{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T22:14:43Z","timestamp":1775081683168,"version":"3.50.1"},"reference-count":68,"publisher":"Springer Science and Business Media LLC","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Cogn Tech Work"],"published-print":{"date-parts":[[2009,6]]},"DOI":"10.1007\/s10111-007-0106-8","type":"journal-article","created":{"date-parts":[[2008,2,4]],"date-time":"2008-02-04T07:11:46Z","timestamp":1202109106000},"page":"165-176","source":"Crossref","is-referenced-by-count":10,"title":["Cognition, tasks and planning: supporting the planning of shunting operations at the Netherlands Railways"],"prefix":"10.1007","volume":"11","author":[{"given":"Wout","family":"van Wezel","sequence":"first","affiliation":[]},{"given":"Ren\u00e9","family":"Jorna","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,2,5]]},"reference":[{"key":"106_CR1","volume-title":"Computers in railways V: volume 1: railway systems and management","author":"JJ Allan","year":"1996","unstructured":"Allan JJ, Mellitt B, Brebbia CA (1996) Computers in railways V: volume 1: railway systems and management. Computational Mechanics Publications, Southampton"},{"key":"106_CR2","volume-title":"The human operator in process control","author":"L Bainbridge","year":"1974","unstructured":"Bainbridge L (1974) Analysis of verbal protocols from a process control task. In: Edwards E, Lees FP (eds) The human operator in process control. Taylor and Francis, London"},{"key":"106_CR3","volume-title":"The human operator in process control","author":"RJ Beishon","year":"1974","unstructured":"Beishon RJ (1974) An analysis and simulation of an operator\u2019s behaviour in controlling continuous baking ovens. In: Edwards E, Lees FP (eds) The human operator in process control. Taylor and Francis, London"},{"key":"106_CR4","doi-asserted-by":"crossref","unstructured":"Benbasat I, Todd P (1996) The effects of decision support and task contingencies on model formulation: a cognitive perspective, Decision support systems, vol 17, pp 241\u2013252","DOI":"10.1016\/0167-9236(96)00003-6"},{"issue":"6","key":"106_CR5","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1016\/0305-0548(94)90082-5","volume":"21","author":"JJ Bernardo","year":"1994","unstructured":"Bernardo JJ, Lin KS (1994) An interactive procedure for bi-criteria production scheduling. Comput Oper Res 21(6):677\u2013688","journal-title":"Comput Oper Res"},{"issue":"2","key":"106_CR6","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1002\/hfm.4530040207","volume":"4","author":"S Bi","year":"1994","unstructured":"Bi S, Salvendy G (1994) Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems. Int J Hum Factors Manuf 4(2):205\u2013234","journal-title":"Int J Hum Factors Manuf"},{"key":"106_CR7","unstructured":"Breuker JW, Van de Velde W (eds) (1994) Common KADS library for expertise modeling: reusable problem solving components. IOS, Amsterdam"},{"key":"106_CR8","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/0377-2217(89)90349-4","volume":"39","author":"G Buxey","year":"1989","unstructured":"Buxey G (1989) Production scheduling: practice and theory. Eur J Oper Res 39:17\u201331","journal-title":"Eur J Oper Res"},{"key":"106_CR9","first-page":"195","volume":"37","author":"M Carey","year":"2003","unstructured":"Carey M, Carville S (2003) Scheduling and platforming trains at busy complex stations. Transp Res Part A 37:195\u2013224","journal-title":"Transp Res Part A"},{"key":"106_CR10","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/0004-3702(85)90016-5","volume":"27","author":"WJ Clancey","year":"1985","unstructured":"Clancey WJ (1985) Heuristic classification. Artif Intell 27:289\u2013350","journal-title":"Artif Intell"},{"key":"106_CR11","volume-title":"Human performance in planning and scheduling","author":"S Crawford","year":"2001","unstructured":"Crawford S (2001) Making sense of scheduling: the realities of scheduling practice in an engineering firm. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London"},{"key":"106_CR13","volume-title":"Human performance in planning and scheduling","author":"S Crawford","year":"2001","unstructured":"Crawford S, Wiers VCS (2001) From anecdotes to theory: a review of existing knowledge on human factors of planning and scheduling. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London"},{"key":"106_CR12","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s101110050033","volume":"1","author":"S Crawford","year":"1999","unstructured":"Crawford S, MacCarthy BL, Wilson JR, Vernon C (1999) Investigating the work of industrial schedulers through field study. Cognition Technol Work 1:63\u201377","journal-title":"Cognition Technol Work"},{"key":"106_CR14","volume-title":"Cognitive planning","author":"JP Das","year":"1996","unstructured":"Das JP, Karr BC, Parrila RK (1996). Cognitive planning. Sage, New Delhi"},{"key":"106_CR15","doi-asserted-by":"crossref","unstructured":"De Sitter U, Den Hertog JF, Dankbaar B (1997) From complex organizations with simple jobs to simple organizations with complex jobs. Human Relations 50(5)","DOI":"10.1177\/001872679705000503"},{"issue":"9","key":"106_CR16","doi-asserted-by":"crossref","first-page":"925","DOI":"10.1016\/S0098-1354(96)00343-2","volume":"21","author":"K Dockx","year":"1997","unstructured":"Dockx K, De Boeck Y, Meert K (1997) Interactive scheduling in the chemical process industry. Comput Chem Eng 21(9):925\u2013946","journal-title":"Comput Chem Eng"},{"issue":"1","key":"106_CR17","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/00207546408943041","volume":"3","author":"JM Dutton","year":"1964","unstructured":"Dutton JM (1964) Production scheduling: a behavior model. Int J Prod Res 3(1):3\u201327","journal-title":"Int J Prod Res"},{"issue":"6","key":"106_CR18","first-page":"354","volume":"18","author":"PD Fox","year":"1967","unstructured":"Fox PD, Kriebel CH (1967) An empirical study of scheduling decision behavior. Int J Ind Eng 18(6):354\u2013360","journal-title":"Int J Ind Eng"},{"key":"106_CR19","unstructured":"Freling R, Lentink RM, Kroon LG, Huisman D (2002) Shunting of passenger train units in a railway station, Econometric Institute Report Erasmus University Rotterdam no. EI2002-26. Notes: Accepted for publication in: Transportation Science"},{"issue":"3","key":"106_CR20","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1016\/S0377-2217(01)00188-6","volume":"139","author":"V Gabrel","year":"2002","unstructured":"Gabrel V, Vanderpooten D (2002) Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite. Eur J Oper Res 139(3):533\u2013542","journal-title":"Eur J Oper Res"},{"key":"106_CR21","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1207\/s15516709cog0304_1","volume":"3","author":"B Hayes-Roth","year":"1979","unstructured":"Hayes-Roth B, Hayes-Roth F (1979) A cognitive model of planning. Cognit Sci 3:275\u2013310","journal-title":"Cognit Sci"},{"key":"106_CR22","volume-title":"Cognitive psychology of planning","author":"JM Hoc","year":"1988","unstructured":"Hoc JM (1988) Cognitive psychology of planning. Academic, San Diego"},{"key":"106_CR23","unstructured":"Hofstede GJ (1992) Modesty in modeling: on the applicability of interactive planning systems, with a case study in pot plant cultivation. University of Wageningen, Wageningen"},{"issue":"4","key":"106_CR24","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1287\/mnsc.14.4.B182","volume":"14","author":"EG Hurst","year":"1967","unstructured":"Hurst EG, McNamara AB (1967) Heuristic scheduling in a woolen mill. Manage Sci 14(4):182\u2013203","journal-title":"Manage Sci"},{"key":"106_CR26","doi-asserted-by":"crossref","unstructured":"Jorna RJ, Van Wezel W (2002) Planning, anticipatory systems, and kinds of actors. In: Dubois DM (eds) Computing anticipatory systems, casys 2001. Melville (NY): American institute of physics conference proceedings, vol 627, pp 411\u2013423","DOI":"10.1063\/1.1503713"},{"key":"106_CR25","unstructured":"Jorna RJ, Gazendam H, Heesen HC, Van Wezel W (1996) Plannen en Roosteren: Taakgericht analyseren, ontwerpen en ondersteunen. Leidschendam, Lansa. (Planning and Scheduling: task oriented analysis, design and support)"},{"key":"106_CR27","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1016\/j.apergo.2005.05.009","volume":"36","author":"DJ Kiewiet","year":"2005","unstructured":"Kiewiet DJ, Jorna RJ, Van Wezel W (2005) Planners and their cognitive maps: an analysis of domain representations using multi dimensional scaling. Appl Ergon 36:695\u2013708","journal-title":"Appl Ergon"},{"issue":"4","key":"106_CR28","doi-asserted-by":"crossref","first-page":"765","DOI":"10.1080\/00140139408963687","volume":"37","author":"RJ Koubek","year":"1994","unstructured":"Koubek RJ, Clarkston TP (1994) The training of knowledge structures for manufacturing tasks: an empirical study. Ergonomics 37(4):765\u2013780","journal-title":"Ergonomics"},{"issue":"6","key":"106_CR29","doi-asserted-by":"crossref","first-page":"613","DOI":"10.1016\/0305-0483(94)90052-3","volume":"22","author":"J Lauer","year":"1994","unstructured":"Lauer J, Jacobs LW, Brusco MJ, Bechtold SE (1994) An Interactive, Optimization-based Decision Support System for Scheduling Part-time, Computer Lab Attendants. Omega Int J Manage Sci 22(6):613\u2013626","journal-title":"Omega Int J Manage Sci"},{"key":"106_CR30","unstructured":"MacCarthy B, Wilson J (2001) The human contribution to planning, scheduling and control in manufacturing Industry\u2014background and context. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London"},{"issue":"4","key":"106_CR31","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1287\/inte.18.4.84","volume":"8","author":"KN McKay","year":"1988","unstructured":"McKay KN, Safayeni FR, Buzacott JA (1988) Job-shop scheduling theory: what is relevant? Interfaces 8(4):84\u201390","journal-title":"Interfaces"},{"issue":"6","key":"106_CR32","doi-asserted-by":"crossref","first-page":"1587","DOI":"10.1080\/00207549508930230","volume":"33","author":"KN McKay","year":"1995","unstructured":"McKay KN, Safayeni FR, Buzacott JA (1995) \u2018Common sense\u2019 realities of planning and scheduling in printed circuit board production. Int J Prod Res 33(6):1587\u20131603","journal-title":"Int J Prod Res"},{"key":"106_CR33","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/S0166-3615(99)00063-9","volume":"42","author":"KN McKay","year":"2000","unstructured":"McKay KN, Buzacott JA (2000) The application of computerized production control systems in job shop environments. Comput Ind 42:9\u201397","journal-title":"Comput Ind"},{"issue":"2","key":"106_CR34","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1007\/s10111-002-0117-4","volume":"5","author":"KN McKay","year":"2003","unstructured":"McKay KN, Wiers VCS (2003) Planning, scheduling and dispatching tasks in production control. Cognition Technol Work 5(2):82\u201393","journal-title":"Cognition Technol Work"},{"key":"106_CR35","unstructured":"Mietus DM (1994) Understanding planning for effective decision support. University of Groningen, Groningen"},{"key":"106_CR36","doi-asserted-by":"crossref","unstructured":"Miller GA, Galanter E, Pribram KJ (1960) Plans and the structure of behavior. Rinehart and Winston, Holt","DOI":"10.1037\/10039-000"},{"issue":"6","key":"106_CR37","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1177\/001872089103300602","volume":"33","author":"N Moray","year":"1991","unstructured":"Moray N, Dessouky MI, Kijowski BA, Adapathya R (1991) Strategic behavior, workload and performance in task scheduling. Hum Factors 33(6):607\u2013629","journal-title":"Hum Factors"},{"key":"106_CR38","unstructured":"Myers KL, Tyson WM, Wolverton MJ, Jarvis PA, Lee TJ, desJardins M (2002) PASSAT: a user-centric planning framework. In: Proceedings of the 3rd international NASA workshop on planning and scheduling for space"},{"issue":"4","key":"106_CR39","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1080\/00207548808947885","volume":"26","author":"N Nakamura","year":"1988","unstructured":"Nakamura N, Salvendy G (1988) An experimental study of human decision-making in computer-based scheduling of flexible manufacturing system. Int J Prod Res 26(4):567\u2013583","journal-title":"Int J Prod Res"},{"issue":"2","key":"106_CR40","first-page":"1","volume":"2","author":"A Newell","year":"1981","unstructured":"Newell A (1981) The knowledge level. AI Magazine 2(2):1\u201320","journal-title":"AI Magazine"},{"key":"106_CR42","unstructured":"Newell A, Simon HA (1972) Human problem solving. Prentice-Hall, Englewood Cliffs"},{"key":"106_CR41","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1037\/h0048495","volume":"65","author":"A Newell","year":"1958","unstructured":"Newell A, Shaw JC, Simon HA (1958) Elements of a theory of human problem solving. Psychol Rev 65:151\u2013166","journal-title":"Psychol Rev"},{"issue":"11","key":"106_CR43","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1057\/jors.1990.159","volume":"41","author":"P Norman","year":"1990","unstructured":"Norman P, Naveed S (1990) A comparison of expert system and human operator performance for cement kiln operation. J Oper Res Soc 41(11):1007\u20131019","journal-title":"J Oper Res Soc"},{"issue":"2","key":"106_CR44","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/S0933-3657(00)00060-9","volume":"20","author":"A Oddi","year":"2000","unstructured":"Oddi A, Cesta A (2000) Toward interactive scheduling systems for managing medical resources. Artif Intell Med 20(2):113\u2013138","journal-title":"Artif Intell Med"},{"key":"106_CR45","unstructured":"Prietula MJ, Hsu W, Ow PS (1994) MacMerl: mixed-Initiative scheduling with coincident problem spaces. In: Zweben M, Fox MS (eds) Intelligent scheduling. Morgan Kaufman, San Francisco"},{"key":"106_CR46","unstructured":"Riesbeck CK, Schank RC (1989) Inside case-based reasoning. Lawrence Erlbaum Associates, Hillsdale"},{"key":"106_CR47","doi-asserted-by":"crossref","unstructured":"Reizebos J, Van Wezel W (2006) Planner-oriented design of algorithms for train shunting scheduling. In: Van Wezel W, Jorna RJ, Meystel A (eds) Planning in intelligent systems, Wiley, New York","DOI":"10.1002\/0471781266.ch17"},{"issue":"6","key":"106_CR48","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1177\/001872088903100602","volume":"31","author":"PM Sanderson","year":"1989","unstructured":"Sanderson PM (1989) The human planning and scheduling role in advanced manufacturing systems: an emerging human factors domain. Hum Factors 31(6):635\u2013666","journal-title":"Hum Factors"},{"key":"106_CR49","unstructured":"Schank R, Abelson R (1977) Scripts plans goals and understanding. Lawrence Erlbaum Associates, Nillside"},{"key":"106_CR50","doi-asserted-by":"crossref","unstructured":"Schraagen JM, Chipman SF, Shalin VL (eds) (2000) Cognitive task analysis. Lawrence Erlbaum Associates, Mahwah","DOI":"10.4324\/9781410605795"},{"key":"106_CR51","doi-asserted-by":"crossref","unstructured":"Schreiber G, Akkermans H, Anjewierden A, De Hoog R, Shadbolt N, Van de Velde W, Wielinga B (2000) Knowledge engineering and management: the common-KADS methodology. MIT, Cambridge","DOI":"10.7551\/mitpress\/4073.001.0001"},{"key":"106_CR52","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1002\/net.3230060303","volume":"6","author":"DR Shier","year":"1976","unstructured":"Shier DR (1976) Iterative methods for determining the k shortest paths in a network. Networks 6:205\u2013230","journal-title":"Networks"},{"issue":"6","key":"106_CR53","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1007\/s001700050177","volume":"16","author":"J Smed","year":"2000","unstructured":"Smed J, Johtela T, Johnsson M, Puranen M, Nevalainen O (2000) An interactive system for scheduling jobs in electronic assembly. Int J Adv Manuf Technol 16(6):450\u2013459","journal-title":"Int J Adv Manuf Technol"},{"issue":"4","key":"106_CR54","doi-asserted-by":"crossref","first-page":"350","DOI":"10.1080\/09537289208919407","volume":"3","author":"SF Smith","year":"1992","unstructured":"Smith SF (1992) Knowledge-based production management: approaches, results and prospects. Prod Plann Control 3(4):350\u2013380","journal-title":"Prod Plann Control"},{"issue":"2","key":"106_CR55","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1016\/0377-2217(95)00360-6","volume":"90","author":"G Ulusoy","year":"1996","unstructured":"Ulusoy G, \u00d6zdamar L (1996) A framework for an interactive project scheduling system under limited resources. Eur J Oper Res 90(2):362\u2013375","journal-title":"Eur J Oper Res"},{"key":"106_CR56","unstructured":"Van Wezel W (2001) Tasks, hierarchies, and flexibility. Planning in food processing industries. Labyrint Publication, Capelle a\/d IJssel"},{"key":"106_CR60","unstructured":"Van Wezel W, Barten B (2002) Hierarchical mixed-initiative planning support. In: Grant T, Witteveen C (eds) Plansig 2002. Proceedings of the 21st workshop of the UK planning and scheduling special interest group. Delft University of Technology, Delft"},{"issue":"1","key":"106_CR58","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/S0167-9236(99)00018-4","volume":"26","author":"W Van Wezel","year":"1999","unstructured":"Van Wezel W, Jorna RJ (1999) The SEC-system: reuse support for scheduling system development. Decis Support Syst 26(1):67\u201387","journal-title":"Decis Support Syst"},{"key":"106_CR59","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/S0952-1976(01)00009-4","volume":"14\/3","author":"W Wezel Van","year":"2001","unstructured":"Van Wezel W, Jorna RJ (2001) Paradoxes in planning. Eng Appl Artif Intell 14\/3:269\u2013286","journal-title":"Eng Appl Artif Intell"},{"key":"106_CR61","doi-asserted-by":"crossref","unstructured":"Van Wezel W, Jorna RJ, Meystel A (eds) (2006) Planning in intelligent systems. Wiley, New York","DOI":"10.1002\/0471781266"},{"issue":"9","key":"106_CR57","first-page":"357","volume":"3","author":"W Wezel Van","year":"1996","unstructured":"Van Wezel W, Jorna RJ, Mietus D (1996) Scheduling in a generic perspective. Int J Expert Syst Res Appl 3(9):357\u2013381","journal-title":"Int J Expert Syst Res Appl"},{"key":"106_CR62","doi-asserted-by":"crossref","unstructured":"Vicente KJ (1999) Cognitive work analysis.LEA, Mahwah","DOI":"10.1201\/b12457"},{"key":"106_CR63","doi-asserted-by":"crossref","unstructured":"Waern Y (1989) Cognitive aspects of computer supported tasks. Wiley, Chichester","DOI":"10.1016\/B978-0-444-70536-5.50036-1"},{"key":"106_CR64","unstructured":"W\u00e4fler T (2001) Planning and sScheduling in secondary work systems. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London"},{"issue":"4","key":"106_CR65","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1080\/03081060008717655","volume":"23","author":"R Watson","year":"2000","unstructured":"Watson R (2000) Prospects for computer aided railway scheduling: perspectives from users and parallels from mass transit. Transp Plann Technol 23(4):303\u2013321","journal-title":"Transp Plann Technol"},{"issue":"4","key":"106_CR66","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1080\/09537289608930366","volume":"7","author":"VCS Wiers","year":"1996","unstructured":"Wiers VCS (1996) A quantitative field study of the decision behaviour of four shop floor schedulers. Prod Plann Control 7(4):383\u2013392","journal-title":"Prod Plann Control"},{"issue":"3","key":"106_CR67","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1287\/trsc.30.3.181","volume":"30","author":"PJ Zwaneveld","year":"1996","unstructured":"Zwaneveld PJ, Kroon LG, Romeijn HE, Salomon M, Dauz\u00e8re-P\u00e9r\u00e8s S, Van Hoesel SPM, Ambergen HW (1996) Routing trains through railway stations: model formulation and algorithms. Transp Sci 30(3):181\u2013194","journal-title":"Transp Sci"},{"key":"106_CR68","unstructured":"Zweben M, Fox MS (1994) Intelligent scheduling. Morgan Kaufman, San Francisco"}],"container-title":["Cognition, Technology &amp; Work"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10111-007-0106-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,1]],"date-time":"2020-05-01T13:08:59Z","timestamp":1588338539000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10111-007-0106-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,2,5]]},"references-count":68,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2009,6]]}},"alternative-id":["106"],"URL":"https:\/\/doi.org\/10.1007\/s10111-007-0106-8","relation":{},"ISSN":["1435-5558","1435-5566"],"issn-type":[{"value":"1435-5558","type":"print"},{"value":"1435-5566","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,2,5]]}}}