{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T09:50:15Z","timestamp":1775728215341,"version":"3.50.1"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2020,4]]},"DOI":"10.1007\/s00521-019-04571-5","type":"journal-article","created":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T10:48:33Z","timestamp":1572605313000},"page":"1857-1868","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":43,"title":["Application research of improved genetic algorithm based on machine learning in production scheduling"],"prefix":"10.1007","volume":"32","author":[{"given":"Kai","family":"Guo","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mei","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hai","family":"Zhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,11,1]]},"reference":[{"issue":"1","key":"4571_CR1","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1007\/s40747-017-0036-x","volume":"3","author":"N Su","year":"2017","unstructured":"Su N, Yi M, Zhang M (2017) Genetic programming for production scheduling: a survey with a unified framework. Complex & Intelligent Systems 3(1):41\u201366","journal-title":"Complex & Intelligent Systems"},{"key":"4571_CR2","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1016\/j.ress.2015.10.013","volume":"146","author":"X Lei","year":"2016","unstructured":"Lei X, Song S, Chen X et al (2016) Joint optimization of production scheduling and machine group preventive maintenance. Reliability Engineering & System Safety 146:68\u201378","journal-title":"Reliability Engineering & System Safety"},{"issue":"6","key":"4571_CR3","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1109\/21.23085","volume":"18","author":"FA Rodammer","year":"2015","unstructured":"Rodammer FA, White KP (2015) A recent survey of production scheduling. IEEE Transactions on Systems Man & Cybernetics 18(6):841\u2013851","journal-title":"IEEE Transactions on Systems Man & Cybernetics"},{"issue":"1","key":"4571_CR4","doi-asserted-by":"publisher","first-page":"110","DOI":"10.1109\/TEVC.2015.2429314","volume":"20","author":"J Branke","year":"2016","unstructured":"Branke J, Nguyen S, Pickardt CW et al (2016) Automated design of production scheduling heuristics: a review. IEEE Transactions on Evolutionary Computation 20(1):110\u2013124","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"4","key":"4571_CR5","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1080\/00207548308942390","volume":"21","author":"J Gonzalez","year":"2017","unstructured":"Gonzalez J, Reeves G (2017) Master production scheduling: a multiple-objective linear programming approach. International Journal of Production Research 21(4):553\u2013562","journal-title":"International Journal of Production Research"},{"issue":"2","key":"4571_CR6","doi-asserted-by":"publisher","first-page":"955","DOI":"10.3233\/JIFS-169389","volume":"34","author":"Jianren Shang","year":"2018","unstructured":"Shang Jianren, Tian Yunnan, Liu Yi, Liu Runlong (2018) Production scheduling optimization method based on hybrid particle swarm optimization algorithm. Journal of Intelligent and Fuzzy Systems 34(2):955\u2013964","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"6","key":"4571_CR7","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1016\/j.jclepro.2013.12.024","volume":"67","author":"F Shrouf","year":"2014","unstructured":"Shrouf F, Ordieres-Mer\u00e9 J, Garc\u00eda-S\u00e1nchez A et al (2014) Optimizing the production scheduling of a single machine to minimize total energy consumption costs. Journal of Cleaner Production 67(6):197\u2013207","journal-title":"Journal of Cleaner Production"},{"issue":"11","key":"4571_CR8","doi-asserted-by":"publisher","first-page":"3163","DOI":"10.1007\/s00521-016-2226-7","volume":"28","author":"Ming-Wei Li","year":"2017","unstructured":"Li Ming-Wei, Hong Wei-Chiang, Geng Jing, Wang Jianlun (2017) Berth and quay crane coordinated scheduling using multi-objective chaos cloud particle swarm optimization algorithm. Neural Computing and Applications 28(11):3163\u20133182","journal-title":"Neural Computing and Applications"},{"issue":"9","key":"4571_CR9","doi-asserted-by":"publisher","first-page":"1305","DOI":"10.1057\/jors.2013.81","volume":"65","author":"A Lamghari","year":"2014","unstructured":"Lamghari A, Dimitrakopoulos R, Ferland JA (2014) A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty. Journal of the Operational Research Society 65(9):1305\u20131314","journal-title":"Journal of the Operational Research Society"},{"issue":"9","key":"4571_CR10","first-page":"1","volume":"86","author":"J Koo","year":"2016","unstructured":"Koo J, Kim BI (2016) Some comments on \u201cOptimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency\u201d. International Journal of Advanced Manufacturing Technology 86(9):1\u20134","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"4571_CR11","doi-asserted-by":"publisher","first-page":"577","DOI":"10.1016\/j.asoc.2018.02.002","volume":"65","author":"Ali Gharaei","year":"2018","unstructured":"Gharaei Ali, Jolai Fariborz (2018) A multi-agent approach to the integrated production scheduling and distribution problem in multi-factory supply chain. Applied Soft Computing 65:577\u2013589","journal-title":"Applied Soft Computing"},{"key":"4571_CR12","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1016\/j.cie.2018.09.048","volume":"126","author":"Akram Chergui","year":"2018","unstructured":"Chergui Akram, Hadj-Hamou Khaled, Vignat Fr\u00e9d\u00e9ric (2018) Production scheduling and nesting in additive manufacturing. Computer and Industrial Engineering 126:292\u2013301","journal-title":"Computer and Industrial Engineering"},{"issue":"7","key":"4571_CR13","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.ijpe.2014.02.014","volume":"153","author":"C Low","year":"2014","unstructured":"Low C, Chang CM, Li RK et al (2014) Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics 153(7):139\u2013148","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"4571_CR14","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.cor.2014.02.006","volume":"47","author":"WW Cui","year":"2014","unstructured":"Cui WW, Lu Z, Pan E (2014) Integrated production scheduling and maintenance policy for robustness in a single machine. Computers & Operations Research 47(7):81\u201391","journal-title":"Computers & Operations Research"},{"issue":"11","key":"4571_CR15","doi-asserted-by":"publisher","first-page":"5184","DOI":"10.1166\/jctn.2017.6729","volume":"14","author":"MRA Bakar","year":"2017","unstructured":"Bakar MRA, Abbas IT, Kalal MA et al (2017) Solution for multi-objective optimisation master production scheduling problems based on swarm intelligence algorithms. Journal of Computational and Theoretical Nanoscience 14(11):5184\u20135194","journal-title":"Journal of Computational and Theoretical Nanoscience"},{"issue":"1","key":"4571_CR16","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1016\/j.ejor.2015.08.051","volume":"250","author":"A Lamghari","year":"2016","unstructured":"Lamghari A, Dimitrakopoulos R (2016) Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty. European Journal of Operational Research 250(1):273\u2013290","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"4571_CR17","first-page":"230","volume":"76","author":"L Zeng","year":"2016","unstructured":"Zeng L, Liang X, Yan OU et al (2016) Energy integrated scheduling based on multiobjective-constrained optimization evolutionary algorithm. Computer Integrated Manufacturing Systems 76(2):230\u2013267","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"4571_CR18","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1016\/j.knosys.2016.08.010","volume":"111","author":"SL Jiang","year":"2016","unstructured":"Jiang SL, Liu M, Lin JH et al (2016) A prediction-based online soft scheduling algorithm for the real-world steelmaking-continuous casting production. Knowledge-Based Systems 111:159\u2013172","journal-title":"Knowledge-Based Systems"},{"issue":"1","key":"4571_CR19","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1162\/evco.1999.7.1.1","volume":"7","author":"C Bierwirth","year":"2014","unstructured":"Bierwirth C, Mattfeld DC (2014) Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7(1):1\u201317","journal-title":"Evolutionary Computation"},{"issue":"8","key":"4571_CR20","first-page":"2769","volume":"44","author":"HJ Wen","year":"2014","unstructured":"Wen HJ, Hou SW (2014) Application of dimensional information sharing-based particle swarm optimization algorithm for production scheduling. Industrial Engineering Journal 44(8):2769\u20132771","journal-title":"Industrial Engineering Journal"},{"key":"4571_CR21","doi-asserted-by":"publisher","first-page":"46346","DOI":"10.1109\/ACCESS.2018.2866133","volume":"6","author":"T Jiang","year":"2018","unstructured":"Jiang T, Deng G (2018) Optimizing the low-carbon flexible job shop scheduling problem considering energy consumption. IEEE Access 6:46346\u201346355","journal-title":"IEEE Access"},{"issue":"8","key":"4571_CR22","doi-asserted-by":"publisher","first-page":"1250","DOI":"10.1057\/jors.2014.88","volume":"66","author":"HS Yan","year":"2015","unstructured":"Yan HS, Wan XQ, Xiong FL (2015) Integrated production planning and scheduling for a mixed batch job-shop based on alternant iterative genetic algorithm. Journal of the Operational Research Society 66(8):1250\u20131258","journal-title":"Journal of the Operational Research Society"},{"key":"4571_CR23","unstructured":"Zhang YX, Xu G (2015) A research of collateral production scheduling based on genetic algorithms. In: International conference on computer modeling and simulation"},{"issue":"1","key":"4571_CR24","first-page":"30","volume":"17","author":"W Hai-Jun","year":"2014","unstructured":"Hai-Jun W, Shi-Wang H (2014) Application of dimensional information sharing-based particle swarm optimization algorithm for production scheduling. Ind Eng J 17(1):30\u201335","journal-title":"Ind Eng J"},{"issue":"5\u20136","key":"4571_CR25","first-page":"549","volume":"41","author":"MM Soares","year":"2014","unstructured":"Soares MM, Vieira GE (2014) A new multi-objective optimization method for master production scheduling problems based on genetic algorithm. International Journal of Advanced Manufacturing Technology 41(5\u20136):549\u2013567","journal-title":"International Journal of Advanced Manufacturing Technology"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-019-04571-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00521-019-04571-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-019-04571-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,31]],"date-time":"2020-10-31T00:42:17Z","timestamp":1604104937000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00521-019-04571-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11,1]]},"references-count":25,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2020,4]]}},"alternative-id":["4571"],"URL":"https:\/\/doi.org\/10.1007\/s00521-019-04571-5","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,11,1]]},"assertion":[{"value":"19 July 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 October 2019","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 November 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declared that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}