{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:48:57Z","timestamp":1760708937275},"reference-count":52,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2015,10,26]],"date-time":"2015-10-26T00:00:00Z","timestamp":1445817600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cent Eur J Oper Res"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s10100-015-0428-1","type":"journal-article","created":{"date-parts":[[2015,10,26]],"date-time":"2015-10-26T12:23:27Z","timestamp":1445862207000},"page":"123-138","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":23,"title":["Master disassembly scheduling in a remanufacturing system with stochastic routings"],"prefix":"10.1007","volume":"25","author":[{"given":"Muris","family":"Lage Junior","sequence":"first","affiliation":[]},{"given":"Moacir","family":"Godinho\u00a0Filho","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,26]]},"reference":[{"key":"428_CR1","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/j.ijpe.2009.09.002","volume":"124","author":"SS Ahiska","year":"2010","unstructured":"Ahiska SS, King RE (2010) Inventory optimization in a one product recoverable manufacturing system. Int J Prod Econ 124:11\u201319","journal-title":"Int J Prod Econ"},{"key":"428_CR2","unstructured":"Aksoy HK, Gupta SM (2001) Capacity and buffer trade-offs in a remanufacturing system. In: Proceedings of the SPIE international conference on environmentally conscious manufacturing II, Newton, Massachusetts, pp 167\u2013174"},{"issue":"5","key":"428_CR3","doi-asserted-by":"crossref","first-page":"1243","DOI":"10.1080\/00207543.2011.571921","volume":"50","author":"A Alinovi","year":"2012","unstructured":"Alinovi A, Bottani E, Montanari R (2012) Reverse logistics: a stochastic EOQ-based inventory control model for mixed manufacturing\/remanufacturing systems with return policies. Int J Prod Res 50(5):1243\u20131264","journal-title":"Int J Prod Res"},{"issue":"10","key":"428_CR4","doi-asserted-by":"crossref","first-page":"1731","DOI":"10.1287\/mnsc.1080.0893","volume":"54","author":"A Atasu","year":"2008","unstructured":"Atasu A, Sarvary M, Van Wassenhove LN (2008) Remanufacturing as a marketing strategy. Manag Sci 54(10):1731\u20131746","journal-title":"Manag Sci"},{"issue":"3","key":"428_CR5","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1080\/09537280410001697701","volume":"15","author":"BM Beamon","year":"2004","unstructured":"Beamon BM, Fernandes C (2004) Supply-chain network configuration for product recovery. Prod Plann Control 15(3):270\u2013281","journal-title":"Prod Plann Control"},{"key":"428_CR6","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1016\/j.cie.2007.11.001","volume":"56","author":"H Behret","year":"2009","unstructured":"Behret H, Korugan A (2009) Performance analysis of a hybrid system under quality impact of returns. Comput Ind Eng 56:507\u2013520","journal-title":"Comput Ind Eng"},{"key":"428_CR7","volume-title":"Dynamic programming","author":"R Bellman","year":"1957","unstructured":"Bellman R (1957) Dynamic programming. Princeton University Press, Princeton"},{"key":"428_CR8","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.cor.2014.05.006","volume":"51","author":"ML Bentaha","year":"2014","unstructured":"Bentaha ML, Batta\u00efa O, Dolgui A (2014) A sample average approximation method for disassembly line balancing problem under uncertainty. Comput Oper Res 51:111\u2013122","journal-title":"Comput Oper Res"},{"issue":"2","key":"428_CR9","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1108\/01443570210414338","volume":"22","author":"JWM Bertrand","year":"2002","unstructured":"Bertrand JWM, Fransoo JC (2002) Operations management research methodologies using quantitative modeling. Int J Oper Prod Manag 22(2):241\u2013264","journal-title":"Int J Oper Prod Manag"},{"key":"428_CR10","doi-asserted-by":"crossref","first-page":"1187","DOI":"10.1007\/s00170-013-5538-0","volume":"71","author":"M Chen","year":"2014","unstructured":"Chen M, Abrishami P (2014) A mathematical model for production planning in hybrid manufacturing\u2013remanufacturing systems. Int J Adv Manuf Technol 71:1187\u20131196","journal-title":"Int J Adv Manuf Technol"},{"key":"428_CR11","volume-title":"Dynamic programming: models and applications","author":"EV Denardo","year":"1982","unstructured":"Denardo EV (1982) Dynamic programming: models and applications. Prentice-Hall, Englewood Cliffs"},{"issue":"3","key":"428_CR12","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1109\/TEM.2009.2024506","volume":"57","author":"M Denizel","year":"2010","unstructured":"Denizel M, Ferguson M, Souza GC (2010) Multiperiod remanufacturing planning with uncertain quality of inputs. IEEE Trans Eng Manag 57(3):394\u2013404","journal-title":"IEEE Trans Eng Manag"},{"issue":"7","key":"428_CR13","doi-asserted-by":"crossref","first-page":"573","DOI":"10.1080\/09537280701542210","volume":"18","author":"GW Depuy","year":"2007","unstructured":"Depuy GW, Usher JS, Walker RL, Taylor GD (2007) Production planning for remanufactured products. Prod Plann Control 18(7):573\u2013583","journal-title":"Prod Plann Control"},{"issue":"1","key":"428_CR14","first-page":"84","volume":"17","author":"Y Du","year":"2011","unstructured":"Du Y, Cao H, Liu F, Yan P, Li C (2011) Evaluation of machine tool remanufacturing scheme based on entropy weight and AHP. Comput Integr Manuf Syst 17(1):84\u201388","journal-title":"Comput Integr Manuf Syst"},{"issue":"1","key":"428_CR15","doi-asserted-by":"crossref","first-page":"432","DOI":"10.1016\/j.ijpe.2010.04.018","volume":"133","author":"Y Feng","year":"2011","unstructured":"Feng Y, Viswanathan S (2011) A new lot-sizing heuristic for manufacturing systems with product recovery. Int J Prod Econ 133(1):432\u2013438","journal-title":"Int J Prod Econ"},{"key":"428_CR16","unstructured":"Ferguson M, Guide VDR Jr, Koca E, Souza GC (2007) Remanufacturing planning with different quality levels for product returns. Social science research network electronic paper collection, working paper no RHS-06-050"},{"issue":"3","key":"428_CR17","doi-asserted-by":"crossref","first-page":"540","DOI":"10.1016\/S0377-2217(02)00454-X","volume":"149","author":"G Ferrer","year":"2003","unstructured":"Ferrer G (2003) Yield information and supplier responsiveness in remanufacturing operations. Eur J Oper Res 149(3):540\u2013556","journal-title":"Eur J Oper Res"},{"issue":"2","key":"428_CR18","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1111\/j.1937-5956.2001.tb00073.x","volume":"10","author":"G Ferrer","year":"2001","unstructured":"Ferrer G, Whybark DC (2001) Material planning for a remanufacturing facility. Prod Oper Manag 10(2):112\u2013124","journal-title":"Prod Oper Manag"},{"key":"428_CR19","doi-asserted-by":"publisher","unstructured":"Gan S, Su C (2009) Inventory control for remanufacturing system with stochastic product returns. In: 16th International Conference on Industrial Engineering and Engineering Management, 2009. IE&EM \u201909, IEEE, Beijing, pp 802\u2013807. doi: 10.1109\/ICIEEM.2009.5344478","DOI":"10.1109\/ICIEEM.2009.5344478"},{"key":"428_CR20","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.ejor.2012.09.021","volume":"225","author":"P Georgiadis","year":"2013","unstructured":"Georgiadis P, Athanasiou E (2013) Flexible long-term capacity planning in closed-loop supply chains with remanufacturing. Eur J Oper Res 225:44\u201358","journal-title":"Eur J Oper Res"},{"key":"428_CR21","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jclepro.2014.06.014","volume":"81","author":"P Goodall","year":"2014","unstructured":"Goodall P, Rosamond E, Harding J (2014) A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility. J Clean Prod 81:1\u201315","journal-title":"J Clean Prod"},{"issue":"18\u201319","key":"428_CR22","doi-asserted-by":"crossref","first-page":"3953","DOI":"10.1080\/00207540600806406","volume":"44","author":"RW Grubbstrom","year":"2006","unstructured":"Grubbstrom RW, Tang O (2006) Optimal production opportunities in a remanufacturing system. Int J Prod Res 44(18\u201319):3953\u20133966","journal-title":"Int J Prod Res"},{"issue":"1","key":"428_CR23","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1287\/opre.1080.0628","volume":"57","author":"VDR Guide Jr","year":"2009","unstructured":"Guide VDR Jr, Wassenhove LNV (2009) The evolution of closed-loop supply chain research. Oper Res 57(1):10\u201318","journal-title":"Oper Res"},{"issue":"4","key":"428_CR24","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/S0272-6963(00)00034-6","volume":"18","author":"VDR Guide Jr","year":"2000","unstructured":"Guide VDR Jr (2000) Production planning and control for remanufacturing: industry practice and research needs. J Oper Manag 18(4):467\u2013483","journal-title":"J Oper Manag"},{"issue":"1","key":"428_CR25","first-page":"221","volume":"15","author":"VDR Guide Jr","year":"1999","unstructured":"Guide VDR Jr, Jayaraman V, Srivastava R (1999) Production planning and control for remanufacturing: a state-of-the-art survey. Robot Comput Integr Manuf 15(1):221\u2013230","journal-title":"Robot Comput Integr Manuf"},{"key":"428_CR26","volume-title":"Dynamic programming: with management applications","author":"NAJ Hastings","year":"1973","unstructured":"Hastings NAJ (1973) Dynamic programming: with management applications. Butterworths, London"},{"issue":"2","key":"428_CR27","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1142\/S021968670800136X","volume":"7","author":"C Huajun","year":"2008","unstructured":"Huajun C, Yanbin D, Fei L (2008) A disassembly capability planning model for the make-to-order remanufacturing system. J Adv Manuf Syst 7(2):329\u2013332","journal-title":"J Adv Manuf Syst"},{"issue":"3","key":"428_CR28","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1007\/s10845-009-0300-z","volume":"22","author":"KS Jung","year":"2011","unstructured":"Jung KS, Hwang H (2011) Competition and cooperation in a remanufacturing system with take-back requirement. J Intell Manuf 22(3):427\u2013433","journal-title":"J Intell Manuf"},{"issue":"3","key":"428_CR29","doi-asserted-by":"crossref","first-page":"413","DOI":"10.1108\/17410381311318909","volume":"24","author":"CB Kalayci","year":"2013","unstructured":"Kalayci CB, Gupta SM (2013) Ant colony optimization for sequence-dependent disassembly line balancing problem. J Manuf Technol Manag 24(3):413\u2013427","journal-title":"J Manuf Technol Manag"},{"issue":"1\u20134","key":"428_CR30","first-page":"403","volume":"54","author":"A Karamouzian","year":"2010","unstructured":"Karamouzian A, Teimoury E, Modarres M (2010) A model for admission control of returned products in a remanufacturing facility using queuing theory. Int J Adv Manuf Technol 54(1\u20134):403\u2013412","journal-title":"Int J Adv Manuf Technol"},{"key":"428_CR31","doi-asserted-by":"crossref","first-page":"452","DOI":"10.1016\/j.cie.2009.11.004","volume":"58","author":"I Konstantaras","year":"2010","unstructured":"Konstantaras I, Skouri K, Jaber MY (2010) Lot sizing for a recoverable product with inspection and sorting. Comput Ind Eng 58:452\u2013462","journal-title":"Comput Ind Eng"},{"issue":"6","key":"428_CR32","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1080\/09537287.2011.561815","volume":"23","author":"M Lage Junior","year":"2012","unstructured":"Lage Junior M, Godinho Filho M (2012) Production planning and control for remanufacturing: literature review and analysis. Prod Plan Control 23(6):419\u2013435","journal-title":"Prod Plan Control"},{"key":"428_CR33","doi-asserted-by":"crossref","first-page":"1276","DOI":"10.1016\/j.jclepro.2010.04.010","volume":"18","author":"HB Lee","year":"2010","unstructured":"Lee HB, Cho NW, Hong YS (2010) A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations. J Clean Prod 18:1276\u20131283","journal-title":"J Clean Prod"},{"issue":"13","key":"428_CR34","doi-asserted-by":"crossref","first-page":"3657","DOI":"10.1080\/00207540701837029","volume":"47","author":"C Li","year":"2009","unstructured":"Li C, Liu F, Cao H, Wang Q (2009) A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. Int J Prod Res 47(13):3657\u20133668","journal-title":"Int J Prod Res"},{"key":"428_CR35","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1007\/s00291-005-0012-5","volume":"28","author":"Y Li","year":"2006","unstructured":"Li Y, Chen J, Cai X (2006) Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution. OR Spectr 28:101\u2013125","journal-title":"OR Spectr"},{"key":"428_CR36","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.ijpe.2004.11.017","volume":"105","author":"Y Li","year":"2007","unstructured":"Li Y, Chen J, Cai X (2007) Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. Int J Prod Econ 105:301\u2013317","journal-title":"Int J Prod Econ"},{"key":"428_CR37","doi-asserted-by":"crossref","unstructured":"Lim C, Sim E (2005) Production planning in manufacturing\/remanufacturing environment using genetic algorithm. GECCO\u201905, Washington, DC, USA, June 25\u201329","DOI":"10.1145\/1068009.1068382"},{"issue":"3","key":"428_CR38","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1287\/opre.49.3.325.11213","volume":"49","author":"JR Meredith","year":"2001","unstructured":"Meredith JR (2001) Reconsidering the philosophical basis of OR\/MS. Oper Res 49(3):325\u2013333","journal-title":"Oper Res"},{"key":"428_CR39","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/j.ejor.2013.09.003","volume":"233","author":"O Ondemir","year":"2014","unstructured":"Ondemir O, Gupta SM (2014) A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system. Eur J Oper Res 233:408\u2013419","journal-title":"Eur J Oper Res"},{"issue":"3","key":"428_CR40","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.ejor.2004.01.013","volume":"163","author":"A Robotis","year":"2005","unstructured":"Robotis A, Bhattacharya S, Wassenhove LNV (2005) The effect of remanufacturing on procurement decisions for resellers in secondary markets. Eur J Oper Res 163(3):688\u2013705","journal-title":"Eur J Oper Res"},{"issue":"1","key":"428_CR41","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1016\/j.ijpe.2010.08.014","volume":"133","author":"AMA Saadany","year":"2011","unstructured":"Saadany AMA, Jaber MY (2011) A production\/remanufacture model with returns\u2019 subassemblies managed differently. Int J Prod Econ 133(1):119\u2013126","journal-title":"Int J Prod Econ"},{"issue":"3","key":"428_CR42","first-page":"1","volume":"1","author":"T Schulz","year":"2011","unstructured":"Schulz T, Ferretti I (2011) On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield. J Remanuf 1(3):1\u201311","journal-title":"J Remanuf"},{"key":"428_CR43","doi-asserted-by":"crossref","unstructured":"Seliger G, Kernbaum S, Zettl M (2006) Remanufacturing approaches contributing to sustainable engineering. Gest Prod 13(3):367\u2013384","DOI":"10.1590\/S0104-530X2006000300002"},{"issue":"1","key":"428_CR44","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.aei.2010.03.002","volume":"25","author":"SS Smith","year":"2011","unstructured":"Smith SS, Chen W (2011) Rule-based recursive selective disassembly sequence planning for green design. Adv Eng Inform 25(1):77\u201387","journal-title":"Adv Eng Inform"},{"key":"428_CR45","volume-title":"Dynamic programming: a practical introduction","author":"DK Smith","year":"1991","unstructured":"Smith DK (1991) Dynamic programming: a practical introduction. Ellis Horwood Limited, London"},{"issue":"2","key":"428_CR46","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1080\/00207540110090920","volume":"40","author":"GC Souza","year":"2002","unstructured":"Souza GC, Ketzenberg ME (2002) Two-stage make-to-order remanufacturing with service-level constraints. Int J Prod Res 40(2):477\u2013493","journal-title":"Int J Prod Res"},{"issue":"2","key":"428_CR47","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1111\/j.1937-5956.2002.tb00493.x","volume":"11","author":"GC Souza","year":"2002","unstructured":"Souza GC, Ketzenberg ME, Guide VDR Jr (2002) Capacitated remanufacturing with service level constraints. Prod Oper Manag 11(2):231\u2013248","journal-title":"Prod Oper Manag"},{"issue":"23\u201324","key":"428_CR48","doi-asserted-by":"crossref","first-page":"6972","DOI":"10.1080\/00207543.2013.836780","volume":"51","author":"DW Steeneck","year":"2013","unstructured":"Steeneck DW, Sarin SC (2013) Pricing and production planning for reverse supply chain: a review. Int J Prod Res 51(23\u201324):6972\u20136989","journal-title":"Int J Prod Res"},{"key":"428_CR49","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1016\/j.rcim.2008.02.004","volume":"25","author":"M Tripathi","year":"2009","unstructured":"Tripathi M, Agrawal S, Pandey MK, Shankar R, Tiwari MK (2009) Real world disassembly modeling and sequencing problem: optimization by algorithm of self-guided ants (ASGA). Robot Comput Integr Manuf 25:483\u2013496","journal-title":"Robot Comput Integr Manuf"},{"key":"428_CR50","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.ejor.2012.04.031","volume":"222","author":"CH Wu","year":"2012","unstructured":"Wu CH (2012) Product-design and pricing strategies with remanufacturing. Euro J Oper Res 222:204\u2013215","journal-title":"Euro J Oper Res"},{"key":"428_CR51","first-page":"81","volume":"44\u201347","author":"DH Xiao","year":"2011","unstructured":"Xiao DH, Fan ZK, Jian HY (2011) Development of monitoring and control system for laser remanufacturing. Appl Mech Mater 44\u201347:81\u201385","journal-title":"Appl Mech Mater"},{"key":"428_CR52","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1080\/07408170701488078","volume":"40","author":"C Zikopoulos","year":"2008","unstructured":"Zikopoulos C, Tagaras G (2008) On the attractiveness of sorting before disassembly in remanufacturing. IEE Trans 40:313\u2013323","journal-title":"IEE Trans"}],"container-title":["Central European Journal of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-015-0428-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10100-015-0428-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-015-0428-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-015-0428-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T09:49:34Z","timestamp":1559123374000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10100-015-0428-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,26]]},"references-count":52,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["428"],"URL":"https:\/\/doi.org\/10.1007\/s10100-015-0428-1","relation":{},"ISSN":["1435-246X","1613-9178"],"issn-type":[{"value":"1435-246X","type":"print"},{"value":"1613-9178","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,10,26]]}}}