{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,13]],"date-time":"2025-11-13T07:11:30Z","timestamp":1763017890707,"version":"3.37.3"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2018,4,26]],"date-time":"2018-04-26T00:00:00Z","timestamp":1524700800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2018,4,26]],"date-time":"2018-04-26T00:00:00Z","timestamp":1524700800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/100000084","name":"Directorate for Engineering","doi-asserted-by":"publisher","award":["ECCS Grant #1162328"],"award-info":[{"award-number":["ECCS Grant #1162328"]}],"id":[{"id":"10.13039\/100000084","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1007\/s10287-018-0309-x","type":"journal-article","created":{"date-parts":[[2018,4,26]],"date-time":"2018-04-26T15:40:41Z","timestamp":1524757241000},"page":"563-582","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["An adaptive model with joint chance constraints for a hybrid wind-conventional generator system"],"prefix":"10.1007","volume":"15","author":[{"given":"Bismark","family":"Singh","sequence":"first","affiliation":[]},{"given":"David P.","family":"Morton","sequence":"additional","affiliation":[]},{"given":"Surya","family":"Santoso","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,4,26]]},"reference":[{"key":"309_CR1","first-page":"261","volume":"10","author":"S Ahmed","year":"2008","unstructured":"Ahmed S, Shapiro A (2008) Solving chance-constrained stochastic programs via sampling and integer programming. Tutor Oper Res 10:261\u2013269","journal-title":"Tutor Oper Res"},{"issue":"3","key":"309_CR2","doi-asserted-by":"publisher","first-page":"1098","DOI":"10.1109\/59.871739","volume":"15","author":"JM Arroyo","year":"2000","unstructured":"Arroyo JM, Conejo AJ (2000) Optimal response of a thermal unit to an electricity spot market. IEEE Trans Power Syst 15(3):1098\u20131104","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"309_CR3","doi-asserted-by":"publisher","first-page":"1753","DOI":"10.1016\/j.rser.2010.12.008","volume":"15","author":"R Banos","year":"2011","unstructured":"Banos R, Manzano-Agugliaro F, Montoya F, Gil C, Alcayde A, G\u00f3mez J (2011) Optimization methods applied to renewable and sustainable energy: a review. Renew Sustain Energy Rev 15(4):1753\u20131766","journal-title":"Renew Sustain Energy Rev"},{"key":"309_CR4","unstructured":"Baring-Gould EI (2017) Wind\/diesel power systems basics and examples. \n                    https:\/\/www.pembina.org\/reports\/wind-diesel-power-systems-basics.pdf\n                    \n                  . Accessed 15 Aug 2017"},{"issue":"2","key":"309_CR5","doi-asserted-by":"publisher","first-page":"1420","DOI":"10.1109\/TPWRS.2015.2411332","volume":"31","author":"L Baringo","year":"2016","unstructured":"Baringo L, Conejo AJ (2016) Offering strategy of wind-power producer: a multi-stage risk-constrained approach. IEEE Trans Power Syst 31(2):1420\u20131429","journal-title":"IEEE Trans Power Syst"},{"key":"309_CR6","doi-asserted-by":"publisher","first-page":"898","DOI":"10.1287\/opre.1110.0926","volume":"59","author":"G Bayraksan","year":"2011","unstructured":"Bayraksan G, Morton DP (2011) A sequential sampling procedure for stochastic programming. Oper Res 59:898\u2013913","journal-title":"Oper Res"},{"key":"309_CR7","volume-title":"Nonlinear programming","author":"DP Bertsekas","year":"1999","unstructured":"Bertsekas DP (1999) Nonlinear programming. Athena Scientific, Belmont"},{"issue":"8","key":"309_CR8","doi-asserted-by":"publisher","first-page":"1184","DOI":"10.1175\/1520-0450(1984)023<1184:TSMTSA>2.0.CO;2","volume":"23","author":"BG Brown","year":"1984","unstructured":"Brown BG, Katz RW, Murphy AH (1984) Time series models to simulate and forecast wind speed and wind power. J Climate Appl Meteorol 23(8):1184\u20131195","journal-title":"J Climate Appl Meteorol"},{"issue":"3","key":"309_CR9","doi-asserted-by":"publisher","first-page":"1371","DOI":"10.1109\/TPWRS.2006.876672","volume":"21","author":"M Carri\u00f3n","year":"2006","unstructured":"Carri\u00f3n M, Arroyo JM (2006) A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem. IEEE Trans Power Syst 21(3):1371\u20131378","journal-title":"IEEE Trans Power Syst"},{"issue":"1\u20132","key":"309_CR10","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1007\/s10107-015-0919-9","volume":"158","author":"P Damc\u0131-Kurt","year":"2016","unstructured":"Damc\u0131-Kurt P, K\u00fc\u00e7\u00fckyavuz S, Rajan D, Atamt\u00fcrk A (2016) A polyhedral study of production ramping. Math Program 158(1\u20132):175\u2013205","journal-title":"Math Program"},{"issue":"6","key":"309_CR11","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1109\/MPAE.2005.1524619","volume":"3","author":"EA DeMeo","year":"2005","unstructured":"DeMeo EA, Grant W, Milligan MR, Schuerger MJ (2005) Wind plant integration [wind power plants]. IEEE Power Energy Mag 3(6):38\u201346","journal-title":"IEEE Power Energy Mag"},{"issue":"1","key":"309_CR12","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1016\/j.rser.2006.07.011","volume":"12","author":"MK Deshmukh","year":"2008","unstructured":"Deshmukh MK, Deshmukh SS (2008) Modeling of hybrid renewable energy systems. Renew Sustain Energy Rev 12(1):235\u2013249","journal-title":"Renew Sustain Energy Rev"},{"issue":"3","key":"309_CR13","doi-asserted-by":"publisher","first-page":"172","DOI":"10.1061\/(ASCE)0733-9402(2007)133:3(172)","volume":"133","author":"MJ Duran","year":"2007","unstructured":"Duran MJ, Cros D, Riquelme J (2007) Short-term wind power forecast based on ARX models. J Energy Eng 133(3):172\u2013180","journal-title":"J Energy Eng"},{"key":"309_CR14","unstructured":"Electric Power Research Institute and Cooperative Research Network of the National Rural Electric Cooperation Association (2003) Costs of utility distributed generators, 1\u201310 MW: twenty-four case studies. \n                    http:\/\/www.publicpower.org\/files\/deed\/finalreportcostsofutilitydistributedgenerators.pdf\n                    \n                  . Accessed 22 Aug 2017"},{"key":"309_CR15","unstructured":"Electric Reliability Council of Texas, Inc (2016) Market prices. \n                    http:\/\/www.ercot.com\/mktinfo\/prices\n                    \n                  . Accessed 17 Feb 2016"},{"key":"309_CR16","unstructured":"Energy Efficiency and Conservation Authority Energywise (2015) Stand alone power systems (SAPS). \n                    http:\/\/www.energywise.govt.nz\/how-to-be-energy-efficient\/generating-renewable-energy-at-home\/stand-alone-power-systems\n                    \n                  . Accessed 22 Aug 2017"},{"key":"309_CR17","doi-asserted-by":"publisher","first-page":"987","DOI":"10.2307\/1912773","volume":"50","author":"RF Engle","year":"1982","unstructured":"Engle RF (1982) Autoregressive conditional heteroscedasticity with estimates of the variance of United Kingdom inflation. Econometrica 50:987\u20131007","journal-title":"Econometrica"},{"key":"309_CR18","unstructured":"GAMS\u2014The Solver Manuals (2017) OSICPLEX, OSIGUROBI, OSIMOSEK, OSISOPLEX, OSIXPRESS. \n                    http:\/\/www.gams.com\/help\/topic\/gams.doc\/solvers\/allsolvers.pdf\n                    \n                  . Accessed 22 Aug 2017"},{"key":"309_CR19","unstructured":"Global Wind Energy Council (GWEC) (2017) Wind in numbers. \n                    http:\/\/www.gwec.net\/global-figures\/wind-in-numbers\/\n                    \n                  . Accessed 22 Aug 2017"},{"issue":"8","key":"309_CR20","doi-asserted-by":"publisher","first-page":"1671","DOI":"10.1016\/j.renene.2010.01.010","volume":"35","author":"JS Gonz\u00e1lez","year":"2010","unstructured":"Gonz\u00e1lez JS, Rodriguez AGG, Mora JC, Santos JR, Payan MB (2010) Optimization of wind farm turbines layout using an evolutive algorithm. Renew Energy 35(8):1671\u20131681","journal-title":"Renew Energy"},{"issue":"3","key":"309_CR21","doi-asserted-by":"publisher","first-page":"321","DOI":"10.1109\/TSTE.2011.2114902","volume":"2","author":"DA Halamay","year":"2011","unstructured":"Halamay DA, Brekken TK, Simmons A, McArthur S (2011) Reserve requirement impacts of large-scale integration of wind, solar, and ocean wave power generation. IEEE Trans Sustain Energy 2(3):321\u2013328","journal-title":"IEEE Trans Sustain Energy"},{"key":"309_CR22","unstructured":"Harack B (2010) Electricity grid: Key terms and definitions. \n                    http:\/\/www.visionofearth.org\/industry\/electricity-grid-key-terms-and-definitions\/#Forms_of_Power_Resources\n                    \n                  . Accessed 22 Aug 2017"},{"issue":"1","key":"309_CR23","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/S0038-092X(97)00037-6","volume":"61","author":"L Kamal","year":"1997","unstructured":"Kamal L, Jafri YZ (1997) Time series models to simulate and forecast hourly averaged wind speed in Quetta, Pakistan. Sol Energy 61(1):23\u201332","journal-title":"Sol Energy"},{"issue":"5","key":"309_CR24","doi-asserted-by":"publisher","first-page":"3404","DOI":"10.1109\/TPWRS.2015.2499275","volume":"31","author":"A Kargarian","year":"2016","unstructured":"Kargarian A, Fu Y, Wu H (2016) Chance-constrained system of systems based operation of power systems. IEEE Trans Power Syst 31(5):3404\u20133413","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"309_CR25","first-page":"1","volume":"18","author":"E Klotz","year":"2013","unstructured":"Klotz E, Newman AM (2013) Practical guidelines for solving difficult linear programs. Surv Oper Res Manag Sci 18(1):1\u201317","journal-title":"Surv Oper Res Manag Sci"},{"issue":"1\u20132","key":"309_CR26","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1007\/s10107-010-0385-3","volume":"132","author":"S K\u00fc\u00e7\u00fckyavuz","year":"2012","unstructured":"K\u00fc\u00e7\u00fckyavuz S (2012) On mixing sets arising in chance-constrained programming. Math Program 132(1\u20132):31\u201356","journal-title":"Math Program"},{"issue":"3","key":"309_CR27","doi-asserted-by":"publisher","first-page":"276","DOI":"10.1109\/60.937208","volume":"16","author":"S Li","year":"2001","unstructured":"Li S, Wunsch DC, O\u2019Hair E, Giesselmann MG et al (2001) Using neural networks to estimate wind turbine power generation. IEEE Trans Energy Convers 16(3):276\u2013282","journal-title":"IEEE Trans Energy Convers"},{"key":"309_CR28","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s10107-014-0832-7","volume":"157","author":"X Liu","year":"2014","unstructured":"Liu X, K\u00fc\u00e7\u00fckyavuz S, Luedtke J (2014) Decomposition algorithms for two-stage chance-constrained programs. Math Program 157:219\u2013243","journal-title":"Math Program"},{"issue":"2","key":"309_CR29","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1093\/biomet\/65.2.297","volume":"65","author":"GM Ljung","year":"1978","unstructured":"Ljung GM, Box GE (1978) On a measure of lack of fit in time series models. Biometrika 65(2):297\u2013303","journal-title":"Biometrika"},{"issue":"1\u20132","key":"309_CR30","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s10107-013-0684-6","volume":"146","author":"J Luedtke","year":"2014","unstructured":"Luedtke J (2014) A branch-and-cut decomposition algorithm for solving chance-constrained mathematical programs with finite support. Math Program 146(1\u20132):219\u2013244","journal-title":"Math Program"},{"key":"309_CR31","doi-asserted-by":"crossref","unstructured":"Luedtke J, Ahmed S, Nemhauser G (2007) An integer programming approach for linear programs with probabilistic constraints. In: Integer programming and combinatorial optimization. Springer, pp 410\u2013423","DOI":"10.1007\/978-3-540-72792-7_31"},{"issue":"1\u20133","key":"309_CR32","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1007\/s10107-003-0397-3","volume":"98","author":"AJ Miller","year":"2003","unstructured":"Miller AJ, Wolsey LA (2003) Tight formulations for some simple mixed integer programs and convex objective integer programs. Math Program 98(1\u20133):73\u201388","journal-title":"Math Program"},{"key":"309_CR33","unstructured":"Milligan M, Schwartz M, Wan Y (2003) Statistical wind power forecasting models: results for US wind farms. \n                    http:\/\/www.nrel.gov\/docs\/fy03osti\/33956.pdf\n                    \n                  . Accessed 10 Aug 2017"},{"issue":"1","key":"309_CR34","doi-asserted-by":"publisher","first-page":"554","DOI":"10.1109\/TPWRS.2009.2036810","volume":"25","author":"JM Morales","year":"2010","unstructured":"Morales JM, Conejo AJ, P\u00e9rez-Ruiz J (2010) Short-term trading for a wind power producer. IEEE Trans Power Syst 25(1):554\u2013564","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"309_CR35","doi-asserted-by":"publisher","first-page":"4897","DOI":"10.1109\/TPWRS.2013.2251373","volume":"28","author":"G Morales-Espa\u00f1a","year":"2013","unstructured":"Morales-Espa\u00f1a G, Latorre JM, Ramos A (2013) Tight and compact MILP formulation for the thermal unit commitment problem. IEEE Trans Power Syst 28(4):4897\u20134908","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"309_CR36","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1109\/TPWRS.2011.2162008","volume":"27","author":"J Ostrowski","year":"2012","unstructured":"Ostrowski J, Anjos MF, Vannelli A (2012) Tight mixed integer linear programming formulations for the unit commitment problem. IEEE Trans Power Syst 27(1):39\u201346","journal-title":"IEEE Trans Power Syst"},{"issue":"3","key":"309_CR37","doi-asserted-by":"publisher","first-page":"1589","DOI":"10.1109\/TPWRS.2004.831651","volume":"19","author":"UA Ozturk","year":"2004","unstructured":"Ozturk UA, Mazumdar M, Norman B (2004) A solution to the stochastic unit commitment problem using chance constrained programming. IEEE Trans Power Syst 19(3):1589\u20131598","journal-title":"IEEE Trans Power Syst"},{"issue":"6","key":"309_CR38","doi-asserted-by":"publisher","first-page":"1482","DOI":"10.1287\/opre.2016.1520","volume":"64","author":"K Pan","year":"2016","unstructured":"Pan K, Guan Y (2016) Strong formulations for multistage stochastic self-scheduling unit commitment. Oper Res 64(6):1482\u20131498","journal-title":"Oper Res"},{"key":"309_CR39","doi-asserted-by":"publisher","first-page":"889","DOI":"10.1287\/opre.1090.0773","volume":"58","author":"R Pasupathy","year":"2010","unstructured":"Pasupathy R (2010) On choosing parameters in retrospective-approximation algorithms for stochastic root finding and simulation optimization. Oper Res 58:889\u2013901","journal-title":"Oper Res"},{"key":"309_CR40","doi-asserted-by":"publisher","first-page":"178","DOI":"10.1016\/j.renene.2013.11.037","volume":"67","author":"JH Peterseim","year":"2014","unstructured":"Peterseim JH, White S, Tadros A, Hellwig U (2014) Concentrating solar power hybrid plants-enabling cost effective synergies. Renew Energy 67:178\u2013185","journal-title":"Renew Energy"},{"issue":"3","key":"309_CR41","doi-asserted-by":"publisher","first-page":"2842","DOI":"10.1109\/TPWRS.2012.2227841","volume":"28","author":"D Pozo","year":"2013","unstructured":"Pozo D, Contreras J (2013) A chance-constrained unit commitment with an $$n-{K}$$ security criterion and significant wind generation. IEEE Trans Power Syst 28(3):2842\u20132851","journal-title":"IEEE Trans Power Syst"},{"key":"309_CR42","doi-asserted-by":"publisher","DOI":"10.1007\/978-94-017-3087-7","volume-title":"Stochastic programming","author":"A Pr\u00e9kopa","year":"1995","unstructured":"Pr\u00e9kopa A (1995) Stochastic programming. Kluwer Academic Publishers, Dordrecht"},{"key":"309_CR43","unstructured":"Rajan D, Takriti S (2005) Minimum up\/down polytopes of the unit commitment problem with start-up costs. \n                    https:\/\/domino.research.ibm.com\/library\/cyberdig.nsf\/1e4115aea78b6e7c85256b360066f0d4\/cdcb02a7c809d89e8525702300502ac0\n                    \n                  . Accessed 11 Aug 2017"},{"key":"309_CR44","doi-asserted-by":"publisher","first-page":"762","DOI":"10.1287\/opre.2013.1163","volume":"61","author":"JO Royset","year":"2013","unstructured":"Royset JO, Szechtman R (2013) Optimal budget allocation for sample average approximation. Oper Res 61:762\u2013776","journal-title":"Oper Res"},{"key":"309_CR45","volume-title":"Learning with kernels: support vector machines, regularization, optimization, and beyond","author":"B Sch\u00f6lkopf","year":"2002","unstructured":"Sch\u00f6lkopf B, Smola AJ (2002) Learning with kernels: support vector machines, regularization, optimization, and beyond. MIT Press, Cambridge"},{"issue":"7","key":"309_CR46","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1016\/S0142-0615(98)00013-1","volume":"20","author":"S Sen","year":"1998","unstructured":"Sen S, Kothari DP (1998) Optimal thermal generating unit commitment: a review. Int J Electr Power Energy Syst 20(7):443\u2013451","journal-title":"Int J Electr Power Energy Syst"},{"key":"309_CR47","first-page":"1035","volume":"5","author":"A Tikhonov","year":"1963","unstructured":"Tikhonov A (1963) Solution of incorrectly formulated problems and the regularization method. Sov Math Doklady 5:1035\u20131038","journal-title":"Sov Math Doklady"},{"issue":"1","key":"309_CR48","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1109\/TEC.2006.889616","volume":"22","author":"BC Ummels","year":"2007","unstructured":"Ummels BC, Gibescu M, Pelgrum E, Kling WL, Brand AJ (2007) Impacts of wind power on thermal generation unit commitment and dispatch. IEEE Trans Energy Convers 22(1):44\u201351","journal-title":"IEEE Trans Energy Convers"},{"key":"309_CR49","doi-asserted-by":"publisher","first-page":"298","DOI":"10.1016\/j.solener.2013.03.007","volume":"92","author":"BD Vick","year":"2013","unstructured":"Vick BD, Moss TA (2013) Adding concentrated solar power plants to wind farms to achieve a good utility electrical load match. Sol Energy 92:298\u2013312","journal-title":"Sol Energy"},{"issue":"4","key":"309_CR50","doi-asserted-by":"publisher","first-page":"3885","DOI":"10.1109\/TPWRS.2013.2272546","volume":"28","author":"M Vrakopoulou","year":"2013","unstructured":"Vrakopoulou M, Margellos K, Lygeros J, Andersson G (2013) A probabilistic framework for reserve scheduling and $${N}-1$$ security assessment of systems with high wind power penetration. IEEE Trans Power Syst 28(4):3885\u20133896","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"309_CR51","doi-asserted-by":"publisher","first-page":"206","DOI":"10.1109\/TPWRS.2011.2159522","volume":"27","author":"Q Wang","year":"2012","unstructured":"Wang Q, Guan Y, Wang J (2012) A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output. IEEE Trans Power Syst 27(1):206\u2013215","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"309_CR52","doi-asserted-by":"publisher","first-page":"1583","DOI":"10.1109\/TPWRS.2013.2296438","volume":"29","author":"H Wu","year":"2014","unstructured":"Wu H, Shahidehpour M, Li Z, Tian W (2014) Chance-constrained day-ahead scheduling in stochastic power system operation. IEEE Trans Power Syst 29(4):1583\u20131591","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"309_CR53","doi-asserted-by":"publisher","first-page":"2581","DOI":"10.1109\/TPWRS.2011.2148370","volume":"26","author":"L Wu","year":"2011","unstructured":"Wu L (2011) A tighter piecewise linear approximation of quadratic cost curves for unit commitment problems. IEEE Trans Power Syst 26(4):2581\u20132583","journal-title":"IEEE Trans Power Syst"},{"issue":"5","key":"309_CR54","doi-asserted-by":"publisher","first-page":"1317","DOI":"10.1287\/mnsc.2013.1822","volume":"60","author":"M Zhang","year":"2014","unstructured":"Zhang M, K\u00fc\u00e7\u00fckyavuz S, Goel S (2014) A branch-and-cut method for dynamic decision making under joint chance constraints. Manage Sci 60(5):1317\u20131333","journal-title":"Manage Sci"},{"key":"309_CR55","doi-asserted-by":"publisher","first-page":"3637","DOI":"10.1109\/TPWRS.2017.2655078","volume":"32","author":"Y Zhang","year":"2017","unstructured":"Zhang Y, Wang J, Zeng B, Hu Z (2017) Chance-constrained two-stage unit commitment under uncertain load and wind power output using bilinear benders decomposition. IEEE Trans Power Syst 32:3637\u20133647","journal-title":"IEEE Trans Power Syst"},{"issue":"6","key":"309_CR56","doi-asserted-by":"publisher","first-page":"2696","DOI":"10.1109\/TPWRS.2014.2319260","volume":"29","author":"C Zhao","year":"2014","unstructured":"Zhao C, Wang Q, Wang J, Guan Y (2014) Expected value and chance constrained stochastic unit commitment ensuring wind power utilization. IEEE Trans Power Syst 29(6):2696\u20132705","journal-title":"IEEE Trans Power Syst"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10287-018-0309-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-018-0309-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-018-0309-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,16]],"date-time":"2020-05-16T17:02:38Z","timestamp":1589648558000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10287-018-0309-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,4,26]]},"references-count":56,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2018,10]]}},"alternative-id":["309"],"URL":"https:\/\/doi.org\/10.1007\/s10287-018-0309-x","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"type":"print","value":"1619-697X"},{"type":"electronic","value":"1619-6988"}],"subject":[],"published":{"date-parts":[[2018,4,26]]},"assertion":[{"value":"8 September 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 April 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 April 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}