{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T13:05:09Z","timestamp":1760101509946,"version":"3.37.3"},"reference-count":68,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2024,11,18]],"date-time":"2024-11-18T00:00:00Z","timestamp":1731888000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2024,11,18]],"date-time":"2024-11-18T00:00:00Z","timestamp":1731888000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100004252","name":"Qatar University","doi-asserted-by":"crossref","id":[{"id":"10.13039\/501100004252","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Neural Comput &amp; Applic"],"published-print":{"date-parts":[[2025,1]]},"abstract":"<jats:title>Abstract<\/jats:title>\n          <jats:p>The Engineering Procurement Construction (EPC) contract systems are widely employed in the construction industry. Among the prevalent issues in this sector, cash flow problems frequently lead to decreased productivity and efficiency. To address these challenges, a claim management system is developed based on the Improved Monarch Butterfly Optimization Algorithm (IMBOA) and the principles of EPC. Conventional construction models typically optimize only a single objective, such as time, cost, or delay, which may not effectively enhance overall performance. This study aims to develop a claim management system based on IMBOA and EPC principles to optimize multiple objectives, focusing on minimizing project costs and time delays while ensuring high-quality results. The basic methodology of this research involves integrating EPC and claim management principles with the IMBOA algorithm to create an efficient, high-quality system. This process starts with a comprehensive literature review on EPC, claims, MBOA, and related algorithms. Common disputes and claims in the construction industry are examined, and critical factors influencing these claims are identified. The Monarch Butterfly Optimization Algorithm (MBOA) and its improved version (IMBOA) are explored for their application in optimizing project performance. A case study in China's coal mining industry evaluates the effectiveness of the EPC approach, demonstrating that it minimizes time delays and costs. The IMBOA approach proposed in this study has the potential to mitigate 23% of risks and avoid 32% of risks associated with the action plan of China's coal mining industry. Furthermore, comparative analysis with other optimization models indicates that the developed IMBOA model yields superior results, reducing overall project time by 15% and cost by 18%.<\/jats:p>","DOI":"10.1007\/s00521-024-10414-9","type":"journal-article","created":{"date-parts":[[2024,11,18]],"date-time":"2024-11-18T07:11:49Z","timestamp":1731913909000},"page":"169-184","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models"],"prefix":"10.1007","volume":"37","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3922-5832","authenticated-orcid":false,"given":"K.","family":"Mukilan","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1304-0098","authenticated-orcid":false,"given":"C.","family":"Rameshbabu","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2777-4551","authenticated-orcid":false,"given":"B.","family":"Baranitharan","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9156-2054","authenticated-orcid":false,"given":"Suresh","family":"Muthusamy","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7309-3138","authenticated-orcid":false,"given":"Ponarun","family":"Ramamoorthi","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2730-6483","authenticated-orcid":false,"given":"Kishor Kumar","family":"Sadasivuni","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5345-3113","authenticated-orcid":false,"given":"Kamil","family":"Oflaz","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3806-5956","authenticated-orcid":false,"given":"Anish","family":"Khan","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,18]]},"reference":[{"issue":"9","key":"10414_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.17485\/ijst\/2018\/v11i9\/92741","volume":"11","author":"M Dachyar","year":"2018","unstructured":"Dachyar M, Sanjiwo Z (2018) Business process re-engineering of engineering procurement construction (EPC) project in oil and gas industry in Indonesia. Indian J Sci Technol 11(9):1\u20138","journal-title":"Indian J Sci Technol"},{"key":"10414_CR2","doi-asserted-by":"publisher","first-page":"678","DOI":"10.1016\/j.procs.2021.01.218","volume":"181","author":"M Echternach","year":"2021","unstructured":"Echternach M, Pellerin R, Joblot L (2021) Litigation management process in construction industry. Proc Comput Sci 181:678\u2013684. https:\/\/doi.org\/10.1016\/j.procs.2021.01.218","journal-title":"Proc Comput Sci"},{"key":"10414_CR3","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)la.1943-4170.0000517","author":"I Osman","year":"2022","unstructured":"Osman I, Ataei H (2022) Studying construction claims due to COVID-19 for road and highway projects. J Leg Aff Dispute Resolut Eng Constr. https:\/\/doi.org\/10.1061\/(asce)la.1943-4170.0000517","journal-title":"J Leg Aff Dispute Resolut Eng Constr"},{"key":"10414_CR4","doi-asserted-by":"crossref","unstructured":"Ganbat T, Chong HY, Liao PC, Leroy J (2019) Identification of Critical Risks in International Engineering Procurement Construction Projects of Chinese Contractors from the Network Perspective. Can J Civ Eng 10(ja)","DOI":"10.1139\/cjce-2019-0549"},{"key":"10414_CR5","doi-asserted-by":"publisher","unstructured":"Gmoser M, Steinschaden L, Heck D (2021) Financing costs in the event of deviations in work performance under contract standards. Proc Int Struct Eng Constr. https:\/\/doi.org\/10.14455\/isec.2021.8(1).ldr-02","DOI":"10.14455\/isec.2021.8(1).ldr-02"},{"key":"10414_CR6","doi-asserted-by":"crossref","unstructured":"Habibi M, Kermanshachi S, Safapour E (2018) Engineering, procurement and construction cost and schedule performance leading indicators: state-of-the-art review. In: Proceedings of construction research congress, pp 2\u20134. New Orleans, Louisiana: ASCE","DOI":"10.1061\/9780784481271.037"},{"key":"10414_CR7","unstructured":"Zhang SB, Yang QB (2008) Design management by owner for international EPC\/Turnkey project. China Harbour Engineering, 5"},{"key":"10414_CR8","doi-asserted-by":"publisher","first-page":"1079","DOI":"10.3233\/JIFS-16798","volume":"32","author":"S Aroraa","year":"2017","unstructured":"Aroraa S, Singh S (2017) An improved butterfly optimization algorithm with chaos. J Intell Fuzzy Syst 32:1079\u20131088","journal-title":"J Intell Fuzzy Syst"},{"key":"10414_CR9","doi-asserted-by":"publisher","DOI":"10.1080\/15623599.2023.2299527","author":"S Narayan","year":"2024","unstructured":"Narayan S, Tan HC, Jack LB (2024) Claims management: a review of challenges faced. Int J Constr Manag. https:\/\/doi.org\/10.1080\/15623599.2023.2299527","journal-title":"Int J Constr Manag"},{"issue":"2","key":"10414_CR10","doi-asserted-by":"publisher","first-page":"04522066","DOI":"10.1061\/JLADAH.LADR-921","volume":"15","author":"EG Cinko","year":"2023","unstructured":"Cinko EG, Demirkesen S, Sadikoglu E, Zhang C (2023) Investigating the critical success factors of claims management in construction contracts. J Leg Aff Dispute Resolut Eng Constr 15(2):04522066. https:\/\/doi.org\/10.1061\/JLADAH.LADR-921","journal-title":"J Leg Aff Dispute Resolut Eng Constr"},{"issue":"1","key":"10414_CR11","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1007\/s12205-016-0784-y","volume":"21","author":"WS Yoo","year":"2017","unstructured":"Yoo WS, Yang J, Kang S, Lee S (2017) Development of a computerized risk management system for international NPP EPC projects. KSCE J Civ Eng 21(1):11\u201326","journal-title":"KSCE J Civ Eng"},{"key":"10414_CR12","doi-asserted-by":"publisher","unstructured":"Matseke DA, Khatleli NT (2021) Claims management: underlying causes in mega-construction projects. Proc Int Struct Eng Constr. https:\/\/doi.org\/10.14455\/isec.2021.8(1).con-27","DOI":"10.14455\/isec.2021.8(1).con-27"},{"key":"10414_CR13","doi-asserted-by":"crossref","unstructured":"Tizhoosh HR (2005) Opposition-based learning: a new scheme for machine intelligence. In: International conference on computational intelligence for modelling, control and automation and international conference on intelligent agents, web technologies and internet commerce (CIMCAIAWTIC'06), IEEE. 1: 695e701","DOI":"10.1109\/CIMCA.2005.1631345"},{"key":"10414_CR14","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1016\/S2212-5671(15)00327-5","volume":"23","author":"NA Bakhary","year":"2015","unstructured":"Bakhary NA, Adnan H, Ibrahim A (2015) A study of construction claim management problems in Malaysia. Proc Econ Finance 23:63\u201370","journal-title":"Proc Econ Finance"},{"key":"10414_CR15","doi-asserted-by":"publisher","first-page":"17882","DOI":"10.1016\/j.ijhydene.2020.04.256","volume":"45","author":"S Bao","year":"2020","unstructured":"Bao S, Ebadi A, Toughani M, Dalle J, Maseleno A, Y\u0131ld\u0131zbas\u0131 A (2020) A new method for optimal parameters identification of a PEMFC using an improved version of Monarch Butterfly Optimization Algorithm. Int J Hydrog Energy 45:17882\u201317892. https:\/\/doi.org\/10.1016\/j.ijhydene.2020.04.256","journal-title":"Int J Hydrog Energy"},{"issue":"4","key":"10414_CR16","doi-asserted-by":"publisher","first-page":"04519018","DOI":"10.1061\/(ASCE)LA.1943-4170.0000303","volume":"11","author":"D Parikh","year":"2019","unstructured":"Parikh D, Joshi GJ, Patel DA (2019) Development of prediction models for claim cause analyses in highway projects. J Leg Aff Dispute Resolut Eng Constr 11(4):04519018","journal-title":"J Leg Aff Dispute Resolut Eng Constr"},{"key":"10414_CR17","doi-asserted-by":"crossref","unstructured":"Ou-Yang C, and Chen W-L (2019) A hybrid approach for project crashing optimization strategy with risk consideration: a case study for an EPC project. Math Probl Eng","DOI":"10.1155\/2019\/9649632"},{"issue":"3","key":"10414_CR18","doi-asserted-by":"publisher","first-page":"469","DOI":"10.3390\/su9030469","volume":"9","author":"M Kim","year":"2017","unstructured":"Kim M, Lee I, Jung Y (2017) International project risk management for nuclear power plant (NPP) construction: featuring comparative analysis with fossil and gas power plants. Sustainability 9(3):469","journal-title":"Sustainability"},{"issue":"2","key":"10414_CR19","doi-asserted-by":"publisher","first-page":"04018126","DOI":"10.1061\/(ASCE)CO.1943-7862.0001593","volume":"145","author":"MS Islam","year":"2019","unstructured":"Islam MS, Madhav PN, Skitmore M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. J Constr Eng Manag 145(2):04018126","journal-title":"J Constr Eng Manag"},{"issue":"4","key":"10414_CR20","doi-asserted-by":"publisher","first-page":"743","DOI":"10.1061\/(ASCE)0733-9364(1993)119:4(743)","volume":"119","author":"JH Paek","year":"1993","unstructured":"Paek JH, Lee YW, Ock JH (1993) Pricing construction risks: fuzzy set application. J Constr Eng Manag 119(4):743\u2013756","journal-title":"J Constr Eng Manag"},{"key":"10414_CR21","volume-title":"Management of risk in construction","author":"S Burtonshaw-Gunn","year":"2013","unstructured":"Burtonshaw-Gunn S (2013) Management of risk in construction. University of Salford, Greater Manchester, England"},{"issue":"7","key":"10414_CR22","doi-asserted-by":"publisher","first-page":"1995","DOI":"10.1007\/s00521-015-1923-y","volume":"31","author":"GG Wang","year":"2019","unstructured":"Wang GG, Deb S, Cui Z (2019) Monarch butterfly optimization. Neural Comput Appl 31(7):1995\u20132014","journal-title":"Neural Comput Appl"},{"issue":"1","key":"10414_CR23","doi-asserted-by":"publisher","first-page":"15","DOI":"10.3390\/buildings9010015","volume":"9","author":"K Kabirifar","year":"2019","unstructured":"Kabirifar K, Mojtahedi M (2019) The impact of engineering, procurement and construction (EPC) phases on project performance: a case of large-scale residential construction project. Buildings 9(1):15","journal-title":"Buildings"},{"key":"10414_CR24","doi-asserted-by":"publisher","first-page":"116931","DOI":"10.1016\/j.eswa.2022.116931","volume":"200","author":"M Abdelhamid","year":"2022","unstructured":"Abdelhamid M, Houssein EH, Mahdy MA, Selim A, Kamel S (2022) An improved seagull optimization algorithm for optimal coordination of distance and directional over-current relays. Expert Syst Appl 200:116931. https:\/\/doi.org\/10.1016\/j.eswa.2022.116931","journal-title":"Expert Syst Appl"},{"issue":"19","key":"10414_CR25","doi-asserted-by":"publisher","first-page":"14241","DOI":"10.1007\/s00500-023-08874-7","volume":"27","author":"PS Raghavendran","year":"2023","unstructured":"Raghavendran PS, Ragul S, Asokan R, Loganathan AK, Muthusamy S, Mishra OP, Ramamoorthi P, Sundararajan SCM (2023) A new method for chest X-ray images categorization using transfer learning and CovidNet_2020 employing convolution neural network. Soft Comput 27(19):14241\u201314251","journal-title":"Soft Comput"},{"key":"10414_CR26","doi-asserted-by":"publisher","first-page":"1935","DOI":"10.1007\/s11277-023-10836-z","volume":"133","author":"S Mann","year":"2024","unstructured":"Mann S, Yadav D, Muthusamy S, Rathee D, Mishra OP (2024) A novel method for prediction and analysis of COVID 19 transmission using machine learning based time series models. Wirel Personal Commun 133:1935\u20131961","journal-title":"Wirel Personal Commun"},{"issue":"7","key":"10414_CR27","doi-asserted-by":"publisher","first-page":"3513","DOI":"10.1007\/s00521-023-09324-z","volume":"36","author":"MD Ramasamy","year":"2024","unstructured":"Ramasamy MD, Periasamy K, Periasamy S, Muthusamy S, Ramamoorthi P, Thangavel G, Sekaran S, Sadasivuni KK, Geetha M (2024) A novel adaptive neural network-based Laplacian of Gaussian (AnLoG) classification algorithm for detecting diabetic retinopathy with colour retinal fundus images. Neural Comput Appl 36(7):3513\u20133524","journal-title":"Neural Comput Appl"},{"key":"10414_CR28","first-page":"107","volume":"10","author":"S Chen","year":"2017","unstructured":"Chen S, Chen R, Gao J (2017) A monarch butterfly optimization for the dynamic vehicle routing problem. MDPIs 10:107","journal-title":"MDPIs"},{"issue":"12","key":"10414_CR29","doi-asserted-by":"publisher","first-page":"06017022","DOI":"10.1061\/(ASCE)GM.1943-5622.0001019","volume":"17","author":"B Jellali","year":"2017","unstructured":"Jellali B, Frikha W (2017) Constrained particle swarm optimization algorithm applied to slope stability. Int J Geomech 17(12):06017022","journal-title":"Int J Geomech"},{"key":"10414_CR30","doi-asserted-by":"publisher","first-page":"9825640","DOI":"10.1155\/2023\/9825640","volume":"2023","author":"S Pervaiz","year":"2023","unstructured":"Pervaiz S, Ul-Qayyum Z, Bangyal WH, Gao L, Ahmad J (2023) A systematic literature review on particle swarm optimization techniques for medical diseases detection. Comput Math Methods Med 2023:9825640. https:\/\/doi.org\/10.1155\/2023\/9825640","journal-title":"Comput Math Methods Med"},{"issue":"1","key":"10414_CR31","first-page":"50","volume":"6","author":"BS Waziri","year":"2017","unstructured":"Waziri BS, Bala K, Bustani SA (2017) Artificial neural networks in construction engineering and management. Int J Arch Eng Constr 6(1):50\u201360","journal-title":"Int J Arch Eng Constr"},{"issue":"1","key":"10414_CR32","doi-asserted-by":"publisher","first-page":"82","DOI":"10.31181\/taci1120238","volume":"1","author":"S Kozakijevic","year":"2023","unstructured":"Kozakijevic S, Salb M, Elsadai A, Mani J, Devi K, Sharko AD, Muthusamy S (2023) Seizure detection via time series classification using modified metaheuristic optimized recurrent networks. Theor Appl Comput Intell 1(1):82\u201394","journal-title":"Theor Appl Comput Intell"},{"key":"10414_CR33","doi-asserted-by":"publisher","first-page":"2055","DOI":"10.1007\/s11277-023-10532-y","volume":"131","author":"RA Sinnaswamy","year":"2023","unstructured":"Sinnaswamy RA, Palanisamy N, Subramaniam K, Muthusamy S, Lamba R, Sekaran S (2023) An extensive review on deep learning and machine learning intervention in prediction and classification of types of aneurysms. Wirel Personal Commun 131:2055\u20132080","journal-title":"Wirel Personal Commun"},{"key":"10414_CR34","doi-asserted-by":"publisher","first-page":"14219","DOI":"10.1007\/s00500-023-08561-7","volume":"27","author":"K Subramaniam","year":"2023","unstructured":"Subramaniam K, Palanisamy N, Sinnaswamy RA, Muthusamy S, Mishra OP, Loganathan AK, Ramamoorthi P, Gnanakkan CA, Thangavel G, Sundararajan SC (2023) A comprehensive review of analyzing the chest X-ray images to detect COVID-19 infections using deep learning techniques. Soft Comput 27:14219\u201314240","journal-title":"Soft Comput"},{"key":"10414_CR35","doi-asserted-by":"publisher","first-page":"1261","DOI":"10.1108\/ECAM-08-2017-0150","volume":"26","author":"F Nasirzadeh","year":"2019","unstructured":"Nasirzadeh F, Carmichael DG, Jarban MJ, Rostamnezhad M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Eng Constr Archit Manag 26:1261\u20131276","journal-title":"Eng Constr Archit Manag"},{"key":"10414_CR36","doi-asserted-by":"publisher","first-page":"14205","DOI":"10.1007\/s00500-023-08448-7","volume":"27","author":"K Thangavel","year":"2023","unstructured":"Thangavel K, Palanisamy N, Muthusamy S, Mishra OP, Sundararajan SCM, Panchal H, Loganathan AK, Ramamoorthi P (2023) A novel method for image captioning using multimodal feature fusion employing mask RNN and LSTM models. Soft Comput 27:14205\u201314218","journal-title":"Soft Comput"},{"key":"10414_CR37","doi-asserted-by":"publisher","first-page":"14189","DOI":"10.1007\/s00500-023-08390-8","volume":"27","author":"NS Gnanadesigan","year":"2023","unstructured":"Gnanadesigan NS, Dhanasegar N, Ramasamy MD, Muthusamy S, Mishra OP, Pugalendhi GK, Sundararajan SC, Ravindaran A (2023) An integrated network topology and deep learning model for prediction of Alzheimer disease candidate genes. Soft Comput 27:14189\u201314203","journal-title":"Soft Comput"},{"key":"10414_CR38","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1108\/SASBE-10-2019-0141","volume":"10","author":"MP Jalal","year":"2020","unstructured":"Jalal MP, Roushan TY, Noorzai E, Alizadeh M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart Sustain Built Environ 10:227\u2013257","journal-title":"Smart Sustain Built Environ"},{"key":"10414_CR39","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1007\/s11277-023-10446-9","volume":"131","author":"BBC Batcha","year":"2023","unstructured":"Batcha BBC, Singaravelu R, Ramachandran M, Muthusamy S, Panchal H, Thangaraj K, Ravindaran A (2023) A novel security algorithm RPBB31 for securing the social media analyzed data using machine learning algorithms. Wireless Pers Commun 131:581\u2013608","journal-title":"Wireless Pers Commun"},{"key":"10414_CR40","doi-asserted-by":"crossref","unstructured":"Bennet MA, Mishra OP, Muthusamy S (2023) Modeling of upper limb and prediction of various yoga postures using artificial neural networks. In: 2023 International conference on sustainable computing and data communication systems (ICSCDS), pp 503\u2013508. IEEE","DOI":"10.1109\/ICSCDS56580.2023.10104630"},{"key":"10414_CR41","doi-asserted-by":"publisher","first-page":"5990999","DOI":"10.1155\/2021\/5990999","volume":"2021","author":"S Pervaiz","year":"2021","unstructured":"Pervaiz S, Ul-Qayyum Z, Bangyal WH, Gao L, Ahmad J (2021) A systematic literature review on particle swarm optimization techniques for medical diseases detection. Comput Math Methods Med 2021:5990999. https:\/\/doi.org\/10.1155\/2021\/5990999","journal-title":"Comput Math Methods Med"},{"issue":"5","key":"10414_CR42","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1007\/s00339-023-06648-4","volume":"129","author":"V Jagadeesan","year":"2023","unstructured":"Jagadeesan V, Venkatachalam D, Vinod VM, Loganathan AK, Muthusamy S, Krishnamoorthy M, Sadasivuni KK, Geetha M (2023) Design and development of a new metamaterial sensor-based Minkowski fractal antenna for medical imaging. Appl Phys A 129(5):391","journal-title":"Appl Phys A"},{"issue":"1","key":"10414_CR43","first-page":"841","volume":"45","author":"E Kannan","year":"2023","unstructured":"Kannan E, Avudaiappan M, Kaliyaperumal S, Muthusamy S, Pandiyan S, Panchal H, Manickam K, Shanmugam C (2023) A novel single phase grid connected solar photovoltaic system for state of charge estimation using recurrent neural networks. Energy Sources Part A Recovery Util Environ Effects 45(1):841\u2013859","journal-title":"Energy Sources Part A Recovery Util Environ Effects"},{"key":"10414_CR44","doi-asserted-by":"publisher","first-page":"1049","DOI":"10.3390\/sym11081049","volume":"11","author":"G Li","year":"2019","unstructured":"Li G, Shuang F, Zhao P, Le C (2019) An improved butterfly optimization algorithm for engineering design problems using the cross-entropy method. Symmetry 11:1049","journal-title":"Symmetry"},{"key":"10414_CR45","doi-asserted-by":"publisher","unstructured":"Bangyal WH, Malik ZA, Saleem I, Rehman NU (2021) An analysis of initialization techniques of particle swarm optimization algorithm for global optimization. In: 2021 International conference on innovative computing (ICIC), Lahore, Pakistan, pp 1\u20137. https:\/\/doi.org\/10.1109\/ICIC53490.2021.9692931","DOI":"10.1109\/ICIC53490.2021.9692931"},{"issue":"1","key":"10414_CR46","doi-asserted-by":"publisher","first-page":"4478","DOI":"10.1109\/TCE.2023.3328479","volume":"70","author":"A Ashraf","year":"2024","unstructured":"Ashraf A, Qingjie Z, Bangyal WHK, Iqbal M (2024) Analysis of brain imaging data for the detection of early age autism spectrum disorder using transfer learning approaches for Internet of Things. IEEE Trans Consum Electron 70(1):4478\u20134489. https:\/\/doi.org\/10.1109\/TCE.2023.3328479","journal-title":"IEEE Trans Consum Electron"},{"issue":"1","key":"10414_CR47","doi-asserted-by":"publisher","first-page":"012040","DOI":"10.1088\/1755-1315\/506\/1\/012040","volume":"506","author":"A Nurdiana","year":"2020","unstructured":"Nurdiana A, Susanti R (2020) Assessing Risk on the engineering procurement construction (EPC) project from the perspective of the owner: a case study. IOP Conf Ser Earth Environ Sci 506(1):012040","journal-title":"IOP Conf Ser Earth Environ Sci"},{"issue":"5","key":"10414_CR48","doi-asserted-by":"publisher","first-page":"625","DOI":"10.1007\/s42107-018-0048-x","volume":"9","author":"D Prayogo","year":"2018","unstructured":"Prayogo D, Cheng MY, Wong FT, Tjandra D, Tran DH (2018) Optimization model for construction project resource leveling using a novel modified symbiotic organisms search. Asian J Civ Eng 9(5):625\u2013638","journal-title":"Asian J Civ Eng"},{"key":"10414_CR49","unstructured":"O'neal TP, Bossingham RA (2018) Hill-Rom services Inc., 2018. Head end siderail. U.S. Patent Application 29\/577251"},{"issue":"6","key":"10414_CR50","doi-asserted-by":"publisher","first-page":"727","DOI":"10.3846\/13923730.2017.1281839","volume":"23","author":"W Shen","year":"2017","unstructured":"Shen W, Tang W, Yu W, Duffield CF, Hui FK, Wei Y, Fang J (2017) Causes of contractors\u2019 claims in international engineering-procurement-construction projects. J Civ Eng Manag 23(6):727\u2013739","journal-title":"J Civ Eng Manag"},{"issue":"4","key":"10414_CR51","first-page":"66","volume":"15","author":"K Tochaiwat","year":"2004","unstructured":"Tochaiwat K, Chovichien V (2004) Contractors construction claims and claim management process. Eng J Res Dev 15(4):66\u201373","journal-title":"Eng J Res Dev"},{"key":"10414_CR52","doi-asserted-by":"crossref","unstructured":"Nosheen A, Arewa AO, Akhtar HM (2020) Preventive approach to unsubstantiated claims and disputes in the UK construction industry","DOI":"10.29117\/cic.2020.0014"},{"issue":"4","key":"10414_CR53","doi-asserted-by":"publisher","first-page":"785","DOI":"10.1061\/(ASCE)0733-9364(1994)120:4(785)","volume":"120","author":"C Semple","year":"1994","unstructured":"Semple C, Hartman FT, Jergeas G (1994) Construction claims and disputes: causes and cost\/time overruns. J Constr Eng Manag 120(4):785\u2013795","journal-title":"J Constr Eng Manag"},{"key":"10414_CR54","doi-asserted-by":"crossref","unstructured":"Walker D, Hampson K (2003) Enterprise networks, partnering and alliancing. Procurement Strategies, p 30","DOI":"10.1002\/9780470690635.ch3"},{"key":"10414_CR55","unstructured":"Baram GE, Barken DM (2001) EPC project management---the SNC-lavalin approach. AACE Int Trans, PM11"},{"key":"10414_CR56","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1016\/j.proeng.2011.11.156","volume":"20","author":"N Jaffar","year":"2011","unstructured":"Jaffar N, Tharim AA, Shuib MN (2011) Factors of conflict in construction industry: a literature review. Proc Eng 20:193\u2013202","journal-title":"Proc Eng"},{"key":"10414_CR57","doi-asserted-by":"crossref","unstructured":"Rahnamayan S, Tizhoosh HR, Salama MM (2007) Quasioppositional differential evolution. In: 2007 IEEE congress on evolutionary computation, p 2229e36. IEEE","DOI":"10.1109\/CEC.2007.4424748"},{"issue":"2","key":"10414_CR58","doi-asserted-by":"publisher","first-page":"621e33","DOI":"10.1007\/s00500-016-2360-2","volume":"22","author":"C Rim","year":"2018","unstructured":"Rim C, Piao S, Li G, Pak U (2018) A niching chaos optimization algorithm for multimodal optimization. Soft Comput 22(2):621e33","journal-title":"Soft Comput"},{"key":"10414_CR59","unstructured":"Kumar R (2012) Project activity planning in engineering, procurement and construction (EPC) oil & gas project for the realization of nitrogen generation package (SKID)"},{"key":"10414_CR60","unstructured":"Herv\u00e9-Mignucci M, Wang X (2015) Slowing the growth of coal power outside China: the role of Chinese finance. Climate Policy Initiative"},{"issue":"7 Special Issue","key":"10414_CR61","first-page":"3580","volume":"29","author":"AG Syaputri","year":"2020","unstructured":"Syaputri AG, Dachyar M, Gabriel DS (2020) Optimizing commissioning scheduling EPCC industry projects by integrating AHP and CPM methods. Int J Adv Sci Technol 29(7 Special Issue):3580\u20133587","journal-title":"Int J Adv Sci Technol"},{"key":"10414_CR62","doi-asserted-by":"crossref","unstructured":"Yang D, Wang X, Tian X, Zhang Y (2020) Improving monarch butterfy optimization through\u00a0simulated annealing strategy. J Ambient Intell Human Comput","DOI":"10.1007\/s12652-020-01702-y"},{"key":"10414_CR63","doi-asserted-by":"publisher","first-page":"114418","DOI":"10.1016\/j.eswa.2020.114418","volume":"168","author":"Y Feng","year":"2020","unstructured":"Feng Y, Deb S, Wang G-G, Alavi AH (2020) Monarch butterfly optimization: a comprehensive review. Expert Syst Appl 168:114418","journal-title":"Expert Syst Appl"},{"key":"10414_CR64","doi-asserted-by":"crossref","unstructured":"Yang XS (2009) Firefly algorithms for multimodal optimization. In: International symposium on stochastic algorithms (pp. 169\u2013178). Springer, Berlin","DOI":"10.1007\/978-3-642-04944-6_14"},{"key":"10414_CR65","doi-asserted-by":"crossref","unstructured":"Chong CS, Low MYH, Sivakumar AI, Gay KL (2006) A bee colony optimization algorithm to job shop scheduling. In: Proceedings of the 2006 winter simulation conference, pp. 1954\u20131961. IEEE","DOI":"10.1109\/WSC.2006.322980"},{"key":"10414_CR66","doi-asserted-by":"publisher","first-page":"115723","DOI":"10.1016\/j.apenergy.2020.115723","volume":"278","author":"P Singh","year":"2020","unstructured":"Singh P, Meena NK, Yang J, Vega-Fuentes E, Bishni SK (2020) Multi-criteria decision making monarch butterfly optimization for optimal distributed energy resources mix in distribution networks. Appl Energy 278:115723","journal-title":"Appl Energy"},{"key":"10414_CR67","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2018\/5025672","volume":"2018","author":"X Lv","year":"2018","unstructured":"Lv X, Wang Y, Deng J, Zhang G, Zhang L (2018) Improved particle swarm optimization algorithm based on last-eliminated principle and enhanced information sharing. Comput Intell Neurosci 2018:1\u201317","journal-title":"Comput Intell Neurosci"},{"issue":"9","key":"10414_CR68","doi-asserted-by":"publisher","first-page":"4715","DOI":"10.1007\/s00521-018-3483-4","volume":"31","author":"J Huo","year":"2019","unstructured":"Huo J, Liu L (2019) Application research of multi-objective Artificial Bee Colony optimization algorithm for parameters calibration of hydrological model. Neural Comput Appl 31(9):4715\u20134732","journal-title":"Neural Comput Appl"}],"container-title":["Neural Computing and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-024-10414-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00521-024-10414-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00521-024-10414-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,1,23]],"date-time":"2025-01-23T02:17:56Z","timestamp":1737598676000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00521-024-10414-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,11,18]]},"references-count":68,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2025,1]]}},"alternative-id":["10414"],"URL":"https:\/\/doi.org\/10.1007\/s00521-024-10414-9","relation":{},"ISSN":["0941-0643","1433-3058"],"issn-type":[{"type":"print","value":"0941-0643"},{"type":"electronic","value":"1433-3058"}],"subject":[],"published":{"date-parts":[[2024,11,18]]},"assertion":[{"value":"19 November 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 August 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 November 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"To the best of my knowledge and belief any actual, perceived or potential conflicts between my duties as an employee and my private and\/or business interests have been fully disclosed in this form in accordance with the requirements of the journal.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interests"}},{"value":"This material is the authors' own original work, which has not been previously published elsewhere. The paper is not currently being considered for publication elsewhere. The paper reflects the authors' own research and analysis in a truthful and complete manner.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}},{"value":"I have been informed of the risks and benefits involved, and all my questions have been answered to my satisfaction. Furthermore, I have been assured that any future questions I may have will also be answered by a member of the research team. I voluntarily agree to take part in this study.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent to participate"}},{"value":"Individuals may consent to participate in a study, but object to having their data published in a journal article.","order":5,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent to publish"}},{"value":"The authors hereby assure that this research does not involves any human participants or animals.","order":6,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human and animals rights"}}]}}