{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,8]],"date-time":"2026-04-08T03:55:33Z","timestamp":1775620533279,"version":"3.50.1"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2024,11,23]],"date-time":"2024-11-23T00:00:00Z","timestamp":1732320000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2024,11,23]],"date-time":"2024-11-23T00:00:00Z","timestamp":1732320000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100000780","name":"European Commission","doi-asserted-by":"publisher","award":["101070149"],"award-info":[{"award-number":["101070149"]}],"id":[{"id":"10.13039\/501100000780","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cogn Tech Work"],"published-print":{"date-parts":[[2025,6]]},"abstract":"<jats:title>Abstract<\/jats:title>\n          <jats:p>Planning and Scheduling (P&amp;S) are critical components of organizational management that influence efficiency, overall performance, and human factors in the workplace. The aerospace manufacturing industry is experiencing rapid changes, marked by heightened demands for new aircraft and the need for precise task execution to accommodate increasing air traffic and rigorous safety regulations. This study explores the human factors and emerging needs in the P&amp;S processes within aerospace manufacturing. A qualitative research approach was employed, featuring semi-structured interviews with 15 professionals from a prominent European organization. The participants, actively engaged in P&amp;S operations, were chosen to offer diverse perspectives on their roles and the industry\u2019s specific requirements. Results indicate that planners\/schedulers, IT experts, and operations team leaders are crucial in ensuring efficiency throughout the various stages of P&amp;S operations. The findings reveal that emerging needs encompass workforce and customer management (i.e., allocating human resources, responding to client requests, and addressing workforce resistance to new technology adoption), prioritization (i.e., scheduling tasks based on urgency, error susceptibility, and cost efficiency), and contingency handling (i.e., machinery availability, time constraints, quality issues, human performance variability, and weather conditions). These needs highlight the importance of considering human factors and cognitive aspects when designing and implementing P&amp;S systems. The study underscores the challenges the aerospace manufacturing industry faces as it adapts to technological advancements and evolving market conditions. The findings emphasize the necessity of advanced P&amp;S systems that integrate innovative technological solutions with an understanding of human factors and cognition.<\/jats:p>","DOI":"10.1007\/s10111-024-00785-3","type":"journal-article","created":{"date-parts":[[2024,11,23]],"date-time":"2024-11-23T01:47:49Z","timestamp":1732326469000},"page":"59-77","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Human factors and emerging needs in aerospace manufacturing planning and scheduling"],"prefix":"10.1007","volume":"27","author":[{"ORCID":"https:\/\/orcid.org\/0009-0007-3984-164X","authenticated-orcid":false,"given":"Sofia","family":"Morandini","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4777-1617","authenticated-orcid":false,"given":"Federico","family":"Fraboni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mark","family":"Hall","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Santiago","family":"Quintana-Amate","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3966-3800","authenticated-orcid":false,"given":"Luca","family":"Pietrantoni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,11,23]]},"reference":[{"key":"785_CR1","doi-asserted-by":"publisher","first-page":"492","DOI":"10.1002\/9781119171386.ch19","volume-title":"Handbook of practical research methods","author":"W Adams","year":"2015","unstructured":"Adams W (2015) Conducting semi-structured interviews. In: Hay RB (ed) Handbook of practical research methods, 2nd edn. Wiley, New York, pp 492\u2013505. https:\/\/doi.org\/10.1002\/9781119171386.ch19","edition":"2"},{"key":"785_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/20479700.2017.1298228","volume":"12","author":"I Ahmed","year":"2019","unstructured":"Ahmed I (2019) Staff well-being in high-risk operating room environment: definition, facilitators, stressors, leadership, and team-working\u2014A case-study from a large teaching hospital. Int J Healthc Manag 12:1\u201317. https:\/\/doi.org\/10.1080\/20479700.2017.1298228","journal-title":"Int J Healthc Manag"},{"key":"785_CR3","unstructured":"Akhtar M, Al-Bazi A, Adediran T, Rowley S (2019) An Integrated Real-Time Autonomous Production Planning and Scheduling System for Aerospace Manufacturing Systems. In 4Th International Conference on Innovation in Business, Economics & Marketing Research. IBEM 2019"},{"key":"785_CR4","doi-asserted-by":"publisher","first-page":"219","DOI":"10.46743\/2160-3715\/2018.2872","volume":"23","author":"MR Armat","year":"2018","unstructured":"Armat MR, Assarroudi A, Rad M, Sharifi H, Heydari A (2018) Inductive and deductive: ambiguous labels in qualitative content analysis. Qual Rep 23:219\u2013221. https:\/\/doi.org\/10.46743\/2160-3715\/2018.2872","journal-title":"Qual Rep"},{"key":"785_CR5","doi-asserted-by":"publisher","first-page":"3259","DOI":"10.1007\/s00170-017-1429-0","volume":"95","author":"A Azami","year":"2018","unstructured":"Azami A, Demirli K, Bhuiyan N (2018) Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem. Int J Adv Manuf Technol 95:3259\u20133274. https:\/\/doi.org\/10.1007\/s00170-017-1429-0","journal-title":"Int J Adv Manuf Technol"},{"key":"785_CR6","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.jmsy.2023.07.003","volume":"70","author":"Z Bao","year":"2023","unstructured":"Bao Z, Chen L, Qiu K (2023) A surrogate-assisted heuristic approach for the joint optimization of resource allocation and scheduling of an aircraft final assembly line. J Manuf Syst 70:99\u2013112. https:\/\/doi.org\/10.1016\/j.jmsy.2023.07.003","journal-title":"J Manuf Syst"},{"key":"785_CR7","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1191\/1478088706qp063oa","volume":"3","author":"V Braun","year":"2006","unstructured":"Braun V, Clarke V (2006) Using thematic analysis in psychology. Qual Res Psychol 3:77\u2013101. https:\/\/doi.org\/10.1191\/1478088706qp063oa","journal-title":"Qual Res Psychol"},{"key":"785_CR8","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1007\/s10111-022-00711-5","volume":"25","author":"J Cahill","year":"2023","unstructured":"Cahill J, Cullen P, Gaynor K (2023) The case for change: Aviation worker well-being during the COVID-19 pandemic and the need for an integrated health and safety culture. Cogn Technol Work 25:75\u2013117. https:\/\/doi.org\/10.1007\/s10111-022-00711-5","journal-title":"Cogn Technol Work"},{"key":"785_CR9","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1016\/j.jmsy.2022.02.001","volume":"48","author":"L Chen","year":"2019","unstructured":"Chen L, Wang T, Li P (2019) The role of technology literacy in modern manufacturing. J Manuf Syst 48:125\u2013134. https:\/\/doi.org\/10.1016\/j.jmsy.2022.02.001","journal-title":"J Manuf Syst"},{"key":"785_CR10","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1007\/978-3-030-14273-5_11","volume-title":"Human Mental workload: models and applications","author":"L Comberti","year":"2019","unstructured":"Comberti L, Leva MC, Demichela M, Desideri S, Baldissone G, Modaffari F (2019) An empirical approach to workload and human capability assessment in a manufacturing plant. In: Longo L, Leva MC (eds) Human Mental workload: models and applications, 2nd edn. Springer, Cham, pp 180\u2013201. https:\/\/doi.org\/10.1007\/978-3-030-14273-5_11","edition":"2"},{"key":"785_CR11","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.ejor.2017.03.031","volume":"262","author":"M Doumic","year":"2017","unstructured":"Doumic M, Perthame B, Ribes E, Salort D, Toubiana N (2017) Toward an integrated workforce planning framework using structured equations. Eur J Oper Res 262:217\u2013230. https:\/\/doi.org\/10.1016\/j.ejor.2017.03.031","journal-title":"Eur J Oper Res"},{"key":"785_CR12","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1080\/00207546108943095","volume":"1","author":"JM Dutton","year":"1962","unstructured":"Dutton JM (1962) Simulation of an actual production scheduling and workflow control system. Int J Prod Res 1:21\u201341. https:\/\/doi.org\/10.1080\/00207546108943095","journal-title":"Int J Prod Res"},{"key":"785_CR13","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1080\/00207546408942995","volume":"3","author":"JM Dutton","year":"1964","unstructured":"Dutton JM (1964) Production scheduling\u2014a behavioral model. Int J Prod Res 3:3\u201327. https:\/\/doi.org\/10.1080\/00207546408942995","journal-title":"Int J Prod Res"},{"key":"785_CR14","unstructured":"Gizzi MC, R\u00e4diker S (2021) The practice of qualitative data analysis: Research examples using MAXQDA. BoD\u2013Books on Demand"},{"key":"785_CR15","doi-asserted-by":"publisher","first-page":"265","DOI":"10.1007\/s40092-016-0171-9","volume":"13","author":"M Gohareh","year":"2017","unstructured":"Gohareh M, Gharneh NG, Yaghin R (2017) Techniques for cash management in scheduling manufacturing operations. J Ind Eng Int 13:265\u2013273. https:\/\/doi.org\/10.1007\/s40092-016-0171-9","journal-title":"J Ind Eng Int"},{"key":"785_CR16","doi-asserted-by":"publisher","unstructured":"Herrmann JW, Fleischer M, Lin E, Mathur V, Glasser J (2001) Affordable space systems manufacturing: Intelligent synthesis technology, process planning, and production scheduling. In: Proceedings of the ASME 2001 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. ASME, New York, pp 493\u2013500. https:\/\/doi.org\/10.1115\/DETC2001\/CIE-21281","DOI":"10.1115\/DETC2001\/CIE-21281"},{"key":"785_CR17","doi-asserted-by":"publisher","first-page":"5857","DOI":"10.1080\/00207543.2018.1554918","volume":"57","author":"C Hueber","year":"2019","unstructured":"Hueber C, Fischer G, Schwingshandl N, Schledjewski R (2019) Production planning optimization for composite aerospace manufacturing. Int J Prod Res 57:5857\u20135873. https:\/\/doi.org\/10.1080\/00207543.2018.1554918","journal-title":"Int J Prod Res"},{"key":"785_CR18","doi-asserted-by":"publisher","DOI":"10.1108\/JMTM-12-2020-0475","author":"A Ito","year":"2021","unstructured":"Ito A, Ylip\u00e4\u00e4 T, Gullander P, Bokrantz J, Centerholt V, Skoogh A (2021) Dealing with resistance to using industry 4.0 technologies in production disturbance management. J Manuf Technol Manag. https:\/\/doi.org\/10.1108\/JMTM-12-2020-0475","journal-title":"J Manuf Technol Manag"},{"key":"785_CR19","doi-asserted-by":"publisher","first-page":"2954","DOI":"10.1111\/jan.13031","volume":"72","author":"H Kallio","year":"2016","unstructured":"Kallio H, Pietil\u00e4 AM, Johnson M, Kangasniemi M (2016) Systematic methodological review: developing a framework for a qualitative semi-structured interview guide. J Adv Nurs 72:2954\u20132965","journal-title":"J Adv Nurs"},{"key":"785_CR20","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J Kallrath","year":"2002","unstructured":"Kallrath J (2002) Planning and scheduling in the process industry. OR Spectr 24:219\u2013250","journal-title":"OR Spectr"},{"key":"785_CR21","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1002\/cae.22197","volume":"28","author":"H Liu","year":"2020","unstructured":"Liu H, Jin X (2020) Digital manufacturing course framework for senior aircraft manufacturing engineering undergraduates. Comput Appl Eng Educ 28:338\u2013356. https:\/\/doi.org\/10.1002\/cae.22197","journal-title":"Comput Appl Eng Educ"},{"issue":"11\u201312","key":"785_CR22","doi-asserted-by":"publisher","first-page":"4973","DOI":"10.1007\/s00170-023-11707-4","volume":"127","author":"H Ma","year":"2023","unstructured":"Ma H, Huang X, Hu Z, Chen Y, Qian D, Deng J, Hua L (2023) Multi-objective production scheduling optimization and management control system of complex aerospace components: a review. Int J Adv Manuf Technol 127(11\u201312):4973\u20134993. https:\/\/doi.org\/10.1007\/s00170-023-11707-4","journal-title":"Int J Adv Manuf Technol"},{"key":"785_CR23","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1007\/978-1-4615-2263-8_2","volume-title":"Intelligent scheduling systems","author":"KN McKay","year":"1995","unstructured":"McKay KN, Safayeni FR, Buzacott JA (1995) Schedulers and planners: what and how can we learn from them? In: Brown DE, Scherer WT (eds) Intelligent scheduling systems. Kluwer, Boston, pp 41\u201362"},{"key":"785_CR24","doi-asserted-by":"publisher","first-page":"161","DOI":"10.31181\/rme040115092023m","volume":"4","author":"G Monek","year":"2023","unstructured":"Monek G, Fischer S (2023) DES and IIoT fusion approach towards real-time synchronization of physical and digital components in manufacturing processes. Rep Mech Eng 4:161\u2013174. https:\/\/doi.org\/10.31181\/rme040115092023m","journal-title":"Rep Mech Eng"},{"key":"785_CR25","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/B978-0-12-814062-8.00002-9","volume-title":"Additive manufacturing for the aerospace industry","author":"JC Najmon","year":"2019","unstructured":"Najmon JC, Raeisi S, Tovar A (2019) Review of additive manufacturing technologies and applications in the aerospace industry. In: Gibson I, Rosen DW, Stucker B (eds) Additive manufacturing for the aerospace industry. Elsevier, Amsterdam, pp 7\u201331. https:\/\/doi.org\/10.1016\/B978-0-12-814062-8.00002-9"},{"key":"785_CR26","first-page":"331","volume-title":"Design of work and development of personnel in Advanced Manufacturing","author":"N Nakamura","year":"1994","unstructured":"Nakamura N, Salvendy G (1994) Human planner and scheduler. In: Salvendy G, Karwowski W (eds) Design of work and development of personnel in Advanced Manufacturing. Wiley, New York, pp 331\u2013354"},{"key":"785_CR27","doi-asserted-by":"publisher","DOI":"10.11113\/jest.v5n2.123","author":"M Nawi","year":"2023","unstructured":"Nawi M, Zainol N, Naim F, Mamat M, Hamzah N (2023) Employers\u2019 perceptions of the manufacturing industry on workplace safety culture. J Energy Saf Technol. https:\/\/doi.org\/10.11113\/jest.v5n2.123","journal-title":"J Energy Saf Technol"},{"key":"785_CR28","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1111\/j.1465-7295.2007.00098.x","volume":"46","author":"R Nelson","year":"2008","unstructured":"Nelson R, Drews J (2008) Strict product liability and safety: evidence from the general aviation market. Econ Inq 46:425\u2013437. https:\/\/doi.org\/10.1111\/j.1465-7295.2007.00098.x","journal-title":"Econ Inq"},{"key":"785_CR29","doi-asserted-by":"publisher","first-page":"275","DOI":"10.1016\/j.jer.2023.09.027","volume":"12","author":"NC Nwasuka","year":"2024","unstructured":"Nwasuka NC, Nwaiwu U (2024) Computer-based production planning, scheduling and control: a review. J Eng Res 12:275\u2013280","journal-title":"J Eng Res"},{"key":"785_CR30","doi-asserted-by":"publisher","first-page":"259","DOI":"10.3926\/jiem.451","volume":"5","author":"M Othman","year":"2012","unstructured":"Othman M, Gouw GJ, Bhuiyan N (2012) Workforce scheduling: a new model incorporating human factors. J Ind Eng Manag 5:259\u2013284. https:\/\/doi.org\/10.3926\/jiem.451","journal-title":"J Ind Eng Manag"},{"key":"785_CR31","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1007\/s10111-020-00629-w","volume":"23","author":"KJ Parnell","year":"2021","unstructured":"Parnell KJ, Banks VA, Allison CK, Plant KL, Beecroft P, Stanton NA (2021) Designing flight deck applications: combining insight from end-users and ergonomists. Cogn Technol Work 23:353\u2013365. https:\/\/doi.org\/10.1007\/s10111-020-00629-w","journal-title":"Cogn Technol Work"},{"key":"785_CR32","doi-asserted-by":"crossref","unstructured":"Pralet C, Roussel S, Polacsek T, Bouissi\u00e8re F, Cuiller C, Dereux PE, Lelay M (2018) A scheduling tool for bridging the gap between aircraft design and aircraft manufacturing. In: Proceedings of the International Conference on Automated Planning and Scheduling, Vol. 28. pp 347\u2013355","DOI":"10.1609\/icaps.v28i1.13910"},{"key":"785_CR33","doi-asserted-by":"publisher","first-page":"635","DOI":"10.1177\/001872088903100602","volume":"31","author":"PM Sanderson","year":"1989","unstructured":"Sanderson PM (1989) The human planning and scheduling role in advanced manufacturing systems: an emerging human factors domain. Hum Factors 31:635\u2013666. https:\/\/doi.org\/10.1177\/001872088903100602","journal-title":"Hum Factors"},{"key":"785_CR34","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/j.jom.2010.12.006","volume":"29","author":"C Snoo","year":"2010","unstructured":"Snoo C, Wezel W, Jorna R (2010) An empirical investigation of scheduling performance criteria. J Oper Manag 29:181\u2013193. https:\/\/doi.org\/10.1016\/j.jom.2010.12.006","journal-title":"J Oper Manag"},{"key":"785_CR35","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1007\/978-3-319-04271-8_6","volume-title":"Advanced Manufacturing Systems","author":"A Sommer","year":"2014","unstructured":"Sommer A (2014) Challenges in request management: demand management of customer-driven product development. In: Varga M, Smith J (eds) Advanced Manufacturing Systems. Springer, Berlin, pp 63\u201372. https:\/\/doi.org\/10.1007\/978-3-319-04271-8_6"},{"key":"785_CR36","doi-asserted-by":"publisher","unstructured":"Sruti S, Bhuiyan A, Guo Z (2018) Work-in-progress: precise scheduling of mixed-criticality tasks by varying processor speed. IEEE Real-Time Syst Symp 173\u2013176. https:\/\/doi.org\/10.1145\/3356401.3356410","DOI":"10.1145\/3356401.3356410"},{"key":"785_CR38","doi-asserted-by":"publisher","first-page":"012027","DOI":"10.1088\/1757-899X\/1258\/1\/012027","volume":"1258","author":"N Subramanya","year":"2022","unstructured":"Subramanya N, Kumar A, Yadav V, Venkatesh R (2022) Manufacturing process planning in aerospace systems. IOP Conf Ser Mater Sci Eng 1258:012027. https:\/\/doi.org\/10.1088\/1757-899X\/1258\/1\/012027","journal-title":"IOP Conf Ser Mater Sci Eng"},{"key":"785_CR39","doi-asserted-by":"publisher","unstructured":"Sunday A, Omolayo M, Samuel A, Samuel O, Abdulkareem A, Moses E, Olamma U (2021) The Role of Production Planning in Enhancing an Efficient Manufacturing System \u2013 An Overview. E3S Web Conf. https:\/\/doi.org\/10.1051\/e3sconf\/202130901002","DOI":"10.1051\/e3sconf\/202130901002"},{"key":"785_CR40","unstructured":"Tuples |Trustworthy AI http:\/\/www.tuples.ai\/ [accessed 13 May 2024]"},{"key":"785_CR41","doi-asserted-by":"publisher","first-page":"124","DOI":"10.4103\/0976-8580.113058","volume":"3","author":"V Tyagi","year":"2013","unstructured":"Tyagi V, Jain A, Jain P (2013) An integrated production planning and scheduling framework for make-to-order environment. J Eng Technol 3:124. https:\/\/doi.org\/10.4103\/0976-8580.113058","journal-title":"J Eng Technol"},{"key":"785_CR43","doi-asserted-by":"publisher","first-page":"849","DOI":"10.3390\/sym11070849","volume":"11","author":"Q Wang","year":"2019","unstructured":"Wang Q, Luo H, Xiong J, Song Y, Zhang Z (2019) Evolutionary algorithm for aerospace shell product digital production line scheduling problem. Symmetry 11:849. https:\/\/doi.org\/10.3390\/sym11070849","journal-title":"Symmetry"},{"key":"785_CR44","doi-asserted-by":"publisher","DOI":"10.4324\/9780429346156","volume-title":"Air transportation: a global management perspective","author":"J Wensveen","year":"2023","unstructured":"Wensveen J (2023) Air transportation: a global management perspective. Routledge, London"},{"key":"785_CR45","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1080\/095372897234876","volume":"8","author":"VC Wiers","year":"1997","unstructured":"Wiers VC, Van Der Schaaf TW (1997) A framework for decision support in production scheduling tasks. Prod Plan Control 8:533\u2013544. https:\/\/doi.org\/10.1080\/095372897234876","journal-title":"Prod Plan Control"},{"key":"785_CR47","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ijpe.2018.11.012","volume":"208","author":"Y Yang","year":"2019","unstructured":"Yang Y, Pan S, Ballot E (2019) Integrated planning for aerospace supply chain: a literature review and future research directions. Int J Prod Econ 208:1\u201315. https:\/\/doi.org\/10.1016\/j.ijpe.2018.11.012","journal-title":"Int J Prod Econ"},{"key":"785_CR46","doi-asserted-by":"publisher","first-page":"5190","DOI":"10.3390\/app13085190","volume":"13","author":"G Yang","year":"2023","unstructured":"Yang G, Tan Q, Tian Z, Jiang X, Chen K, Lu Y, Yuan P (2023) Integrated optimization of process planning and scheduling for aerospace complex component based on honey-bee mating algorithm. Appl Sci 13:5190. https:\/\/doi.org\/10.3390\/app13085190","journal-title":"Appl Sci"}],"container-title":["Cognition, Technology &amp; Work"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10111-024-00785-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10111-024-00785-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10111-024-00785-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,6]],"date-time":"2025-09-06T00:46:53Z","timestamp":1757119613000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10111-024-00785-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,11,23]]},"references-count":45,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2025,6]]}},"alternative-id":["785"],"URL":"https:\/\/doi.org\/10.1007\/s10111-024-00785-3","relation":{},"ISSN":["1435-5558","1435-5566"],"issn-type":[{"value":"1435-5558","type":"print"},{"value":"1435-5566","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,11,23]]},"assertion":[{"value":"6 June 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"6 November 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 November 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}]}}