{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,5]],"date-time":"2026-01-05T07:32:39Z","timestamp":1767598359963},"reference-count":68,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2015,3,1]],"date-time":"2015-03-01T00:00:00Z","timestamp":1425168000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10287-015-0229-y","type":"journal-article","created":{"date-parts":[[2015,2,27]],"date-time":"2015-02-27T23:56:16Z","timestamp":1425081376000},"page":"491-518","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":69,"title":["A scalable solution framework for stochastic transmission and generation planning problems"],"prefix":"10.1007","volume":"12","author":[{"given":"Francisco D.","family":"Munoz","sequence":"first","affiliation":[]},{"given":"Jean-Paul","family":"Watson","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,3,1]]},"reference":[{"issue":"8\u20139","key":"229_CR1","doi-asserted-by":"crossref","first-page":"2844","DOI":"10.1016\/j.enconman.2011.02.023","volume":"52","author":"T Akbari","year":"2011","unstructured":"Akbari T, Rahimikian A, Kazemi A (2011) A multi-stage stochastic transmission expansion planning method. Energy Conv Manag 52(8\u20139):2844\u20132853","journal-title":"Energy Conv Manag"},{"issue":"3","key":"229_CR2","doi-asserted-by":"crossref","first-page":"1070","DOI":"10.1109\/TPWRS.2003.814891","volume":"18","author":"N Alguacil","year":"2003","unstructured":"Alguacil N, Motto A, Conejo A (2003) Transmission expansion planning: a mixed-integer LP approach. IEEE Trans Power Syst 18(3):1070\u20131077","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"229_CR3","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1109\/59.932295","volume":"16","author":"L Bahiense","year":"2001","unstructured":"Bahiense L, Oliveira G, Pereira M, Granville S (2001) A mixed integer disjunctive model for transmission network expansion. IEEE Trans Power Syst 16(3):560\u2013565","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"229_CR4","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"J Benders","year":"1962","unstructured":"Benders J (1962) Partitioning procedures for solving mixed-variables programming problems. Numer Math 4(1):238\u2013252","journal-title":"Numer Math"},{"issue":"2","key":"229_CR5","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1109\/59.918294","volume":"16","author":"S Binato","year":"2001","unstructured":"Binato S, De Oliveira GC, De Ara\u00fajo JL (2001) A greedy randomized adaptive search procedure for transmission expansion planning. IEEE Trans Power Syst 16(2):247\u2013253","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"229_CR6","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1109\/59.918292","volume":"16","author":"S Binato","year":"2001","unstructured":"Binato S, Pereira M, Granville S (2001) A new benders decomposition approach to solve power transmission network design problems. IEEE Trans Power Syst 16(2):235\u2013240","journal-title":"IEEE Trans Power Syst"},{"key":"229_CR7","volume-title":"Introduction to stochastic programming","author":"J Birge","year":"1997","unstructured":"Birge J, Louveaux F (1997) Introduction to stochastic programming. Springer, New York"},{"issue":"1","key":"229_CR8","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1287\/opre.31.1.84","volume":"31","author":"JA Bloom","year":"1983","unstructured":"Bloom JA (1983) Solving an electricity generating capacity expansion planning problem by generalized benders\u2019 decomposition. Oper Res 31(1):84\u2013100","journal-title":"Oper Res"},{"issue":"2","key":"229_CR9","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1287\/opre.32.2.290","volume":"32","author":"JA Bloom","year":"1984","unstructured":"Bloom JA, Caramanis M, Charny L (1984) Long-range generation planning using generalized benders\u2019 decomposition: implementation and experience. Oper Res 32(2):290\u2013313","journal-title":"Oper Res"},{"key":"229_CR10","volume-title":"Decomposition techniques in mathematical programming","author":"E Castillo","year":"2006","unstructured":"Castillo E, Minguez R, Conejo A, Garcia-Bertrand R (2006) Decomposition techniques in mathematical programming. Springer, Berlin"},{"key":"229_CR11","volume-title":"Transforming Americas Power Industry","author":"MW Chupka","year":"2008","unstructured":"Chupka MW, Earle R, Fox-Penner P, Hledik R (2008) Transforming Americas Power Industry. The Brattle Group, Cambridge"},{"key":"229_CR12","doi-asserted-by":"crossref","unstructured":"da Silva EL, Gil HA, Areiza JM (1999) Transmission network expansion planning under an improved genetic algorithm. In: Proceedings of the 21st 1999 IEEE international conference on power industry computer applications, 1999, pp 315\u2013321, IEEE","DOI":"10.1109\/PICA.1999.779513"},{"key":"229_CR13","unstructured":"Dantzig G, Glynn PW, Avriel M, Stone J, Entriken R, Nakayama M (1989) Decomposition techniques for multi-area generation and transmission planning under uncertainty: final report. Electric Power Research Institute"},{"issue":"3","key":"229_CR14","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1007\/s10107-002-0331-0","volume":"95","author":"J Dupa\u010dov\u00e1","year":"2003","unstructured":"Dupa\u010dov\u00e1 J, Gr\u00f6we-Kuska N, R\u00f6misch W (2003) Scenario reduction in stochastic programming. Math Program 95(3):493\u2013511","journal-title":"Math Program"},{"key":"229_CR15","unstructured":"EIA: Energy Information Administration, Electricity Power Annual (2014) Retrieved August 30, 2014, from URL http:\/\/www.eia.gov\/electricity\/annual\/html\/epa_01_01.html"},{"key":"229_CR16","unstructured":"Energy Exemplar PLEXOS Software (2014) URL http:\/\/energyexemplar.com\/software\/plexos-desktop-edition\/"},{"issue":"1","key":"229_CR17","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.cor.2012.05.005","volume":"40","author":"Y Feng","year":"2013","unstructured":"Feng Y, Ryan SM (2013) Scenario construction and reduction applied to stochastic power generation expansion planning. Comput Oper Res 40(1):9\u201323","journal-title":"Comput Oper Res"},{"key":"229_CR18","doi-asserted-by":"crossref","unstructured":"Feng Y, Ryan SM (2014) Solution sensitivity-based scenario reduction for stochastic unit commitment. Comput Manag Sci 1\u201334","DOI":"10.1007\/s10287-014-0220-z"},{"key":"229_CR19","unstructured":"Gade D, Hackebeil G, Ryan S, Watson J, Wets R, Woodruff D (2014) Obtaining lower bounds from the progressive hedging algorithm for stochastic mixed-integer programs. Under review"},{"issue":"1","key":"229_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/opre.49.1.1.11187","volume":"49","author":"S Garille","year":"2001","unstructured":"Garille S, Gass S (2001) Stigler\u2019s diet problem revisited. Oper Res 49(1):1\u201313","journal-title":"Oper Res"},{"key":"229_CR21","doi-asserted-by":"crossref","first-page":"1688","DOI":"10.1109\/TPAS.1970.292825","volume":"7","author":"LL Garver","year":"1970","unstructured":"Garver LL (1970) Transmission network estimation using linear programming. IEEE Trans Power Apparatus Syst 7:1688\u20131697","journal-title":"IEEE Trans Power Apparatus Syst"},{"issue":"4","key":"229_CR22","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1007\/BF00934810","volume":"10","author":"AM Geoffrion","year":"1972","unstructured":"Geoffrion AM (1972) Generalized benders decomposition. J Optim Theory Appl 10(4):237\u2013260","journal-title":"J Optim Theory Appl"},{"key":"229_CR23","unstructured":"Granville S, Pereira MVF (1985) Analysis of the linearized power flow model in Benders decomposition. System Optimization Lab., Dept. of Operations Research, Stanford University. Technical report, SOL 85\u201304"},{"key":"229_CR24","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-3226-5","volume-title":"Pyomo: optimization modeling in python","author":"WE Hart","year":"2012","unstructured":"Hart WE, Laird C, Watson JP, Woodruff DL (2012) Pyomo: optimization modeling in python. Springer, Berlin"},{"issue":"3","key":"229_CR25","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s12532-011-0026-8","volume":"3","author":"W Hart","year":"2011","unstructured":"Hart W, Watson J, Woodruff D (2011) Pyomo: modeling and solving mathematical programs in python. Math Program Comput 3(3):219\u2013260","journal-title":"Math Program Comput"},{"key":"229_CR26","doi-asserted-by":"crossref","unstructured":"Hedman K, Gao F, Sheble G (2005) Overview of transmission expansion planning using real options analysis. In: Proceedings of the 37th annual North American power symposium, 2005, pp 497\u2013502, IEEE","DOI":"10.1109\/NAPS.2005.1560573"},{"issue":"1","key":"229_CR27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(94)00190-N","volume":"83","author":"BF Hobbs","year":"1995","unstructured":"Hobbs BF (1995) Optimization methods for electric utility resource planning. Eur J Oper Res 83(1):1\u201320","journal-title":"Eur J Oper Res"},{"issue":"6","key":"229_CR28","doi-asserted-by":"crossref","first-page":"836","DOI":"10.1287\/opre.47.6.836","volume":"47","author":"BF Hobbs","year":"1999","unstructured":"Hobbs BF, Ji YD (1999) Stochastic programming-based bounding of expected production costs for multiarea electric power systems. Oper Res 47(6):836\u2013848","journal-title":"Oper Res"},{"issue":"2\u20133","key":"229_CR29","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1023\/A:1021853807313","volume":"24","author":"K H\u00f8yland","year":"2003","unstructured":"H\u00f8yland K, Kaut M, Wallace SW (2003) A heuristic for moment-matching scenario generation. Comput Optim Appl 24(2\u20133):169\u2013185","journal-title":"Comput Optim Appl"},{"issue":"1","key":"229_CR30","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1007\/BF02060936","volume":"39","author":"G Infanger","year":"1992","unstructured":"Infanger G (1992) Monte carlo (importance) sampling within a benders decomposition algorithm for stochastic linear programs. Ann Oper Res 39(1):69\u201395","journal-title":"Ann Oper Res"},{"issue":"3\u20134","key":"229_CR31","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1007\/s12667-011-0042-9","volume":"2","author":"S Jin","year":"2011","unstructured":"Jin S, Ryan SM, Watson JP, Woodruff DL (2011) Modeling and solving a large-scale generation expansion planning problem under uncertainty. Energy Syst 2(3\u20134):209\u2013242","journal-title":"Energy Syst"},{"issue":"5","key":"229_CR32","doi-asserted-by":"crossref","first-page":"2033","DOI":"10.1109\/TPWRS.2014.2299760","volume":"29","author":"S Jin","year":"2014","unstructured":"Jin S, Botterud A, Ryan SM (2014) Temporal versus stochastic granularity in thermal generation capacity planning with wind power. IEEE Trans Power Syst 29(5):2033\u20132041","journal-title":"IEEE Trans Power Syst"},{"issue":"9","key":"229_CR33","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.tej.2010.10.003","volume":"23","author":"E Kahn","year":"2010","unstructured":"Kahn E (2010) Wind integration studies: optimization vs simulation. Electr J 23(9):51\u201364","journal-title":"Electr J"},{"issue":"2","key":"229_CR34","doi-asserted-by":"crossref","first-page":"938","DOI":"10.1109\/TPWRS.2003.811168","volume":"18","author":"G Latorre","year":"2003","unstructured":"Latorre G, Cruz RD, Areiza JM, Villegas A (2003) Classification of publications and models on transmission expansion planning. IEEE Trans Power Syst 18(2):938\u2013946","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"229_CR35","doi-asserted-by":"crossref","first-page":"1886","DOI":"10.1109\/59.331446","volume":"9","author":"G Latorre-Bayona","year":"1994","unstructured":"Latorre-Bayona G, Perez-Arriaga IJ (1994) Chopin, a heuristic model for long term transmission expansion planning. IEEE Trans Power Syst 9(4):1886\u20131894","journal-title":"IEEE Trans Power Syst"},{"key":"229_CR36","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1007\/BF00247208","volume":"2","author":"A L\u00f8kketangen","year":"1996","unstructured":"L\u00f8kketangen A, Woodruff DL (1996) Progressive hedging and tabu search applied to mixed integer (0,1) multistage stochastic programming. J Heuristics 2:111\u2013128","journal-title":"J Heuristics"},{"issue":"3","key":"229_CR37","doi-asserted-by":"crossref","first-page":"1732","DOI":"10.1016\/j.enpol.2011.01.002","volume":"39","author":"A Mills","year":"2011","unstructured":"Mills A, Phadke A, Wiser R (2011) Exploration of resource and transmission expansion decisions in the western renewable energy zone initiative. Energy Policy 39(3):1732\u20131745","journal-title":"Energy Policy"},{"key":"229_CR38","unstructured":"Mills A, Wiser R (2012) An evaluation of solar valuation methods used in utility planning and procurement processes. Technical report. Lawrence Berkeley National Laboratory"},{"key":"229_CR39","doi-asserted-by":"crossref","unstructured":"Mills A, Wiser R (2012) Changes in the economic value of variable generation at high penetration levels: a pilot case study of california. Technical report. Lawrence Berkeley National Laboratory","DOI":"10.2172\/1183176"},{"key":"229_CR40","unstructured":"Munoz FD (2014) Engineering\u2013economic methods for power transmission planning under uncertainty and renewable resource policies. Ph.D. thesis, The Johns Hopkins University, Baltimore"},{"issue":"1","key":"229_CR41","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1109\/TPWRS.2013.2279654","volume":"29","author":"FD Munoz","year":"2014","unstructured":"Munoz FD, Hobbs BF, Ho J, Kasina S (2014) An engineering\u2013economic approach to transmission planning under market and regulatory uncertainties: WECC case study. IEEE Trans Power Syst 29(1):307\u2013317","journal-title":"IEEE Trans Power Syst"},{"key":"229_CR42","doi-asserted-by":"crossref","unstructured":"Munoz FD, Hobbs BF, Kasina S (2012) Efficient proactive planning to accommodate renewables. In: IEEE Power and Energy Society General Meeting, pp 1\u20137","DOI":"10.1109\/PESGM.2012.6345237"},{"key":"229_CR43","unstructured":"Munoz FD, Hobbs BF, Watson JP (2014) New bounding and decomposition methods for MILP investment problems: multi-area transmission and generation planning under policy constraints. JHU Working Paper"},{"key":"229_CR44","doi-asserted-by":"crossref","unstructured":"Munoz FD, Mills AD (2015) Endogenous assessment of the capacity value of solar PV in generation investment planning studies. Sandia Technical Report","DOI":"10.1109\/TSTE.2015.2456019"},{"issue":"3","key":"229_CR45","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1007\/s11149-013-9209-8","volume":"43","author":"FD Munoz","year":"2013","unstructured":"Munoz FD, Sauma EE, Hobbs BF (2013) Approximations in power transmission planning: implications for the cost and performance of renewable portfolio standards. J Regul Econ 43(3):305\u2013338","journal-title":"J Regul Econ"},{"issue":"4","key":"229_CR46","doi-asserted-by":"crossref","first-page":"1828","DOI":"10.1109\/59.476047","volume":"10","author":"G Oliveira","year":"1995","unstructured":"Oliveira G, Costa A, Binato S (1995) Large scale transmission network planning using optimization and heuristic techniques. IEEE Trans Power Syst 10(4):1828\u20131834","journal-title":"IEEE Trans Power Syst"},{"key":"229_CR47","unstructured":"ONeill RP, Dautel T, Krall E (2011) Recent ISO software enhancements and future software and modeling plans. Retrieved August 30, 2014, from URL http:\/\/www.ferc.gov\/industries\/electric\/indus-act\/rto\/rto-iso-soft-2011.pdf"},{"issue":"2","key":"229_CR48","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1007\/s10107-013-0695-3","volume":"140","author":"RP O\u2019Neill","year":"2013","unstructured":"O\u2019Neill RP, Krall EA, Hedman KW, Oren SS (2013) A model and approach to the challenge posed by optimal power systems planning. Math Program 140(2):239\u2013266","journal-title":"Math Program"},{"issue":"3","key":"229_CR49","doi-asserted-by":"crossref","first-page":"578","DOI":"10.1287\/opre.2013.1174","volume":"61","author":"A Papavasiliou","year":"2013","unstructured":"Papavasiliou A, Oren SS (2013) Multiarea stochastic unit commitment for high wind penetration in a transmission constrained network. Oper Res 61(3):578\u2013592","journal-title":"Oper Res"},{"issue":"3","key":"229_CR50","doi-asserted-by":"crossref","first-page":"2395","DOI":"10.1109\/TPWRS.2013.2251481","volume":"28","author":"H Park","year":"2013","unstructured":"Park H, Baldick R (2013) Transmission planning under uncertainties of wind and load: sequential approximation approach. IEEE Trans Power Syst 28(3):2395\u20132402","journal-title":"IEEE Trans Power Syst"},{"issue":"11","key":"229_CR51","doi-asserted-by":"crossref","first-page":"3074","DOI":"10.1109\/TPAS.1985.318815","volume":"104","author":"MVF Pereira","year":"1985","unstructured":"Pereira MVF, Pinto LMVG, Cunha SHF, Oliveira GC (1985) A decomposition approach to automated generation transmission expansion planning. IEEE Trans Power Apparatus Syst 104(11):3074\u20133083","journal-title":"IEEE Trans Power Apparatus Syst"},{"key":"229_CR52","doi-asserted-by":"crossref","unstructured":"Pierre-Louis P, Bayraksan G, Morton DP (2011) A combined deterministic and sampling-based sequential bounding method for stochastic programming. In: Proceedings of the 2011 winter simulation conference (Wsc), pp 4167\u20134178","DOI":"10.1109\/WSC.2011.6148105"},{"key":"229_CR53","doi-asserted-by":"crossref","unstructured":"Price JE, Goodin J (2011) Reduced network modeling of WECC as a market design prototype. In: IEEE Power and Energy Society General Meeting, pp 1\u20136","DOI":"10.1109\/PES.2011.6039476"},{"key":"229_CR54","unstructured":"PSR Netplan Software (2012) URL http:\/\/www.psr-inc.com.br\/portal\/psr\/servicos\/modelos_de_apoio_a_decisao\/studio_plan\/netplan\/"},{"issue":"2","key":"229_CR55","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1109\/TPWRS.2005.846073","volume":"20","author":"FS Reis","year":"2005","unstructured":"Reis FS, Carvalho P, Ferreira L (2005) Reinforcement scheduling convergence in power systems transmission planning. IEEE Trans Power Syst 20(2):1151\u20131157","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"229_CR56","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1287\/moor.16.1.119","volume":"16","author":"RT Rockafellar","year":"1991","unstructured":"Rockafellar RT, Wets RJB (1991) Scenarios and policy aggregation in optimization under uncertainty. Math Oper Res 16(1):119\u2013147","journal-title":"Math Oper Res"},{"issue":"1","key":"229_CR57","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1109\/59.317588","volume":"9","author":"R Romero","year":"1994","unstructured":"Romero R, Monticelli A (1994) A hierarchical decomposition approach for transmission network expansion planning. IEEE Trans Power Syst 9(1):373\u2013380","journal-title":"IEEE Trans Power Syst"},{"key":"229_CR58","doi-asserted-by":"crossref","unstructured":"Ryan SM, Wets RJB, Woodruff DL, Silva-Monroy C, Watson JP (2013) Toward scalable, parallel progressive hedging for stochastic unit commitment. In: 2013 IEEE Power and Energy Society General Meeting (PES), pp 1\u20135, IEEE","DOI":"10.1109\/PESMG.2013.6673013"},{"issue":"4","key":"229_CR59","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/S0142-0615(00)00042-9","volume":"23","author":"H Samarakoon","year":"2001","unstructured":"Samarakoon H, Shrestha R, Fujiwara O (2001) A mixed integer linear programming model for transmission expansion planning with generation location selection. Int J Electr Power Energy Syst 23(4):285\u2013293","journal-title":"Int J Electr Power Energy Syst"},{"issue":"4","key":"229_CR60","doi-asserted-by":"crossref","first-page":"1565","DOI":"10.1109\/TPWRS.2006.881159","volume":"21","author":"I Silva","year":"2006","unstructured":"Silva I, Rider M, Romero R, Murari C (2006) Transmission network expansion planning considering uncertainty in demand. IEEE Trans Power Syst 21(4):1565\u20131573","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"229_CR61","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1080\/00401706.1987.10488205","volume":"29","author":"M Stein","year":"1987","unstructured":"Stein M (1987) Large sample properties of simulations using latin hypercube sampling. Technometrics 29(2):143\u2013151","journal-title":"Technometrics"},{"key":"229_CR62","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1111\/1467-9868.00293","volume":"63","author":"R Tibshirani","year":"2001","unstructured":"Tibshirani R, Walther G, Hastie T (2001) Estimating the number of clusters in a data set via the gap statistic. J R Stat Soc Ser B Stat Methodol 63:411\u2013423","journal-title":"J R Stat Soc Ser B Stat Methodol"},{"issue":"6","key":"229_CR63","doi-asserted-by":"crossref","first-page":"2089","DOI":"10.1016\/j.eneco.2012.02.015","volume":"34","author":"AH Weijde van der","year":"2012","unstructured":"van der Weijde AH, Hobbs BF (2012) The economics of planning electricity transmission to accommodate renewables: using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty. Energy Econ 34(6):2089\u20132101","journal-title":"Energy Econ"},{"key":"229_CR64","unstructured":"VENTYX PROMOD IV Software (2014) URL http:\/\/www.ventyx.com\/en\/enterprise\/business-operations\/business-products\/promod-iv"},{"key":"229_CR65","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1109\/TPAS.1985.319049","volume":"2","author":"R Villasana","year":"1985","unstructured":"Villasana R, Garver L, Salon S (1985) Transmission network planning using linear programming. IEEE Trans Power Apparatus Syst 2:349\u2013356","journal-title":"IEEE Trans Power Apparatus Syst"},{"issue":"2","key":"229_CR66","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/s12532-012-0036-1","volume":"4","author":"JP Watson","year":"2012","unstructured":"Watson JP, Woodruff D, Hart W (2012) Pysp: modeling and solving stochastic programs in python. Math Program Comput 4(2):109\u2013149","journal-title":"Math Program Comput"},{"issue":"4","key":"229_CR67","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1007\/s10287-010-0125-4","volume":"8","author":"J Watson","year":"2011","unstructured":"Watson J, Woodruff D (2011) Progressive hedging innovations for a class of stochastic mixed-integer resource allocation problems. Comput Manag Sci 8(4):355\u2013370","journal-title":"Comput Manag Sci"},{"issue":"5","key":"229_CR68","doi-asserted-by":"crossref","first-page":"2210","DOI":"10.1109\/TPWRS.2014.2300697","volume":"29","author":"S Wogrin","year":"2014","unstructured":"Wogrin S, Duenas P, Delgadillo A, Reneses J (2014) A new approach to model load levels in electric power systems with high renewable penetration. IEEE Trans Power Syst 29(5):2210\u20132218","journal-title":"IEEE Trans Power Syst"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-015-0229-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10287-015-0229-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-015-0229-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,21]],"date-time":"2019-08-21T07:30:01Z","timestamp":1566372601000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10287-015-0229-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3,1]]},"references-count":68,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["229"],"URL":"https:\/\/doi.org\/10.1007\/s10287-015-0229-y","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3,1]]}}}