{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,13]],"date-time":"2026-01-13T12:06:43Z","timestamp":1768306003616,"version":"3.49.0"},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2023,5,18]],"date-time":"2023-05-18T00:00:00Z","timestamp":1684368000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2023,5,18]],"date-time":"2023-05-18T00:00:00Z","timestamp":1684368000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/100000001","name":"National Science Foundation","doi-asserted-by":"publisher","award":["1808169"],"award-info":[{"award-number":["1808169"]}],"id":[{"id":"10.13039\/100000001","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Tokushu Tokai Paper Co., Ltd."},{"DOI":"10.13039\/100008047","name":"Carnegie Mellon University","doi-asserted-by":"crossref","id":[{"id":"10.13039\/100008047","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2023,12]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>This work investigates approaches to simplify capacity planning for electricity systems with hydroelectric and renewable generators with three specific foci. First, we examine approaches to represent the efficiency of hydroelectric units. Next, we explore the effects of water-travel times and the representation of run-of-river units within cascaded hydroelectric systems. Third, we analyze the use of representative operating periods to capture electricity-system operations. We conduct these analyses using an archetypal planning models that is applied to the Columbia River system in the northwestern United States of America. We demonstrate that planning models can be simplified significantly, which improves model tractability with little loss of fidelity.<\/jats:p>","DOI":"10.1007\/s10287-023-00451-5","type":"journal-article","created":{"date-parts":[[2023,5,19]],"date-time":"2023-05-19T05:01:36Z","timestamp":1684472496000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Simplifying capacity planning for electricity systems with hydroelectric and renewable generation"],"prefix":"10.1007","volume":"20","author":[{"given":"Kenjiro","family":"Yagi","sequence":"first","affiliation":[]},{"given":"Ramteen","family":"Sioshansi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2023,5,18]]},"reference":[{"key":"451_CR1","doi-asserted-by":"crossref","unstructured":"Ahlhaus P, Stursberg P (2013) Transmission capacity expansion: an improved transport model. In: (2013) 4th IEEE\/PES Innovative smart grid technologies Europe (ISGT EUROPE). Institute of electrical and electronics engineers, Lyngby, Denmark","DOI":"10.1109\/ISGTEurope.2013.6695322"},{"key":"451_CR2","doi-asserted-by":"publisher","first-page":"1075","DOI":"10.1198\/jasa.2011.tm10183","volume":"106","author":"J Bien","year":"2011","unstructured":"Bien J, Tibshirani R (2011) Hierarchical clustering with prototypes via minimax linkage. J Am Stat Assoc 106:1075\u20131084","journal-title":"J Am Stat Assoc"},{"key":"451_CR3","unstructured":"Black, Veatch (2012) Cost and performance data for power generation technologies. Tech. rep., prepared for National Renewable Energy Laboratory"},{"issue":"104","key":"451_CR4","first-page":"457","volume":"84","author":"L Boffino","year":"2019","unstructured":"Boffino L, Conejo AJ, Sioshansi R et al (2019) A two-stage stochastic optimization planning framework to deeply decarbonize electric power systems. Energy Econ 84(104):457","journal-title":"Energy Econ"},{"key":"451_CR5","doi-asserted-by":"publisher","first-page":"1115","DOI":"10.1109\/TPWRS.2008.926704","volume":"23","author":"A Borghetti","year":"2008","unstructured":"Borghetti A, D\u2019Ambrosio C, Lodi A et al (2008) An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Trans Power Sys 23:1115\u20131124","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR6","unstructured":"Cohen S, Becker J, Bielen D, et\u00a0al (2019) Regional energy deployment system (ReEDS) Model documentation: Version 2018. Tech. Rep. NREL\/TP-6A20-72023, National renewable energy laboratory, Golden, CO"},{"key":"451_CR7","doi-asserted-by":"publisher","first-page":"1265","DOI":"10.1109\/TPWRS.2002.804951","volume":"17","author":"AJ Conejo","year":"2002","unstructured":"Conejo AJ, Arroyo JM, Contreras J et al (2002) Self-scheduling of a hydro producer in a pool-based electricity market. IEEE Trans Power Sys 17:1265\u20131272","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR8","doi-asserted-by":"crossref","unstructured":"Diniz AL, Esteves PPI, Sagastiz\u00e1bal CA (2007) A mathematical model for the efficiency curves of hydroelectric units. In: IEEE Power engineering society general meeting. Institute of electrical and electronics engineers, Tampa, Florida","DOI":"10.1109\/PES.2007.385632"},{"key":"451_CR9","unstructured":"E3 (2012) Cost and performance review of generation technologies: recommendations for WECC 10-and 20-Year study process. Tech. rep., prepared for Western Electric Coordinating Council"},{"key":"451_CR10","unstructured":"GE Energy (2010) Western Wind and Solar Integration Study. Tech. Rep. NREL\/SR-550-47434, National Renewable Energy Laboratory, Golden, CO"},{"key":"451_CR11","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1061\/(ASCE)WR.1943-5452.0000258","volume":"140","author":"IG Hidalgo","year":"2014","unstructured":"Hidalgo IG, Fontane DG, Lopes JEG et al (2014) Efficiency curves for hydroelectric generating units. J Water Resour Plann Manag 140:86\u201391","journal-title":"J Water Resour Plann Manag"},{"key":"451_CR12","doi-asserted-by":"publisher","first-page":"e220","DOI":"10.1002\/wene.220","volume":"6","author":"D Huertas-Hernando","year":"2017","unstructured":"Huertas-Hernando D, Farahmand H, Holttinen H et al (2017) Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration. WIREs Energy Environ 6:e220","journal-title":"WIREs Energy Environ"},{"key":"451_CR13","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1007\/s40518-021-00197-1","volume":"8","author":"R Hunter-Rinderle","year":"2021","unstructured":"Hunter-Rinderle R, Sioshansi R (2021) Data-driven modeling of operating characteristics of hydroelectric generating units. Curr Sustain\/Renew Energy Reports 8:199\u2013206","journal-title":"Curr Sustain\/Renew Energy Reports"},{"key":"451_CR14","doi-asserted-by":"publisher","first-page":"518","DOI":"10.1016\/j.energy.2014.07.017","volume":"74","author":"E Ibanez","year":"2014","unstructured":"Ibanez E, Magee T, Clement M et al (2014) Enhancing hydropower modeling in variable generation integration studies. Energy 74:518\u2013528","journal-title":"Energy"},{"issue":"082","key":"451_CR15","first-page":"002","volume":"240","author":"J Kong","year":"2019","unstructured":"Kong J, Skjelbred HI, Abgottspon H (2019) Short-term hydro scheduling of a variable speed pumped storage hydropower plant considering head loss in a shared penstock. IOP Conf Series: Earth Environ Sci 240(082):002","journal-title":"IOP Conf Series: Earth Environ Sci"},{"issue":"113","key":"451_CR16","first-page":"729","volume":"255","author":"G Limpens","year":"2019","unstructured":"Limpens G, Moret S, Jeanmart H et al (2019) EnergyScope TD: a novel open-source model for regional energy systems. Appl Energy 255(113):729","journal-title":"Appl Energy"},{"key":"451_CR17","unstructured":"Liu Y (2016) Electricity capacity investments and cost recovery with renewables. PhD thesis, The Ohio State University, Columbus, OH, USA"},{"key":"451_CR18","doi-asserted-by":"publisher","first-page":"3029","DOI":"10.1109\/TPWRS.2017.2746379","volume":"33","author":"Y Liu","year":"2018","unstructured":"Liu Y, Sioshansi R, Conejo AJ (2018a) Hierarchical clustering to find representative operating periods for capacity-expansion modeling. IEEE Trans Power Sys 33:3029\u20133039","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR19","doi-asserted-by":"publisher","first-page":"781","DOI":"10.1109\/TPWRS.2017.2694612","volume":"33","author":"Y Liu","year":"2018","unstructured":"Liu Y, Sioshansi R, Conejo AJ (2018b) Multistage stochastic investment planning with multiscale representation of uncertainties and decisions. IEEE Trans Power Sys 33:781\u2013791","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR20","doi-asserted-by":"publisher","first-page":"644","DOI":"10.1016\/j.ijepes.2018.06.008","volume":"103","author":"B Maluenda","year":"2018","unstructured":"Maluenda B, Negrete-Pincetic M, Olivares DE et al (2018) Expansion planning under uncertainty for hydrothermal systems with variable resources. Int J Electr Power Energy Sys 103:644\u2013651","journal-title":"Int J Electr Power Energy Sys"},{"key":"451_CR21","unstructured":"Mason T, Curry T (2012) Capital costs for transmission and substations: recommendations for WECC transmission expansion planning. B &V Project No. 176322, Prepared for Western electricity coordination council"},{"key":"451_CR22","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.eneco.2016.08.001","volume":"59","author":"JH Merrick","year":"2016","unstructured":"Merrick JH (2016) On representation of temporal variability in electricity capacity planning models. Energy Econ 59:261\u2013274","journal-title":"Energy Econ"},{"key":"451_CR23","doi-asserted-by":"publisher","first-page":"430","DOI":"10.1016\/j.energy.2016.06.081","volume":"112","author":"P Nahmmacher","year":"2016","unstructured":"Nahmmacher P, Schmid E, Hirth L et al (2016) Carpe diem: a novel approach to select representative days for long-term power system modeling. Energy 112:430\u2013442","journal-title":"Energy"},{"key":"451_CR24","doi-asserted-by":"publisher","first-page":"1936","DOI":"10.1109\/TPWRS.2016.2596803","volume":"32","author":"K Poncelet","year":"2017","unstructured":"Poncelet K, H\u00f6schle H, Delarue E et al (2017) Selecting representative days for capturing the implications of integrating intermittent renewables in generation expansion planning problems. IEEE Trans Power Sys 32:1936\u20131948","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR25","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1016\/j.rser.2018.12.021","volume":"105","author":"G Ram\u00edrez-Sagner","year":"2019","unstructured":"Ram\u00edrez-Sagner G, Mu\u00f1oz FD (2019) The effect of head-sensitive hydropower approximations on investments and operations in planning models for policy analysis. Renew Sustain Energy Rev 105:38\u201347","journal-title":"Renew Sustain Energy Rev"},{"key":"451_CR26","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/j.enpol.2015.12.041","volume":"95","author":"R Sioshansi","year":"2016","unstructured":"Sioshansi R (2016) Retail electricity tariff and mechanism design to incentivize distributed renewable generation. Energy Policy 95:498\u2013508","journal-title":"Energy Policy"},{"key":"451_CR27","doi-asserted-by":"publisher","first-page":"860","DOI":"10.1109\/TPWRS.2021.3104768","volume":"37","author":"R Sioshansi","year":"2022","unstructured":"Sioshansi R, Denholm P, Arteaga J et al (2022) Energy-storage modeling: state-of-the-art and future research directions. IEEE Trans Power Sys 37:860\u2013875","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR28","doi-asserted-by":"publisher","DOI":"10.1109\/9780470545584","volume-title":"Power system economics: designing markets for electricity","author":"S Stoft","year":"2002","unstructured":"Stoft S (2002) Power system economics: designing markets for electricity. Wiley, New York"},{"key":"451_CR29","doi-asserted-by":"publisher","first-page":"2925","DOI":"10.1109\/TPWRS.2019.2892619","volume":"34","author":"M Sun","year":"2019","unstructured":"Sun M, Teng F, Zhang X et al (2019) Data-driven representative day selection for investment decisions: a cost-oriented approach. IEEE Trans Power Sys 34:2925\u20132936","journal-title":"IEEE Trans Power Sys"},{"key":"451_CR30","doi-asserted-by":"publisher","first-page":"1283","DOI":"10.1016\/j.apenergy.2019.02.012","volume":"239","author":"H Teichgraeber","year":"2019","unstructured":"Teichgraeber H, Brandt AR (2019) Clustering methods to find representative periods for the optimization of energy systems: an initial framework and comparison. Appl Energy 239:1283\u20131293","journal-title":"Appl Energy"},{"key":"451_CR31","unstructured":"Yagi K (2020) Analyses of Issues Arising in Power Systems and Electricity Markets with High Renewable Penetration. PhD thesis, The Ohio State University, Columbus, OH"},{"key":"451_CR32","doi-asserted-by":"publisher","first-page":"7076","DOI":"10.1109\/TPWRS.2018.2850840","volume":"33","author":"B Zhao","year":"2018","unstructured":"Zhao B, Conejo AJ, Sioshansi R (2018) Using electrical energy storage to mitigate natural gas-supply shortages. IEEE Trans Power Sys 33:7076\u20137086","journal-title":"IEEE Trans Power Sys"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-023-00451-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10287-023-00451-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-023-00451-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,10]],"date-time":"2023-11-10T16:10:07Z","timestamp":1699632607000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10287-023-00451-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,5,18]]},"references-count":32,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2023,12]]}},"alternative-id":["451"],"URL":"https:\/\/doi.org\/10.1007\/s10287-023-00451-5","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,5,18]]},"assertion":[{"value":"8 July 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 March 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 May 2023","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}],"article-number":"26"}}