{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,9]],"date-time":"2025-04-09T10:07:34Z","timestamp":1744193254985},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2017,9,2]],"date-time":"2017-09-02T00:00:00Z","timestamp":1504310400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2019,7]]},"DOI":"10.1007\/s00521-017-3171-9","type":"journal-article","created":{"date-parts":[[2017,9,2]],"date-time":"2017-09-02T09:00:09Z","timestamp":1504342809000},"page":"2131-2141","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["A study of hybrid data selection method for a wavelet SVR mid-term load forecasting model"],"prefix":"10.1007","volume":"31","author":[{"given":"Hamid Reza","family":"Alirezaei","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abolfazl","family":"Salami","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad","family":"Mohammadinodoushan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,9,2]]},"reference":[{"issue":"3","key":"3171_CR1","doi-asserted-by":"publisher","first-page":"1477","DOI":"10.1109\/tpwrs.2012.2184308","volume":"27","author":"M Alamaniotis","year":"2012","unstructured":"Alamaniotis M, Ikonomopoulos A, Tsoukalas LH (2012) Evolutionary multiobjective optimization of kernel-based very-short-term load forecasting. IEEE Trans Power Syst 27(3):1477\u20131484. doi:\n                    10.1109\/tpwrs.2012.2184308","journal-title":"IEEE Trans Power Syst"},{"issue":"6","key":"3171_CR2","doi-asserted-by":"publisher","first-page":"1355","DOI":"10.1007\/s00521-014-1809-4","volume":"26","author":"H \u00c7evik","year":"2015","unstructured":"\u00c7evik H, \u00c7unka\u015f M (2015) Short-term load forecasting using fuzzy logic and ANFIS. Neural Comput Appl 26(6):1355\u20131367. doi:\n                    10.1007\/s00521-014-1809-4","journal-title":"Neural Comput Appl"},{"key":"3171_CR3","volume-title":"Demand forecasting in the deregulated market: a bibliography survey","author":"LF Sugianto","year":"2002","unstructured":"Sugianto LF, Lu X-B (2002) Demand forecasting in the deregulated market: a bibliography survey. School of Business Systems, Victoria"},{"key":"3171_CR4","doi-asserted-by":"publisher","unstructured":"Fan S, Chen L, Lee WJ (2008) Short-term load forecasting using comprehensive combination based on multi-meteorological information. In: Industrial and commercial power systems technical conference, 2008. ICPS 2008. IEEE\/IAS, 4\u20138 May 2008, pp 1\u20137. doi:\n                    10.1109\/icps.2008.4606288","DOI":"10.1109\/icps.2008.4606288"},{"issue":"4","key":"3171_CR5","doi-asserted-by":"publisher","first-page":"1946","DOI":"10.1109\/tpwrs.2006.883666","volume":"21","author":"E Gonzalez-Romera","year":"2006","unstructured":"Gonzalez-Romera E, Jaramillo-Moran MA, Carmona-Fernandez D (2006) Monthly electric energy demand forecasting based on trend extraction. IEEE Trans Power Syst 21(4):1946\u20131953. doi:\n                    10.1109\/tpwrs.2006.883666","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"3171_CR6","doi-asserted-by":"publisher","first-page":"1274","DOI":"10.1109\/tpwrs.2011.2181981","volume":"27","author":"A Khosravi","year":"2012","unstructured":"Khosravi A, Nahavandi S, Creighton D, Srinivasan D (2012) Interval type-2 fuzzy logic systems for load forecasting: a comparative study. IEEE Trans Power Syst 27(3):1274\u20131282. doi:\n                    10.1109\/tpwrs.2011.2181981","journal-title":"IEEE Trans Power Syst"},{"key":"3171_CR7","first-page":"269","volume-title":"Applied mathematics for restructured electric power systems. Power electronics and power systems","author":"E Feinberg","year":"2005","unstructured":"Feinberg E, Genethliou D (2005) Load forecasting. In: Chow J, Wu F, Momoh J (eds) Applied mathematics for restructured electric power systems. Power electronics and power systems. Springer, New York, pp 269\u2013285"},{"issue":"5","key":"3171_CR8","doi-asserted-by":"publisher","first-page":"5197","DOI":"10.1016\/j.eswa.2010.10.041","volume":"38","author":"M Zhao","year":"2011","unstructured":"Zhao M, Fu C, Ji L, Tang K, Zhou M (2011) Feature selection and parameter optimization for support vector machines: a new approach based on genetic algorithm with feature chromosomes. Expert Syst Appl 38(5):5197\u20135204. doi:\n                    10.1016\/j.eswa.2010.10.041","journal-title":"Expert Syst Appl"},{"issue":"2","key":"3171_CR9","doi-asserted-by":"publisher","first-page":"559","DOI":"10.1109\/59.867141","volume":"15","author":"K Kwang-Ho","year":"2000","unstructured":"Kwang-Ho K, Hyoung-sun Y, Yong-Cheol K (2000) Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method. IEEE Trans Power Syst 15(2):559\u2013565. doi:\n                    10.1109\/59.867141","journal-title":"IEEE Trans Power Syst"},{"key":"3171_CR10","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.epsr.2014.10.003","volume":"119","author":"N Ding","year":"2015","unstructured":"Ding N, Besanger Y, Fdr Wurtz (2015) Next-day MV\/LV substation load forecaster using time series method. Electr Power Syst Res 119:345\u2013354. doi:\n                    10.1016\/j.epsr.2014.10.003","journal-title":"Electr Power Syst Res"},{"issue":"4","key":"3171_CR11","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1016\/j.ijforecast.2008.08.006","volume":"24","author":"LF Amaral","year":"2008","unstructured":"Amaral LF, Souza RC, Stevenson M (2008) A smooth transition periodic autoregressive (STPAR) model for short-term load forecasting. Int J Forecast 24(4):603\u2013615. doi:\n                    10.1016\/j.ijforecast.2008.08.006","journal-title":"Int J Forecast"},{"issue":"12","key":"3171_CR12","doi-asserted-by":"publisher","first-page":"1560","DOI":"10.1016\/j.epsr.2006.11.003","volume":"77","author":"GJ Tsekouras","year":"2007","unstructured":"Tsekouras GJ, Dialynas EN, Hatziargyriou ND, Kavatza S (2007) A non-linear multivariable regression model for midterm energy forecasting of power systems. Electr Power Syst Res 77(12):1560\u20131568. doi:\n                    10.1016\/j.epsr.2006.11.003","journal-title":"Electr Power Syst Res"},{"key":"3171_CR13","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1016\/j.epsr.2014.09.002","volume":"119","author":"M Ghayekhloo","year":"2015","unstructured":"Ghayekhloo M, Menhaj MB, Ghofrani M (2015) A hybrid short-term load forecasting with a new data preprocessing framework. Electr Power Syst Res 119:138\u2013148. doi:\n                    10.1016\/j.epsr.2014.09.002","journal-title":"Electr Power Syst Res"},{"key":"3171_CR14","doi-asserted-by":"publisher","first-page":"18","DOI":"10.1016\/j.epsr.2012.04.009","volume":"91","author":"M L\u00f3pez","year":"2012","unstructured":"L\u00f3pez M, Valero S, Senabre C, Aparicio J, Gabaldon A (2012) Application of SOM neural networks to short-term load forecasting: the Spanish electricity market case study. Electr Power Syst Res 91:18\u201327. doi:\n                    10.1016\/j.epsr.2012.04.009","journal-title":"Electr Power Syst Res"},{"issue":"3","key":"3171_CR15","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1007\/s00521-014-1727-5","volume":"26","author":"J-r Dong","year":"2015","unstructured":"Dong J-r, Zheng C-y, Kan G-y, Zhao M, Wen J, Yu J (2015) Applying the ensemble artificial neural network-based hybrid data-driven model to daily total load forecasting. Neural Comput Appl 26(3):603\u2013611. doi:\n                    10.1007\/s00521-014-1727-5","journal-title":"Neural Comput Appl"},{"issue":"8","key":"3171_CR16","doi-asserted-by":"publisher","first-page":"1961","DOI":"10.1007\/s00521-011-0599-1","volume":"21","author":"M Sheikhan","year":"2012","unstructured":"Sheikhan M, Mohammadi N (2012) Neural-based electricity load forecasting using hybrid of GA and ACO for feature selection. Neural Comput Appl 21(8):1961\u20131970. doi:\n                    10.1007\/s00521-011-0599-1","journal-title":"Neural Comput Appl"},{"issue":"1","key":"3171_CR17","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1109\/TPWRS.2005.860926","volume":"21","author":"GJ Tsekouras","year":"2006","unstructured":"Tsekouras GJ, Hatziargyriou ND, Dialynas EN (2006) An optimized adaptive neural network for annual midterm energy forecasting. IEEE Trans Power Syst 21(1):385\u2013391. doi:\n                    10.1109\/TPWRS.2005.860926","journal-title":"IEEE Trans Power Syst"},{"key":"3171_CR18","first-page":"16","volume":"5","author":"Y-y Li","year":"2005","unstructured":"Li Y-y, Niu D-x (2005) An optimum credibility based integrated optimum gray neural network model of monthly power load forecasting. Power Syst Technol 5:16\u201319","journal-title":"Power Syst Technol"},{"issue":"1","key":"3171_CR19","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1016\/j.ijepes.2010.08.008","volume":"33","author":"P-C Chang","year":"2011","unstructured":"Chang P-C, Fan C-Y, Lin J-J (2011) Monthly electricity demand forecasting based on a weighted evolving fuzzy neural network approach. Int J Electr Power Energy Syst 33(1):17\u201327. doi:\n                    10.1016\/j.ijepes.2010.08.008","journal-title":"Int J Electr Power Energy Syst"},{"issue":"2","key":"3171_CR20","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1016\/j.ijforecast.2013.07.002","volume":"30","author":"JR Lloyd","year":"2014","unstructured":"Lloyd JR (2014) GEFCom2012 hierarchical load forecasting: gradient boosting machines and Gaussian processes. Int J Forecast 30(2):369\u2013374. doi:\n                    10.1016\/j.ijforecast.2013.07.002","journal-title":"Int J Forecast"},{"issue":"3","key":"3171_CR21","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1023\/B:STCO.0000035301.49549.88","volume":"14","author":"AJ Smola","year":"2004","unstructured":"Smola AJ, Sch\u00f6lkopf B (2004) A tutorial on support vector regression. Stat Comput 14(3):199\u2013222","journal-title":"Stat Comput"},{"issue":"3","key":"3171_CR22","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/j.ijforecast.2004.12.004","volume":"21","author":"HS Hippert","year":"2005","unstructured":"Hippert HS, Bunn DW, Souza RC (2005) Large neural networks for electricity load forecasting: are they overfitted? Int J Forecast 21(3):425\u2013434. doi:\n                    10.1016\/j.ijforecast.2004.12.004","journal-title":"Int J Forecast"},{"issue":"4","key":"3171_CR23","doi-asserted-by":"publisher","first-page":"1821","DOI":"10.1109\/tpwrs.2004.835679","volume":"19","author":"C Bo-Juen","year":"2004","unstructured":"Bo-Juen C, Ming-Wei C, Chih-Jen L (2004) Load forecasting using support vector machines: a study on EUNITE competition 2001. IEEE Trans Power Syst 19(4):1821\u20131830. doi:\n                    10.1109\/tpwrs.2004.835679","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"3171_CR24","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1007\/s10287-005-0003-7","volume":"3","author":"M Espinoza","year":"2006","unstructured":"Espinoza M, Suykens JK, Moor B (2006) Fixed-size least squares support vector machines: a large scale application in electrical load forecasting. CMS 3(2):113\u2013129. doi:\n                    10.1007\/s10287-005-0003-7","journal-title":"CMS"},{"key":"3171_CR25","doi-asserted-by":"publisher","unstructured":"Abbas SR, Arif M (2006) Electric load forecasting using support vector machines optimized by genetic algorithm. In: Multitopic conference, 2006. INMIC \u201806. IEEE, 23\u201324 December 2006, pp 395\u2013399. doi:\n                    10.1109\/inmic.2006.358199","DOI":"10.1109\/inmic.2006.358199"},{"issue":"9","key":"3171_CR26","doi-asserted-by":"publisher","first-page":"5568","DOI":"10.1016\/j.energy.2011.07.015","volume":"36","author":"W-C Hong","year":"2011","unstructured":"Hong W-C (2011) Electric load forecasting by seasonal recurrent SVR (support vector regression) with chaotic artificial bee colony algorithm. Energy 36(9):5568\u20135578. doi:\n                    10.1016\/j.energy.2011.07.015","journal-title":"Energy"},{"issue":"1","key":"3171_CR27","doi-asserted-by":"publisher","first-page":"173","DOI":"10.3390\/en4010173","volume":"4","author":"P Duan","year":"2011","unstructured":"Duan P, Xie K, Guo T, Huang X (2011) Short-term load forecasting for electric power systems using the PSO\u2013SVR and FCM clustering techniques. Energies 4(1):173\u2013184","journal-title":"Energies"},{"issue":"6","key":"3171_CR28","doi-asserted-by":"publisher","first-page":"2074","DOI":"10.1007\/s11771-011-0945-6","volume":"18","author":"Yang S-x","year":"2011","unstructured":"S-x Yang, Cao Y, Liu D, C-f Huang (2011) RS-SVM forecasting model and power supply-demand forecast. J Cent South Univ Technol 18(6):2074\u20132079. doi:\n                    10.1007\/s11771-011-0945-6","journal-title":"J Cent South Univ Technol"},{"issue":"1","key":"3171_CR29","doi-asserted-by":"publisher","first-page":"194","DOI":"10.1016\/j.eswa.2009.05.011","volume":"37","author":"Q Wu","year":"2010","unstructured":"Wu Q (2010) Power load forecasts based on hybrid PSO with Gaussian and adaptive mutation and Wv\u2013SVM. Expert Syst Appl 37(1):194\u2013201. doi:\n                    10.1016\/j.eswa.2009.05.011","journal-title":"Expert Syst Appl"},{"issue":"1","key":"3171_CR30","doi-asserted-by":"publisher","first-page":"379","DOI":"10.1016\/j.eswa.2010.06.075","volume":"38","author":"Q Wu","year":"2011","unstructured":"Wu Q (2011) Hybrid model based on wavelet support vector machine and modified genetic algorithm penalizing Gaussian noises for power load forecasts. Expert Syst Appl 38(1):379\u2013385","journal-title":"Expert Syst Appl"},{"key":"3171_CR31","doi-asserted-by":"publisher","unstructured":"Wu Z-d, Xie W-x, Yu J-p (2003) Fuzzy C-means clustering algorithm based on kernel method. In: Proceedings of fifth international conference on computational intelligence and multimedia applications, 2003. ICCIMA 2003, 27\u201330 September 2003, pp 49\u201354. doi:\n                    10.1109\/iccima.2003.1238099","DOI":"10.1109\/iccima.2003.1238099"},{"key":"3171_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/s40064-016-1665-z","volume":"5","author":"M Alamaniotis","year":"2016","unstructured":"Alamaniotis M, Bargiotas D, Tsoukalas LH (2016) Towards smart energy systems: application of kernel machine regression for medium term electricity load forecasting. SpringerPlus Eng 5:1\u201315. doi:\n                    10.1186\/s40064-016-1665-z","journal-title":"SpringerPlus Eng"},{"issue":"1","key":"3171_CR33","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1109\/tfuzz.2010.2087382","volume":"19","author":"Y Xiaowei","year":"2011","unstructured":"Xiaowei Y, Guangquan Z, Jie L, Jun M (2011) A kernel fuzzy c-means clustering-based fuzzy support vector machine algorithm for classification problems with outliers or noises. IEEE Trans Fuzzy Syst 19(1):105\u2013115. doi:\n                    10.1109\/tfuzz.2010.2087382","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"10","key":"3171_CR34","doi-asserted-by":"publisher","first-page":"2678","DOI":"10.1016\/j.enconman.2008.04.008","volume":"49","author":"N Amjady","year":"2008","unstructured":"Amjady N, Keynia F (2008) Mid-term load forecasting of power systems by a new prediction method. Energy Convers Manag 49(10):2678\u20132687. doi:\n                    10.1016\/j.enconman.2008.04.008","journal-title":"Energy Convers Manag"},{"issue":"4","key":"3171_CR35","doi-asserted-by":"publisher","first-page":"438","DOI":"10.1109\/tsmcc.2010.2040176","volume":"40","author":"EE Elattar","year":"2010","unstructured":"Elattar EE, Goulermas J, Wu QH (2010) Electric load forecasting based on locally weighted support vector regression. IEEE Trans Syst Man Cybern Part C Appl Rev 40(4):438\u2013447. doi:\n                    10.1109\/tsmcc.2010.2040176","journal-title":"IEEE Trans Syst Man Cybern Part C Appl Rev"},{"issue":"5","key":"3171_CR36","doi-asserted-by":"publisher","first-page":"1539","DOI":"10.1016\/j.patcog.2007.08.013","volume":"41","author":"KW Lau","year":"2008","unstructured":"Lau KW, Wu QH (2008) Local prediction of non-linear time series using support vector regression. Pattern Recogn 41(5):1539\u20131547. doi:\n                    10.1016\/j.patcog.2007.08.013","journal-title":"Pattern Recogn"},{"issue":"1\u20132","key":"3171_CR37","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/S0167-2789(97)00118-8","volume":"110","author":"L Cao","year":"1997","unstructured":"Cao L (1997) Practical method for determining the minimum embedding dimension of a scalar time series. Physica D 110(1\u20132):43\u201350. doi:\n                    10.1016\/S0167-2789(97)00118-8","journal-title":"Physica D"},{"key":"3171_CR38","doi-asserted-by":"crossref","unstructured":"M\u00fcller K-R, Smola AJ, R\u00e4tsch G, Sch\u00f6lkopf B, Kohlmorgen J, Vapnik V (1997) Predicting time series with support vector machines. In: Artificial neural networks\u2014ICANN\u201997. Springer, pp 999\u20131004","DOI":"10.1007\/BFb0020283"},{"issue":"1","key":"3171_CR39","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1109\/tsmcb.2003.811113","volume":"34","author":"Z Li","year":"2004","unstructured":"Li Z, Weida Z, Licheng J (2004) Wavelet support vector machine. IEEE Trans Syst Man Cybern B Cybern 34(1):34\u201339. doi:\n                    10.1109\/tsmcb.2003.811113","journal-title":"IEEE Trans Syst Man Cybern B Cybern"},{"key":"3171_CR40","unstructured":"Smola AJ (1996) Regression estimation with support vector learning machines. Master\u2019s thesis, Technische Universit at M unchen"},{"key":"3171_CR41","unstructured":"Eunite (2001) European network of excellence on intelligent technologies for smart adaptive systems. \n                    http:\/\/neuron.tuke.sk\/competition\/\n                    \n                  . Accessed 1 Mar 2012"},{"key":"3171_CR42","unstructured":"IGMCo (2008) Iran Grid Management Co. \n                    http:\/\/www.igmc.ir\/\n                    \n                  . Accessed 20 Apr 2008"},{"key":"3171_CR43","unstructured":"Iranian-Calendar-Center (2012) Institute of Geophysics, University of Tehran. \n                    http:\/\/calendar.ut.ac.ir\/\n                    \n                  . Accessed 20 Mar 2012 (in Farsi)"},{"key":"3171_CR44","doi-asserted-by":"publisher","unstructured":"El-Attar EE, Goulermas JY, Wu QH (2009) Forecasting electric daily peak load based on local prediction. In: Power & energy society general meeting, 2009. PES \u201809. IEEE, 26\u201330 July 2009, pp 1\u20136. doi:\n                    10.1109\/pes.2009.5275587","DOI":"10.1109\/pes.2009.5275587"},{"key":"3171_CR45","doi-asserted-by":"publisher","unstructured":"Haishan W, Xiaoling C (2006) Power load forecasting with least squares support vector machines and chaos theory. In: The sixth world congress on Intelligent control and automation, 2006. WCICA 2006, 0-0 0 2006. pp 4369\u20134373. doi:\n                    10.1109\/wcica.2006.1713202","DOI":"10.1109\/wcica.2006.1713202"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-017-3171-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-017-3171-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-017-3171-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,28]],"date-time":"2019-08-28T10:31:27Z","timestamp":1566988287000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-017-3171-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,9,2]]},"references-count":45,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2019,7]]}},"alternative-id":["3171"],"URL":"https:\/\/doi.org\/10.1007\/s00521-017-3171-9","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,9,2]]},"assertion":[{"value":"9 September 2015","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 August 2017","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 September 2017","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}