{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,5]],"date-time":"2024-06-05T15:38:20Z","timestamp":1717601900585},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2011,12,8]],"date-time":"2011-12-08T00:00:00Z","timestamp":1323302400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["4OR-Q J Oper Res"],"published-print":{"date-parts":[[2012,3]]},"DOI":"10.1007\/s10288-011-0192-6","type":"journal-article","created":{"date-parts":[[2011,12,7]],"date-time":"2011-12-07T08:52:34Z","timestamp":1323247954000},"page":"81-103","source":"Crossref","is-referenced-by-count":15,"title":["Robust energy planning in buildings with energy and comfort costs"],"prefix":"10.1007","volume":"10","author":[{"given":"Mireille","family":"Jacomino","sequence":"first","affiliation":[]},{"given":"Minh Hoang","family":"Le","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,12,8]]},"reference":[{"key":"192_CR1","unstructured":"AFNOR (2006) Ergonomie des ambiances thermiques. Norme Europ\u00e9enne et Fran\u00e7aise"},{"issue":"2","key":"192_CR2","first-page":"20","volume":"67","author":"R Alvarez-Vald\u00e9s Olagu\u00edbel","year":"1993","unstructured":"Alvarez-Vald\u00e9s Olagu\u00edbel R, Tamarit Goerlich J (1993) The project scheduling polyhedron, facets and lifting theorems: dimension, facets and lifting theorems. Eur J Oper Res 67(2): 20\u2013204","journal-title":"Eur J Oper Res"},{"key":"192_CR3","unstructured":"Artigues C, Lopez P, Hait A (2009) Scheduling under energy constraints. In: International conference on industrial engineering and systems management (IESM 2009), Monrea, Canada"},{"key":"192_CR4","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1287\/opre.1030.0065","volume":"52-1","author":"D Bertsimas","year":"2004","unstructured":"Bertsimas D, Sim M (2004) The price of robustness. Oper Res 52-1: 35\u201353","journal-title":"Oper Res"},{"key":"192_CR5","doi-asserted-by":"crossref","DOI":"10.1002\/9780470611432","volume-title":"Flexibility and robustness in scheduling","author":"JC Billaut","year":"2008","unstructured":"Billaut JC, Moukrim A, Sanlaville E (2008) Flexibility and robustness in scheduling. ISTE, Wiley, London"},{"key":"192_CR6","doi-asserted-by":"crossref","first-page":"1003","DOI":"10.1016\/j.compchemeng.2005.12.014","volume":"30","author":"P Castro","year":"2006","unstructured":"Castro P, Grossmann I (2006) An efficient mipl model for the short-term scheduling of single stage batch plants. Comput Chem Eng 30: 1003\u20131018","journal-title":"Comput Chem Eng"},{"key":"192_CR7","doi-asserted-by":"crossref","first-page":"1353","DOI":"10.1016\/j.enbuild.2007.12.007","volume":"40","author":"R Freire","year":"2008","unstructured":"Freire R, Oliveira G, Mendes N (2008) Predictive controllers for thermal comfort optimization and energy savings. Energy Build 40: 1353\u20131365","journal-title":"Energy Build"},{"key":"192_CR8","unstructured":"Ha D (2007) Un syst\u00e8me avanc\u00e9 de gestion d\u2019\u00e9nergie dans le b\u00e2timent pour coordonner production et consommation. Ph.D. thesis, Grenoble Institute of Technology, Grenoble, France"},{"key":"192_CR9","doi-asserted-by":"crossref","unstructured":"Ha DL, Ploix S, Zamai E, Jacomino M (2006) A home automation system to improve the household energy control. In: INCOM2006 12th IFAC symposium on information control problems in manufacturing","DOI":"10.3182\/20060517-3-FR-2903.00011"},{"key":"192_CR10","unstructured":"Hawarah L, Jacomino M, Ploix S (2010) Smart home: user\u2019s behavior prediction of home energy consumption. In: 7th International conference on informatics in control, automation and robotics"},{"key":"192_CR11","unstructured":"House J, Smith T (1995) Optimal control of building and hvac systems. In: Proceedings of the American control conference, Seattle, Washington"},{"key":"192_CR12","unstructured":"IEA (2006) Energy technology perspectives: scenarios and trategies to 2050. IEA Publications"},{"key":"192_CR13","doi-asserted-by":"crossref","unstructured":"Kon\u00e9 O, Artigues C, Lopez P, Mongeau M (2011) Event-based milp models for resource-constrained project scheduling problems. Comput Oper Res 38(1):3\u201313","DOI":"10.1016\/j.cor.2009.12.011"},{"key":"192_CR14","unstructured":"Le MH, Jcomino M, Ploix S DLH (2009) An approach for home load energy management problem in uncertain context. In: Dubrovnik conference on sustainable development of energy, water and environment systems (SWEDES 2009)"},{"key":"192_CR15","unstructured":"Liu N, Ritzert G, Belloc A (2005) Rapport final: ModTlisation des flux TnergTtiques dans une maison autonome. Technical report, Ecole Centrale de Lyon"},{"key":"192_CR16","doi-asserted-by":"crossref","DOI":"10.1002\/9780470611050","volume-title":"Production scheduling","author":"P Lopez","year":"2008","unstructured":"Lopez P, Roubellat F (2008) Production scheduling. ISTE, Wiley, London"},{"key":"192_CR17","doi-asserted-by":"crossref","first-page":"1063","DOI":"10.1016\/j.enbuild.2009.05.008","volume":"41","author":"MA Lozano","year":"2009","unstructured":"Lozano MA, Ramos J, Carvalho M, Serra L (2009) Structure optimization of energy supply systems in tertiary sector buildings. Energy Build 41: 1063\u20131075","journal-title":"Energy Build"},{"key":"192_CR18","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1016\/j.enbuild.2009.05.014","volume":"41","author":"P Mago","year":"2009","unstructured":"Mago P, Chamra L (2009) Analysis and optimization of cchp systems based on energy, economical, and environmental considerations. Energy Build 41: 1099\u20131106","journal-title":"Energy Build"},{"issue":"5","key":"192_CR19","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1287\/mnsc.44.5.714","volume":"44","author":"A Mingozzi","year":"1998","unstructured":"Mingozzi A, Maniezzo V, Ricciardelli S, Bianco L (1998) An exact algorithm for the multiple resource- constrained project scheduling problem based on a new mathematical formulation. Manag Sci 44(5): 29\u2013714","journal-title":"Manag Sci"},{"issue":"3","key":"192_CR20","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1287\/opre.43.3.477","volume":"43","author":"J Mulvey","year":"1995","unstructured":"Mulvey J, Ruszczynski A (1995) A new scenario decomposition method for large-scale stochastic optimization. Oper Res 43(3): 477\u2013490","journal-title":"Oper Res"},{"key":"192_CR21","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1021\/ie9503095","volume":"35","author":"JM Pinto","year":"1995","unstructured":"Pinto JM, Grossmann I (1995) A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Ind Eng Chem Res 35: 338\u2013342","journal-title":"Ind Eng Chem Res"},{"key":"192_CR22","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1023\/A:1018929829086","volume":"81","author":"JM Pinto","year":"1998","unstructured":"Pinto JM, Grossmann IE (1998) Assignment and sequencing models for the scheduling of process systems. Ann Oper Res 81: 433\u2013466","journal-title":"Ann Oper Res"},{"issue":"3","key":"192_CR23","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.ejor.2008.12.036","volume":"200","author":"B Roy","year":"2010","unstructured":"Roy B (2010) Robustness in operational research and decision aiding: a multi-faceted issue. Eur J Oper Res 200(3): 629\u2013638","journal-title":"Eur J Oper Res"},{"key":"192_CR24","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1002\/er.1228","volume":"31","author":"G Wood","year":"2007","unstructured":"Wood G, Newborough M (2007) Influencing user behaviour with energy information display systems for intelligent homes. Int J Energy Res 31: 56\u201378","journal-title":"Int J Energy Res"},{"key":"192_CR25","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1016\/S0925-5273(99)00074-2","volume":"64","author":"CS Yu","year":"2000","unstructured":"Yu CS, Li HL (2000) A robust optimization model for stochastic logistic problems. Int J Prod Econ 64: 385\u2013397","journal-title":"Int J Prod Econ"},{"key":"192_CR26","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1115\/1.1824110","volume":"127","author":"G Zhou","year":"2005","unstructured":"Zhou G, Krarti M (2005) Parametric analysis of active and passive building thermal storage utilization. J Solar Energy Eng 127: 37\u201346","journal-title":"J Solar Energy Eng"}],"container-title":["4OR"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-011-0192-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10288-011-0192-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-011-0192-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,20]],"date-time":"2019-06-20T13:12:18Z","timestamp":1561036338000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10288-011-0192-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,12,8]]},"references-count":26,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2012,3]]}},"alternative-id":["192"],"URL":"https:\/\/doi.org\/10.1007\/s10288-011-0192-6","relation":{},"ISSN":["1619-4500","1614-2411"],"issn-type":[{"value":"1619-4500","type":"print"},{"value":"1614-2411","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,12,8]]}}}