{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,18]],"date-time":"2025-12-18T19:52:39Z","timestamp":1766087559416,"version":"3.37.3"},"reference-count":59,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2020,6,4]],"date-time":"2020-06-04T00:00:00Z","timestamp":1591228800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,6,4]],"date-time":"2020-06-04T00:00:00Z","timestamp":1591228800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cent Eur J Oper Res"],"published-print":{"date-parts":[[2021,12]]},"DOI":"10.1007\/s10100-020-00687-5","type":"journal-article","created":{"date-parts":[[2020,6,4]],"date-time":"2020-06-04T13:03:41Z","timestamp":1591275821000},"page":"1289-1315","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes"],"prefix":"10.1007","volume":"29","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3734-9620","authenticated-orcid":false,"given":"G.","family":"Rius-Sorolla","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5796-9053","authenticated-orcid":false,"given":"J.","family":"Maheut","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6119-373X","authenticated-orcid":false,"given":"S.","family":"Estell\u00e9s-Miguel","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9097-2852","authenticated-orcid":false,"given":"J. P.","family":"Garc\u00eda-Sabater","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,6,4]]},"reference":[{"issue":"4","key":"687_CR1","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1007\/s10732-007-9011-9","volume":"13","author":"SA Araujo","year":"2007","unstructured":"Araujo SA, Arenales MN, Clark A (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J Heuristics 13(4):337\u2013358. https:\/\/doi.org\/10.1007\/s10732-007-9011-9","journal-title":"J Heuristics"},{"key":"687_CR2","unstructured":"ASIC (2018) Cl\u00faster de c\u00e1lculo: Rigel. http:\/\/www.upv.es\/entidades\/ASIC\/catalogo\/857893normalc.html. Accessed date 22 July 2018"},{"issue":"1","key":"687_CR3","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1111\/j.1540-5915.1977.tb01065.x","volume":"8","author":"KR Baker","year":"1977","unstructured":"Baker KR (1977) An experimental study of the effectiveness of rolling schedules in production planning. Decis Sci 8(1):19\u201327. https:\/\/doi.org\/10.1111\/j.1540-5915.1977.tb01065.x","journal-title":"Decis Sci"},{"issue":"6","key":"687_CR4","doi-asserted-by":"publisher","first-page":"569","DOI":"10.1016\/0305-0548(91)90062-V","volume":"18","author":"RT Barrett","year":"1991","unstructured":"Barrett RT, LaForge RL (1991) A study of replanning frequencies in a material requirements planning system. Comput Oper Res 18(6):569\u2013578. https:\/\/doi.org\/10.1016\/0305-0548(91)90062-V","journal-title":"Comput Oper Res"},{"key":"687_CR5","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s10845-014-0890-y","volume":"27","author":"J Behnamian","year":"2014","unstructured":"Behnamian J, Fatemi Ghomi SMT (2014) A survey of multi-factory scheduling. J Intell Manuf 27:1\u201319. https:\/\/doi.org\/10.1007\/s10845-014-0890-y","journal-title":"J Intell Manuf"},{"issue":"10","key":"687_CR6","doi-asserted-by":"publisher","first-page":"1126","DOI":"10.1287\/mnsc.29.10.1126","volume":"29","author":"PJ Billington","year":"1983","unstructured":"Billington PJ, McClain JO, Thomas LJ (1983) Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Manag Sci 29(10):1126\u20131141. https:\/\/doi.org\/10.1287\/mnsc.29.10.1126","journal-title":"Manag Sci"},{"issue":"4","key":"687_CR7","doi-asserted-by":"publisher","first-page":"691","DOI":"10.1111\/j.1540-5915.1980.tb01170.x","volume":"11","author":"JD Blackburn","year":"1980","unstructured":"Blackburn JD, Millen RA (1980) Heuristic lot-sizing performance in a rolling-schedule environment. Decis Sci 11(4):691\u2013701. https:\/\/doi.org\/10.1111\/j.1540-5915.1980.tb01170.x","journal-title":"Decis Sci"},{"key":"687_CR8","unstructured":"Cao Y (2015) Long-distance procurement planning in global sourcing. Ecole Centrale Paris. https:\/\/tel.archives-ouvertes.fr\/tel-01154871\/. Accessed 15 Dec 2017"},{"issue":"1","key":"687_CR9","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1111\/j.1540-5915.1982.tb00136.x","volume":"13","author":"RC Carlson","year":"1982","unstructured":"Carlson RC, Beckman SL, Kropp DH (1982) The effectiveness o extending the horizon in rolling production scheduling. Decis Sci 13(1):129\u2013146. https:\/\/doi.org\/10.1111\/j.1540-5915.1982.tb00136.x","journal-title":"Decis Sci"},{"issue":"1","key":"687_CR10","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1287\/msom.4.1.25.287","volume":"4","author":"S Chand","year":"2002","unstructured":"Chand S, Hsu VN, Sethi S (2002) Forecast, solution, and rolling horizons in operations management problems: a classified bibliography. Manuf Serv Oper Manag 4(1):25\u201343. https:\/\/doi.org\/10.1287\/msom.4.1.25.287","journal-title":"Manuf Serv Oper Manag"},{"key":"687_CR11","doi-asserted-by":"publisher","unstructured":"Coronado-Hern\u00e1ndez JR (2016) An\u00e1lisis del efecto de algunos factores de complejidad e incertidumbre en el rendimiento de las Cadenas de Suministro. Propuesta de una herramienta de valoraci\u00f3n basada en simulaci\u00f3n. Universitat Polit\u00e8cnica de Val\u00e8ncia, Valencia (Spain). https:\/\/doi.org\/10.4995\/Thesis\/10251\/61467","DOI":"10.4995\/Thesis\/10251\/61467"},{"key":"687_CR12","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.ijpe.2017.01.003","volume":"190","author":"RJB de Sampaio","year":"2017","unstructured":"de Sampaio RJB, Wollmann RRG, Vieira PFG (2017) A flexible production planning for rolling-horizons. Int J Prod Econ 190:31\u201336. https:\/\/doi.org\/10.1016\/j.ijpe.2017.01.003","journal-title":"Int J Prod Econ"},{"issue":"1","key":"687_CR13","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/j.ejor.2015.11.006","volume":"251","author":"GD DeYong","year":"2016","unstructured":"DeYong GD, Cattani KD (2016) Fenced in? Stochastic and deterministic planning models in a time-fenced, rolling-horizon scheduling system. Eur J Oper Res 251(1):85\u201395. https:\/\/doi.org\/10.1016\/j.ejor.2015.11.006","journal-title":"Eur J Oper Res"},{"issue":"3","key":"687_CR14","doi-asserted-by":"publisher","first-page":"456","DOI":"10.1287\/opre.42.3.456","volume":"42","author":"A Federgruen","year":"1994","unstructured":"Federgruen A, Tzur M (1994) Minimal forecast horizons and a new planning procedure for the general dynamic lot sizing model: nervousness revisited. Oper Res 42(3):456\u2013468. https:\/\/doi.org\/10.1287\/opre.42.3.456","journal-title":"Oper Res"},{"issue":"5","key":"687_CR15","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1287\/mnsc.47.5.679.10485","volume":"47","author":"ML Fisher","year":"2001","unstructured":"Fisher ML, Ramdas K, Zheng YS (2001) Ending inventory valuation in multiperiod production scheduling. Manag Sci 47(5):679\u2013692. https:\/\/doi.org\/10.1287\/mnsc.47.5.679.10485","journal-title":"Manag Sci"},{"key":"687_CR16","doi-asserted-by":"publisher","unstructured":"Garcia-Sabater JP, Maheut J, Garcia-Sabater JJ (2009. A capacitated material requirements planning model considering delivery constraints: a case study from the automotive industry. In: 2009 international conference on computers and industrial engineering, IEEE, pp 378\u2013383. https:\/\/doi.org\/10.1109\/ICCIE.2009.5223806","DOI":"10.1109\/ICCIE.2009.5223806"},{"issue":"2","key":"687_CR17","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1007\/s10696-011-9126-z","volume":"24","author":"JP Garcia-Sabater","year":"2012","unstructured":"Garcia-Sabater JP, Maheut J, Garcia-Sabater JJ (2012) A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. Flex Serv Manuf J 24(2):171\u2013209. https:\/\/doi.org\/10.1007\/s10696-011-9126-z","journal-title":"Flex Serv Manuf J"},{"issue":"2","key":"687_CR18","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1504\/EJIE.2013.052572","volume":"7","author":"JP Garcia-Sabater","year":"2013","unstructured":"Garcia-Sabater JP, Maheut J, Marin-Garcia JA (2013) A new formulation technique to model materials and operations planning: the generic materials and operations planning (GMOP) problem. Eur J Ind Eng 7(2):119. https:\/\/doi.org\/10.1504\/EJIE.2013.052572","journal-title":"Eur J Ind Eng"},{"key":"687_CR19","volume-title":"An\u00e1lisis multivariante","author":"JF Hair","year":"1999","unstructured":"Hair JF, Prentice E, Cano D (1999) An\u00e1lisis multivariante. Prentice-Hall, Upper Saddle River"},{"issue":"18","key":"687_CR20","doi-asserted-by":"publisher","first-page":"4955","DOI":"10.1080\/00207540802047106","volume":"47","author":"K Hozak","year":"2009","unstructured":"Hozak K, Hill JA (2009) Issues and opportunities regarding replanning and rescheduling frequencies. Int J Prod Res 47(18):4955\u20134970. https:\/\/doi.org\/10.1080\/00207540802047106","journal-title":"Int J Prod Res"},{"key":"687_CR21","doi-asserted-by":"publisher","first-page":"3369","DOI":"10.1109\/ACCESS.2016.2616366","volume":"5","author":"CH Hsu","year":"2017","unstructured":"Hsu CH, Yang HC (2017) Real-time near-optimal scheduling with rolling horizon for automatic manufacturing cell. IEEE Access 5:3369\u20133375. https:\/\/doi.org\/10.1109\/ACCESS.2016.2616366","journal-title":"IEEE Access"},{"issue":"1","key":"687_CR22","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1287\/ijoc.1080.0283","volume":"21","author":"R Jans","year":"2009","unstructured":"Jans R (2009) Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints. Inf J Comput 21(1):123\u2013136. https:\/\/doi.org\/10.1287\/ijoc.1080.0283","journal-title":"Inf J Comput"},{"issue":"5","key":"687_CR23","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B Karimi","year":"2003","unstructured":"Karimi B, Fatemi Ghomi SMT, Wilson JM (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31(5):365\u2013378. https:\/\/doi.org\/10.1016\/S0305-0483(03)00059-8","journal-title":"Omega"},{"key":"687_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-50162-3","volume-title":"Multi-level lot sizing and scheduling","author":"A Kimms","year":"1997","unstructured":"Kimms A (1997) Multi-level lot sizing and scheduling, vol 53. Physica-Verlag, Heidelberg. https:\/\/doi.org\/10.1007\/978-3-642-50162-3"},{"issue":"5","key":"687_CR25","doi-asserted-by":"publisher","first-page":"485","DOI":"10.1287\/mnsc.24.5.485","volume":"24","author":"P Kleindorfer","year":"1978","unstructured":"Kleindorfer P, Kunreuther H (1978) Stochastic horizons for the aggregate planning problem. Manag Sci 24(5):485\u2013497. https:\/\/doi.org\/10.1287\/mnsc.24.5.485","journal-title":"Manag Sci"},{"key":"687_CR26","doi-asserted-by":"publisher","DOI":"10.17485\/ijst\/2016\/v9i38\/86938","author":"BK Kumar","year":"2016","unstructured":"Kumar BK, Nagaraju D, Narayanan S (2016) Supply chain coordination models: a literature review. Indian J Sci Technol. https:\/\/doi.org\/10.17485\/ijst\/2016\/v9i38\/86938","journal-title":"Indian J Sci Technol"},{"issue":"18","key":"687_CR27","doi-asserted-by":"publisher","first-page":"5378","DOI":"10.1080\/00207543.2017.1315192","volume":"55","author":"I Lalami","year":"2017","unstructured":"Lalami I, Frein Y, Gayon JP (2017) Production planning in automotive powertrain plants: a case study. Int J Prod Res 55(18):5378\u20135393. https:\/\/doi.org\/10.1080\/00207543.2017.1315192","journal-title":"Int J Prod Res"},{"issue":"3","key":"687_CR28","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.43.4.546","volume":"38","author":"HL Lee","year":"1997","unstructured":"Lee HL, Padmanabhan V, Whang S (1997) The bullwhip effect in supply chains 1. Sloan Manag Rev Assoc 38(3):93\u2013102. https:\/\/doi.org\/10.1287\/mnsc.43.4.546","journal-title":"Sloan Manag Rev Assoc"},{"issue":"6","key":"687_CR29","doi-asserted-by":"publisher","first-page":"659","DOI":"10.1109\/TC.2006.81","volume":"55","author":"DU Lee","year":"2006","unstructured":"Lee DU, Villasenor JD, Luk W, Leong PHW (2006) A hardware Gaussian noise generator using the box-muller method and its error analysis. IEEE Trans Comput 55(6):659\u2013671. https:\/\/doi.org\/10.1109\/TC.2006.81","journal-title":"IEEE Trans Comput"},{"issue":"1","key":"687_CR30","doi-asserted-by":"publisher","first-page":"23","DOI":"10.3390\/app7010023","volume":"7","author":"Y Lv","year":"2017","unstructured":"Lv Y, Zhang J, Qin W (2017) A genetic regulatory network-based method for dynamic hybrid flow shop scheduling with uncertain processing times. Appl Sci 7(1):23. https:\/\/doi.org\/10.3390\/app7010023","journal-title":"Appl Sci"},{"key":"687_CR31","doi-asserted-by":"publisher","unstructured":"Maheut J (2013) Modelos y Algoritmos Basados en el Concepto Stroke para la Planificaci\u00f3n y Programaci\u00f3n de Operaciones con Alternativas en Redes de Suministro. Universitat Polit\u00e8cnica de Val\u00e8ncia, Valencia (Spain). https:\/\/doi.org\/10.4995\/Thesis\/10251\/29290","DOI":"10.4995\/Thesis\/10251\/29290"},{"key":"687_CR32","first-page":"46","volume":"45","author":"J Maheut","year":"2011","unstructured":"Maheut J, Garcia-Sabater JP (2011) La matriz de operaciones y materiales y la matriz de operaciones y recursos, un nuevo enfoque para resolver el problema GMOP basado en el concepto del stroke. Direccion y Organizacion 45:46\u201357","journal-title":"Direccion y Organizacion"},{"key":"687_CR33","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1007\/978-1-4471-2321-7","volume-title":"Industrial engineering: innovative networks","author":"J Maheut","year":"2012","unstructured":"Maheut J, Garcia-sabater JP, Mula J (2012) A supply chain operations lot-sizing and scheduling model with alternative operations. In: Sethi SP, Bogataj M, Ros-McDonnell L (eds) Industrial engineering: innovative networks. Springer, London, pp 309\u2013316. https:\/\/doi.org\/10.1007\/978-1-4471-2321-7"},{"key":"687_CR34","unstructured":"Meindl B, Templ M (2012) Analysis of commercial and free and open source solvers for linear optimization problems. Common Tools and Harmonized Methodologies for SDC in the ESS, pp 1\u201313. http:\/\/neon.vb.cbs.nl\/cascprivate\/..%5Ccasc%5CESSNet2%5Cdeliverable_solverstudy.pdf. Accessed 15 Dec 2016"},{"issue":"2","key":"687_CR35","doi-asserted-by":"publisher","first-page":"277","DOI":"10.1016\/S0377-2217(01)00373-3","volume":"139","author":"H Meyr","year":"2002","unstructured":"Meyr H (2002) Simultaneous lotsizing and scheduling on parallel machines. Eur J Oper Res 139(2):277\u2013292. https:\/\/doi.org\/10.1016\/S0377-2217(01)00373-3","journal-title":"Eur J Oper Res"},{"issue":"1","key":"687_CR36","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/j.ijpe.2010.04.038","volume":"127","author":"A Narayanan","year":"2010","unstructured":"Narayanan A, Robinson P (2010) Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems. Int J Prod Econ 127(1):85\u201394. https:\/\/doi.org\/10.1016\/j.ijpe.2010.04.038","journal-title":"Int J Prod Econ"},{"issue":"9","key":"687_CR37","doi-asserted-by":"publisher","first-page":"2767","DOI":"10.1080\/00207543.2014.884732","volume":"52","author":"H Nedaei","year":"2014","unstructured":"Nedaei H, Mahlooji H (2014) Joint multi-objective master production scheduling and rolling horizon policy analysis in make-to-order supply chains. Int J Prod Res 52(9):2767\u20132787. https:\/\/doi.org\/10.1080\/00207543.2014.884732","journal-title":"Int J Prod Res"},{"issue":"5","key":"687_CR38","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1080\/00107510500052444","volume":"46","author":"M Newman","year":"2005","unstructured":"Newman M (2005) Power laws, Pareto distributions and Zipf\u2019s law. Contemp Phys 46(5):323\u2013351. https:\/\/doi.org\/10.1080\/00107510500052444","journal-title":"Contemp Phys"},{"issue":"20","key":"687_CR39","doi-asserted-by":"publisher","first-page":"5857","DOI":"10.1080\/00207540802130803","volume":"47","author":"MK Omar","year":"2009","unstructured":"Omar MK, Bennell JA (2009) Revising the master production schedule in a HPP framework context. Int J Prod Res 47(20):5857\u20135878. https:\/\/doi.org\/10.1080\/00207540802130803","journal-title":"Int J Prod Res"},{"key":"687_CR40","volume-title":"Estad\u00edstica pr\u00e1ctica con Statgraphics\u00ae","author":"C P\u00e9rez","year":"2002","unstructured":"P\u00e9rez C (2002) Estad\u00edstica pr\u00e1ctica con Statgraphics\u00ae. PEARSON EDUCACI\u00d3N, S. A, Madrid"},{"issue":"12","key":"687_CR41","doi-asserted-by":"publisher","first-page":"14778","DOI":"10.1016\/j.eswa.2011.05.072","volume":"38","author":"R Poler","year":"2011","unstructured":"Poler R, Mula J (2011) Forecasting model selection through out-of-sample rolling horizon weighted errors. Expert Syst Appl 38(12):14778\u201314785. https:\/\/doi.org\/10.1016\/j.eswa.2011.05.072","journal-title":"Expert Syst Appl"},{"issue":"7","key":"687_CR42","doi-asserted-by":"publisher","first-page":"520","DOI":"10.1007\/s0017010180520","volume":"18","author":"PSS Prasad","year":"2001","unstructured":"Prasad PSS, Krishnaiah Chetty OV (2001) Multilevel lot sizing with a genetic algorithm under fixed and rolling horizons. Int J Adv Manuf Technol 18(7):520\u2013527. https:\/\/doi.org\/10.1007\/s0017010180520","journal-title":"Int J Adv Manuf Technol"},{"key":"687_CR43","volume-title":"A reactive planning approach for demand-driven wood remanufacturing industry: a real-scale application","author":"R Rafiei","year":"2012","unstructured":"Rafiei R, Gaudreault J, Bouchard M, Santa-Eulalia L (2012) A reactive planning approach for demand-driven wood remanufacturing industry: a real-scale application, vol 71. CIRRELT, Montreal"},{"issue":"14","key":"687_CR44","doi-asserted-by":"publisher","first-page":"4198","DOI":"10.1080\/00207543.2013.869631","volume":"52","author":"R Rafiei","year":"2014","unstructured":"Rafiei R, Nourelfath M, Gaudreault J, Santa-Eulalia LA, Bouchard M (2014) A periodic re-planning approach for demand-driven wood remanufacturing industry: a real-scale application. Int J Prod Res 52(14):4198\u20134215. https:\/\/doi.org\/10.1080\/00207543.2013.869631","journal-title":"Int J Prod Res"},{"issue":"9\u201312","key":"687_CR45","doi-asserted-by":"publisher","first-page":"2389","DOI":"10.1007\/s00170-016-8955-z","volume":"88","author":"R Ramezanian","year":"2017","unstructured":"Ramezanian R, Fallah Sanami S, Shafiei Nikabadi M (2017) A simultaneous planning of production and scheduling operations in flexible flow shops: case study of tile industry. Int J Adv Manuf Technol 88(9\u201312):2389\u20132403. https:\/\/doi.org\/10.1007\/s00170-016-8955-z","journal-title":"Int J Adv Manuf Technol"},{"key":"687_CR46","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1016\/j.compchemeng.2017.03.006","volume":"103","author":"MA Rodriguez","year":"2017","unstructured":"Rodriguez MA, Montagna JM, Vecchietti A, Corsano G (2017) Generalized disjunctive programming model for the multi-period production planning optimization: an application in a polyurethane foam manufacturing plant. Comput Chem Eng 103:69\u201380. https:\/\/doi.org\/10.1016\/j.compchemeng.2017.03.006","journal-title":"Comput Chem Eng"},{"issue":"18","key":"687_CR47","doi-asserted-by":"publisher","first-page":"5413","DOI":"10.1080\/00207543.2013.775523","volume":"51","author":"F Sahin","year":"2013","unstructured":"Sahin F, Narayanan A, Robinson EP (2013) Rolling horizon planning in supply chains: review, implications and directions for future research. Int J Prod Res 51(18):5413\u20135436. https:\/\/doi.org\/10.1080\/00207543.2013.775523","journal-title":"Int J Prod Res"},{"issue":"1","key":"687_CR48","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1007\/BF02283607","volume":"29","author":"S Sethi","year":"1991","unstructured":"Sethi S, Sorger G (1991) A theory of rolling horizon decision making. Ann Oper Res 29(1):387\u2013415. https:\/\/doi.org\/10.1007\/BF02283607","journal-title":"Ann Oper Res"},{"issue":"9","key":"687_CR49","doi-asserted-by":"publisher","first-page":"899","DOI":"10.1016\/S0305-0548(00)00015-0","volume":"28","author":"NC Simpson","year":"2001","unstructured":"Simpson NC (2001) Questioning the relative virtues of dynamic lot sizing rules. Comput Oper Res 28(9):899\u2013914. https:\/\/doi.org\/10.1016\/S0305-0548(00)00015-0","journal-title":"Comput Oper Res"},{"issue":"2","key":"687_CR50","doi-asserted-by":"publisher","first-page":"318","DOI":"10.1287\/mnsc.46.2.318.11924","volume":"46","author":"H Stadtler","year":"2000","unstructured":"Stadtler H (2000) Improved rolling schedules for the dynamic single-level lot-sizing problem. Manag Sci 46(2):318\u2013326. https:\/\/doi.org\/10.1287\/mnsc.46.2.318.11924","journal-title":"Manag Sci"},{"issue":"3","key":"687_CR51","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1287\/opre.51.3.487.14949","volume":"51","author":"H Stadtler","year":"2003","unstructured":"Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51(3):487\u2013502. https:\/\/doi.org\/10.1287\/opre.51.3.487.14949","journal-title":"Oper Res"},{"key":"687_CR52","doi-asserted-by":"publisher","first-page":"803","DOI":"10.1016\/j.ijpe.2012.02.007","volume":"140","author":"L Tiacci","year":"2012","unstructured":"Tiacci L, Saetta S (2012) Demand forecasting, lot sizing and scheduling on a rolling horizon basis. Int J Prod Econ 140:803\u2013814. https:\/\/doi.org\/10.1016\/j.ijpe.2012.02.007","journal-title":"Int J Prod Econ"},{"issue":"1","key":"687_CR53","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1080\/07408178708975371","volume":"19","author":"WW Trigeiro","year":"1987","unstructured":"Trigeiro WW (1987) A dual-cost heuristic for the capacitated lot sizing problem. IIE Trans 19(1):67\u201372. https:\/\/doi.org\/10.1080\/07408178708975371","journal-title":"IIE Trans"},{"issue":"12","key":"687_CR59","doi-asserted-by":"publisher","first-page":"1587","DOI":"10.1287\/mnsc.48.12.1587.442","volume":"48","author":"LA Wolsey","year":"2002","unstructured":"Wolsey LA (2002) Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation. Manage Sci 48(12):1587\u20131602. https:\/\/doi.org\/10.1287\/mnsc.48.12.1587.442","journal-title":"Manage Sci"},{"issue":"1","key":"687_CR54","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1016\/S0925-5273(02)00262-1","volume":"83","author":"J Xie","year":"2003","unstructured":"Xie J, Zhao X, Lee TS (2003) Freezing the master production schedule under single resource constraint and demand uncertainty. Int J Prod Econ 83(1):65\u201384. https:\/\/doi.org\/10.1016\/S0925-5273(02)00262-1","journal-title":"Int J Prod Econ"},{"issue":"2\u20133","key":"687_CR55","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1007\/s00291-005-0203-0","volume":"27","author":"I Y\u0131ld\u0131r\u0131m","year":"2005","unstructured":"Y\u0131ld\u0131r\u0131m I, Tan B, Karaesmen F (2005) A multiperiod stochastic production planning and sourcing problem with service level constraints. OR Spectrum 27(2\u20133):471\u2013489. https:\/\/doi.org\/10.1007\/s00291-005-0203-0","journal-title":"OR Spectrum"},{"issue":"4","key":"687_CR56","doi-asserted-by":"publisher","first-page":"371","DOI":"10.1080\/095372898234109","volume":"9","author":"X Zhao","year":"1998","unstructured":"Zhao X, Xie J (1998) Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems. Prod Plan Control 9(4):371\u2013384. https:\/\/doi.org\/10.1080\/095372898234109","journal-title":"Prod Plan Control"},{"issue":"2","key":"687_CR57","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1080\/00207548808947857","volume":"26","author":"K Zoller","year":"1988","unstructured":"Zoller K, Robrade A (1988) Efficient heuristics for dynamic lot sizing. Int J Prod Res 26(2):249\u2013265. https:\/\/doi.org\/10.1080\/00207548808947857","journal-title":"Int J Prod Res"},{"key":"687_CR58","doi-asserted-by":"publisher","first-page":"776","DOI":"10.1016\/j.jclepro.2017.08.152","volume":"167","author":"NI Zulkafli","year":"2017","unstructured":"Zulkafli NI, Kopanos GM (2017) Integrated condition-based planning of production and utility systems under uncertainty. J Clean Prod 167:776\u2013805. https:\/\/doi.org\/10.1016\/j.jclepro.2017.08.152","journal-title":"J Clean Prod"}],"container-title":["Central European Journal of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-020-00687-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10100-020-00687-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10100-020-00687-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,3]],"date-time":"2021-09-03T22:25:54Z","timestamp":1630707954000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10100-020-00687-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,4]]},"references-count":59,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2021,12]]}},"alternative-id":["687"],"URL":"https:\/\/doi.org\/10.1007\/s10100-020-00687-5","relation":{},"ISSN":["1435-246X","1613-9178"],"issn-type":[{"type":"print","value":"1435-246X"},{"type":"electronic","value":"1613-9178"}],"subject":[],"published":{"date-parts":[[2020,6,4]]},"assertion":[{"value":"4 June 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}