{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,2]],"date-time":"2026-04-02T20:31:13Z","timestamp":1775161873831,"version":"3.50.1"},"reference-count":65,"publisher":"Springer Science and Business Media LLC","issue":"11","license":[{"start":{"date-parts":[[2016,3,7]],"date-time":"2016-03-07T00:00:00Z","timestamp":1457308800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2017,11]]},"DOI":"10.1007\/s00521-016-2235-6","type":"journal-article","created":{"date-parts":[[2016,3,7]],"date-time":"2016-03-07T04:50:16Z","timestamp":1457326216000},"page":"3393-3411","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":34,"title":["Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry"],"prefix":"10.1007","volume":"28","author":[{"given":"Vahid","family":"Mohagheghi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. Meysam","family":"Mousavi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Behnam","family":"Vahdani","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,3,7]]},"reference":[{"issue":"4","key":"2235_CR1","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1016\/0377-841X(79)90003-2","volume":"4","author":"B Almond","year":"1979","unstructured":"Almond B, Remer RS (1979) Models for present-worth analysis of selected industrial cash flow patterns. Eng Process Econ 4(4):455\u2013466","journal-title":"Eng Process Econ"},{"issue":"8","key":"2235_CR2","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1016\/j.ijproman.2006.09.011","volume":"24","author":"R Atkinson","year":"2006","unstructured":"Atkinson R, Crawford L, Ward S (2006) Fundamental uncertainties in projects and the scope of project management. Int J Project Manag 24(8):687\u2013698","journal-title":"Int J Project Manag"},{"issue":"5","key":"2235_CR3","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1080\/01446193.2001.9709623","volume":"19","author":"PS Barbosa","year":"2001","unstructured":"Barbosa PS, Pimentel PR (2001) A linear programming model for cash flow management in the Brazilian construction industry. Constr Manag Econ 19(5):469\u2013479","journal-title":"Constr Manag Econ"},{"issue":"2","key":"2235_CR4","doi-asserted-by":"crossref","first-page":"142","DOI":"10.1061\/(ASCE)0733-9364(2000)126:2(142)","volume":"126","author":"GA Barraza","year":"2000","unstructured":"Barraza GA, Back WE, Mata F (2000) Probabilistic monitoring of project performance using SS-curves. J Constr Eng Manag 126(2):142\u2013148","journal-title":"J Constr Eng Manag"},{"key":"2235_CR5","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4757-0450-1","volume-title":"Pattern recognition with fuzzy objective function algorithms","author":"JC Bezdek","year":"1981","unstructured":"Bezdek JC (1981) Pattern recognition with fuzzy objective function algorithms. Kluwer, Dordrecht"},{"issue":"1","key":"2235_CR6","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1108\/09699980610646511","volume":"13","author":"K Blyth","year":"2006","unstructured":"Blyth K, Kaka A (2006) A novel multiple linear regression model for forecasting S-curves. Eng Constr Archit Manag 13(1):82\u201395","journal-title":"Eng Constr Archit Manag"},{"issue":"6","key":"2235_CR7","doi-asserted-by":"crossref","first-page":"745","DOI":"10.1080\/014461999371088","volume":"17","author":"AH Boussabaine","year":"1999","unstructured":"Boussabaine AH, Elhag T (1999) Applying fuzzy techniques to cash flow analysis. Constr Manag Econ 17(6):745\u2013755","journal-title":"Constr Manag Econ"},{"issue":"4","key":"2235_CR8","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1080\/014461998372240","volume":"16","author":"AH Boussabaine","year":"1998","unstructured":"Boussabaine AH, Kaka AP (1998) A neural networks approach for cost flow forecasting. Constr Manag Econ 16(4):471\u2013479","journal-title":"Constr Manag Econ"},{"key":"2235_CR9","doi-asserted-by":"publisher","DOI":"10.3846\/20294913.2015.105627","author":"E Celik","year":"2015","unstructured":"Celik E, Gumus AT (2015) An assessment approach for non-governmental organizations in humanitarian relief logistics and an application in Turkey. Technol Econ Dev Econ. doi: 10.3846\/20294913.2015.1056277","journal-title":"Technol Econ Dev Econ"},{"key":"2235_CR10","series-title":"Studies in fuzziness and soft computing","isbn-type":"print","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-89924-2","volume-title":"Modeling uncertainty with fuzzy logic","author":"A Celikyilmaz","year":"2009","unstructured":"Celikyilmaz A, Turksen IB (2009) Modeling uncertainty with fuzzy logic. Studies in fuzziness and soft computing, vol 240. Springer, Berlin, Heidelberg. ISBN 978-3-540-89923-5","ISBN":"https:\/\/id.crossref.org\/isbn\/9783540899235"},{"issue":"5","key":"2235_CR11","doi-asserted-by":"crossref","first-page":"1002","DOI":"10.1080\/18756891.2014.964011","volume":"7","author":"SC Onar","year":"2014","unstructured":"Onar SC, Oztaysi B, Kahraman C (2014) Strategic decision selection using hesitant fuzzy TOPSIS and interval type-2 fuzzy AHP: a case study. Int J Comput Intell Syst 7(5):1002\u20131021","journal-title":"Int J Comput Intell Syst"},{"issue":"1","key":"2235_CR12","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0165-0114(81)90030-0","volume":"5","author":"S Chanas","year":"1981","unstructured":"Chanas S, Kamburowski J (1981) The use of fuzzy variables in PERT. Fuzzy Sets Syst 5(1):11\u201319","journal-title":"Fuzzy Sets Syst"},{"issue":"6","key":"2235_CR13","doi-asserted-by":"crossref","first-page":"669","DOI":"10.1061\/(ASCE)0733-9364(2005)131:6(669)","volume":"131","author":"HL Chen","year":"2005","unstructured":"Chen HL, O\u2019Brien WJ, Herbsman ZJ (2005) Assessing the accuracy of cash flow models: the significance of payment conditions. J Constr Eng Manag 131(6):669\u2013676","journal-title":"J Constr Eng Manag"},{"issue":"1","key":"2235_CR14","doi-asserted-by":"crossref","first-page":"824","DOI":"10.1016\/j.eswa.2009.06.094","volume":"37","author":"SM Chen","year":"2010","unstructured":"Chen SM, Lee LW (2010) Fuzzy multiple attributes group decision-making based on the ranking values and the arithmetic operations of interval type-2 fuzzy sets. Expert Syst Appl 37(1):824\u2013833","journal-title":"Expert Syst Appl"},{"issue":"5","key":"2235_CR15","doi-asserted-by":"crossref","first-page":"5295","DOI":"10.1016\/j.eswa.2011.11.008","volume":"39","author":"SM Chen","year":"2012","unstructured":"Chen SM, Yang MW, Lee LW, Yang SW (2012) Fuzzy multiple attributes group decision-making based on ranking interval type-2 fuzzy sets. Expert Syst Appl 39(5):5295\u20135308","journal-title":"Expert Syst Appl"},{"issue":"3","key":"2235_CR16","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/j.ijproman.2004.08.001","volume":"23","author":"DF Cioffi","year":"2005","unstructured":"Cioffi DF (2005) A tool for managing projects: an analytic parameterization of the S curve. Int J Project Manage 23(3):215\u2013222","journal-title":"Int J Project Manage"},{"issue":"5","key":"2235_CR17","doi-asserted-by":"crossref","first-page":"1638","DOI":"10.1016\/j.apm.2013.09.012","volume":"38","author":"H Deng","year":"2014","unstructured":"Deng H (2014) Comparing and ranking fuzzy numbers using ideal solutions. Appl Math Model 38(5):1638\u20131646","journal-title":"Appl Math Model"},{"issue":"2","key":"2235_CR18","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/j.compind.2010.10.006","volume":"62","author":"T Dereli","year":"2011","unstructured":"Dereli T, Baykasoglu A, Altun K, Durmusoglu A, T\u00fcrksen IB (2011) Industrial applications of type-2 fuzzy sets and systems: a concise review. Comput Ind 62(2):125\u2013137","journal-title":"Comput Ind"},{"issue":"6","key":"2235_CR19","first-page":"243","volume":"21","author":"M Gates","year":"1979","unstructured":"Gates M, Scarpa A (1979) Preliminary cumulative cash flow analysis. Cost Engineering 21(6):243\u2013249","journal-title":"Cost Engineering"},{"issue":"7\u20138","key":"2235_CR20","doi-asserted-by":"crossref","first-page":"2167","DOI":"10.1007\/s00521-012-1167-z","volume":"23","author":"Tolunay G\u00f6\u00e7ken","year":"2013","unstructured":"G\u00f6\u00e7ken Tolunay (2013) Solution of fuzzy multi-objective project crashing problem. Neural Comput Appl 23(7\u20138):2167\u20132175","journal-title":"Neural Comput Appl"},{"issue":"2","key":"2235_CR21","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1016\/j.ejor.2006.07.041","volume":"182","author":"FM Gormley","year":"2007","unstructured":"Gormley FM, Meade N (2007) The utility of cash flow forecasts in the management of corporate cash balances. Eur J Oper Res 182(2):923\u2013935","journal-title":"Eur J Oper Res"},{"issue":"3","key":"2235_CR22","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/0165-0114(95)00338-X","volume":"83","author":"M Hapke","year":"1996","unstructured":"Hapke M, Slowinski R (1996) Fuzzy priority heuristics for project scheduling. Fuzzy Sets Syst 83(3):291\u2013299","journal-title":"Fuzzy Sets Syst"},{"issue":"2","key":"2235_CR23","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1061\/(ASCE)1076-0431(1999)5:2(49)","volume":"5","author":"NL Holland","year":"1999","unstructured":"Holland NL, Hobson D Jr (1999) Indirect cost categorization and allocation by construction contractors. J Archit Eng 5(2):49\u201356","journal-title":"J Archit Eng"},{"key":"2235_CR24","unstructured":"Hsu K (2003) Estimation of a double S-curve model. AACE Int Trans 1:IT13.1\u2013IT13.5"},{"issue":"5","key":"2235_CR25","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/S0263-7863(01)00037-0","volume":"20","author":"NG Hwee","year":"2002","unstructured":"Hwee NG, Tiong RL (2002) Model on cash flow forecasting and risk analysis for contracting firms. Int J Project Manage 20(5):351\u2013363","journal-title":"Int J Project Manage"},{"issue":"3","key":"2235_CR26","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1061\/(ASCE)0733-9364(2007)133:3(235)","volume":"133","author":"RE Jarrah","year":"2007","unstructured":"Jarrah RE, Kulkarni D, O\u2019Connor JT (2007) Cash flow projections for selected TxDoT highway projects. J Constr Eng Manag 133(3):235\u2013241","journal-title":"J Constr Eng Manag"},{"issue":"4","key":"2235_CR27","doi-asserted-by":"crossref","first-page":"510","DOI":"10.3846\/13923730.2011.604537","volume":"17","author":"A Jiang","year":"2011","unstructured":"Jiang A, Issa RR, Malek M (2011) Construction project cash flow planning using the Pareto optimality efficiency network model. J Civil Eng Manag 17(4):510\u2013519","journal-title":"J Civil Eng Manag"},{"issue":"3","key":"2235_CR28","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1080\/01446199100000023","volume":"9","author":"AP Kaka","year":"1991","unstructured":"Kaka AP, Price ADF (1991) Net cashflow models: are they reliable? Constr Manag Econ 9(3):291\u2013308","journal-title":"Constr Manag Econ"},{"issue":"4","key":"2235_CR29","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1080\/01446199300000027","volume":"11","author":"AP Kaka","year":"1993","unstructured":"Kaka AP, Price ADF (1993) Modelling standard cost commitment curves for contractors\u2019 cash flow forecasting. Constr Manag Econ 11(4):271\u2013283","journal-title":"Constr Manag Econ"},{"issue":"7","key":"2235_CR30","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1111\/j.1467-8667.2007.00508.x","volume":"22","author":"F Khosrowshahi","year":"2007","unstructured":"Khosrowshahi F, Kaka AP (2007) A decision support model for construction cash flow management. Comput Aided Civil Infrastruct Eng 22(7):527\u2013539","journal-title":"Comput Aided Civil Infrastruct Eng"},{"key":"2235_CR31","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1016\/j.asoc.2014.11.028","volume":"27","author":"M Kili\u00e7","year":"2015","unstructured":"Kili\u00e7 M, Kaya \u0130 (2015) Investment project evaluation by a decision making methodology based on type-2 fuzzy sets. Appl Soft Comput 27:399\u2013410","journal-title":"Appl Soft Comput"},{"issue":"1","key":"2235_CR32","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1108\/eb021135","volume":"7","author":"VS Kumar","year":"2000","unstructured":"Kumar VS, Hanna AS, Adams T (2000) Assessment of working capital requirements by fuzzy set theory. Eng Constr Archit Manag 7(1):93\u2013103","journal-title":"Eng Constr Archit Manag"},{"issue":"1","key":"2235_CR33","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1080\/014461901452085","volume":"19","author":"KC Lam","year":"2001","unstructured":"Lam KC, So ATP, Hu T, Ng T, Yuen RKK, Lo SM et al (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Constr Manag Econ 19(1):63\u201376","journal-title":"Constr Manag Econ"},{"key":"2235_CR34","unstructured":"Lee LW, Chen SM (2008) A new method for fuzzy multiple attributes group decision-making based on the arithmetic operations of interval type-2 fuzzy sets. In: IEEE 2008 international conference on machine learning and cybernetics, vol 6, pp 3084\u20133089"},{"issue":"3","key":"2235_CR35","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/0165-0114(94)90113-9","volume":"62","author":"H Lee-Kwang","year":"1994","unstructured":"Lee-Kwang H, Song YS, Lee KM (1994) Similarity measure between fuzzy sets and between elements. Fuzzy Sets Syst 62(3):291\u2013293","journal-title":"Fuzzy Sets Syst"},{"key":"2235_CR36","doi-asserted-by":"crossref","first-page":"1088","DOI":"10.1016\/j.matdes.2015.09.113","volume":"88","author":"TW Liao","year":"2015","unstructured":"Liao TW (2015) Two interval type 2 fuzzy TOPSIS material selection methods. Mater Des 88:1088\u20131099","journal-title":"Mater Des"},{"issue":"3","key":"2235_CR37","first-page":"1793","volume":"1","author":"S Maity","year":"2009","unstructured":"Maity S, Sil J (2009) Color image segmentation using type-2 fuzzy sets. Int J Comput Electr Eng 1(3):1793\u20138163","journal-title":"Int J Comput Electr Eng"},{"key":"2235_CR38","unstructured":"Maravas A, Pantouvakis JP (2010) A study of cash flows in projects with fuzzy activity durations. In: Proceedings of the international conference on computing in civil and building engineering, Nottingham"},{"issue":"3","key":"2235_CR39","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1016\/j.ijproman.2011.08.005","volume":"30","author":"A Maravas","year":"2012","unstructured":"Maravas A, Pantouvakis JP (2012) Project cash flow analysis in the presence of uncertainty in activity duration and cost. Int J Project Manage 30(3):374\u2013384","journal-title":"Int J Project Manage"},{"issue":"10","key":"2235_CR40","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1016\/0898-1221(88)90120-4","volume":"15","author":"CS McCahon","year":"1988","unstructured":"McCahon CS, Lee ES (1988) Project network analysis with fuzzy activity times. Comput Math Appl 15(10):829\u2013838","journal-title":"Comput Math Appl"},{"key":"2235_CR41","first-page":"10","volume":"1","author":"JM Mendel","year":"2003","unstructured":"Mendel JM (2003) Type-2 fuzzy sets: some questions and answers. IEEE Connect Newsl IEEE Neural Netw Soc 1:10\u201313","journal-title":"IEEE Connect Newsl IEEE Neural Netw Soc"},{"issue":"1","key":"2235_CR42","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1109\/MCI.2007.380672","volume":"2","author":"JM Mendel","year":"2007","unstructured":"Mendel JM (2007) Type-2 fuzzy sets and systems: an overview. Comput Intell Mag IEEE 2(1):20\u201329","journal-title":"Comput Intell Mag IEEE"},{"issue":"6","key":"2235_CR43","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1109\/TFUZZ.2006.879986","volume":"14","author":"JM Mendel","year":"2006","unstructured":"Mendel JM, John RI, Liu F (2006) Interval type-2 fuzzy logic systems made simple. IEEE Trans Fuzzy Syst 14(6):808\u2013821","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"2235_CR44","doi-asserted-by":"crossref","DOI":"10.1002\/9780470599655","volume-title":"Perceptual computing: aiding people in making subjective judgments","author":"J Mendel","year":"2010","unstructured":"Mendel J, Wu D (2010) Perceptual computing: aiding people in making subjective judgments, vol 13. Wiley, New York"},{"key":"2235_CR45","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/978-1-4614-6666-6_1","volume-title":"Advances in type-2 fuzzy sets and systems","author":"JM Mendel","year":"2013","unstructured":"Mendel JM (2013) Interval type-2 fuzzy logic systems and perceptual computers: their similarities and differences. In: Sadeghian A, Mendel J, Tahayori H (eds) Advances in type-2 fuzzy sets and systems. Springer, New York, pp 3\u201317"},{"key":"2235_CR46","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/j.rcim.2012.04.006","volume":"29","author":"SM Mousavi","year":"2013","unstructured":"Mousavi SM, Tavakkoli-Moghaddam R, Vahdani B, Hashemi H, Sanjari MJ (2013) A new support vector model-based imperialist competitive algorithm for time estimation in new product development projects. Robot Comput Integr Manuf 29:157\u2013168","journal-title":"Robot Comput Integr Manuf"},{"key":"2235_CR47","doi-asserted-by":"crossref","first-page":"2047","DOI":"10.3233\/IFS-151682","volume":"29","author":"SM Mousavi","year":"2015","unstructured":"Mousavi SM, Vahdani B, Abdollahzade M (2015) An intelligent model for cost prediction in new product development projects. J Intell Fuzzy Syst 29:2047\u20132057","journal-title":"J Intell Fuzzy Syst"},{"issue":"1","key":"2235_CR48","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1061\/(ASCE)0733-9364(1996)122:1(22)","volume":"122","author":"R Navon","year":"1996","unstructured":"Navon R (1996) Company-level cash-flow management. J Constr Eng Manag 122(1):22\u201329","journal-title":"J Constr Eng Manag"},{"issue":"2","key":"2235_CR49","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/0165-0114(79)90022-8","volume":"2","author":"H Prade","year":"1979","unstructured":"Prade H (1979) Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets Syst 2(2):153\u2013165","journal-title":"Fuzzy Sets Syst"},{"key":"2235_CR50","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.knosys.2015.05.025","volume":"86","author":"J Qin","year":"2015","unstructured":"Qin J, Liu X, Pedrycz W (2015) An extended VIKOR method based on prospect theory for multiple attribute decision making under interval type-2 fuzzy environment. Knowl Based Syst 86:116\u2013130","journal-title":"Knowl Based Syst"},{"issue":"1","key":"2235_CR51","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/j.cie.2011.10.011","volume":"62","author":"P Renna","year":"2012","unstructured":"Renna P, Argoneto P (2012) Capacity investment decision in co-opetitive network by information sharing. Comput Ind Eng 62(1):359\u2013367","journal-title":"Comput Ind Eng"},{"issue":"2","key":"2235_CR52","doi-asserted-by":"crossref","first-page":"89","DOI":"10.13189\/aeb.2013.010205","volume":"1","author":"AA Rostamy","year":"2013","unstructured":"Rostamy AA, Takanlou F, AnvaryRostamy A (2013) A fuzzy statistical expert system for cash flow analysis and management under uncertainty. Adv Econ Bus 1(2):89\u2013102","journal-title":"Adv Econ Bus"},{"key":"2235_CR53","doi-asserted-by":"publisher","DOI":"10.1007\/s40815-015-0040-5","author":"IU Sari","year":"2015","unstructured":"Sari IU, Kahraman C (2015) Interval type-2 fuzzy capital budgeting. Int J Fuzzy Syst. doi: 10.1007\/s40815-015-0040-5","journal-title":"Int J Fuzzy Syst"},{"key":"2235_CR54","first-page":"R.5.1","volume":"2","author":"S Singh","year":"1992","unstructured":"Singh S, Lokanathan G (1992) Computer-based cash flow model. AACE Int Trans 2:R.5.1\u2013R.5.14","journal-title":"AACE Int Trans"},{"issue":"5","key":"2235_CR55","doi-asserted-by":"crossref","first-page":"719","DOI":"10.1061\/(ASCE)0733-9364(2004)130:5(719)","volume":"130","author":"A Touran","year":"2004","unstructured":"Touran A, Atgun M, Bhurisith I (2004) Analysis of the United States Department of Transportation prompt pay provisions. J Constr Eng Manag 130(5):719\u2013725","journal-title":"J Constr Eng Manag"},{"issue":"3","key":"2235_CR56","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1016\/S0165-0114(01)00195-6","volume":"130","author":"L Tran","year":"2002","unstructured":"Tran L, Duckstein L (2002) Comparison of fuzzy numbers using a fuzzy distance measure. Fuzzy Sets Syst 130(3):331\u2013341","journal-title":"Fuzzy Sets Syst"},{"issue":"4","key":"2235_CR57","first-page":"2790","volume":"37","author":"S Turk","year":"2014","unstructured":"Turk S, John R, \u00d6zcan E (2014) Interval type-2 fuzzy sets in supplier selection. Type-2 TOPSIS method. Expert Syst Appl 37(4):2790\u20132798","journal-title":"Expert Syst Appl"},{"issue":"1","key":"2235_CR58","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/S0165-0114(98)00354-6","volume":"106","author":"IB Turksen","year":"1999","unstructured":"Turksen IB (1999) Type I and type II fuzzy system modeling. Fuzzy Sets Syst 106(1):11\u201334","journal-title":"Fuzzy Sets Syst"},{"key":"2235_CR59","first-page":"11","volume":"10","author":"B Vahdani","year":"2012","unstructured":"Vahdani B, Mousavi SM, Mousakhani M, Sharifi M, Hashemi H (2012) A neural network model based on support vector machine for conceptual cost estimation in construction projects. J Optim Ind Eng 10:11\u201318","journal-title":"J Optim Ind Eng"},{"key":"2235_CR60","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.knosys.2012.01.005","volume":"30","author":"W Wang","year":"2012","unstructured":"Wang W, Liu X, Qin Y (2012) Multi-attribute group decision making models under interval type-2 fuzzy environment. Knowl Based Syst 30:121\u2013128","journal-title":"Knowl Based Syst"},{"issue":"3","key":"2235_CR61","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1016\/0165-0114(92)90239-Z","volume":"52","author":"L Xuecheng","year":"1992","unstructured":"Xuecheng L (1992) Entropy, distance measure and similarity measure of fuzzy sets and their relations. Fuzzy Sets Syst 52(3):305\u2013318","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"2235_CR62","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1016\/j.ejor.2004.06.017","volume":"170","author":"JS Yao","year":"2006","unstructured":"Yao JS, Chen MS, Lu HF (2006) A fuzzy stochastic single-period model for cash management. Eur J Oper Res 170(1):72\u201390","journal-title":"Eur J Oper Res"},{"key":"2235_CR63","first-page":"1","volume-title":"The concept of a linguistic variable and its application to approximate reasoning","author":"LA Zadeh","year":"1974","unstructured":"Zadeh LA (1974) The concept of a linguistic variable and its application to approximate reasoning. Springer, New York, pp 1\u201310"},{"issue":"3","key":"2235_CR64","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/j.ijproman.2008.03.006","volume":"27","author":"FA Zammori","year":"2009","unstructured":"Zammori FA, Braglia M, Frosolini M (2009) A fuzzy multi-criteria approach for critical path definition. Int J Project Manage 27(3):278\u2013291","journal-title":"Int J Project Manage"},{"issue":"7","key":"2235_CR65","doi-asserted-by":"crossref","first-page":"4948","DOI":"10.1016\/j.apm.2012.10.006","volume":"37","author":"Z Zhang","year":"2013","unstructured":"Zhang Z, Zhang S (2013) A novel approach to multi attribute group decision making based on trapezoidal interval type-2 fuzzy soft sets. Appl Math Model 37(7):4948\u20134971","journal-title":"Appl Math Model"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-016-2235-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-016-2235-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-016-2235-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-016-2235-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,8]],"date-time":"2022-06-08T15:09:19Z","timestamp":1654700959000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-016-2235-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,3,7]]},"references-count":65,"journal-issue":{"issue":"11","published-print":{"date-parts":[[2017,11]]}},"alternative-id":["2235"],"URL":"https:\/\/doi.org\/10.1007\/s00521-016-2235-6","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,3,7]]}}}