{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,30]],"date-time":"2022-03-30T01:44:05Z","timestamp":1648604645072},"reference-count":16,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2016,6,29]],"date-time":"2016-06-29T00:00:00Z","timestamp":1467158400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Artif Life Robotics"],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1007\/s10015-016-0285-6","type":"journal-article","created":{"date-parts":[[2016,6,29]],"date-time":"2016-06-29T04:16:55Z","timestamp":1467173815000},"page":"324-331","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Study on constraint time construction model for replacement of air handling unit in department stores"],"prefix":"10.1007","volume":"21","author":[{"given":"Yan-Chyuan","family":"Shiau","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hui-Wen","family":"Chuang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chen-Chung","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Po-Hsiang","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,6,29]]},"reference":[{"issue":"4","key":"285_CR1","doi-asserted-by":"crossref","first-page":"414","DOI":"10.1061\/(ASCE)CO.1943-7862.0000582","volume":"139","author":"Lorterapong Pasit","year":"2013","unstructured":"Pasit Lorterapong, Ussavadilokrit M (2013) Construction\u00a0scheduling using the\u00a0constraint\u00a0satisfaction problem method. J Const Eng Manag 139(4):414\u2013422","journal-title":"J Const Eng Manag"},{"issue":"5","key":"285_CR2","doi-asserted-by":"crossref","first-page":"04014062","DOI":"10.1061\/(ASCE)CP.1943-5487.0000363","volume":"29","author":"TQ Nguyen","year":"2015","unstructured":"Nguyen TQ, Chua DKH (2015) Preemptive\u00a0Constraint\u00a0Analysis in\u00a0Construction\u00a0Schedules. J Comp Civil Eng 29(5):04014062","journal-title":"J Comp Civil Eng"},{"issue":"3\u20134","key":"285_CR3","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1504\/IJDSRM.2010.037490","volume":"2","author":"AA Talukhaba","year":"2010","unstructured":"Talukhaba AA, Acheampong E, Miruka CO (2010) Improving\u00a0time\u00a0management\u00a0in the South African\u00a0construction\u00a0industry. Int J Decision Sci Risk Manag 2(3\u20134):327\u2013339","journal-title":"Int J Decision Sci Risk Manag"},{"key":"285_CR4","unstructured":"Jan SH, Ping HS (2006) Construction\u00a0project buffer\u00a0management\u00a0in\u00a0scheduling\u00a0planning and control, 2006 Proceedings of the 23rd International Symposium on Robotics and Automation in\u00a0Construction.\u00a0858\u2013863"},{"key":"285_CR5","doi-asserted-by":"crossref","unstructured":"Sonmez R, Iranagh MA, Uysal F (2016) Critical sequence crashing heuristic for resource-constrained discrete\u00a0time-cost trade-off problem. J Const Eng Manag. 142(3):04015090","DOI":"10.1061\/(ASCE)CO.1943-7862.0001077"},{"issue":"1","key":"285_CR6","first-page":"37","volume":"96","author":"S Tiwari","year":"2015","unstructured":"Tiwari S, Johari S (2015) Project\u00a0scheduling\u00a0by integration of\u00a0time\u00a0cost trade-off and constrained resource\u00a0scheduling. J Inst Eng (India) Ser A (Civil Architect Environ Agric Eng) 96(1):37\u201346","journal-title":"J Inst Eng (India) Ser A (Civil Architect Environ Agric Eng)"},{"issue":"4","key":"285_CR7","first-page":"125","volume":"47","author":"YS Cheng","year":"2014","unstructured":"Cheng YS, Cheng H (2014) Concept and application of engineering breakdown structure. China Civil Eng J 47(4):125\u2013130","journal-title":"China Civil Eng J"},{"issue":"1","key":"285_CR8","doi-asserted-by":"crossref","first-page":"33","DOI":"10.4018\/ijitpm.2014010104","volume":"5","author":"A Maravas","year":"2014","unstructured":"Maravas A, Pantouvakis JP, Lambropoulos S (2014) An Integrated Information System for Monitoring Construction Works. Int J Info Technol Project Manag 5(1):33\u201344","journal-title":"Int J Info Technol Project Manag"},{"issue":"5","key":"285_CR9","first-page":"7","volume":"108","author":"S Doty","year":"2011","unstructured":"Doty S (2011) Energy saving measure interactions in chilled water systems. Energy Eng J Assoc Energy Eng 108(5):7\u201335","journal-title":"Energy Eng J Assoc Energy Eng"},{"issue":"12","key":"285_CR10","first-page":"22","volume":"56","author":"JJ Callari","year":"2010","unstructured":"Callari JJ (2010) Well, well, well\u00b7\u00b7\u00b7 processor taps into novel underground cooling solution. Plastics Technol 56(12):22\u201324","journal-title":"Plastics Technol"},{"key":"285_CR11","unstructured":"Central Weather Bureau\u2014Weather Statistics http:\/\/www.cwb.gov.tw\/V7\/climate\/monthlyData\/mD.htm . Accessed 2016\/5\/25"},{"key":"285_CR12","unstructured":"Taiwan Refrigeration and Air-Conditioning Engineering Association. Installation Manual for Air Conditioning Engineering. Taipei, 2010"},{"issue":"4","key":"285_CR13","doi-asserted-by":"crossref","first-page":"414","DOI":"10.1061\/(ASCE)CO.1943-7862.0000582","volume":"139","author":"P Lorterapong","year":"2013","unstructured":"Lorterapong P, Ussavadilokrit M (2013) Construction scheduling using the constraint satisfaction problem method. J Const Eng Manag 139(4):414\u2013422","journal-title":"J Const Eng Manag"},{"issue":"8","key":"285_CR14","doi-asserted-by":"crossref","first-page":"1110","DOI":"10.1016\/j.autcon.2011.04.012","volume":"20","author":"SS Liu","year":"2011","unstructured":"Liu SS, Wang CJ (2011) Optimizing project selection and scheduling problems with time-dependent resource constraints. Auto Const 20(8):1110\u20131119","journal-title":"Auto Const"},{"issue":"9","key":"285_CR15","first-page":"1938","volume":"18","author":"ZY Zhang","year":"2012","unstructured":"Zhang ZY, Sun LY, Liu JF (2012) Optimization of steel plate cutting stock planning with time constraint. Comp Integrated Manuf Syst 18(9):1938\u20131947","journal-title":"Comp Integrated Manuf Syst"},{"key":"285_CR16","volume-title":"Practical project management","author":"WD Yu","year":"2013","unstructured":"Yu WD (2013) Practical project management. National Chung Hua University Department of Construction Management, Hsinchu"}],"container-title":["Artificial Life and Robotics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10015-016-0285-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10015-016-0285-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10015-016-0285-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T06:19:49Z","timestamp":1568096389000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10015-016-0285-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,6,29]]},"references-count":16,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,9]]}},"alternative-id":["285"],"URL":"https:\/\/doi.org\/10.1007\/s10015-016-0285-6","relation":{},"ISSN":["1433-5298","1614-7456"],"issn-type":[{"value":"1433-5298","type":"print"},{"value":"1614-7456","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,6,29]]}}}