{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T20:50:30Z","timestamp":1761598230643},"reference-count":75,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2020,6,29]],"date-time":"2020-06-29T00:00:00Z","timestamp":1593388800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,6,29]],"date-time":"2020-06-29T00:00:00Z","timestamp":1593388800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2021,4]]},"DOI":"10.1007\/s00521-020-05095-z","type":"journal-article","created":{"date-parts":[[2020,6,29]],"date-time":"2020-06-29T10:02:43Z","timestamp":1593424963000},"page":"2263-2284","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector"],"prefix":"10.1007","volume":"33","author":[{"given":"Seyed Ali","family":"Mirnezami","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seyed Meysam","family":"Mousavi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vahid","family":"Mohagheghi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,6,29]]},"reference":[{"key":"5095_CR1","unstructured":"Adjei EAG, Fugar FDK, Adinyira E (2019) A review on appropriate tool to predict profitability of building projects using established significant cash flow factors. In: 14th international postgraduate research conference 2019: contemporary and future directions in the built environment, pp 38\u201344"},{"issue":"3","key":"5095_CR2","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1061\/(ASCE)0733-9364(1990)116:3(533)","volume":"116","author":"JF Al-Bahar","year":"1990","unstructured":"Al-Bahar JF, Crandall KC (1990) Systematic risk management approach for construction projects. J Constr Eng Manag 116(3):533\u2013546","journal-title":"J Constr Eng Manag"},{"issue":"5","key":"5095_CR3","doi-asserted-by":"crossref","first-page":"742","DOI":"10.3846\/20294913.2015.1056276","volume":"23","author":"A Balin","year":"2017","unstructured":"Balin A, Bara\u00e7li H (2017) A fuzzy multi-criteria decision making methodology based upon the interval type-2 fuzzy sets for evaluating renewable energy alternatives in Turkey. Technol Econ Dev Econ 23(5):742\u2013763","journal-title":"Technol Econ Dev Econ"},{"key":"5095_CR4","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/j.ijproman.2016.10.003","volume":"35","author":"J Batselier","year":"2017","unstructured":"Batselier J, Vanhoucke M (2017) Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting. Int J Project Manag 35:28\u201343","journal-title":"Int J Project Manag"},{"issue":"4","key":"5095_CR5","first-page":"32","volume":"94","author":"JA Camps","year":"1996","unstructured":"Camps JA (1996) Simple steps help minimize costs risks in project management. Oil Gas J 94(4):32\u201336","journal-title":"Oil Gas J"},{"key":"5095_CR6","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.ins.2016.03.026","volume":"354","author":"O Castillo","year":"2016","unstructured":"Castillo O, Amador-Angulo L, Castro JR, Garcia-Valdez M (2016) A comparative study of type-1 fuzzy logic systems, interval type-2 fuzzy logic systems and generalized type-2 fuzzy logic systems in control problems. Inf Sci 354:257\u2013274","journal-title":"Inf Sci"},{"key":"5095_CR7","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.ins.2016.03.001","volume":"354","author":"O Castillo","year":"2016","unstructured":"Castillo O, Cervantes L, Soria J, Sanchez M, Castro JR (2016) A generalized type-2 fuzzy granular approach with applications to aerospace. Inf Sci 354:165\u2013177","journal-title":"Inf Sci"},{"key":"5095_CR8","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1016\/j.oceaneng.2018.01.039","volume":"155","author":"E Celik","year":"2018","unstructured":"Celik E, Akyuz E (2018) An interval type-2 fuzzy AHP and TOPSIS methods for decision-making problems in maritime transportation engineering: the case of ship loader. Ocean Eng 155:371\u2013381","journal-title":"Ocean Eng"},{"issue":"6","key":"5095_CR9","doi-asserted-by":"crossref","first-page":"2847","DOI":"10.3233\/IFS-141246","volume":"27","author":"E Celik","year":"2014","unstructured":"Celik E, Gumus AT, Alegoz M (2014) A trapezoidal type-2 fuzzy MCDM method to identify and evaluate critical success factors for humanitarian relief logistics management. J Intell Fuzzy Syst 27(6):2847\u20132855","journal-title":"J Intell Fuzzy Syst"},{"issue":"1","key":"5095_CR10","first-page":"24","volume":"6","author":"SK Chaharsooghi","year":"2019","unstructured":"Chaharsooghi SK, Seyfi Sariqaya M, Rahimnezhad F (2019) Optimization of project cash flow under uncertainty by genetic algorithm. Int J Ind Eng Manag Sci 6(1):24\u201337","journal-title":"Int J Ind Eng Manag Sci"},{"key":"5095_CR11","volume-title":"Project risk management: processes, techniques and insights","author":"CB Chapman","year":"1997","unstructured":"Chapman CB, Ward S (1997) Project risk management: processes, techniques and insights. Wiley, New York"},{"issue":"3","key":"5095_CR12","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1016\/j.ejor.2012.11.038","volume":"226","author":"T-Y Chen","year":"2013","unstructured":"Chen T-Y, Chang C-H, Lu J-FR (2013) The extended QUALIFLEX method for multiple criteria decision analysis based on interval type- 2 fuzzy sets and applications to medical decision making. Eur J Oper Res 226(3):615\u2013625","journal-title":"Eur J Oper Res"},{"issue":"12","key":"5095_CR13","doi-asserted-by":"crossref","first-page":"1665","DOI":"10.1109\/TSMC.2014.2314724","volume":"44","author":"SM Chen","year":"2014","unstructured":"Chen SM, Hong JA (2014) Fuzzy multiple attributes group decision-making based on ranking interval type-2 fuzzy sets and the TOPSIS method. IEEE Trans Syst Man Cybern Syst 44(12):1665\u20131673","journal-title":"IEEE Trans Syst Man Cybern Syst"},{"issue":"4","key":"5095_CR14","doi-asserted-by":"crossref","first-page":"2790","DOI":"10.1016\/j.eswa.2009.09.012","volume":"37","author":"SM Chen","year":"2010","unstructured":"Chen SM, Lee LW (2010) Fuzzy multiple attributes group decision-making based on the interval type-2 TOPSIS method. Expert Syst Appl 37(4):2790\u20132798","journal-title":"Expert Syst Appl"},{"key":"5095_CR15","doi-asserted-by":"crossref","unstructured":"Debnath J, Biswas A (2018) Assessment of occupational risks in construction sites using interval type-2 fuzzy analytic hierarchy process. In: Industry interactive innovations in science, engineering and technology. Springer, Singapore, pp 283\u2013297","DOI":"10.1007\/978-981-10-3953-9_28"},{"issue":"2","key":"5095_CR16","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/j.compind.2010.10.006","volume":"62","author":"T Dereli","year":"2011","unstructured":"Dereli T, Baykasoglu A, Altun K, Durmusoglu A, T\u00fcrksen IB (2011) Industrial applications of type-2 fuzzy sets and systems: a concise review. Comput Ind 62(2):125\u2013137","journal-title":"Comput Ind"},{"issue":"10","key":"5095_CR17","doi-asserted-by":"crossref","first-page":"1288","DOI":"10.1057\/jors.2016.22","volume":"67","author":"JY Dong","year":"2016","unstructured":"Dong JY, Wan SP (2016) Virtual enterprise partner selection integrating LINMAP and TOPSIS. J Oper Res Soc 67(10):1288\u20131308","journal-title":"J Oper Res Soc"},{"key":"5095_CR18","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1016\/j.cie.2018.04.015","volume":"120","author":"Y Dorfeshan","year":"2018","unstructured":"Dorfeshan Y, Mousavi SM, Mohagheghi V, Vahdani B (2018) Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods. Comput Ind Eng 120:160\u2013178","journal-title":"Comput Ind Eng"},{"issue":"4","key":"5095_CR19","first-page":"2579","volume":"26","author":"Y Dorfeshan","year":"2019","unstructured":"Dorfeshan Y, Mousavi SM, Vahdani B, Siadat A (2019) Determining project characteristics and critical path by a new approach based on modified NWRT method and risk assessment under an interval type-2 fuzzy environment. Sci Iran 26(4):2579\u20132600","journal-title":"Sci Iran"},{"issue":"3","key":"5095_CR20","first-page":"319","volume":"50","author":"M Ekhtiari","year":"2016","unstructured":"Ekhtiari M, Yadegari E, Sadidi G (2016) Ranking enterpreneurship main risks in non-profit financial funds by Todim technique under grey conditions (a case study in Iran). Econ Comput Econ Cybern Stud Res 50(3):319\u2013336","journal-title":"Econ Comput Econ Cybern Stud Res"},{"issue":"3","key":"5095_CR21","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1108\/ECAM-11-2014-0135","volume":"23","author":"E Elbeltagi","year":"2016","unstructured":"Elbeltagi E, Ammar M, Sanad H, Kassab M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Eng Constr Archit Manag 23(3):265\u2013282","journal-title":"Eng Constr Archit Manag"},{"key":"5095_CR22","doi-asserted-by":"publisher","DOI":"10.1080\/15623599.2019.1573477","author":"F Elghaish","year":"2019","unstructured":"Elghaish F, Abrishami S, Abu Samra S, Gaterell M, Hosseini MR, Wise R (2019) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. Int J Constr Manag. https:\/\/doi.org\/10.1080\/15623599.2019.1573477","journal-title":"Int J Constr Manag"},{"key":"5095_CR23","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00521-018-04002-x","volume":"31","author":"A Eshghi","year":"2019","unstructured":"Eshghi A, Mousavi SM, Mohagheghi V (2019) A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study). Neural Comput Appl 31:5109\u20135133","journal-title":"Neural Comput Appl"},{"key":"5095_CR24","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1016\/j.enconman.2018.01.035","volume":"160","author":"AL Facci","year":"2018","unstructured":"Facci AL, Ubertini S (2018) Meta-heuristic optimization for a high-detail smart management of complex energy systems. Energy Convers Manag 160:341\u2013353","journal-title":"Energy Convers Manag"},{"issue":"5\u20138","key":"5095_CR25","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1007\/s00170-014-6142-7","volume":"75","author":"MK Ghorabaee","year":"2014","unstructured":"Ghorabaee MK, Amiri M, Sadaghiani JS, Goodarzi GH (2014) Multiple criteria group decision-making for supplier selection based on COPRAS method with interval type-2 fuzzy sets. Int J Adv Manuf Technol 75(5\u20138):1115\u20131130","journal-title":"Int J Adv Manuf Technol"},{"key":"5095_CR26","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/j.jclepro.2016.07.031","volume":"137","author":"MK Ghorabaee","year":"2016","unstructured":"Ghorabaee MK, Zavadskas EK, Amiri M, Esmaeili A (2016) Multi-criteria evaluation of green suppliers using an extended WASPAS method with interval type-2 fuzzy sets. J Clean Prod 137:213\u2013229","journal-title":"J Clean Prod"},{"key":"5095_CR27","volume-title":"Critical chain: a business novel","author":"EM Goldratt","year":"1997","unstructured":"Goldratt EM (1997) Critical chain: a business novel. The North River Press, Great Barrington"},{"issue":"1","key":"5095_CR28","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.ejor.2007.10.046","volume":"193","author":"LFAM Gomes","year":"2009","unstructured":"Gomes LFAM (2009) An application of the TODIM method to the multicriteria rental evaluation of residential properties. Eur J Oper Res 193(1):204\u2013211","journal-title":"Eur J Oper Res"},{"key":"5095_CR29","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/978-3-319-47054-2_1","volume-title":"Nature-inspired design of hybrid intelligent systems","author":"CI Gonzalez","year":"2017","unstructured":"Gonzalez CI, Melin P, Castro JR, Mendoza O, Castillo O (2017) General type-2 fuzzy edge detection in the preprocessing of a face recognition system. In: Melin P, Castillo O, Kacprzyk J (eds) Nature-inspired design of hybrid intelligent systems. Springer International Publishing, Berlin, pp 3\u201318"},{"key":"5095_CR30","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1016\/j.ins.2016.03.046","volume":"357","author":"X Gou","year":"2016","unstructured":"Gou X, Xu Z, Liao H (2016) Alternative queuing method for multiple criteria decision making with hybrid fuzzy and ranking information. Inf Sci 357:144\u2013160","journal-title":"Inf Sci"},{"issue":"2","key":"5095_CR31","first-page":"130","volume":"16","author":"WS Guildford","year":"1998","unstructured":"Guildford WS (1998) Practical risk assessment for project management. Int J Project Manag 16(2):130\u2013131","journal-title":"Int J Project Manag"},{"issue":"2","key":"5095_CR32","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1504\/EJIE.2016.075846","volume":"10","author":"M Gul","year":"2016","unstructured":"Gul M, Celik E, Gumus AT, Guneri AF (2016) Emergency department performance evaluation by an integrated simulation and interval type-2 fuzzy MCDM-based scenario analysis. Eur J Ind Eng 10(2):196\u2013223","journal-title":"Eur J Ind Eng"},{"key":"5095_CR33","doi-asserted-by":"crossref","first-page":"780","DOI":"10.1016\/j.asoc.2019.01.048","volume":"77","author":"MH Haghighi","year":"2019","unstructured":"Haghighi MH, Mousavi SM, Mohagheghi V (2019) A new soft computing model based on linear assignment and linear programming technique for multidimensional analysis of preference with interval type-2 fuzzy sets. Appl Soft Comput 77:780\u2013796","journal-title":"Appl Soft Comput"},{"key":"5095_CR34","first-page":"1","volume":"31","author":"ST Hashemi","year":"2017","unstructured":"Hashemi ST, Kaur H (2017) A hybrid conceptual cost estimating model using ANN and GA for power plant projects. Neural Comput Appl 31:1\u201312","journal-title":"Neural Comput Appl"},{"key":"5095_CR35","doi-asserted-by":"crossref","first-page":"157427","DOI":"10.1109\/ACCESS.2019.2944746","volume":"7","author":"Y He","year":"2019","unstructured":"He Y, Zhang J, He Z (2019) Metaheuristic algorithms for multimode multiproject scheduling with the objective of positive cash flow balance. IEEE Access 7:157427\u2013157436","journal-title":"IEEE Access"},{"key":"5095_CR36","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1016\/j.knosys.2012.11.007","volume":"43","author":"J Hu","year":"2013","unstructured":"Hu J, Zhang Y, Chen X, Liu Y (2013) Multi-criteria decision making method based on possibility degree of interval type-2 fuzzy number. Knowl-Based Syst 43:21\u201329","journal-title":"Knowl-Based Syst"},{"issue":"6","key":"5095_CR37","doi-asserted-by":"crossref","first-page":"1817","DOI":"10.3390\/su10061817","volume":"10","author":"SH Jo","year":"2018","unstructured":"Jo SH, Lee EB, Pyo KY (2018) Integrating a procurement management process into critical chain project management (CCPM): a case-study on oil and gas projects, the piping process. Sustainability 10(6):1817","journal-title":"Sustainability"},{"issue":"3","key":"5095_CR38","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1080\/01446199100000023","volume":"9","author":"A Kaka","year":"1991","unstructured":"Kaka A, Price AD (1991) Net cash flow models: are they reliable? Constr Manag Econ 9(3):291\u2013308","journal-title":"Constr Manag Econ"},{"key":"5095_CR39","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1016\/j.asoc.2014.11.028","volume":"27","author":"M Kilic","year":"2015","unstructured":"Kilic M, Kaya \u0130 (2015) Investment project evaluation by a decision making methodology based on type-2 fuzzy sets. Appl Soft Comput 27:399\u2013410","journal-title":"Appl Soft Comput"},{"issue":"1","key":"5095_CR40","doi-asserted-by":"crossref","first-page":"255","DOI":"10.5267\/j.msl.2019.7.036","volume":"10","author":"T Le","year":"2020","unstructured":"Le T, Vu T, Nguyen V (2020) Identifying factors influencing on the cash flow of construction companies: evidence from Vietnam stock exchange. Manag Sci Lett 10(1):255\u2013264","journal-title":"Manag Sci Lett"},{"key":"5095_CR41","volume-title":"Critical chain project management","author":"LP Leach","year":"2014","unstructured":"Leach LP (2014) Critical chain project management. Artech House, Norwood"},{"key":"5095_CR42","doi-asserted-by":"crossref","first-page":"667","DOI":"10.1016\/j.jclepro.2019.04.406","volume":"229","author":"D Liu","year":"2019","unstructured":"Liu D, Qi X, Li M, Zhu W, Zhang L, Faiz MA, Cui S (2019) A resilience evaluation method for a combined regional agricultural water and soil resource system based on Weighted Mahalanobis distance and a Gray-TOPSIS model. J Clean Prod 229:667\u2013679","journal-title":"J Clean Prod"},{"issue":"2","key":"5095_CR43","first-page":"554","volume":"68","author":"HC Liu","year":"2018","unstructured":"Liu HC, Hu YP, Wang JJ, Sun M (2018) Failure mode and effects analysis using two-dimensional uncertain linguistic variables and alternative queuing method. IEEE Trans Reliab 68(2):554\u2013565","journal-title":"IEEE Trans Reliab"},{"issue":"12","key":"5095_CR44","doi-asserted-by":"crossref","first-page":"1268","DOI":"10.1061\/(ASCE)CO.1943-7862.0000235","volume":"136","author":"SS Liu","year":"2010","unstructured":"Liu SS, Wang CJ (2010) Profit optimization for multiproject scheduling problems considering cash flow. J Constr Eng Manag 136(12):1268\u20131278","journal-title":"J Constr Eng Manag"},{"issue":"1\u20134","key":"5095_CR45","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1023\/A:1010966401888","volume":"102","author":"A Lova","year":"2001","unstructured":"Lova A, Tormos P (2001) Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Ann Oper Res 102(1\u20134):263\u2013286","journal-title":"Ann Oper Res"},{"issue":"3","key":"5095_CR46","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1016\/j.ijproman.2011.08.005","volume":"30","author":"A Maravas","year":"2012","unstructured":"Maravas A, Pantouvakis JP (2012) Project cash flow analysis in the presence of uncertainty in activity duration and cost. Int J Project Manag 30(3):374\u2013384","journal-title":"Int J Project Manag"},{"key":"5095_CR47","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/j.sbspro.2015.11.378","volume":"210","author":"M Mazlum","year":"2015","unstructured":"Mazlum M, G\u00fcneri AF (2015) CPM, PERT and project management with fuzzy logic technique and implementation on a business. Proc-Soc Behav Sci 210:348\u2013357","journal-title":"Proc-Soc Behav Sci"},{"key":"5095_CR48","first-page":"10","volume":"1","author":"JM Mendel","year":"2003","unstructured":"Mendel JM (2003) Type-2 fuzzy sets: some questions and answers, IEEE connections, newsletter of the IEEE. Neural Netw Soc 1:10\u201313","journal-title":"Neural Netw Soc"},{"issue":"6","key":"5095_CR49","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1109\/TFUZZ.2006.879986","volume":"14","author":"JM Mendel","year":"2006","unstructured":"Mendel JM, John RI, Liu F (2006) Interval type-2 fuzzy logic systems made simple. IEEE Trans Fuzzy Syst 14(6):808\u2013821","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"22","key":"5095_CR50","first-page":"73","volume":"10","author":"V Mohagheghi","year":"2017","unstructured":"Mohagheghi V, Mousavi SM, Vahdani B (2017) An assessment method for project cash flow under interval-valued fuzzy environment. J Optim Ind Eng 10(22):73\u201380","journal-title":"J Optim Ind Eng"},{"issue":"11","key":"5095_CR51","doi-asserted-by":"crossref","first-page":"3393","DOI":"10.1007\/s00521-016-2235-6","volume":"28","author":"V Mohagheghi","year":"2017","unstructured":"Mohagheghi V, Mousavi SM, Vahdani B (2017) Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry. Neural Comput Appl 28(11):3393\u20133411","journal-title":"Neural Comput Appl"},{"issue":"6","key":"5095_CR52","doi-asserted-by":"crossref","first-page":"4069","DOI":"10.3233\/JIFS-152510","volume":"32","author":"V Mohagheghi","year":"2017","unstructured":"Mohagheghi V, Mousavi SM, Vahdani B, Siadat A (2017) A mathematical modeling approach for high and new technology-project portfolio selection under uncertain environments. J Intell Fuzzy Syst 32(6):4069\u20134079","journal-title":"J Intell Fuzzy Syst"},{"key":"5095_CR53","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/j.jclepro.2017.08.154","volume":"168","author":"S Mousakhani","year":"2017","unstructured":"Mousakhani S, Nazari-Shirkouhi S, Bozorgi-Amiri A (2017) A novel interval type-2 fuzzy evaluation model based group decision analysis for green supplier selection problems: a case study of battery industry. J Clean Prod 168:205\u2013218","journal-title":"J Clean Prod"},{"key":"5095_CR54","first-page":"79","volume":"30","author":"N Moradi","year":"2018","unstructured":"Moradi N, Mousavi SM, Vahdani B (2018) An interval type-2 fuzzy model for project-earned value analysis under uncertainty. J Mult-Valued Logic Soft Comput 30:79\u2013103","journal-title":"J Mult-Valued Logic Soft Comput"},{"issue":"1","key":"5095_CR55","first-page":"175","volume":"54","author":"E Ontiveros-Robles","year":"2018","unstructured":"Ontiveros-Robles E, Melin P, Castillo O (2018) Comparative analysis of noise robustness of type 2 fuzzy logic controllers. Kybernetika 54(1):175\u2013201","journal-title":"Kybernetika"},{"issue":"5","key":"5095_CR56","first-page":"1","volume":"24","author":"B Oztaysi","year":"2015","unstructured":"Oztaysi B (2015) A group decision making approach using project selection. J Mult Valued Logic Soft Comput 24(5):1\u201315","journal-title":"J Mult Valued Logic Soft Comput"},{"issue":"3","key":"5095_CR57","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1109\/17.104290","volume":"37","author":"ME Pate-Cornell","year":"1990","unstructured":"Pate-Cornell ME, Tagaras G, Eisenhardt KM (1990) Dynamic optimization of cash flow management decisions: a stochastic model. IEEE Trans Eng Manag 37(3):203\u2013212","journal-title":"IEEE Trans Eng Manag"},{"issue":"1","key":"5095_CR58","first-page":"1217","volume":"7","author":"A Purnus","year":"2015","unstructured":"Purnus A, Bodea CN (2015) Financial management of the construction projects: a proposed cash flow analysis model at project portfolio level. Organ Technol Manag Constr Int J 7(1):1217\u20131227","journal-title":"Organ Technol Manag Constr Int J"},{"key":"5095_CR59","doi-asserted-by":"publisher","DOI":"10.1080\/15623599.2016.1225327","author":"E Roghanian","year":"2017","unstructured":"Roghanian E, Alipour M, Rezaei M (2017) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. Int J Constr Manag. https:\/\/doi.org\/10.1080\/15623599.2016.1225327","journal-title":"Int J Constr Manag"},{"key":"5095_CR60","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1016\/j.renene.2014.10.045","volume":"75","author":"\u00dc \u015eeng\u00fcl","year":"2015","unstructured":"\u015eeng\u00fcl \u00dc, Eren M, Shiraz SE, Gezder V, \u015eeng\u00fcl AB (2015) Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey. Renew Energy 75:617\u2013625","journal-title":"Renew Energy"},{"issue":"5","key":"5095_CR61","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1177\/8756972818787976","volume":"49","author":"AA Shash","year":"2018","unstructured":"Shash AA, Qarra AA (2018) Cash flow management of construction projects in Saudi Arabia. Project Manag J 49(5):48\u201363","journal-title":"Project Manag J"},{"issue":"1","key":"5095_CR62","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1016\/0263-7863(94)90003-5","volume":"12","author":"SJ Simister","year":"1994","unstructured":"Simister SJ (1994) Usage and benefits of project risk analysis and management. Int J Project Manag 12(1):5\u201310","journal-title":"Int J Project Manag"},{"key":"5095_CR63","doi-asserted-by":"crossref","unstructured":"Su Y, Lucko G, Thompson RC (2016) Evaluating performance of critical chain project management to mitigate delays based on different schedule network complexities. In: IEEE 2016 winter simulation conference (WSC), pp 3314\u20133324","DOI":"10.1109\/WSC.2016.7822362"},{"issue":"2","key":"5095_CR64","first-page":"647","volume":"63","author":"SMA Tabei","year":"2019","unstructured":"Tabei SMA, Bagherpour M, Mahmoudi A (2019) Application of fuzzy modelling to predict construction projects cash flow. Period Polytech Civ Eng 63(2):647\u2013659","journal-title":"Period Polytech Civ Eng"},{"key":"5095_CR65","doi-asserted-by":"crossref","DOI":"10.4324\/9781315585741","volume-title":"Gower handbook of project management","author":"R Turner","year":"2016","unstructured":"Turner R (2016) Gower handbook of project management. Routledge, London"},{"issue":"3","key":"5095_CR66","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1007\/s40815-016-0177-x","volume":"19","author":"G Wei","year":"2017","unstructured":"Wei G, Alsaadi FE, Hayat T, Alsaedi A (2017) A linear assignment method for multiple criteria decision analysis with hesitant fuzzy sets based on fuzzy measure. Int J Fuzzy Syst 19(3):607\u2013614","journal-title":"Int J Fuzzy Syst"},{"issue":"6","key":"5095_CR67","doi-asserted-by":"crossref","first-page":"1145","DOI":"10.1109\/TFUZZ.2007.896325","volume":"15","author":"D Wu","year":"2007","unstructured":"Wu D, Mendel JM (2007) Aggregation using the linguistic weighted average and interval type-2 fuzzy sets. IEEE Trans Fuzzy Syst 15(6):1145\u20131161","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"4","key":"5095_CR68","doi-asserted-by":"crossref","first-page":"487","DOI":"10.3846\/13923730.2016.1210215","volume":"23","author":"MC Yu","year":"2017","unstructured":"Yu MC, Dang VL, Yeh HC (2017) Measuring cash flow and overdraft for fuzzy project networks with overlapping activities. J Civ Eng Manag 23(4):487\u2013498","journal-title":"J Civ Eng Manag"},{"key":"5095_CR69","unstructured":"Zadeh LA (1974) Fuzzy logic and its application to approximate reasoning. In: IFIP congress, vol 591"},{"issue":"3","key":"5095_CR70","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/0020-0255(75)90036-5","volume":"8","author":"LA Zadeh","year":"1975","unstructured":"Zadeh LA (1975) The concept of a linguistic variable and its application to approximate reasoning\u2014I. Inf Sci 8(3):199\u2013249","journal-title":"Inf Sci"},{"key":"5095_CR71","doi-asserted-by":"crossref","unstructured":"Zarandi MH, Yazdi EH (2008) A type-2 fuzzy rule-based expert system model for portfolio selection. In: 11th joint international conference on information sciences. Atlantis Press","DOI":"10.2991\/jcis.2008.116"},{"issue":"4","key":"5095_CR72","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/j.ijproman.2007.05.012","volume":"26","author":"T Zayed","year":"2008","unstructured":"Zayed T, Amer M, Pan J (2008) Assessing risk and uncertainty inherent in Chinese highway projects using AHP. Int J Project Manag 26(4):408\u2013419","journal-title":"Int J Project Manag"},{"issue":"1","key":"5095_CR73","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/j.ejor.2014.03.048","volume":"238","author":"J Zhang","year":"2014","unstructured":"Zhang J, Elmaghraby SE (2014) The relevance of the \u201calphorn of uncertainty\u201d to the financial management of projects under uncertainty. Eur J Oper Res 238(1):65\u201376","journal-title":"Eur J Oper Res"},{"issue":"7","key":"5095_CR74","doi-asserted-by":"crossref","first-page":"4948","DOI":"10.1016\/j.apm.2012.10.006","volume":"37","author":"Z Zhang","year":"2013","unstructured":"Zhang Z, Zhang S (2013) A novel approach to multi attribute group decision making based on trapezoidal interval type-2 fuzzy soft sets. Appl Math Model 37(7):4948\u20134971","journal-title":"Appl Math Model"},{"issue":"1","key":"5095_CR75","doi-asserted-by":"crossref","first-page":"639","DOI":"10.3233\/JIFS-162013","volume":"35","author":"S Zolfaghari","year":"2018","unstructured":"Zolfaghari S, Mousavi SM (2018) Construction-project risk assessment by a new decision model based on De-Novo multi-approaches analysis and hesitant fuzzy sets under uncertainty. J Intell Fuzzy Syst 35(1):639\u2013649","journal-title":"J Intell Fuzzy Syst"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-020-05095-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00521-020-05095-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-020-05095-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,29]],"date-time":"2021-06-29T00:36:54Z","timestamp":1624927014000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00521-020-05095-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,29]]},"references-count":75,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2021,4]]}},"alternative-id":["5095"],"URL":"https:\/\/doi.org\/10.1007\/s00521-020-05095-z","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"value":"0941-0643","type":"print"},{"value":"1433-3058","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,6,29]]},"assertion":[{"value":"1 November 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 June 2020","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"29 June 2020","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}