{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,5,9]],"date-time":"2023-05-09T07:11:03Z","timestamp":1683616263040},"reference-count":63,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2006,9,22]],"date-time":"2006-09-22T00:00:00Z","timestamp":1158883200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ISeB"],"published-print":{"date-parts":[[2007,2,9]]},"DOI":"10.1007\/s10257-006-0039-4","type":"journal-article","created":{"date-parts":[[2006,10,6]],"date-time":"2006-10-06T00:53:22Z","timestamp":1160096002000},"page":"117-137","source":"Crossref","is-referenced-by-count":3,"title":["The myth of accelerating business processes through parallel job designs"],"prefix":"10.1007","volume":"5","author":[{"given":"Michael","family":"Zapf","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ute","family":"Lindheimer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Armin","family":"Heinzl","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2006,9,22]]},"reference":[{"issue":"204","key":"39_CR1","first-page":"45","volume":"35","author":"B Achermann","year":"1998","unstructured":"Achermann B (1998) Aufbau eines Outbound Telesales Centers in 12 Wochen. HMD 35(204):45\u201355","journal-title":"HMD"},{"issue":"3","key":"39_CR2","doi-asserted-by":"crossref","first-page":"458","DOI":"10.1287\/mnsc.41.3.458","volume":"41","author":"PS Adler","year":"1995","unstructured":"Adler PS, Mandelbaum A, Nguyen V, Schwerer E (1995) From project to process management: an empirically-based framework for analyzing product development time. Manage Sci 41(3):458\u2013484","journal-title":"Manage Sci"},{"key":"39_CR3","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1109\/17.387269","volume":"42","author":"F AitSahlia","year":"1995","unstructured":"AitSahlia F, Johnson E, Will P (1995) Is concurrent engineering always a sensible proposition? IEEE Trans Eng Manage 42:166\u2013170","journal-title":"IEEE Trans Eng Manage"},{"key":"39_CR4","first-page":"483","volume":"30","author":"G Amdahl","year":"1967","unstructured":"Amdahl G (1967) Validity of the single processor approach to achieving large scale computer capabilities. Proc AFIPS Comput Conf 30:483","journal-title":"Proc AFIPS Comput Conf"},{"key":"39_CR5","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1177\/026839629601100307","volume":"11","author":"A Barua","year":"1996","unstructured":"Barua A, Ravindran S (1996) Reengineering information sharing behaviour in organizations. J Inf Technol 11:261\u2013272","journal-title":"J Inf Technol"},{"key":"39_CR6","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1002\/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7","volume":"43","author":"JD Blocher","year":"1996","unstructured":"Blocher JD (1996) The customer order lead-time problem on parallel machines. Nav Res Logist 43:629\u2013654","journal-title":"Nav Res Logist"},{"key":"39_CR7","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1080\/07408170304429","volume":"35","author":"J Bukchin","year":"2003","unstructured":"Bukchin J, Rubinovitz J (2003) A weighted approach for assembly line design with station paralleling and equipment selection. IIE Trans 35:73\u201385","journal-title":"IIE Trans"},{"key":"39_CR8","unstructured":"Bulgren WG (1982) Discrete system simulation. Englewood Cliffs, New Jersey"},{"issue":"5","key":"39_CR9","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1080\/00207549008942758","volume":"28","author":"JA Buzacott","year":"1990","unstructured":"Buzacott JA (1990) Abandoning the moving assembly line: models of human operators and job sequencing. Int J Prod Res 28(5):821\u2013839","journal-title":"Int J Prod Res"},{"issue":"5","key":"39_CR10","doi-asserted-by":"crossref","first-page":"768","DOI":"10.1287\/mnsc.42.5.768","volume":"42","author":"JA Buzacott","year":"1996","unstructured":"Buzacott JA (1996) Commonalities in reengineered business processes: models and issues. Manage Sci 42(5):768\u2013782","journal-title":"Manage Sci"},{"issue":"1","key":"39_CR11","first-page":"103","volume":"34","author":"SH Choi","year":"1998","unstructured":"Choi SH, Kin JS (1998) A study on the measurement of comprehensive flexibility in manufacturing systems. Comput Eng 34(1):103\u2013118","journal-title":"Comput Eng"},{"key":"39_CR12","unstructured":"Clark KB, Fujimoto T (1991) Product development performance. Harvard Business School, Boston"},{"issue":"2","key":"39_CR13","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1287\/orsc.8.2.157","volume":"8","author":"KA Crowston","year":"1997","unstructured":"Crowston KA (1997) Coordination theory approach to organizational process design. Organ Sci 8(2):157\u2013175","journal-title":"Organ Sci"},{"issue":"7","key":"39_CR14","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1515\/zwf-1996-917-816","volume":"91","author":"R Cuiper","year":"1996","unstructured":"Cuiper R, Feldmann C, Rossgoderer U (1996) Rechnerunterst\u00fctzte Parallelisierung von Konstruktion und Montageplanung. Z wirtsch Fabr 91(7):338\u2013341","journal-title":"Z wirtsch Fabr"},{"key":"39_CR15","unstructured":"Davenport TH (1993) Process innovation: reengineering work through information technology. Harvard Business School Press, Boston"},{"issue":"1","key":"39_CR16","first-page":"28","volume":"34","author":"GJ Vreede De","year":"1996","unstructured":"De Vreede GJ, Van Eijck DTT, Sol HG (1996) Dynamic modelling for re-engineering organizations. INFOR 34(1):28\u201342","journal-title":"INFOR"},{"key":"39_CR17","unstructured":"Edosomwan JA (1996) Organizational transformation and process reengineering. Delray Beach, St. Lucie Press, Florida"},{"key":"39_CR18","doi-asserted-by":"crossref","unstructured":"Eversheim W (1995) Prozessorientierte Unternehmensorganisation. Springer, Berlin Heidelberg New York","DOI":"10.1007\/978-3-642-97834-0"},{"issue":"1","key":"39_CR19","first-page":"91","volume":"34","author":"P Farrington","year":"1998","unstructured":"Farrington P, Nazemetz JW (1998) Evaluation of the performance domain of cellular and functional layouts. Comput Eng 34(1):91\u2013101","journal-title":"Comput Eng"},{"key":"39_CR20","unstructured":"Gerpott TJ, Winzer P (1996) Simultaneous engineering: Kritische Analyse eines Planungs- und Organisationsansatzes zur Erfolgsverbesserung industrieller Produktinnovationen. Zeitschrift Planung (2):132\u2013150"},{"issue":"3","key":"39_CR21","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1080\/10580539708907061","volume":"14","author":"PJ Giannini","year":"1997","unstructured":"Giannini PJ, Gruppe FH, Saholsky RM (1997) Reengineering through simulation modeling: optimizing a telephone ordering system at GPO. Inf Syst Manage 14(3):61\u201366","journal-title":"Inf Syst Manage"},{"issue":"203","key":"39_CR22","first-page":"58ff","volume":"35","author":"R Gl\u00fccher","year":"1998","unstructured":"Gl\u00fccher R (1998) Durchsatzsteigerung in einem Image-Processing-System durch Parallelverarbeitung. HMD 35(203):58ff","journal-title":"HMD"},{"key":"39_CR23","unstructured":"Goebel E (1996) Prozessorganisation\u2014radikaler Neubeginn oder alte Wissensbest\u00e4nde im neuen Gewande. Zeitschrift Planung (4):309\u2013318"},{"issue":"1993","key":"39_CR24","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/0737-6782(93)90003-9","volume":"10","author":"A Griffin","year":"1993","unstructured":"Griffin A (1993) Metrics for measuring product development cycle time. J Prod Innov Manage 10(1993):112\u2013125","journal-title":"J Prod Innov Manage"},{"issue":"203","key":"39_CR25","first-page":"38ff","volume":"35","author":"G H\u00e4chler","year":"1998","unstructured":"H\u00e4chler G (1998) Die parallele Koordinationssprache ALWAN. HMD 35(203):38ff","journal-title":"HMD"},{"key":"39_CR26","unstructured":"Hammer M (1990) Reengineering work: don\u2019t automate, obliterate. Harvard Business Review July\u2013August:104\u2013112"},{"key":"39_CR27","doi-asserted-by":"crossref","unstructured":"Hammer M, Champy J (1993) Reengineering the Corporation: a Manifesto for Business Revolution. Harper Collins, New York","DOI":"10.1016\/S0007-6813(05)80064-3"},{"key":"39_CR28","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1109\/17.364562","volume":"41","author":"RB Handfield","year":"1994","unstructured":"Handfield RB (1994) Effects of concurrent engineering on make-to-order products. IEEE Trans Eng Manage 41:384\u2013393","journal-title":"IEEE Trans Eng Manage"},{"key":"39_CR29","unstructured":"Heiss HU (1994) Prozessorzuteilung in Parallelrechnern. Bl-Wiss.-Verlag, Mannheim"},{"key":"39_CR30","doi-asserted-by":"crossref","unstructured":"Housel T, Kanevsky VA (1995) Reengineering business processes: a complexity theory approach to value added. INFOR 33(4)","DOI":"10.1080\/03155986.1995.11732285"},{"key":"39_CR31","unstructured":"IEEE (1995) Special issue on microprocessors. In: Proceedings of the IEEE 83(12)"},{"key":"39_CR32","unstructured":"Jaenicke R (1998) Parallel processing: the future of embedded systems. Can Electron 13(3)"},{"issue":"11","key":"39_CR33","doi-asserted-by":"crossref","first-page":"1309","DOI":"10.1287\/mnsc.29.11.1309","volume":"29","author":"RV Johnson","year":"1983","unstructured":"Johnson RV (1983) A branch and bound algorithm for assembly line balancing problems with formulation irregularities. Manage Sci 29(11):1309\u20131324","journal-title":"Manage Sci"},{"key":"39_CR34","unstructured":"Kelton WD, Sadowski RP, Sadowski DA (1998) Simulation with ARENA. McGraw-Hill, Boston"},{"issue":"3","key":"39_CR35","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0737-6782(98)00048-4","volume":"16","author":"E Kessler","year":"1999","unstructured":"Kessler E, Chakrabarti AK (1999) Speeding up the pace of new product development. J Prod Innov Manage 16(3):231\u2013247","journal-title":"J Prod Innov Manage"},{"issue":"4","key":"39_CR36","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1016\/0361-3682(83)90048-X","volume":"8","author":"RH Kilman","year":"1983","unstructured":"Kilman RH (1983) The costs of organization structure: dispelling the myths of independent divisions and organization-wide decision making. Account Organ Soc 8(4):341\u2013357","journal-title":"Account Organ Soc"},{"key":"39_CR37","unstructured":"Kleinrock L (1975) Queuing systems. Wiley, New York"},{"key":"39_CR38","unstructured":"Law AM et al (1991) Simulation modeling and analysis. McGraw-Hill, New York"},{"key":"39_CR39","doi-asserted-by":"crossref","unstructured":"Liebl F (1995) Simulation. Oldenbourg, M\u00fcnchen","DOI":"10.1515\/9783486788747"},{"issue":"1","key":"39_CR40","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1145\/174666.174668","volume":"26","author":"TW Malone","year":"1994","unstructured":"Malone TW, Crowston K (1994) The interdisciplinary study of coordination. ACM Comput Surv 26(1):88\u2013119","journal-title":"ACM Comput Surv"},{"issue":"3","key":"39_CR41","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1287\/opre.36.3.421","volume":"36","author":"TW Malone","year":"1988","unstructured":"Malone TW, Smith SA (1988) Modeling the performance of organizational structures. Oper Res 36(3):421\u2013436","journal-title":"Oper Res"},{"key":"39_CR42","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1111\/1540-5885.1130236","volume":"11","author":"PA Murmann","year":"1994","unstructured":"Murmann PA (1994) Expected development time reductions in the German mechanical engineering industry. J Prod Innov Manage 11:236\u2013252","journal-title":"J Prod Innov Manage"},{"key":"39_CR43","doi-asserted-by":"crossref","unstructured":"Nissen ME (1998) Redesigning reengineering through measurement-driven inference. MIS Quarterly December:509\u2013534","DOI":"10.2307\/249553"},{"key":"39_CR44","unstructured":"Ould M (1995) Business processes: modelling and analysis for re-engineering and improvement. Wiley, Chichester"},{"key":"39_CR45","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1002\/(SICI)1520-6750(199609)43:6<897::AID-NAV7>3.0.CO;2-#","volume":"43","author":"N Piersma","year":"1996","unstructured":"Piersma N, Romeijn HE (1996) Parallel machine scheduling: a probabilistic analysis. Nav Res Logist 43:897\u2013916","journal-title":"Nav Res Logist"},{"issue":"2","key":"39_CR46","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1080\/00207547508942985","volume":"13","author":"PA Pinto","year":"1975","unstructured":"Pinto PA, Dannenbring DG, Khumawala BM (1975) A branch and bound algorithm for assembly line balancing with paralleling. Int J Prod Res 13(2):183\u2013196","journal-title":"Int J Prod Res"},{"issue":"1","key":"39_CR47","first-page":"41","volume":"4","author":"MJ Prietula","year":"1994","unstructured":"Prietula MJ, Carley KM (1994) Computational organization theory: autonomous agents and emergent behavior. J Organ Comput 4(1):41\u201383","journal-title":"J Organ Comput"},{"key":"39_CR48","unstructured":"Schmelzer HJ (1990) Steigerung der Effektivit\u00e4t und Effizienz durch Verk\u00fcrzung von Entwicklungszeiten. In: Reichwald R, Schmelzer HJ (eds) Durchlaufzeiten in der Entwicklung: Praxis des industriellen F&E Managements, M\u00fcnchen, pp 27\u201364"},{"key":"39_CR49","unstructured":"Schr\u00f6der HH (1994) Die Parallelisierung von Forschungs- und Entwicklungs-(F&E)-Aktivit\u00e4ten als Instrument zur Verk\u00fcrzung der Projektdauer im Lichte des \u201cMagischen Dreiecks\u201d aus Projektdauer, Projektkosten und Projektergebnissen. In: Zahn E (ed) Technologiemanagement und Technologien f\u00fcr das Management, pp 289\u2013323"},{"issue":"2\u20133","key":"39_CR50","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/S0925-5273(97)00037-6","volume":"50","author":"A Seidmann","year":"1997","unstructured":"Seidmann A, Sundararajan A (1997) The Effects of Task and Information Asymmetry on Business Process Redesign. Int J Prod Econ 50(2\u20133):117\u2013128","journal-title":"Int J Prod Econ"},{"issue":"3","key":"39_CR51","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1080\/00207548508904730","volume":"23","author":"K Shanker","year":"1985","unstructured":"Shanker K, Tzen YJJ (1985) A loading and dispatching problem in a random flexible manufacturing system. Int J Prod Res 23(3):579\u2013595","journal-title":"Int J Prod Res"},{"issue":"6","key":"39_CR52","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1016\/S0305-0483(96)00035-7","volume":"24","author":"C Sheu","year":"1996","unstructured":"Sheu C, Babbar S (1996) A managerial assessment of the waiting-time performance for alternative service process designs. Omega 24(6):689\u2013703","journal-title":"Omega"},{"issue":"203","key":"39_CR53","first-page":"9","volume":"35","author":"C Siemers","year":"1998","unstructured":"Siemers C (1998) Paralele Programmierung\u2014Nicht ohne Prozessor- und Rechnertechnik. HMD 35(203):9\u201320","journal-title":"HMD"},{"key":"39_CR54","unstructured":"Smith B (1999) Breaking through the I\/O bottleneck. Network World 16(34)"},{"key":"39_CR55","unstructured":"Stone HS (1987) High performance computing architecture. Addison-Wesley, Reading Mass"},{"key":"39_CR56","unstructured":"Thompson JD (1967) Organizations in action: social science bases of administrative theory. McGraw-Hill, New York"},{"key":"39_CR57","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1016\/0737-6782(93)90098-B","volume":"10","author":"L Trygg","year":"1993","unstructured":"Trygg L (1993) Concurrent engineering practices in selected Swedish companies: a movement or an activity of the few? J Prod Innov Manage 10:403\u2013415","journal-title":"J Prod Innov Manage"},{"key":"39_CR58","unstructured":"Walter ZD (1998) Workflow management in business processes. Dissertation University of Rochester. New York"},{"key":"39_CR59","first-page":"1251","volume":"63","author":"H Wildemann","year":"1993","unstructured":"Wildemann H (1993) Just-In-Time in Forschung & Entwicklung und Konstruktion. Zeitschrift Betriebswirtschaft 63:1251\u20131270","journal-title":"Zeitschrift Betriebswirtschaft"},{"key":"39_CR60","unstructured":"Zangl H (1985) Durchlaufzeiten im B\u00fcro. Schmidt, Berlin"},{"key":"39_CR61","unstructured":"Zapf M (2001) Gestaltung flexibler Kundeninteraktionsprozesse im Communication Center: Theoretische Grundlagen und experimentelle Analyse, Dissertation, University of Bayreuth"},{"key":"39_CR62","doi-asserted-by":"crossref","unstructured":"Zapf M, Heinzl A (2000) Evaluation of generic process design patterns: an experimental study. In: van der Aalst WMP, Desel J, Oberweis A (eds) Business process management: models, techniques, and empirical studies, LNCS 1806. Berlin","DOI":"10.1007\/3-540-45594-9_6"},{"key":"39_CR63","unstructured":"Zapf M, Storch K (2001) Making simulation work for the organizational design of communication centers: challenges and practical experience. In: Proceedings of the 2001 Summer Computer Simulation Conference, Orlando"}],"container-title":["Information Systems and e-Business Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10257-006-0039-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10257-006-0039-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10257-006-0039-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,9]],"date-time":"2023-05-09T06:56:28Z","timestamp":1683615388000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10257-006-0039-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,9,22]]},"references-count":63,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007,2,9]]}},"alternative-id":["39"],"URL":"https:\/\/doi.org\/10.1007\/s10257-006-0039-4","relation":{},"ISSN":["1617-9846","1617-9854"],"issn-type":[{"value":"1617-9846","type":"print"},{"value":"1617-9854","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,9,22]]}}}