{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,9]],"date-time":"2026-08-09T20:42:36Z","timestamp":1786308156747,"version":"build-2736575974"},"reference-count":54,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,12,20]],"date-time":"2017-12-20T00:00:00Z","timestamp":1513728000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"NSERC-CRSNG","award":["386416-2010"],"award-info":[{"award-number":["386416-2010"]}]},{"name":"Hydro-Qu\u00e9bec & NSERC-CRSNG","award":["Industrial Research Chair on the Stochastic Optimization of Electricity Generation"],"award-info":[{"award-number":["Industrial Research Chair on the Stochastic Optimization of Electricity Generation"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2018,1]]},"DOI":"10.1007\/s10287-017-0295-4","type":"journal-article","created":{"date-parts":[[2017,12,20]],"date-time":"2017-12-20T18:26:24Z","timestamp":1513794384000},"page":"55-86","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A successive linear programming algorithm with non-linear time series for the reservoir management problem"],"prefix":"10.1007","volume":"15","author":[{"given":"Charles","family":"Gauvin","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Erick","family":"Delage","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Michel","family":"Gendreau","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,12,20]]},"reference":[{"key":"295_CR1","volume-title":"A theoretical framework for measuring attractiveness by a categorical based evaluation technique (MACBETH)","author":"CA Bana e Costa","year":"1997","unstructured":"Bana e Costa CA, Vansnick JC (1997) A theoretical framework for measuring attractiveness by a categorical based evaluation technique (MACBETH). Springer, New York"},{"key":"295_CR2","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1007\/s10107-003-0454-y","volume":"99","author":"A Ben-Tal","year":"2004","unstructured":"Ben-Tal A, Goryashko E, Guslitzer A, Nemirovski A (2004) Adjustable robust solutions of uncertain linear programs. Math Program 99:351\u2013378","journal-title":"Math Program"},{"issue":"2","key":"295_CR3","first-page":"999","volume":"32","author":"B Bezerra","year":"2017","unstructured":"Bezerra B, Veiga \u00c1, Barroso LA, Pereira M (2017) Stochastic long-term hydrothermal scheduling with parameter uncertainty in autoregressive streamflow models. IEEE Trans Power Syst 32(2):999\u20131006","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR4","volume-title":"Probability and measure","author":"P Billingsley","year":"1995","unstructured":"Billingsley P (1995) Probability and measure, 3rd edn. Wiley, New York","edition":"3"},{"issue":"3","key":"295_CR5","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1109\/TPWRS.2008.926704","volume":"23","author":"A Borghetti","year":"2008","unstructured":"Borghetti A, D\u2019Ambrosio C, Lodi A, Martello S (2008) An milp approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Trans Power Syst 23(3):1115\u20131124","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR6","first-page":"211","volume":"2","author":"GEP Box","year":"1964","unstructured":"Box GEP, Cox DR (1964) An analysis of transformations. J Roy Stat Soc 2:211\u2013252","journal-title":"J Roy Stat Soc"},{"key":"295_CR7","volume-title":"Time series analysis: forecasting and control","author":"GEP Box","year":"2008","unstructured":"Box GEP, Jenkins GM, Reinsel GC (2008) Time series analysis: forecasting and control, 4th edn. Wiley, Hoboken","edition":"4"},{"key":"295_CR8","doi-asserted-by":"crossref","unstructured":"Braaten SV, Gjonnes O, Hjertvik K, Fleten SE (2016) Linear decision rules for seasonal hydropower planning: modelling considerations. Energy Procedia 87:28\u201335. 5th International Workshop on Hydro Scheduling in Competitive Electricity Markets","DOI":"10.1016\/j.egypro.2015.12.354"},{"key":"295_CR9","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4899-0004-3","volume-title":"Time series: theory and methods","author":"PJ Brockwell","year":"1987","unstructured":"Brockwell PJ, Davis RA (1987) Time series: theory and methods. Springer, New York"},{"key":"295_CR10","doi-asserted-by":"crossref","first-page":"2812","DOI":"10.1002\/wrcr.20254","volume":"49","author":"PL Carpentier","year":"2013","unstructured":"Carpentier PL, Gendreau M, Bastin F (2013) Long-term management of a hydroelectric multireservoir system under uncertainty using the progressive hedging algorithm. Water Resour Res 49:2812\u20132827","journal-title":"Water Resour Res"},{"issue":"6","key":"295_CR11","doi-asserted-by":"crossref","first-page":"1595","DOI":"10.1016\/j.automatica.2008.03.003","volume":"44","author":"A Castelletti","year":"2008","unstructured":"Castelletti A, Pianosi F, Soncini-Sessa R (2008) Water reservoir control under economic, social and environmental constraints. Automatica 44(6):1595\u20131607","journal-title":"Automatica"},{"issue":"W09","key":"295_CR12","first-page":"507","volume":"46","author":"A Castelletti","year":"2010","unstructured":"Castelletti A, Galetti S, Restelli M, Soncini-Sessa R (2010) Tree-based reinforcement learning for optimal water reservoir operation. Water Resour Res 46(W09):507","journal-title":"Water Resour Res"},{"issue":"3","key":"295_CR13","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1016\/j.ejor.2011.11.040","volume":"218","author":"S Cerisola","year":"2012","unstructured":"Cerisola S, Latorre JM, Ramos A (2012) Stochastic dual dynamic programming applied to nonconvex hydrothermal models. Eur J Oper Res 218(3):687\u2013697. https:\/\/doi.org\/10.1016\/j.ejor.2011.11.040","journal-title":"Eur J Oper Res"},{"issue":"4","key":"295_CR14","doi-asserted-by":"crossref","first-page":"2187","DOI":"10.1109\/TPWRS.2007.907457","volume":"22","author":"D Ladurantaye De","year":"2007","unstructured":"De Ladurantaye D, Gendreau M, Potvin JY (2007) Strategic bidding for price-taker hydroelectricity producers. IEEE Trans Power Syst 22(4):2187\u20132203","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR15","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/j.cor.2007.10.012","volume":"36","author":"D Ladurantaye De","year":"2009","unstructured":"De Ladurantaye D, Gendreau M, Potvin JY (2009) Optimizing profits from hydroelectricity production. Comput Oper Res 36:499\u2013529","journal-title":"Comput Oper Res"},{"issue":"3","key":"295_CR16","doi-asserted-by":"crossref","first-page":"1298","DOI":"10.1109\/TPWRS.2008.922253","volume":"23","author":"AL Diniz","year":"2000","unstructured":"Diniz AL, Maceira MEP (2000) A four-dimensional model of hydro generation for the shortterm hydrothermal dispatch problem considering head and spillage effects. IEEE Trans Power Syst 23(3):1298\u20131308","journal-title":"IEEE Trans Power Syst"},{"issue":"5","key":"295_CR17","doi-asserted-by":"crossref","first-page":"2427","DOI":"10.1109\/TPWRS.2014.2300755","volume":"29","author":"AL Diniz","year":"2014","unstructured":"Diniz AL, Souza TM (2014) Short-term hydrothermal dispatch with river-level and routing constraints. IEEE Trans Power Syst 29(5):2427\u20132435","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"295_CR18","doi-asserted-by":"crossref","first-page":"1383","DOI":"10.1109\/TPWRS.2009.2023265","volume":"24","author":"TN Santos dos","year":"2009","unstructured":"dos Santos TN, Diniz AL (2009) A new multiperiod stage definition for the multistage benders decomposition approach applied to hydrothermal scheduling. IEEE Trans Power Syst 24(3):1383\u20131392","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"295_CR19","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1109\/TPWRS.2016.2555360","volume":"32","author":"R Egging","year":"2017","unstructured":"Egging R, Fleten SE, Gr\u00f8nvik I, Hadziomerovic A, Ingvoldstad N (2017) Linear decision rules for hydropower scheduling under uncertainty. IEEE Trans Power Syst 32(1):103\u2013113","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR20","volume-title":"Multicriteria optimization","author":"M Ehrgott","year":"2005","unstructured":"Ehrgott M (2005) Multicriteria optimization, 2nd edn. Springer, New York","edition":"2"},{"key":"295_CR21","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1016\/j.ejor.2017.01.044","volume":"261","author":"C Gauvin","year":"2017","unstructured":"Gauvin C, Delage E, Gendreau M (2017) Decision rule approximations for the risk averse reservoir management problem. Eur J Oper Res 261:317\u2013336","journal-title":"Eur J Oper Res"},{"key":"295_CR22","unstructured":"Gauvin C, Delage E, Gendreau M (2016) A stochastic program with tractable time series and affine decision rules for the reservoir management problem. Technical report. G-2016-24, Les cahiers du GERAD"},{"key":"295_CR23","doi-asserted-by":"crossref","unstructured":"Gauvin C, Delage E, Gendreau M (2017) A successive linear programming algorithm with non-linear time series for the reservoir management problem. Technical report","DOI":"10.1007\/s10287-017-0295-4"},{"key":"295_CR24","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1007\/978-3-642-02493-1_2","volume-title":"Long- and medium-term operations planning and stochastic modelling in hydro-dominated power systems based on stochastic dual dynamic programming","author":"A Gjelsvik","year":"2010","unstructured":"Gjelsvik A, Mo B, Haugstad A (2010) Long- and medium-term operations planning and stochastic modelling in hydro-dominated power systems based on stochastic dual dynamic programming. Springer Berlin Heidelberg, Berlin, pp 33\u201355. https:\/\/doi.org\/10.1007\/978-3-642-02493-1_2"},{"issue":"1","key":"295_CR25","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1109\/TPWRS.2016.2550490","volume":"32","author":"A Hamann","year":"2017","unstructured":"Hamann A, Hug G, Rosinski S (2017) Real-time optimization of the mid-columbia hydropower system. IEEE Trans Power Syst 32(1):157\u2013165","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR26","doi-asserted-by":"crossref","unstructured":"Kl\u00f6ckl B, Papaefthymiou G (2010) Multivariate time series models for studies on stochastic generators in power systems. Electr Power Syst Res 80:265\u2013276","DOI":"10.1016\/j.epsr.2009.09.009"},{"key":"295_CR27","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1007\/s10107-009-0331-4","volume":"130","author":"D Kuhn","year":"2011","unstructured":"Kuhn D, Wiesemann W, Georghiou A (2011) Primal and dual linear decision rules in stochastic and robust optimization. Math Program Ser A 130:177\u2013209","journal-title":"Math Program Ser A"},{"key":"295_CR28","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1061\/(ASCE)0733-9496(2004)130:2(93)","volume":"130","author":"J Labadie","year":"2004","unstructured":"Labadie J (2004) Optimal operation of multireservoir systems: state-of-the-art review. J Water Resour Plan Manag 130:93\u2013111","journal-title":"J Water Resour Plan Manag"},{"issue":"1","key":"295_CR29","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.jhydrol.2010.07.011","volume":"391","author":"X Li","year":"2010","unstructured":"Li X, Guo S, Liu P, Chen G (2010) Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. J Hydrol 391(1):124\u2013132","journal-title":"J Hydrol"},{"issue":"1","key":"295_CR30","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/j.ejor.2016.05.011","volume":"255","author":"T Lohmann","year":"2016","unstructured":"Lohmann T, Hering AS, Rebennack S (2016) Spatio-temporal hydro forecasting of multireservoir inflows for hydro-thermal scheduling. Eur J Oper Res 255(1):243\u2013258. https:\/\/doi.org\/10.1016\/j.ejor.2016.05.011","journal-title":"Eur J Oper Res"},{"issue":"1","key":"295_CR31","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1287\/opre.2015.1456","volume":"64","author":"\u00c1 Lorca","year":"2016","unstructured":"Lorca \u00c1, Sun XA, Litvinov E, Zheng T (2016) Multistage adaptive robust optimization for the unit commitment problem. Oper Res 64(1):32\u201351. https:\/\/doi.org\/10.1287\/opre.2015.1456","journal-title":"Oper Res"},{"key":"295_CR32","doi-asserted-by":"crossref","first-page":"1702","DOI":"10.1109\/TPWRS.2014.2357714","volume":"30","author":"A Lorca","year":"2015","unstructured":"Lorca A, Sun XA (2015) Adaptive robust optimization with dynamic uncertainty sets for multi-period economic dispatch under significant wind. IEEE Trans Power Syst 30:1702\u20131713","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR33","unstructured":"Maceira M, Dam\u00e1zio J (2004) The use of par(p) model in the stochastic dual dynamic programming optimization scheme used in the operation planning of the Brazilian hydropower system. In: 8th International conference on probabilistic methods applied to power systems, Iowa State University, pp 397\u2013402"},{"key":"295_CR34","unstructured":"Maceira M, Duarte V, Penna D, Moraes L, Melo A (2008) Ten years of application of stochastic dual dynamic programming in official and agent studies in brazil\u2014description of the newave program. In: 16th PSCC, Glasgow, Scotland"},{"issue":"3","key":"295_CR35","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1061\/(ASCE)0733-9496(2000)126:3(118)","volume":"126","author":"JT Needham","year":"2000","unstructured":"Needham JT, Watkins DW, Lund JR, Nanda SK (2000) Linear programming for flood control in the iowa and des moines rivers. J Water Resour Plan Manag 126(3):118\u2013127","journal-title":"J Water Resour Plan Manag"},{"key":"295_CR36","volume-title":"Numerical optimization. Springer Series in Operations Research","author":"J Nocedal","year":"2006","unstructured":"Nocedal J, Wright SJ (2006) Numerical optimization. Springer Series in Operations Research, 2nd edn. Springer, New York","edition":"2"},{"issue":"1","key":"295_CR37","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1002\/2014WR015380","volume":"51","author":"L Pan","year":"2015","unstructured":"Pan L, Housh M, Liu P, Cai X, Chen X (2015) Robust stochastic optimization for reservoir operation. Water Resour Res 51(1):409\u2013429. https:\/\/doi.org\/10.1002\/2014WR015380","journal-title":"Water Resour Res"},{"key":"295_CR38","unstructured":"Phillpott A, Wahid F, Bonnans F (2016) Midas: a mixed integer dynamic approximation scheme. Technical report. http:\/\/www.optimization-online.org\/DB_FILE\/2016\/05\/5431.pdf"},{"issue":"10","key":"295_CR39","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1029\/2008WR007335.W10430","volume":"45","author":"F Pianosi","year":"2009","unstructured":"Pianosi F, Soncini-Sessa R (2009) Real-time management of a multipurpose water reservoir with a heteroscedastic inflow model. Water Resour Res 45(10):1\u201312. https:\/\/doi.org\/10.1029\/2008WR007335.W10430","journal-title":"Water Resour Res"},{"issue":"12","key":"295_CR40","doi-asserted-by":"crossref","first-page":"04016065","DOI":"10.1061\/(ASCE)WR.1943-5452.0000713","volume":"142","author":"H Poorsepahy-Samian","year":"2016","unstructured":"Poorsepahy-Samian H, Espanmanesh V, Zahraie B (2016) Improved inflow modeling in stochastic dual dynamic programming. J Water Resour Plan Manag 142(12):04016065","journal-title":"J Water Resour Plan Manag"},{"key":"295_CR41","doi-asserted-by":"crossref","first-page":"1033","DOI":"10.1029\/WR006i004p01033","volume":"6","author":"CS ReVelle","year":"1970","unstructured":"ReVelle CS, Kirby W (1970) Linear decision rule in reservoir management and design, 2, performance optimization. Water Resour Res 6:1033\u20131044","journal-title":"Water Resour Res"},{"issue":"1","key":"295_CR42","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1109\/TPWRS.2014.2383911","volume":"31","author":"S S\u00e9guin","year":"2016","unstructured":"S\u00e9guin S, C\u00f4t\u00e9 P, Audet C (2016) Self-scheduling short-term unit commitment and loading problem. IEEE Trans Power Syst 31(1):133\u2013142","journal-title":"IEEE Trans Power Syst"},{"key":"295_CR43","volume-title":"Short-term unit commitment and loading problem","author":"S S\u00e9guin","year":"2014","unstructured":"S\u00e9guin S, C\u00f4t\u00e9 P, Audet C (2014) Short-term unit commitment and loading problem. Tech. rep, Les cahiers du GERAD"},{"key":"295_CR44","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.ejor.2010.08.007","volume":"209","author":"A Shapiro","year":"2011","unstructured":"Shapiro A (2011) Analysis of stochastic dual dynamic programming method. Eur J Oper Res 209:63\u201372","journal-title":"Eur J Oper Res"},{"issue":"2","key":"295_CR45","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1016\/j.ejor.2012.08.022","volume":"224","author":"A Shapiro","year":"2013","unstructured":"Shapiro A, Tekaya W, da Costa JP, Soares MP (2013) Risk neutral and risk averse stochastic dual dynamic programming method. Eur J Oper Res 224(2):375\u2013391. https:\/\/doi.org\/10.1016\/j.ejor.2012.08.022","journal-title":"Eur J Oper Res"},{"key":"295_CR46","unstructured":"Shapiro A, Tekaya W, da Costa JP, Soares MP (2012) Final report for technical cooperation between georgia institute of technology and ons - operador nacional do sistema eletrico. Tech. rep., Georgia Institute of Technology and Operador Nacional do Sistema Eletrico"},{"key":"295_CR47","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/S0022-1694(01)00419-X","volume":"249","author":"JR Stedinger","year":"2001","unstructured":"Stedinger JR, Faber BA (2001) Reservoir optimization using sampling sdp with ensemble streamflow prediction (esp) forecast. J Hydrol 249:113\u2013133","journal-title":"J Hydrol"},{"issue":"2","key":"295_CR48","doi-asserted-by":"crossref","first-page":"669","DOI":"10.1016\/j.ejor.2016.08.006","volume":"257","author":"G Steeger","year":"2017","unstructured":"Steeger G, Rebennack S (2017) Dynamic convexification within nested benders decomposition using lagrangian relaxation: an application to the strategic bidding problem. Eur J Oper Res 257(2):669\u2013686","journal-title":"Eur J Oper Res"},{"key":"295_CR49","unstructured":"Thome F, Pereira M, Granville S, Fampa M (2013) Non-convexities representation on hydrothermal operation planning using sddp (unpublished technical report)"},{"issue":"W06","key":"295_CR50","first-page":"425","volume":"43","author":"A Tilmant","year":"2007","unstructured":"Tilmant A, Kelman R (2007) A stochastic approach to analyze trade-offs and risk associated with large-scale water resources systems. Water Resour Res 43(W06):425","journal-title":"Water Resour Res"},{"key":"295_CR51","doi-asserted-by":"crossref","DOI":"10.1002\/0471746193","volume-title":"Analysis of financial time series","author":"RS Tsay","year":"2005","unstructured":"Tsay RS (2005) Analysis of financial time series, 2nd edn. Wiley, Hoboken","edition":"2"},{"issue":"W12","key":"295_CR52","first-page":"414","volume":"41","author":"A Turgeon","year":"2005","unstructured":"Turgeon A (2005) Solving a stochastic reservoir management problem with multilag autocorrelated inflows. Water Resour Res 41(W12):414","journal-title":"Water Resour Res"},{"key":"295_CR53","doi-asserted-by":"crossref","first-page":"3585","DOI":"10.1029\/98WR02608","volume":"34","author":"A Turgeon","year":"1998","unstructured":"Turgeon A, Charbonneau R (1998) An aggregation-disaggregation approach to long-term reservoir management. Water Resour Res 34:3585\u20133594","journal-title":"Water Resour Res"},{"issue":"3","key":"295_CR54","first-page":"213","volume":"365","author":"CC Wei","year":"2009","unstructured":"Wei CC, Hsu NS (2009) Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system. J Hydrol 365(3):213\u2013224","journal-title":"J Hydrol"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10287-017-0295-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-017-0295-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-017-0295-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,8]],"date-time":"2019-10-08T10:02:34Z","timestamp":1570528954000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10287-017-0295-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12,20]]},"references-count":54,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2018,1]]}},"alternative-id":["295"],"URL":"https:\/\/doi.org\/10.1007\/s10287-017-0295-4","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,12,20]]}}}