{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,31]],"date-time":"2022-03-31T07:26:47Z","timestamp":1648711607000},"reference-count":4,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2006,7,21]],"date-time":"2006-07-21T00:00:00Z","timestamp":1153440000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["4OR"],"published-print":{"date-parts":[[2007,9,24]]},"DOI":"10.1007\/s10288-006-0003-7","type":"journal-article","created":{"date-parts":[[2006,7,20]],"date-time":"2006-07-20T07:42:57Z","timestamp":1153381377000},"page":"247-259","source":"Crossref","is-referenced-by-count":0,"title":["An optimization problem in the electricity market"],"prefix":"10.1007","volume":"5","author":[{"given":"Alberto","family":"Borghetti","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andrea","family":"Lodi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Silvano","family":"Martello","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Michele","family":"Martignani","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carlo Alberto","family":"Nucci","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alessandro","family":"Trebbi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2006,7,21]]},"reference":[{"key":"3_CR1","unstructured":"Cplex (2005) ILOG Cplex user\u2019s manual and reference manual. ILOG, S.A., 9.0.3 edition"},{"key":"3_CR2","unstructured":"Kai S, Shrestha GB, Goel L (2000) Strategic bidding in power market: ramp rate considerations. In: 2000 IEEE power engineering society summer meeting, pp 2144\u20132149"},{"key":"3_CR3","unstructured":"MPL (2002) MPL modeling system. Maximal Software, Inc., 4.2a edition"},{"key":"3_CR4","doi-asserted-by":"crossref","unstructured":"Martinez Ramos JL, Marcolini AM, Fernandez Rivera MT (2003) Influence of the transition from hourly energy programs to power generation dispatches on the use of secondary reserve. In: 2003 IEEE Bologna PowerTech Conference 2003","DOI":"10.1109\/PTC.2003.1304726"}],"container-title":["4OR"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-006-0003-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10288-006-0003-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-006-0003-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T12:12:53Z","timestamp":1559131973000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10288-006-0003-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,7,21]]},"references-count":4,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2007,9,24]]}},"alternative-id":["3"],"URL":"https:\/\/doi.org\/10.1007\/s10288-006-0003-7","relation":{},"ISSN":["1619-4500","1614-2411"],"issn-type":[{"value":"1619-4500","type":"print"},{"value":"1614-2411","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,7,21]]}}}