{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,3]],"date-time":"2026-08-03T19:09:02Z","timestamp":1785784142890,"version":"3.56.0"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2017,8,29]],"date-time":"2017-08-29T00:00:00Z","timestamp":1503964800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"MAPNA Group Co."}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2019,7]]},"DOI":"10.1007\/s00521-017-3175-5","type":"journal-article","created":{"date-parts":[[2017,8,29]],"date-time":"2017-08-29T03:23:09Z","timestamp":1503976989000},"page":"2143-2154","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":37,"title":["A hybrid conceptual cost estimating model using ANN and GA for power plant projects"],"prefix":"10.1007","volume":"31","author":[{"given":"Sanaz Tayefeh","family":"Hashemi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Omid Mahdi","family":"Ebadati E.","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Harleen","family":"Kaur","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,8,29]]},"reference":[{"key":"3175_CR1","unstructured":"Roxas CLC, Ongpeng JMC (2014) An artificial neural network approach to structural cost estimation of building projects in the Philippines"},{"key":"3175_CR2","doi-asserted-by":"publisher","first-page":"4540","DOI":"10.1016\/j.jclepro.2015.09.015","volume":"112","author":"M Marzouk","year":"2016","unstructured":"Marzouk M, Elkadi M (2016) Estimating water treatment plants costs using factor analysis and artificial neural networks. J Clean Prod 112:4540\u20134549","journal-title":"J Clean Prod"},{"issue":"4","key":"3175_CR3","first-page":"519","volume":"12","author":"K Bala","year":"2014","unstructured":"Bala K, Ahmad Bustani S, Shehu Waziri B (2014) A computer-based cost prediction model for institutional building projects in Nigeria: an artificial neural network approach. J Eng Des Technol 12(4):519\u2013530","journal-title":"J Eng Des Technol"},{"key":"3175_CR4","volume-title":"Machine learning","author":"TM Mitchell","year":"1997","unstructured":"Mitchell TM (1997) Machine learning. WCB, McGraw-Hill, Boston"},{"issue":"4","key":"3175_CR5","doi-asserted-by":"publisher","first-page":"470","DOI":"10.3846\/13923730.2014.890657","volume":"21","author":"M Gunduz","year":"2015","unstructured":"Gunduz M, Sahin HB (2015) An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis. J Civil Eng Manag 21(4):470\u2013477","journal-title":"J Civil Eng Manag"},{"key":"3175_CR6","doi-asserted-by":"crossref","unstructured":"Lin H (2014) An artificial neural network model for data prediction. In: Advanced materials research. Trans Tech Publ","DOI":"10.4028\/www.scientific.net\/AMR.971-973.1521"},{"issue":"1","key":"3175_CR7","doi-asserted-by":"publisher","first-page":"63","DOI":"10.3923\/jai.2011.63.75","volume":"4","author":"M Arafa","year":"2011","unstructured":"Arafa M, Alqedra M (2011) Early stage cost estimation of buildings construction projects using artificial neural networks. J Artif Intell 4(1):63\u201375","journal-title":"J Artif Intell"},{"key":"3175_CR8","first-page":"1036","volume":"6","author":"J Sodikov","year":"2005","unstructured":"Sodikov J (2005) Cost estimation of highway projects in developing countries: artificial neural network approach. J Eastern Asia Soc Transp Stud 6:1036\u20131047","journal-title":"J Eastern Asia Soc Transp Stud"},{"key":"#cr-split#-3175_CR9.1","unstructured":"Ahiaga-Dagbui DD, Smith SD (2012) Neural networks for modelling the final target cost of water projects. In: Smith SD"},{"key":"#cr-split#-3175_CR9.2","unstructured":"(ed) Proceedings of the 28th annual ARCOM conference, 3-5 September 2012. Association of Researchers in Construction Management, Edinburgh, UK, pp 307-316"},{"issue":"1","key":"3175_CR10","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1016\/j.eswa.2009.05.044","volume":"37","author":"M Khashei","year":"2010","unstructured":"Khashei M, Bijari M (2010) An artificial neural network (p, d, q) model for timeseries forecasting. Expert Syst Appl 37(1):479\u2013489","journal-title":"Expert Syst Appl"},{"key":"3175_CR11","unstructured":"Iranmanesh SH, Zarezadeh M (2008) Application of artificial neural network to forecast actual cost of a project to improve earned value management system. In: World congress on science, engineering and technology, pp 240\u2013243"},{"key":"3175_CR12","doi-asserted-by":"crossref","unstructured":"Ye Q, Lou X, Sheng L (2017) Generalized predictive control of a class of MIMO models via a projection neural network. Neurocomputing 234:192\u2013197","DOI":"10.1016\/j.neucom.2016.12.067"},{"issue":"1","key":"3175_CR13","doi-asserted-by":"publisher","first-page":"8","DOI":"10.1109\/TNNLS.2015.2489225","volume":"28","author":"Y Nakamura","year":"2017","unstructured":"Nakamura Y, Hasegawa O (2017) Nonparametric density estimation based on self-organizing incremental neural network for large noisy data. IEEE Trans Neural Netw Learn Syst 28(1):8\u201317","journal-title":"IEEE Trans Neural Netw Learn Syst"},{"issue":"1","key":"3175_CR14","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1108\/GS-11-2016-0049","volume":"7","author":"N-M Xie","year":"2017","unstructured":"Xie N-M et al (2017) Estimating a civil aircraft\u2019s development cost with a GM (1, N) model and an MLP neural network. Grey Syst Theory Appl 7(1):2\u201318","journal-title":"Grey Syst Theory Appl"},{"key":"3175_CR15","doi-asserted-by":"publisher","first-page":"1246","DOI":"10.1016\/j.jclepro.2016.11.157","volume":"143","author":"S Lawan","year":"2017","unstructured":"Lawan S et al (2017) Wind power generation via ground wind station and topographical feedforward neural network (T-FFNN) model for small-scale applications. J Clean Prod 143:1246\u20131259","journal-title":"J Clean Prod"},{"key":"3175_CR16","volume-title":"Cost estimation: methods and tools","author":"DA Nussbaum","year":"2015","unstructured":"Nussbaum DA, Mislick GK (2015) Cost estimation: methods and tools. Wiley, Hoboken"},{"issue":"1","key":"3175_CR17","first-page":"25","volume":"40","author":"J Bode","year":"1998","unstructured":"Bode J (1998) Neural networks for cost estimation. Cost Eng 40(1):25\u201330","journal-title":"Cost Eng"},{"issue":"3","key":"3175_CR18","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1016\/S0925-5273(98)00212-6","volume":"62","author":"A Shtub","year":"1999","unstructured":"Shtub A, Versano R (1999) Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis. Int J Prod Econ 62(3):201\u2013207","journal-title":"Int J Prod Econ"},{"issue":"4","key":"3175_CR19","doi-asserted-by":"publisher","first-page":"7435","DOI":"10.1016\/j.eswa.2008.09.014","volume":"36","author":"O Duran","year":"2009","unstructured":"Duran O, Rodriguez N, Consalter LA (2009) Neural networks for cost estimation of shell and tube heat exchangers. Expert Syst Appl 36(4):7435\u20137440","journal-title":"Expert Syst Appl"},{"key":"3175_CR20","first-page":"2258","volume":"3","author":"TK Polat","year":"2010","unstructured":"Polat TK, Arslankaya S (2010) The cost forecasting application in an enterprise with artificial neural networks. Proc World Congr Eng 3:2258\u20132262","journal-title":"Proc World Congr Eng"},{"issue":"9","key":"3175_CR21","doi-asserted-by":"publisher","first-page":"7788","DOI":"10.1016\/j.eswa.2012.01.095","volume":"39","author":"O Duran","year":"2012","unstructured":"Duran O, Maciel J, Rodriguez N (2012) Comparisons between two types of neural networks for manufacturing cost estimation of piping elements. Expert Syst Appl 39(9):7788\u20137795","journal-title":"Expert Syst Appl"},{"issue":"5\u20138","key":"3175_CR22","doi-asserted-by":"publisher","first-page":"1045","DOI":"10.1007\/s00170-012-4238-5","volume":"65","author":"K Zhai","year":"2013","unstructured":"Zhai K, Jiang N, Pedrycz W (2013) Cost prediction method based on an improved fuzzy model. Int J Adv Manuf Technol 65(5\u20138):1045\u20131053","journal-title":"Int J Adv Manuf Technol"},{"key":"3175_CR23","doi-asserted-by":"crossref","unstructured":"Bai Z et al (2014) Predictive model of energy cost in steelmaking process based on BP neural network. In: 2nd international conference on software engineering, knowledge engineering and information engineering (SEKEIE), Singapore, 2014","DOI":"10.2991\/sekeie-14.2014.18"},{"key":"3175_CR24","doi-asserted-by":"crossref","unstructured":"Kumari S, Pushkar S (2017) Software cost estimation using cuckoo search. In: Advances in computational intelligence: proceedings of international conference on computational intelligence 2015. Springer","DOI":"10.1007\/978-981-10-2525-9_17"},{"issue":"3","key":"3175_CR25","doi-asserted-by":"publisher","first-page":"445","DOI":"10.3846\/13923730.2011.598331","volume":"17","author":"H Abdul-Rahman","year":"2011","unstructured":"Abdul-Rahman H, Wang C, Muhammad NAB (2011) Project performance monitoring methods used in Malaysia and perspectives of introducing EVA as a standard approach. J Civil Eng Manag 17(3):445\u2013455","journal-title":"J Civil Eng Manag"},{"issue":"6","key":"3175_CR26","doi-asserted-by":"publisher","first-page":"4224","DOI":"10.1016\/j.eswa.2009.11.080","volume":"37","author":"M-Y Cheng","year":"2010","unstructured":"Cheng M-Y, Tsai H-C, Sudjono E (2010) Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry. Expert Syst Appl 37(6):4224\u20134231","journal-title":"Expert Syst Appl"},{"key":"3175_CR27","doi-asserted-by":"crossref","unstructured":"He X et al (2011) Cost estimation of construction project using fuzzy neural network model embedded with modified particle optimizer. In: Advanced materials research. 2011. Trans Tech Publ","DOI":"10.4028\/www.scientific.net\/AMR.243-249.6296"},{"issue":"4","key":"3175_CR28","first-page":"2250","volume":"2","author":"NI Sawalhi El","year":"2012","unstructured":"El Sawalhi NI (2012) Modelling the parametric construction project cost estimate using fuzzy logic. Int J Emerg Technol Adv Eng 2(4):2250\u20132459","journal-title":"Int J Emerg Technol Adv Eng"},{"issue":"6","key":"3175_CR29","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1061\/(ASCE)CP.1943-5487.0000054","volume":"24","author":"KJ Kim","year":"2010","unstructured":"Kim KJ, Kim K (2010) Preliminary cost estimation model using case-based reasoning and genetic algorithms. J Comput Civil Eng 24(6):499\u2013505","journal-title":"J Comput Civil Eng"},{"key":"3175_CR30","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.autcon.2012.04.006","volume":"25","author":"H-J Kim","year":"2012","unstructured":"Kim H-J, Seo Y-C, Hyun C-T (2012) A hybrid conceptual cost estimating model for large building projects. Autom Constr 25:72\u201381","journal-title":"Autom Constr"},{"issue":"4","key":"3175_CR31","doi-asserted-by":"publisher","first-page":"470","DOI":"10.1016\/j.ijproman.2011.09.002","volume":"30","author":"Y-R Wang","year":"2012","unstructured":"Wang Y-R, Yu C-Y, Chan H-H (2012) Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models. Int J Project Manage 30(4):470\u2013478","journal-title":"Int J Project Manage"},{"key":"3175_CR32","unstructured":"Elhag T, Boussabaine A (1998) An artificial neural system for cost estimation of construction projects. In: Proceedings of the 14th ARCOM annual conference"},{"issue":"4","key":"3175_CR33","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1080\/014461998372240","volume":"16","author":"A Boussabaine","year":"1998","unstructured":"Boussabaine A, Kaka A (1998) A neural networks approach for cost flow forecasting. Constr Manag Econ 16(4):471\u2013479","journal-title":"Constr Manag Econ"},{"issue":"6","key":"3175_CR34","doi-asserted-by":"publisher","first-page":"465","DOI":"10.1080\/01446190210151050","volume":"20","author":"MW Emsley","year":"2002","unstructured":"Emsley MW et al (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Constr Manag Econ 20(6):465\u2013472","journal-title":"Constr Manag Econ"},{"key":"3175_CR35","unstructured":"Setyawati BR, Sahirman S, Creese RC (2002) Neural networks for cost estimation. In: AACE international transactions p. ES131"},{"issue":"10","key":"3175_CR36","doi-asserted-by":"publisher","first-page":"1235","DOI":"10.1016\/j.buildenv.2004.02.013","volume":"39","author":"G-H Kim","year":"2004","unstructured":"Kim G-H, An S-H, Kang K-I (2004) Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Build Environ 39(10):1235\u20131242","journal-title":"Build Environ"},{"issue":"7","key":"3175_CR37","doi-asserted-by":"publisher","first-page":"595","DOI":"10.1016\/j.ijproman.2004.04.002","volume":"22","author":"HM G\u00fcnayd\u0131n","year":"2004","unstructured":"G\u00fcnayd\u0131n HM, Do\u011fan SZ (2004) A neural network approach for early cost estimation of structural systems of buildings. Int J Project Manage 22(7):595\u2013602","journal-title":"Int J Project Manage"},{"issue":"7","key":"3175_CR38","doi-asserted-by":"publisher","first-page":"765","DOI":"10.1061\/(ASCE)0733-9364(2005)131:7(765)","volume":"131","author":"CG Wilmot","year":"2005","unstructured":"Wilmot CG, Mei B (2005) Neural network modeling of highway construction costs. J Constr Eng Manag 131(7):765\u2013771","journal-title":"J Constr Eng Manag"},{"issue":"7","key":"3175_CR39","doi-asserted-by":"publisher","first-page":"745","DOI":"10.1061\/(ASCE)CO.1943-7862.0000184","volume":"136","author":"DP Alex","year":"2009","unstructured":"Alex DP et al (2009) Artificial neural network model for cost estimation: city of Edmonton\u2019s water and sewer installation services. J Constr Eng Manag 136(7):745\u2013756","journal-title":"J Constr Eng Manag"},{"issue":"5","key":"3175_CR40","doi-asserted-by":"publisher","first-page":"1081","DOI":"10.1016\/j.buildenv.2010.11.009","volume":"46","author":"O Tatari","year":"2011","unstructured":"Tatari O, Kucukvar M (2011) Cost premium prediction of certified green buildings: a neural network approach. Build Environ 46(5):1081\u20131086","journal-title":"Build Environ"},{"issue":"6","key":"3175_CR41","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1061\/(ASCE)CO.1943-7862.0000479","volume":"138","author":"K Petroutsatou","year":"2011","unstructured":"Petroutsatou K et al (2011) Early cost estimating of road tunnel construction using neural networks. J Constr Eng Manag 138(6):679\u2013687","journal-title":"J Constr Eng Manag"},{"issue":"4","key":"3175_CR42","first-page":"9","volume":"4","author":"NI El-Sawalhi","year":"2014","unstructured":"El-Sawalhi NI, Shehatto O (2014) A neural network model for building construction projects cost estimating. J Constr Eng Proj Manag 4(4):9\u201316","journal-title":"J Constr Eng Proj Manag"},{"key":"3175_CR43","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.promfg.2015.11.019","volume":"4","author":"GAS Putra","year":"2015","unstructured":"Putra GAS, Triyono RA (2015) Neural network method for instrumentation and control cost estimation of the EPC companies bidding proposal. Procedia Manuf 4:98\u2013106","journal-title":"Procedia Manuf"},{"issue":"1","key":"3175_CR44","doi-asserted-by":"publisher","first-page":"04015021","DOI":"10.1061\/(ASCE)ME.1943-5479.0000381","volume":"32","author":"KH Hyari","year":"2015","unstructured":"Hyari KH, Al-Daraiseh A, El-Mashaleh M (2015) Conceptual cost estimation model for engineering services in public construction projects. J Manag Eng 32(1):04015021","journal-title":"J Manag Eng"},{"issue":"3","key":"3175_CR45","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(210)","volume":"124","author":"T Hegazy","year":"1998","unstructured":"Hegazy T, Ayed A (1998) Neural network model for parametric cost estimation of highway projects. J Constr Eng Manag 124(3):210\u2013218","journal-title":"J Constr Eng Manag"},{"key":"3175_CR46","doi-asserted-by":"crossref","unstructured":"Feng GL, Li L (2013) Application of genetic algorithm and neural network in construction cost estimate. In: Advanced materials research. 2013. Trans Tech Publ","DOI":"10.4028\/www.scientific.net\/AMR.756-759.3194"},{"key":"3175_CR47","doi-asserted-by":"crossref","unstructured":"Paul S, Kumar S, Singh L (2012) Novel hybrid compact genetic algorithm for simultaneous structure and parameter learning of neural networks. In: 2012 IEEE congress on evolutionary computation","DOI":"10.1109\/CEC.2012.6256598"},{"key":"3175_CR48","doi-asserted-by":"crossref","unstructured":"ul Islam B et al (2014) Optimization of neural network architecture using genetic algorithm for load forecasting. In: 5th international conference on intelligent and advanced systems (ICIAS)","DOI":"10.1109\/ICIAS.2014.6869528"},{"issue":"11","key":"3175_CR49","doi-asserted-by":"publisher","first-page":"1333","DOI":"10.1016\/j.buildenv.2004.03.009","volume":"39","author":"G-H Kim","year":"2004","unstructured":"Kim G-H et al (2004) Neural network model incorporating a genetic algorithm in estimating construction costs. Build Environ 39(11):1333\u20131340","journal-title":"Build Environ"},{"issue":"2","key":"3175_CR50","doi-asserted-by":"publisher","first-page":"208","DOI":"10.1061\/(ASCE)0887-3801(2005)19:2(208)","volume":"19","author":"G Kim","year":"2005","unstructured":"Kim G, Seo D, Kang KI (2005) Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates. J Comput Civil Eng 19(2):208\u2013211","journal-title":"J Comput Civil Eng"},{"key":"3175_CR51","volume-title":"Computer-based construction project management","author":"T Hegazy","year":"2002","unstructured":"Hegazy T (2002) Computer-based construction project management. Prentice Hall, Upper Saddle River"},{"key":"3175_CR52","volume-title":"ICTs and the Millennium development goals: a United Nations perspective","year":"2014","unstructured":"Kaur H, Tao X (eds) (2014) ICTs and the Millennium development goals: a United Nations perspective. Springer, New York"},{"key":"3175_CR53","doi-asserted-by":"crossref","unstructured":"Kaur H et al (eds) (2017) Catalyzing development through ICT adoption: the developing world experience. Springer International Publishing, Switzerland","DOI":"10.1007\/978-3-319-56523-1"},{"key":"3175_CR54","doi-asserted-by":"crossref","unstructured":"Kaur H, Chauhan R, Wasan SK. A bayesian network model for probability estimation. In: Encyclopedia of Information Science (2015)","DOI":"10.4018\/978-1-4666-5888-2.ch148"},{"key":"3175_CR55","unstructured":"Setyawati BR, Creese RC, Sahirman S (2003) Neural networks for cost estimation (Part 2). In: AACE international transactions, p. ES141"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-017-3175-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-017-3175-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-017-3175-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,16]],"date-time":"2020-10-16T12:52:35Z","timestamp":1602852755000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-017-3175-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,8,29]]},"references-count":56,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2019,7]]}},"alternative-id":["3175"],"URL":"https:\/\/doi.org\/10.1007\/s00521-017-3175-5","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,8,29]]},"assertion":[{"value":"1 August 2016","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 August 2017","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"29 August 2017","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}