{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,15]],"date-time":"2025-10-15T00:31:19Z","timestamp":1760488279597},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2006,6,13]],"date-time":"2006-06-13T00:00:00Z","timestamp":1150156800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["CMS"],"published-print":{"date-parts":[[2006,9]]},"DOI":"10.1007\/s10287-006-0018-8","type":"journal-article","created":{"date-parts":[[2006,6,12]],"date-time":"2006-06-12T09:04:26Z","timestamp":1150103066000},"page":"271-284","source":"Crossref","is-referenced-by-count":19,"title":["An Optimization Model for Stochastic Project Networks with Cash Flows"],"prefix":"10.1007","volume":"3","author":[{"given":"Stefano","family":"Benati","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2006,6,13]]},"reference":[{"key":"18_CR1","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models and methods. Eur J Oper Res 112: 3\u201341","journal-title":"Eur J Oper Res"},{"key":"18_CR2","doi-asserted-by":"crossref","unstructured":"Buss AH, Rosenblatt MJ (1997) Activity delay in stochastic project networks Operations Research, 45: 126\u2013139","DOI":"10.1287\/opre.45.1.126"},{"key":"18_CR3","doi-asserted-by":"crossref","first-page":"460","DOI":"10.1287\/opre.12.3.460","volume":"12","author":"A Charnes","year":"1964","unstructured":"Charnes A, Cooper WW, Thompson GL (1964) Critical path analysis via chance-constrained and stochastic programming. Oper Res 12: 460\u2013470","journal-title":"Oper Res"},{"key":"18_CR4","unstructured":"Demeulemeester E, Herroelen W, Van Dommelen P (1996) An optimal recursive search procedure for the deterministic uncostrained max-npv project scheduling problem In: Leuven KU (ed) Reseach Report 9603 Department of Applied Economics"},{"key":"18_CR5","doi-asserted-by":"crossref","first-page":"862","DOI":"10.1287\/opre.33.4.862","volume":"33","author":"B Dodin","year":"1985","unstructured":"Dodin B (1985) Bounding the project completion time distribution in PERT network. Oper Res 33: 862\u2013865","journal-title":"Oper Res"},{"key":"18_CR6","doi-asserted-by":"crossref","first-page":"882","DOI":"10.1287\/mnsc.23.8.882","volume":"23","author":"RH Doersch","year":"1977","unstructured":"Doersch RH, Patterson JH (1977) Scheduling a project to maximize its present value: a zero-one programming approach. Manage Sci 23: 882\u2013889","journal-title":"Manage Sci"},{"key":"18_CR7","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1287\/mnsc.13.5.299","volume":"13","author":"SE Elmaghraby","year":"1967","unstructured":"Elmaghraby SE (1967) On the expected duration time of PERT network. Manage Sci 13: 299\u2013306","journal-title":"Manage Sci"},{"key":"18_CR8","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/0377-2217(90)90118-U","volume":"49","author":"SE Elmaghraby","year":"1990","unstructured":"Elmaghraby SE, Herroelen WS (1990) The scheduling of activities to maximize the net present value of projects. Eur J Oper Res 49: 35\u201349","journal-title":"Eur J Oper Res"},{"key":"18_CR9","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1287\/opre.10.6.808","volume":"10","author":"DR Fulkerson","year":"1962","unstructured":"Fulkerson DR (1962) Expected critical path lenghts in PERT networks. Oper Res 10: 808\u2013817","journal-title":"Oper Res"},{"key":"18_CR10","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1007\/978-94-009-7801-0_16","volume-title":"Deterministic and Stochastic Scheduling","author":"W Gaul","year":"1982","unstructured":"Gaul W (1982) On stochastic analysis of project-networks. In: Dempster MAH et\u00a0al (eds) Deterministic and Stochastic Scheduling. Reidel Publishing Company, Dordrecht, pp 297\u2013309"},{"key":"18_CR11","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1002\/nav.3800190110","volume":"19","author":"RC Grinold","year":"1972","unstructured":"Grinold RC (1972) The payment scheduling problem. Naval Res Logist Q 19: 123\u2013136","journal-title":"Naval Res Logist Q"},{"key":"18_CR12","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1002\/net.3230180206","volume":"18","author":"JN Hagstrom","year":"1988","unstructured":"Hagstrom JN (1988) Computational complexity of PERT problems. Networks 18: 139\u2013147","journal-title":"Networks"},{"key":"18_CR13","doi-asserted-by":"crossref","unstructured":"Hagstrom JN (1990) Computing the probability distribution of project duration in a PERT network Networks 20: 231\u2013244","DOI":"10.1002\/net.3230200208"},{"key":"18_CR14","doi-asserted-by":"crossref","first-page":"274","DOI":"10.1016\/0377-2217(93)90340-S","volume":"65","author":"WG Herroelen","year":"1993","unstructured":"Herroelen WG, Gallens E (1993) Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects. Eur J Oper Res 65: 274\u2013277","journal-title":"Eur J Oper Res"},{"key":"18_CR15","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0377-2217(96)00112-9","volume":"100","author":"WS Herroelen","year":"1997","unstructured":"Herroelen WS, Van Dommelen P, Demeulemeester EL (1997) Project network models with discounted cash flows: a guided tour through recent develpments. Eur J Oper Res 100: 97\u2013121","journal-title":"Eur J Oper Res"},{"key":"18_CR16","volume-title":"Stochastic programming","author":"P Kall","year":"1994","unstructured":"Kall P, Wallace S (1994) Stochastic programming. Wiley, New York"},{"key":"18_CR17","doi-asserted-by":"crossref","first-page":"1586","DOI":"10.1287\/opre.19.7.1586","volume":"19","author":"GB Kleindorfer","year":"1971","unstructured":"Kleindorfer GB (1971) Bounding distributions for a stochastic acyclic network. Oper Res 19: 1586\u20131601","journal-title":"Oper Res"},{"key":"18_CR18","doi-asserted-by":"crossref","unstructured":"M\u00f6hring RH (2000) Scheduling under uncertaity: bounding the makespan distribution Working Paper n 700, Technische Universitat Berlin","DOI":"10.1007\/3-540-45506-X_7"},{"key":"18_CR19","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/B978-0-444-87358-3.50006-7","volume-title":"Advances in project scheduling","author":"RH M\u00f6hring","year":"1989","unstructured":"M\u00f6hring RH, Radermacher FJ (1989) The order theoretic approach to scheduling: the deterministic case. In: Slowinski R, Weglarz J (eds) Advances in project scheduling. Elsevier, Amsterdam, pp 29\u201366"},{"key":"18_CR20","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/B978-0-444-87358-3.50024-9","volume-title":"Advances in project scheduling","author":"RH M\u00f6hring","year":"1989","unstructured":"M\u00f6hring RH, Radermacher FJ (1989) The order theoretic approach to scheduling: the stochastic case. In: Slowinski R, Weglarz J (eds) Advances in project scheduling. Elsevier, Amsterdam, pp 497\u2013531"},{"key":"18_CR21","doi-asserted-by":"crossref","first-page":"1642","DOI":"10.1287\/mnsc.38.11.1642","volume":"38","author":"JM Mulvey","year":"1992","unstructured":"Mulvey JM, Vladimirou H (1992) Stochastic network programming for financial planning problem. Manage Sci 38: 1642\u20131664","journal-title":"Manage Sci"},{"key":"18_CR22","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1287\/opre.24.1.177","volume":"24","author":"P Robillard","year":"1976","unstructured":"Robillard P, Trahan M (1976) Expected completion time in PERT networks. Oper Res 24: 177\u2013182","journal-title":"Oper Res"},{"key":"18_CR23","doi-asserted-by":"crossref","unstructured":"Russel AH (1970) Cash-flows in network Manage Sci 16: 357\u2013373","DOI":"10.1287\/mnsc.16.5.357"},{"key":"18_CR24","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/opre.28.3.614","volume":"28","author":"RH Sullivan","year":"1980","unstructured":"Sullivan RH, Hayya JC (1980) A comparison of the method of bounding distribution (MBD) and Monte Carlo simulation for analyzing stochastic acyclic networks. Oper Res 28: 614\u2013617","journal-title":"Oper Res"},{"key":"18_CR25","volume-title":"OR Models and microcomputers","author":"LV Tavares","year":"1986a","unstructured":"Tavares LV (1986a) Stochastic planning and control of program budgeting - the model MACAO. In: Coelho JS and Tavares LV (eds) OR Models and microcomputers. Elsevier Science Publishers, Amsterdam, pp 1\u20131"},{"key":"18_CR26","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/0377-2217(86)92000-X","volume":"25","author":"LV Tavares","year":"1986b","unstructured":"Tavares LV (1986b) Multicriteria scheduling of a railway renewal program. Eur J Oper Res 25: 395\u2013405","journal-title":"Eur J Oper Res"},{"key":"18_CR27","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1016\/0377-2217(93)90176-N","volume":"64","author":"KK Yang","year":"1993","unstructured":"Yang KK, Talbot FB, Patterson JH (1993) Scheduling a project to maximize its present value: an integer programming approach. Eur J Oper Res 64: 188-198","journal-title":"Eur J Oper Res"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-006-0018-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10287-006-0018-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-006-0018-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T12:12:46Z","timestamp":1559131966000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10287-006-0018-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,6,13]]},"references-count":27,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2006,9]]}},"alternative-id":["18"],"URL":"https:\/\/doi.org\/10.1007\/s10287-006-0018-8","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,6,13]]}}}