":"X-R Wang","year":"2013","unstructured":"Wang X-R, Wang J-J (2013) Single-machine scheduling with convex resource dependent processing times and deteriorating jobs. Appl Math Model 37:2388\u20132393","journal-title":"Appl Math Model"},{"key":"1993_CR30","doi-asserted-by":"crossref","first-page":"4905","DOI":"10.1016\/j.apm.2012.09.044","volume":"37","author":"X-Y Wang","year":"2013","unstructured":"Wang X-Y, Wang J-J (2013) Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning. Appl Math Model 37:4905\u20134914","journal-title":"Appl Math Model"},{"key":"1993_CR31","doi-asserted-by":"crossref","first-page":"5231","DOI":"10.1016\/j.apm.2014.04.002","volume":"38","author":"X-Y Wang","year":"2014","unstructured":"Wang X-Y, Wang J-J (2014) Scheduling deteriorating jobs with a learning effect on unrelated parallel machines. Appl Math Model 38:5231\u20135238","journal-title":"Appl Math Model"},{"key":"1993_CR32","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.ins.2014.02.034","volume":"275","author":"J-B Wang","year":"2014","unstructured":"Wang J-B, Wang J-J (2014) Single machine group scheduling with time dependent processing times and ready times. Inf Sci 275:226\u2013231","journal-title":"Inf Sci"},{"key":"1993_CR33","doi-asserted-by":"crossref","unstructured":"Wang J-B, Wang M-Z and Ji P (2012) Scheduling jobs with processing times dependent on position, starting time and allotted resource, Asia-Pacific Journal of Operational Research, vol. 29, Article ID 1250030","DOI":"10.1142\/S0217595912500303"},{"key":"1993_CR34","doi-asserted-by":"crossref","first-page":"458","DOI":"10.1016\/j.cie.2010.06.002","volume":"59","author":"D Wang","year":"2010","unstructured":"Wang D, Wang M-Z, Wang J-B (2010) Single-machine scheduling with learning effect and resource-dependent processing times. Comput Ind Eng 59:458\u2013462","journal-title":"Comput Ind Eng"},{"key":"1993_CR35","doi-asserted-by":"crossref","first-page":"1465","DOI":"10.1007\/s00521-012-0852-2","volume":"21","author":"G Weckman","year":"2012","unstructured":"Weckman G, Bondal AA, Rinder MM, Young WA II (2012) Applying a hybrid artificial immune systems to the job shop scheduling problem. Neural Comput Appl 21:1465\u20131475","journal-title":"Neural Comput Appl"},{"key":"1993_CR36","doi-asserted-by":"crossref","first-page":"792","DOI":"10.1016\/j.apm.2011.07.005","volume":"36","author":"C-M Wei","year":"2012","unstructured":"Wei C-M, Wang J-B, Ji P (2012) Single-machine scheduling with time-and-resource-dependent processing times. Appl Math Model 36:792\u2013798","journal-title":"Appl Math Model"},{"key":"1993_CR37","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1016\/j.apm.2013.05.064","volume":"38","author":"Y-T Xu","year":"2014","unstructured":"Xu Y-T, Zhang Y, Huang X (2014) Single-machine ready times scheduling with group technology and proportional linear deterioration. Appl Math Model 38:384\u2013391","journal-title":"Appl Math Model"},{"key":"1993_CR38","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1007\/s10479-009-0615-3","volume":"172","author":"D-L Yang","year":"2009","unstructured":"Yang D-L, Kuo W-H (2009) Single-machine scheduling with both deterioration and learning effects. Ann Oper Res 172:315\u2013327","journal-title":"Ann Oper Res"},{"key":"1993_CR39","doi-asserted-by":"crossref","unstructured":"Yin, Y, Cheng TCE, Wu C-C (2014) Scheduling with time-dependent processing times. Math Probl Eng. Article ID 201421","DOI":"10.1155\/2014\/201421"},{"key":"1993_CR40","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.cie.2015.01.002","volume":"81","author":"Y Yin","year":"2015","unstructured":"Yin Y, Cheng TCE, Wan L, Wu C-C, Liu J (2015) Two-agent single-machine scheduling with deteriorating jobs. Comput Ind Eng 81:177\u2013185","journal-title":"Comput Ind Eng"},{"key":"1993_CR41","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/j.ins.2014.03.004","volume":"274","author":"N Yin","year":"2014","unstructured":"Yin N, Kang L, Ji P, Wang J-B (2014) Single machine scheduling with sum-of-logarithm-processing-times based deterioration. Inf Sci 274:303\u2013309","journal-title":"Inf Sci"},{"key":"1993_CR42","doi-asserted-by":"crossref","first-page":"4602","DOI":"10.1016\/j.apm.2014.03.014","volume":"38","author":"N Yin","year":"2014","unstructured":"Yin N, Kang L, Wang X-Y (2014) Single-machine group scheduling with processing times dependent on position, starting time and allotted resource. Appl Math Model 38:4602\u20134613","journal-title":"Appl Math Model"},{"key":"1993_CR43","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1080\/0951192X.2014.900872","volume":"28","author":"Y Yin","year":"2015","unstructured":"Yin Y, Wu W-H, Cheng TCE, Wu C-C (2015) Single-machine scheduling with time-dependent and position-dependent deteriorating jobs. Int J Comput Integr Manuf 28:781\u2013790","journal-title":"Int J Comput Integr Manuf"},{"key":"1993_CR44","unstructured":"Zhang G-Q, Wang J-J and Liu Y-J (2014) Scheduling jobs with variable job processing times on unrelated parallel machines. Sci World J, Article ID 242107"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1993-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-015-1993-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-015-1993-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,19]],"date-time":"2022-05-19T06:58:30Z","timestamp":1652943510000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-015-1993-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,7,29]]},"references-count":44,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2016,10]]}},"alternative-id":["1993"],"URL":"https:\/\/doi.org\/10.1007\/s00521-015-1993-x","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,7,29]]}}}