{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,9]],"date-time":"2025-12-09T11:40:01Z","timestamp":1765280401827},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2023,10,18]],"date-time":"2023-10-18T00:00:00Z","timestamp":1697587200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,10,18]],"date-time":"2023-10-18T00:00:00Z","timestamp":1697587200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Manag Sci"],"published-print":{"date-parts":[[2023,12]]},"DOI":"10.1007\/s10287-023-00481-z","type":"journal-article","created":{"date-parts":[[2023,10,18]],"date-time":"2023-10-18T02:01:48Z","timestamp":1697594508000},"update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Integration of inventory control, maintenance policy, and quality control for selling products under warranty"],"prefix":"10.1007","volume":"20","author":[{"given":"Ali","family":"Salmasnia","sequence":"first","affiliation":[]},{"given":"Soudabeh","family":"Hajihaji","sequence":"additional","affiliation":[]},{"given":"Saeid","family":"Sharafi","sequence":"additional","affiliation":[]},{"given":"Mohammad Reza","family":"Maleki","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2023,10,18]]},"reference":[{"key":"481_CR1","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.ejor.2016.10.038","volume":"259","author":"CK Chen","year":"2016","unstructured":"Chen CK, Lo CC, Weng TC (2016) Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period. Eur J Oper Res 259:401\u2013412","journal-title":"Eur J Oper Res"},{"key":"481_CR2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2019.106239","volume":"142","author":"S Duffuaa","year":"2020","unstructured":"Duffuaa S, Kolus A, Al-Turki U, El-Khalifa A (2020) An integrated model of production scheduling, maintenance and quality for a single machine. Comput Ind Eng 142:106239","journal-title":"Comput Ind Eng"},{"key":"481_CR3","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106924","volume":"151","author":"A Farahani","year":"2021","unstructured":"Farahani A, Tohidi H (2021) Integrated optimization of quality and maintenance: a literature review. Comput Ind Eng 151:106924","journal-title":"Comput Ind Eng"},{"key":"481_CR4","doi-asserted-by":"publisher","first-page":"238","DOI":"10.1016\/j.ejor.2006.09.062","volume":"183","author":"BC Giri","year":"2007","unstructured":"Giri BC, Dohi T (2007) Inspection scheduling for imperfect production processes under free repair warranty contract. Eur J Oper Res 183:238\u2013252","journal-title":"Eur J Oper Res"},{"key":"481_CR5","doi-asserted-by":"publisher","first-page":"374","DOI":"10.1016\/j.cie.2016.06.016","volume":"102","author":"EE Gunay","year":"2016","unstructured":"Gunay EE, Kula U (2016) Integration of production quantity and control chart design in automotive manufacturing. Comput Ind Eng 102:374\u2013382","journal-title":"Comput Ind Eng"},{"key":"481_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107304","volume":"157","author":"SM Hadian","year":"2021","unstructured":"Hadian SM, Farughi H, Rasay H (2021) Joint planning of maintenance, buffer stock and quality control for unreliable, imperfect manufacturing systems. Comput Ind Eng 157:107304","journal-title":"Comput Ind Eng"},{"key":"481_CR7","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/j.cie.2019.01.046","volume":"129","author":"Y He","year":"2019","unstructured":"He Y, Liu F, Cui J, Han X, Zhao Y, Chen Z, Zhou D, Zhang A (2019) Reliability-oriented design of integrated model of preventive maintenance and quality control policy with time-between-events control chart. Comput Ind Eng 129:228\u2013238","journal-title":"Comput Ind Eng"},{"key":"481_CR8","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1016\/j.jmsy.2019.11.009","volume":"54","author":"S Huanga","year":"2020","unstructured":"Huanga S, Yanga J, Xie M (2020) A double-sampling SPM scheme for simultaneously monitoring of location and scale shifts and its joint design with maintenance strategies. J Manuf Syst 54:94\u2013102","journal-title":"J Manuf Syst"},{"key":"481_CR9","doi-asserted-by":"publisher","first-page":"2645","DOI":"10.1080\/00949655.2021.1904241","volume":"91","author":"S Jafarian-Namin","year":"2021","unstructured":"Jafarian-Namin S, Fallahnezhad MS, Tavakkoli-Moghadam R, Salmasnia A (2021a) An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart. J Stat Comput Simul 91:2645\u20132669","journal-title":"J Stat Comput Simul"},{"key":"481_CR10","doi-asserted-by":"crossref","unstructured":"Jafarian-Namin S, Fallahnezhad MS, Tavakkoli-Moghadam R, Salmasnia A (2021b) An integrated model for optimal selection of quality, maintenance, and production parameters with autocorrelated data. Sci Iran (in press)","DOI":"10.24200\/sci.2021.56484.4745"},{"key":"481_CR11","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1016\/j.ress.2003.12.001","volume":"84","author":"CS Kim","year":"2004","unstructured":"Kim CS, Djamaludin I, Murthy DNP (2004) Warranty and discrete preventive maintenance. Reliab Eng Syst Saf 84:301\u2013309","journal-title":"Reliab Eng Syst Saf"},{"key":"481_CR12","first-page":"87","volume":"5","author":"G-L Liao","year":"2016","unstructured":"Liao G-L (2016) Production and maintenance strategy for a highreliability imperfect process with free-repair warranty. Int J Syst Sci Oper Logist 5:87\u201398","journal-title":"Int J Syst Sci Oper Logist"},{"issue":"10","key":"481_CR13","doi-asserted-by":"publisher","first-page":"7710","DOI":"10.1080\/03610918.2016.1249880","volume":"46","author":"MR Maleki","year":"2017","unstructured":"Maleki MR, Amiri A, Taheriyoun AR (2017) Phase II monitoring of binary profiles in the presence of within-profile autocorrelation based on Markov model. Commun Stat Simul Comput 46(10):7710\u20137732","journal-title":"Commun Stat Simul Comput"},{"key":"481_CR14","doi-asserted-by":"publisher","first-page":"1245","DOI":"10.1016\/j.cie.2011.07.017","volume":"61","author":"Z Mehrafrooz","year":"2011","unstructured":"Mehrafrooz Z, Noorossana R (2011) An integrated model based on statistical process control and maintenance. Comput Ind Eng 61:1245\u20131255","journal-title":"Comput Ind Eng"},{"key":"481_CR15","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.jmsy.2012.11.009","volume":"32","author":"B Pal","year":"2013","unstructured":"Pal B, Sana SS, Chaudhuri K (2013) A mathematical model on EPQ for stochastic demand in an imperfect production system. J Manuf Syst 32:260\u2013270","journal-title":"J Manuf Syst"},{"key":"481_CR16","doi-asserted-by":"publisher","first-page":"732","DOI":"10.1016\/j.ress.2008.07.003","volume":"94","author":"S Panagiotidou","year":"2009","unstructured":"Panagiotidou S, Nenes G (2009) An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart. Reliab Eng Syst Saf 94:732\u2013741","journal-title":"Reliab Eng Syst Saf"},{"key":"481_CR17","doi-asserted-by":"publisher","first-page":"470","DOI":"10.1016\/j.jmsy.2020.07.004","volume":"56","author":"PD Paraschos","year":"2020","unstructured":"Paraschos PD, Koulinas GK, Koulouriotis DE (2020) Reinforcement learning for combined production-maintenance and quality control of a manufacturing system with deterioration failures. J Manuf Syst 56:470\u2013483","journal-title":"J Manuf Syst"},{"key":"481_CR18","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/j.apm.2016.11.015","volume":"43","author":"M Park","year":"2017","unstructured":"Park M, Jung KM, Park DH (2017) Optimal maintenance strategy under renewable warranty with repair time threshold. Appl Math Model 43:498\u2013508","journal-title":"Appl Math Model"},{"key":"481_CR19","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ress.2017.10.009","volume":"170","author":"M Park","year":"2018","unstructured":"Park M, Jung KM, Park DH (2018) Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty. Reliab Eng Syst Saf 170:1\u20139","journal-title":"Reliab Eng Syst Saf"},{"key":"481_CR20","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1002\/asmb.2512","volume":"36","author":"A Salmasnia","year":"2020","unstructured":"Salmasnia A, Baratian M (2020) Optimization of maintenance policy under warranty length-based demand with consideration of both manufacturer and buyer satisfaction. Appl Stoch Model Bus Ind 36:586\u2013603","journal-title":"Appl Stoch Model Bus Ind"},{"key":"481_CR21","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.jmsy.2016.11.003","volume":"42","author":"A Salmasnia","year":"2017","unstructured":"Salmasnia A, Abdzadeh B, Namdar M (2017) A joint design of production run length, maintenance policy and control chart with multiple assignable causes. J Manuf Syst 42:44\u201356","journal-title":"J Manuf Syst"},{"key":"481_CR22","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1016\/j.cie.2018.02.021","volume":"118","author":"A Salmasnia","year":"2018","unstructured":"Salmasnia A, Kaveie M, Namdar M (2018a) An integrated production and maintenance planning model under VP-T2 Hotelling chart. Comput Ind Eng 118:89\u2013103","journal-title":"Comput Ind Eng"},{"key":"481_CR23","doi-asserted-by":"publisher","first-page":"220","DOI":"10.1016\/j.cie.2018.06.026","volume":"124","author":"A Salmasnia","year":"2018","unstructured":"Salmasnia A, Namdar M, Noroozi M (2018b) Robust design of a VP-NCS chart for joint monitoring mean and variability in series systems under maintenance policy. Comput Ind Eng 124:220\u2013236","journal-title":"Comput Ind Eng"},{"key":"481_CR24","doi-asserted-by":"publisher","first-page":"465","DOI":"10.1080\/00949655.2019.1688327","volume":"90","author":"A Salmasnia","year":"2019","unstructured":"Salmasnia A, Abdzadeh B, Rahimi A (2019a) Joint optimisation of double warning T2-Hotelling chart and maintenance policy with multiple assignable causes. J Stat Comput Simul 90:465\u2013488","journal-title":"J Stat Comput Simul"},{"key":"481_CR25","doi-asserted-by":"publisher","first-page":"886","DOI":"10.1080\/03610918.2018.1489551","volume":"49","author":"A Salmasnia","year":"2019","unstructured":"Salmasnia A, Namdar M, Abdzadeh B (2019b) An integrated quality and maintenance model for two-unit series systems. Commun Stat Simul Comput 49:886\u2013917","journal-title":"Commun Stat Simul Comput"},{"issue":"6","key":"481_CR26","doi-asserted-by":"publisher","first-page":"946","DOI":"10.1080\/02286203.2021.2004341","volume":"42","author":"A Salmasnia","year":"2022","unstructured":"Salmasnia A, Hajihosseini Z, Maleki MR (2022a) An economic manufacturing quantity model with rework process for deteriorating products under maintenance-quality policy. Int J Model Simul 42(6):946\u2013965","journal-title":"Int J Model Simul"},{"issue":"01","key":"481_CR27","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1142\/S0219686721500414","volume":"21","author":"A Salmasnia","year":"2022","unstructured":"Salmasnia A, Emamjomeh E, Maleki MR (2022b) Integration of production planning, maintenance scheduling and noncentral chi-square chart parameters with random failures and multiple assignable causes. J Adv Manuf Syst 21(01):25\u201354","journal-title":"J Adv Manuf Syst"},{"key":"481_CR28","doi-asserted-by":"publisher","first-page":"6763","DOI":"10.1080\/00207543.2011.623838","volume":"23","author":"SS Sana","year":"2012","unstructured":"Sana SS (2012) Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int J Prod Res 23:6763\u20136774","journal-title":"Int J Prod Res"},{"key":"481_CR29","doi-asserted-by":"publisher","DOI":"10.1016\/j.jretconser.2020.102118","volume":"55","author":"SS Sana","year":"2020","unstructured":"Sana SS (2020) Price competition between green and non green products under corporate social responsible firm. J Retail Consum Serv 55:102118","journal-title":"J Retail Consum Serv"},{"key":"481_CR30","volume":"2","author":"SS Sana","year":"2022","unstructured":"Sana SS (2022a) Sale through dual channel retailing system\u2014a mathematical approach. Sustain Anal Model 2:100008","journal-title":"Sustain Anal Model"},{"issue":"15","key":"481_CR31","doi-asserted-by":"publisher","first-page":"8928","DOI":"10.1002\/mma.8246","volume":"45","author":"SS Sana","year":"2022","unstructured":"Sana SS (2022b) Optimum buffer stock during preventive maintenance in an imperfect production system. Math Methods Appl Sci 45(15):8928\u20138939","journal-title":"Math Methods Appl Sci"},{"issue":"2","key":"481_CR32","doi-asserted-by":"publisher","first-page":"1997","DOI":"10.1007\/s10479-020-03895-z","volume":"315","author":"SS Sana","year":"2022","unstructured":"Sana SS (2022c) A structural mathematical model on two echelon supply chain system. Ann Oper Res 315(2):1997\u20132025","journal-title":"Ann Oper Res"},{"key":"481_CR33","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/j.ejor.2015.06.021","volume":"248","author":"B Sarkar","year":"2015","unstructured":"Sarkar B, Saren S (2015) Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur J Oper Res 248:263\u2013271","journal-title":"Eur J Oper Res"},{"issue":"1","key":"481_CR34","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1504\/EJIE.2023.127739","volume":"17","author":"J Taji","year":"2023","unstructured":"Taji J, Farughi H, Rasay H (2023) An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning. Eur J Ind Eng 17(1):1\u201328","journal-title":"Eur J Ind Eng"},{"key":"481_CR35","doi-asserted-by":"publisher","first-page":"1323","DOI":"10.1007\/s10845-014-0954-z","volume":"27","author":"D Wen","year":"2016","unstructured":"Wen D, Ershun P, Ying W, Wenzhu L (2016) An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy. J Intell Manuf 27:1323\u20131333","journal-title":"J Intell Manuf"},{"key":"481_CR36","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1016\/j.ress.2014.09.020","volume":"133","author":"H Yin","year":"2015","unstructured":"Yin H, Zhang G, Zhu H, Deng Y, He F (2015) An integrated model of statistical process control and maintenance based on the delayed monitoring. Reliab Eng Syst Saf 133:323\u2013333","journal-title":"Reliab Eng Syst Saf"}],"container-title":["Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-023-00481-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10287-023-00481-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10287-023-00481-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,10]],"date-time":"2023-11-10T16:13:51Z","timestamp":1699632831000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10287-023-00481-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,18]]},"references-count":36,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2023,12]]}},"alternative-id":["481"],"URL":"https:\/\/doi.org\/10.1007\/s10287-023-00481-z","relation":{},"ISSN":["1619-697X","1619-6988"],"issn-type":[{"value":"1619-697X","type":"print"},{"value":"1619-6988","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,10,18]]},"assertion":[{"value":"4 November 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"27 September 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 October 2023","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"47"}}