{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T21:52:47Z","timestamp":1759701167272},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2010,3,10]],"date-time":"2010-03-10T00:00:00Z","timestamp":1268179200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Cent Eur J Oper Res"],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1007\/s10100-010-0143-x","type":"journal-article","created":{"date-parts":[[2010,3,9]],"date-time":"2010-03-09T01:23:55Z","timestamp":1268097835000},"page":"533-545","source":"Crossref","is-referenced-by-count":13,"title":["Optimal production run time for two-stage production system with imperfect processes and allowable shortages"],"prefix":"10.1007","volume":"19","author":[{"given":"W. L.","family":"Pearn","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"R. H.","family":"Su","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. W.","family":"Weng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C. H.","family":"Hsu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,3,10]]},"reference":[{"key":"143_CR1","first-page":"1","volume":"13","author":"HC Chang","year":"2002","unstructured":"Chang HC, Ouyang LY (2002) Determining the optimal inventory and investment strategies for quality improvement in the fuzzy sense. Int J Inf Manage Sci 13: 1\u201312","journal-title":"Int J Inf Manage Sci"},{"key":"143_CR2","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1016\/j.mcm.2006.01.019","volume":"44","author":"CK Chen","year":"2006","unstructured":"Chen CK, Lo CC (2006) Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Math Comput Model 44: 319\u2013331","journal-title":"Math Comput Model"},{"key":"143_CR3","first-page":"979","volume":"66","author":"SW Chiu","year":"2007","unstructured":"Chiu SW (2007) Production run time problem with machine breakdowns under AR control policy and rework. J Sci Ind Res India 66: 979\u2013988","journal-title":"J Sci Ind Res India"},{"key":"143_CR4","first-page":"488","volume":"30","author":"KJ Chung","year":"2003","unstructured":"Chung KJ, Hou KL (2003) An optimal production run time with imperfect production processes and allowable shortages. Comput Oper Res 30: 488\u2013490","journal-title":"Comput Oper Res"},{"key":"143_CR5","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.ijpe.2006.09.008","volume":"107","author":"MA Darwish","year":"2007","unstructured":"Darwish MA, Ben-Daya M (2007) Effect of inspection errors and preventive maintenance on a two-stage production inventory system. Int J Prod Econ 107: 301\u2013313","journal-title":"Int J Prod Econ"},{"key":"143_CR6","first-page":"537","volume":"31","author":"TK Das","year":"1999","unstructured":"Das TK, Sarkar S (1999) Optimal preventive maintenance in a production inventory system. IIE Trans 31: 537\u2013551","journal-title":"IIE Trans"},{"key":"143_CR7","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1287\/mnsc.38.1.104","volume":"38","author":"H Groenevelt","year":"1992","unstructured":"Groenevelt H, Pintelon L, Seidmann A (1992) Production lot sizing with machine breakdowns. Manage Sci 38: 104\u2013123","journal-title":"Manage Sci"},{"key":"143_CR8","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1002\/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7","volume":"45","author":"M Hariga","year":"1998","unstructured":"Hariga M, Ben-Daya M (1998) The economic manufacturing lot-sizing problem with imperfect manufacturing processes: bounds and optimal solutions. Nav Res Log 45: 423\u2013433","journal-title":"Nav Res Log"},{"key":"143_CR9","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/S0925-5273(99)00122-X","volume":"66","author":"RM Hill","year":"2000","unstructured":"Hill RM (2000) On optimal two-stage lot sizing and inventory batching policies. Int J Prod Econ 66: 149\u2013158","journal-title":"Int J Prod Econ"},{"key":"143_CR10","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/0305-0548(94)00054-C","volume":"22","author":"JD Hong","year":"1995","unstructured":"Hong JD, Hayya JC (1995) Joint investment in quality improvement and setup reduction. Comput Oper Res 22: 567\u2013574","journal-title":"Comput Oper Res"},{"key":"143_CR11","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1080\/07408179208964201","volume":"24","author":"Y Hong","year":"1992","unstructured":"Hong Y, Glassey CR, Seong D (1992) The analysis of a production line with unreliable machine and random processing times. IIE Trans 24: 77\u201383","journal-title":"IIE Trans"},{"key":"143_CR12","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1080\/07408178808966182","volume":"20","author":"G Keller","year":"1988","unstructured":"Keller G, Noori H (1988) Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Trans 20: 284\u2013291","journal-title":"IIE Trans"},{"key":"143_CR13","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/S0925-5273(98)00119-4","volume":"58","author":"CH Kim","year":"1999","unstructured":"Kim CH, Hong Y (1999) An optimal run length in deteriorating production process. Int J Prod Econ 58: 183\u2013189","journal-title":"Int J Prod Econ"},{"key":"143_CR14","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0925-5273(98)00057-7","volume":"58","author":"D Kim","year":"1999","unstructured":"Kim D (1999) Optimal two-stage lot sizing and inventory batching policies. Int J Prod Econ 58: 221\u2013234","journal-title":"Int J Prod Econ"},{"key":"143_CR15","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/S0305-0548(98)00040-9","volume":"26","author":"B Liu","year":"1999","unstructured":"Liu B, Cao J (1999) Analysis of a production-inventory system with machine breakdowns and shutdowns. Comput Oper Res 26: 73\u201391","journal-title":"Comput Oper Res"},{"key":"143_CR16","first-page":"53","volume":"16","author":"LC Lin","year":"2005","unstructured":"Lin LC, Hou KL (2005) EMQ model with maintenance actions for deteriorating production system. Int J Inf Manage Sci 16: 53\u201365","journal-title":"Int J Inf Manage Sci"},{"key":"143_CR17","first-page":"724","volume":"66","author":"GC Lin","year":"2007","unstructured":"Lin GC, Lin HD (2007) Determining a production run time for an imperfect production-inventory system with scrap. J Sci Ind Res India 66: 724\u2013735","journal-title":"J Sci Ind Res India"},{"key":"143_CR18","doi-asserted-by":"crossref","first-page":"1701","DOI":"10.1016\/S0305-0548(01)00051-X","volume":"29","author":"LY Ouyang","year":"2002","unstructured":"Ouyang LY, Chen CK, Chang HC (2002) Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Comput Oper Res 29: 1701\u20131717","journal-title":"Comput Oper Res"},{"key":"143_CR19","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal lot-sizing, process quality improvement and setup cost reduction. Oper Res 34: 137\u2013144","journal-title":"Oper Res"},{"key":"143_CR20","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE Trans 18: 48\u201355","journal-title":"IIE Trans"},{"key":"143_CR21","doi-asserted-by":"crossref","first-page":"915","DOI":"10.1016\/j.ejor.2006.12.005","volume":"184","author":"BR Sarker","year":"2008","unstructured":"Sarker BR, Jamal AMM, Mondal S (2008) Optimal batch sizing in a multi-stage production system with rework consideration. Eur J Oper Res 184: 915\u2013929","journal-title":"Eur J Oper Res"},{"key":"143_CR22","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1080\/00207548308942363","volume":"21","author":"AZ Szendrovits","year":"1983","unstructured":"Szendrovits AZ (1983) Non-integer optimal lot size ratios in two-stage production\/inventory systems. Int J Prod Res 21: 323\u2013336","journal-title":"Int J Prod Res"}],"container-title":["Central European Journal of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-010-0143-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10100-010-0143-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-010-0143-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T05:49:27Z","timestamp":1559108967000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10100-010-0143-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,3,10]]},"references-count":22,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2011,12]]}},"alternative-id":["143"],"URL":"https:\/\/doi.org\/10.1007\/s10100-010-0143-x","relation":{},"ISSN":["1435-246X","1613-9178"],"issn-type":[{"value":"1435-246X","type":"print"},{"value":"1613-9178","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,3,10]]}}}