{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T03:21:05Z","timestamp":1740108065852,"version":"3.37.3"},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2023,12,6]],"date-time":"2023-12-06T00:00:00Z","timestamp":1701820800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,12,6]],"date-time":"2023-12-06T00:00:00Z","timestamp":1701820800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["62273358"],"award-info":[{"award-number":["62273358"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100004735","name":"Natural Science Foundation of Hunan Province","doi-asserted-by":"publisher","award":["2023JJ20075"],"award-info":[{"award-number":["2023JJ20075"]}],"id":[{"id":"10.13039\/501100004735","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2024,3]]},"DOI":"10.1007\/s00521-023-09243-z","type":"journal-article","created":{"date-parts":[[2023,12,6]],"date-time":"2023-12-06T12:02:31Z","timestamp":1701864151000},"page":"3595-3611","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A train dispatching model in case of segment blockages by integrating the prediction of delay propagation"],"prefix":"10.1007","volume":"36","author":[{"given":"Han","family":"Yang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3833-0358","authenticated-orcid":false,"given":"Wenfeng","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shan","family":"Ma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tao","family":"Peng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,12,6]]},"reference":[{"issue":"2","key":"9243_CR1","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1016\/0191-2615(95)00022-4","volume":"30","author":"A Higgins","year":"1996","unstructured":"Higgins A, Kozan E, Ferreira L (1996) Optimal scheduling of trains on a single line track. Transp Res Part B: Methodol 30(2):147\u2013161","journal-title":"Transp Res Part B: Methodol"},{"issue":"3","key":"9243_CR2","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1016\/j.ejor.2013.12.020","volume":"235","author":"I Louwerse","year":"2014","unstructured":"Louwerse I, Huisman D (2014) Adjusting a railway timetable in case of partial or complete blockades. Eur J Oper Res 235(3):583\u2013593","journal-title":"Eur J Oper Res"},{"key":"9243_CR3","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1016\/j.trb.2015.04.001","volume":"78","author":"S Zhan","year":"2015","unstructured":"Zhan S, Kroon LG, Veelenturf LP, Wagenaar JC (2015) Real-time high-speed train rescheduling in case of a complete blockage. Transp Res Part B: Methodol 78:182\u2013201","journal-title":"Transp Res Part B: Methodol"},{"issue":"2","key":"9243_CR4","doi-asserted-by":"publisher","first-page":"208","DOI":"10.1109\/TITS.2006.888605","volume":"8","author":"A D\u2019Ariano","year":"2007","unstructured":"D\u2019Ariano A, Pranzo M, Hansen IA (2007) Conflict resolution and train speed coordination for solving real-time timetable perturbations. IEEE Trans Intell Transp Syst 8(2):208\u2013222","journal-title":"IEEE Trans Intell Transp Syst"},{"issue":"4","key":"9243_CR5","doi-asserted-by":"publisher","first-page":"490","DOI":"10.1007\/s10696-013-9187-2","volume":"26","author":"T Dollevoet","year":"2014","unstructured":"Dollevoet T, Corman F, D\u2019Ariano A, Huisman D (2014) An iterative optimization framework for delay management and train scheduling. Flex Serv Manuf J 26(4):490\u2013515","journal-title":"Flex Serv Manuf J"},{"key":"9243_CR6","doi-asserted-by":"publisher","first-page":"112","DOI":"10.1016\/j.conengprac.2017.02.006","volume":"61","author":"Y Wang","year":"2017","unstructured":"Wang Y, Liao Z, Tao T, Ning B (2017) Train scheduling and circulation planning in urban rail transit lines. Control Eng Pract 61:112\u2013123","journal-title":"Control Eng Pract"},{"key":"9243_CR7","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1016\/j.tre.2016.07.015","volume":"95","author":"S Zhan","year":"2016","unstructured":"Zhan S, Kroon LG, Zhao J, Peng Q (2016) A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage. Transp Res Part E: Logist Transp Rev 95:32\u201361","journal-title":"Transp Res Part E: Logist Transp Rev"},{"key":"9243_CR8","doi-asserted-by":"publisher","first-page":"S01912615163052","DOI":"10.1016\/j.trb.2017.05.008","volume":"104","author":"P Xu","year":"2017","unstructured":"Xu P, Corman F, Peng Q, Luan X (2017) A train rescheduling model integrating speed management during disruptions of high-speed traffic under a quasi-moving block system. Transp Res Part B: Methodol 104:S0191261516305227","journal-title":"Transp Res Part B: Methodol"},{"key":"9243_CR9","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.trb.2018.06.006","volume":"115","author":"X Luan","year":"2018","unstructured":"Luan X, Wang Y, De Schutter B, Meng L, Lodewijks G, Corman F (2018) Integration of real-time traffic management and train control for rail networks-part 1: optimization problems and solution approaches. Transp Res Part B: Methodol 115:41\u201371","journal-title":"Transp Res Part B: Methodol"},{"key":"9243_CR10","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.trb.2018.06.011","volume":"115","author":"X Luan","year":"2018","unstructured":"Luan X, Wang Y, De Schutter B, Meng L, Lodewijks G, Corman F (2018) Integration of real-time traffic management and train control for rail networks-part 2: Extensions towards energy-efficient train operations. Transp Res Part B: Methodol 115:72\u201394","journal-title":"Transp Res Part B: Methodol"},{"issue":"12","key":"9243_CR11","doi-asserted-by":"publisher","first-page":"3381","DOI":"10.1109\/TCYB.2018.2852772","volume":"48","author":"H Dong","year":"2018","unstructured":"Dong H, Zhu H, Li Y, Lv Y, Gao S, Zhang Q, Ning B (2018) Parallel intelligent systems for integrated high-speed railway operation control and dynamic scheduling. IEEE Trans Cybern 48(12):3381\u20133389","journal-title":"IEEE Trans Cybern"},{"issue":"1","key":"9243_CR12","first-page":"14","volume":"1","author":"F Corman","year":"2011","unstructured":"Corman F, D\u2019Ariano A, Hansen IA, Pacciarelli D (2011) Optimal multi-class rescheduling of railway traffic. J Rail Transp Plann Manag 1(1):14\u201324","journal-title":"J Rail Transp Plann Manag"},{"issue":"1","key":"9243_CR13","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/j.trc.2010.09.009","volume":"20","author":"F Corman","year":"2012","unstructured":"Corman F, D\u2019Ariano A, Pacciarelli D, Pranzo M (2012) Bi-objective conflict detection and resolution in railway traffic management. Transp Res Part C: Emerg Technol 20(1):79\u201394","journal-title":"Transp Res Part C: Emerg Technol"},{"issue":"1","key":"9243_CR14","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/j.tre.2011.05.002","volume":"48","author":"F Corman","year":"2012","unstructured":"Corman F, D\u2019Ariano A, Pacciarelli D, Pranzo M (2012) Optimal inter-area coordination of train rescheduling decisions. Transp Res Part E: Logist Transp Rev 48(1):71\u201388","journal-title":"Transp Res Part E: Logist Transp Rev"},{"key":"9243_CR15","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1016\/j.cor.2013.11.011","volume":"44","author":"F Corman","year":"2014","unstructured":"Corman F, D\u2019Ariano A, Pacciarelli D, Pranzo M (2014) Dispatching and coordination in multi-area railway traffic management. Comput Operat Res 44:146\u2013160","journal-title":"Comput Operat Res"},{"key":"9243_CR16","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.trb.2018.03.003","volume":"111","author":"SV Thielen","year":"2018","unstructured":"Thielen SV, Corman F, Vansteenwegen P (2018) Considering a dynamic impact zone for real-time railway traffic management. Transp Res Part B: Methodol 111:39\u201359","journal-title":"Transp Res Part B: Methodol"},{"issue":"4","key":"9243_CR17","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1016\/0191-2615(94)90001-9","volume":"28","author":"M Carey","year":"1994","unstructured":"Carey M, Kwieci\u0144ski A (1994) Stochastic approximation to the effects of headways on knock-on delays of trains. Transp Res Part B: Methodol 28(4):251\u2013267","journal-title":"Transp Res Part B: Methodol"},{"issue":"3","key":"9243_CR18","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/S0191-2615(99)00051-X","volume":"35","author":"T Huisman","year":"2001","unstructured":"Huisman T, Boucherie RJ (2001) Running times on railway sections with heterogeneous train traffic. Transp Res Part B: Methodol 35(3):271\u2013292","journal-title":"Transp Res Part B: Methodol"},{"issue":"2","key":"9243_CR19","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.trb.2006.02.003","volume":"41","author":"RM Goverde","year":"2007","unstructured":"Goverde RM (2007) Railway timetable stability analysis using max-plus system theory. Transp Res Part B: Methodol 41(2):179\u2013201","journal-title":"Transp Res Part B: Methodol"},{"key":"9243_CR20","unstructured":"Landex A, Kaas AH, Nielsen OA (2008) Methods to estimate railway capacity and passenger delays. Technical University of Denmark (DTU)"},{"key":"9243_CR21","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.trc.2016.10.013","volume":"74","author":"LW Jensen","year":"2017","unstructured":"Jensen LW, Landex A, Nielsen OA, Kroon LG, Schmidt M (2017) Strategic assessment of capacity consumption in railway networks: framework and model. Transp Res Part C: Emerg Technol 74:126\u2013149","journal-title":"Transp Res Part C: Emerg Technol"},{"key":"9243_CR22","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1016\/j.trc.2019.02.022","volume":"102","author":"S Harrod","year":"2019","unstructured":"Harrod S, Cerreto F, Nielsen OA (2019) A closed form railway line delay propagation model. Transp Res Part C: Emerg Technol 102:189\u2013209","journal-title":"Transp Res Part C: Emerg Technol"},{"issue":"10","key":"9243_CR23","doi-asserted-by":"publisher","first-page":"1256","DOI":"10.1049\/itr2.12095","volume":"15","author":"G Shrithi Bhagya","year":"2021","unstructured":"Shrithi Bhagya G, Emmanouil C, Stephan T, Felix A, Constantinos A (2021) An estimation framework to quantify railway disruption parameters. IET Intell Transp Syst 15(10):1256\u20131268","journal-title":"IET Intell Transp Syst"},{"key":"9243_CR24","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1360\/SSI-2019-0288","volume":"51","author":"J Zhang","year":"2021","unstructured":"Zhang J, Hu W, Peng T, Yang C (2021) Moving block principle-based multi-strategy optimal scheduling method for trains in case of segment blockages. Sci Sin: Inform 51:413\u2013429","journal-title":"Sci Sin: Inform"},{"issue":"9","key":"9243_CR25","doi-asserted-by":"publisher","first-page":"5343","DOI":"10.1007\/s00521-018-3369-5","volume":"31","author":"M Hajiaghaei-Keshteli","year":"2019","unstructured":"Hajiaghaei-Keshteli M, Fard A (2019) Sustainable closed-loop supply chain network design with discount supposition. Neural Comput Appl 31(9):5343\u20135377","journal-title":"Neural Comput Appl"},{"issue":"15","key":"9243_CR26","doi-asserted-by":"publisher","first-page":"9425","DOI":"10.1007\/s00521-021-05703-6","volume":"33","author":"F Keshavarz-Ghorbani","year":"2021","unstructured":"Keshavarz-Ghorbani F, Pasandideh S (2021) Optimizing a two-level closed-loop supply chain under the vendor managed inventory contract and learning: Fibonacci, ga, iwo, mfo algorithms. Neural Comput Appl 33(15):9425\u20139450","journal-title":"Neural Comput Appl"},{"issue":"10","key":"9243_CR27","first-page":"1","volume":"38","author":"S Zhan","year":"2016","unstructured":"Zhan S, Zhao J, Peng Q (2016) Real-time train rescheduling on high-speed railway under partial segment blockages. J China Railw Soc 38(10):1\u201313","journal-title":"J China Railw Soc"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-023-09243-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00521-023-09243-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-023-09243-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,9]],"date-time":"2024-02-09T12:12:09Z","timestamp":1707480729000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00521-023-09243-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,12,6]]},"references-count":27,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2024,3]]}},"alternative-id":["9243"],"URL":"https:\/\/doi.org\/10.1007\/s00521-023-09243-z","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"type":"print","value":"0941-0643"},{"type":"electronic","value":"1433-3058"}],"subject":[],"published":{"date-parts":[[2023,12,6]]},"assertion":[{"value":"23 June 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 November 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"6 December 2023","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest. This article does not contain any studies with animals performed by any of the authors. Informed consent was obtained from all individual participants included in the study.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}