{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,29]],"date-time":"2022-03-29T20:23:58Z","timestamp":1648585438572},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,4,29]],"date-time":"2014-04-29T00:00:00Z","timestamp":1398729600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2015,1]]},"DOI":"10.1007\/s10287-014-0208-8","type":"journal-article","created":{"date-parts":[[2014,4,28]],"date-time":"2014-04-28T02:28:26Z","timestamp":1398652106000},"page":"111-127","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Stochastic model for energy commercialisation of small hydro plants in the Brazilian energy market"],"prefix":"10.1007","volume":"12","author":[{"given":"Vitor L.","family":"de Matos","sequence":"first","affiliation":[]},{"given":"Mauro A. G.","family":"Sierra","sequence":"additional","affiliation":[]},{"given":"Erlon C.","family":"Finardi","sequence":"additional","affiliation":[]},{"given":"Brigida U.","family":"Decker","sequence":"additional","affiliation":[]},{"given":"Andr\u00e9 A. S.","family":"Milanezi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,4,29]]},"reference":[{"key":"208_CR1","unstructured":"ANEEL (2013) Resolu\u00e7\u00e3o Homologat\u00f3ria n $$^{o}$$ o 1.403, DE 18 De Dezembro de 2012"},{"key":"208_CR2","unstructured":"Arfux GAB, Teive RCG (2012) Risk aversion approach for energy trading based on multi- stage stochastic programming. In: 9th int. conf. Eur. energy mark, Florence, pp 1\u20137"},{"key":"208_CR3","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"JF Benders","year":"1962","unstructured":"Benders JF (1962) Partitioning procedure for solving mixed variables programming problems. Numer Math 4:238\u2013252","journal-title":"Numer Math"},{"key":"208_CR4","doi-asserted-by":"crossref","first-page":"1443","DOI":"10.1016\/j.ijepes.2012.06.021","volume":"43","author":"VL Matos De","year":"2012","unstructured":"De Matos VL, Finardi EC (2012) A computational study of a stochastic optimization model for long term hydrothermal scheduling. Int J Electr Power Energy Syst 43:1443\u20131452","journal-title":"Int J Electr Power Energy Syst"},{"key":"208_CR5","doi-asserted-by":"crossref","unstructured":"Hellemo L, Midthun K, Tomasgard A, Werner A (2012) Multi-stage stochastic programming for natural gas infrastructure design with a production perspective. Program. Appl. Financ. Energy, Plan. Logist, Stoch","DOI":"10.1142\/9789814407519_0010"},{"key":"208_CR6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s12667-011-0024-y","volume":"2","author":"T Homem-de-Mello","year":"2011","unstructured":"Homem-de-Mello T, de Matos V, Finardi E (2011) Sampling strategies and stopping criteria for stochastic dual dynamic programming: a case study in long-term hydrothermal scheduling. Energy Syst 2:1\u201331. doi: 10.1007\/s12667-011-0024-y","journal-title":"Energy Syst"},{"key":"208_CR7","doi-asserted-by":"crossref","unstructured":"Iliadis NA, Pereira MVF, Granville S et al (2006) Benchmarking of hydroelectric stochastic risk management models using financial indicators. Power Eng. Soc. Gen Meet","DOI":"10.1109\/PES.2006.1709283"},{"key":"208_CR8","doi-asserted-by":"crossref","unstructured":"Infanger G, Morton DP (1996) Cut sharing for multistage stochastic linear programs with interstage dependency. Math Program 75(2):241\u2013256. doi: 10.1007\/BF02592154","DOI":"10.1007\/BF02592154"},{"key":"208_CR9","doi-asserted-by":"crossref","first-page":"2593","DOI":"10.1016\/j.enconman.2009.06.010","volume":"50","author":"H Liu","year":"2009","unstructured":"Liu H, Jiang C, Zhang Y (2009) Portfolio management of hydropower producer via stochastic programming. Energy Convers Manag 50:2593\u20132599. doi: 10.1016\/j.enconman.2009.06.010","journal-title":"Energy Convers Manag"},{"key":"208_CR10","unstructured":"Maceira MEP, Mercio CMVDB, Gorenstin GB et al (1998) Energy evaluation of the North\/Northeastern and South\/Southeastern interconnection with NEWAVE model. In: Symp. Spec. Electr. Oper. Expans. Plan. SEPOPE"},{"key":"208_CR11","unstructured":"Maceira MEP, Terry LA, Costa FS et al (2002) Chain of optimization models for setting the energy dispatch and spot price in the Brazilian system. 14th PSCC, Sevilla, pp 1\u20137"},{"key":"208_CR12","doi-asserted-by":"crossref","unstructured":"Marzano LGB, Melo ACG, Souza RC (2003) An approach for portfolio optimization of energy contracts in the Brazilian electric sector. In: 2003 IEEE Bol. Power Tech Conf. IEEE, Bologna, pp 914\u2013921","DOI":"10.1109\/PTC.2003.1304502"},{"key":"208_CR13","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1109\/59.918289","volume":"16","author":"B Mo","year":"2001","unstructured":"Mo B, Gjelsvik A, Grundt A (2001) Integrated risk management of hydro power scheduling and contract management. IEEE Trans Power Syst 16:216\u2013221","journal-title":"IEEE Trans Power Syst"},{"key":"208_CR14","unstructured":"Oliveira MF De, Arfux GAB, Teive RCG (2006) Risk management in the commercialization activity in Brazil\u2014an approach by using Markowitz, VaR and CVaR. Transm. Distrib. Conf. Expo. Lat. Am. Caracas, pp 1\u20136"},{"key":"208_CR15","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1007\/BF01582895","volume":"52","author":"MVF Pereira","year":"1991","unstructured":"Pereira MVF, Pinto LMVG (1991) Multi-stage stochastic optimization applied to energy planning. Math Program 52:359\u2013375","journal-title":"Math Program"},{"key":"208_CR16","doi-asserted-by":"crossref","unstructured":"Philpott AB, de Matos VL (2012) Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion. Eur J Oper Res 218(2):470\u2013483. doi: 10.1016\/j.ejor.2011.10.056","DOI":"10.1016\/j.ejor.2011.10.056"},{"key":"208_CR17","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.ejor.2010.08.007","volume":"209","author":"A Shapiro","year":"2011","unstructured":"Shapiro A (2011) Analysis of stochastic dual dynamic programming method. Eur J Oper Res 209:63\u201372","journal-title":"Eur J Oper Res"},{"key":"208_CR18","doi-asserted-by":"crossref","first-page":"627","DOI":"10.1109\/TPWRS.2005.846239","volume":"20","author":"GB Shrestha","year":"2005","unstructured":"Shrestha GB, Pokharel BK, Lie TT, Fleten S-E (2005) Medium term power planning with bilateral contracts. IEEE Trans Power Syst 20:627\u2013633","journal-title":"IEEE Trans Power Syst"},{"key":"208_CR19","doi-asserted-by":"crossref","first-page":"1136","DOI":"10.1109\/TPWRS.2009.2022981","volume":"24","author":"A Street","year":"2009","unstructured":"Street A, Barroso LA, Flach B et al (2009) Risk constrained Portfolio selection of renewable sources in hydrothermal electricity markets. IEEE Trans Power Syst 24:1136\u20131144","journal-title":"IEEE Trans Power Syst"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-014-0208-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10287-014-0208-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-014-0208-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,9]],"date-time":"2019-08-09T22:55:47Z","timestamp":1565391347000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10287-014-0208-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,4,29]]},"references-count":19,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,1]]}},"alternative-id":["208"],"URL":"https:\/\/doi.org\/10.1007\/s10287-014-0208-8","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,4,29]]}}}